Amendment 0002.pdf

PDF 2 MB Posted

Attached to
SAN RAFAEL CREEK MAINTENANCE DREDGING PROJECT Federal contract opportunity
Solicitation number
W912P722B0001
Issued by
Department of the Army Corps of Engineers Engineering District San Francisco

About this file

This solicitation is for a small business set-aside Invitation for Bid to perform maintenance dredging of the San Rafael Creek and Across the Flats Channel in California. The work includes dredging reaches 0 through 4 of the San Rafael Creek to depths of -6 feet MLLW and the San Rafael Across the Flats Channel to -8 feet MLLW, including one foot of overdepth, and transporting dredged materials to the government-furnished disposal sites. The estimated cost range for the firm fixed-price contract is between $5 million to $10 million. Bids are due by June 21, 2022. The U.S. Army Corps of Engineers, San Francisco District will conduct the procurement and award a single contract. The solicitation will be available on or around May 20, 2022 via the System for Award Management. It is the contractor's responsibility to frequently check for any amendments.

View the file

Other files for this federal contract opportunity

Other files attached to SAN RAFAEL CREEK MAINTENANCE DREDGING PROJECT, newest first.
File Type Posted
San Rafael Bid Abstract- W912P722B0001.pdf PDF
WDR_WQC_2020_to_2024_Final signed.pdf PDF
2015 LTMS BIOP with Addendum.pdf PDF
BCDC_Consistency Notification.pdf PDF
Request for Information.pdf PDF
San Rafael Amendment 0001.pdf PDF
San Rafael Creek Plans _ Amendment 1.pdf PDF
W9129722B001_SanRafaelFY22Dredging_Plans.pdf PDF
W912P722B0001.pdf PDF
W912P722B0001 San Rafael Creek FY22 Specs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Please see summary of changes on page 2 of this amendment for all changes to the soliciation documents.

1. CONTRACT ID CODE PAGE OF PAGES

1 74

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P722B0001

X 9B. DATED (SEE ITEM 11)

20-May-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0002

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Jun-2022

CODE

CONTRACTING DIVISION

450 GOLDEN GATE AVE, 4TH FL

SAN FRANCISCO CA 94102

W912P7 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

X 1

This amendment makes changes to the solicitation; these changes represent one of three types, either adding new information, deleting information, or revising existing information. Changes made by this amendment replace the previously issued sections of the advertisement, as referenced in the below summary of changes:

ADVERTISEMENT FRONT-END (DIVISION 00):

1. Revised SF1442, page 1, blocks 11 & 13- period of performance 134 calendar days and bid opening changed to 23-JUN-2022.

2. Revised Section 00 10 00, Price Schedule – CLIN 0002 – Bid quantities were updated.

3. Revised Section 00 72 00, Clause 52.211-10 - Commencement, Prosecution, and Completion of

Work (APR 1984) -134 calendar days

TECHNICAL SPECIFICATIONS (DIVISION 01-49):

1. Section 01 11 00, Summary of Work

DRAWINGS:

1. Sheets G-02, G-03 and C-08 -Reach 0 was added

ATTACHMENTS

1. General Wage Determination

All offerors are required to acknowledge this amendment and provide a signed copy of this amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non- responsive.

The w ork includes maintenance dredging of the San Rafael Creek to -6-ft (MLLW) plus 1 ft of paid overdepth and San Rafael ATF to -8-ft (MLLW) plus 1 ft of paid overdepth and transporting of the dredged material to the Governmentfurnished site SF-10 and SF-DODS.

This requirement is a small business set-aside. It w ill be issued as an Invitation for Bid (IFB) w hich w ill result in the aw ard of a single Firm Fixed Price contract.

The North American Industry Classif ication System (NAICS) Code for this acquisition is 237990.

Estimated cost range in betw een $5,000,000 and $10,000,000.

See FAR 52.236-27 Site Visit (Construction)

Questions relating to this solicitation and technical inquiries shall be submitted via email to the assigned Contract Specialist. Inquiries must be received no later than 14 calendar days prior to bid opening.

X

ERICA MILLER 415-503-6990

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

20-May-2022

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______1 calendar days and complete it w ithin ________134 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________23 Jun 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USACE, SAN FRANCISCO DISTRICT

450 GOLDEN GATE

SAN FRANCISCO CA 94102

W912P7

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: (415) 503-6995 TEL: FAX:

W912P722B0001 46

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912P7-22-B-0001

Contract Line Item No.(CLIN)

Description of Supplies and Services

*Estimated Quantity

Unit Unit Price

Amount

0001 Mobilization and Demobilization 1 Job

0002 Dredging Reaches 0, 1 and 2 to -8-ft MLLW including 1 foot of paid Over-depth with disposal at SF-10

192,500

198,200 CY $ $

0003 Dredging Reach 3 to -6-ft MLLW including 1 foot of paid Over-depth with disposal at SF-10 30,800 CY $ $

Total Base Bid Price (Item 0001 through 0003)

223,300

229,000 CY $

0004 Dredging Reach 4 to -6-ft MLLW including 1 foot of paid Over-depth with disposal at SF-DODS 27,200 CY $ $

Total Optional Bid Price (Item 0004) 27,200 CY $

Total Evaluated Bid Price $

Notes:

1 .

2 .

* - ALL QUANTITIES ARE ESTIMATES. SEE FAR 52.211-18, SECTION 00 72 00 (GENERAL

CONDITION) OF THE CONTRACT.

To be considered responsive, prices must be submitted on all individual items within Pricing Schedule. Failure to do so may be cause for rejection of bids.

Bidders must complete and submit attached “Dredging Plant and Equipment Schedule”, forms Page 1 and Page 2 as part of their solicitation package for bid evaluation. Failure to do so may cause the bid to be considered nonresponsive. The Contractor shall demonstrate that all necessary equipment will be available and committed to this contract.

OPTIONAL BID ITEMS

SECTION 00 10 00

PRICING SCHEDULE

SAN RAFAEL CREEK AND ATF CHANNEL MAINTENANCE DREDGING PROJECT

BASE BID ITEMS

SECTION 00 10 00 Page 1 of 2

W912P7-22-B-0001

3 .

4 .

5 .

6 .

End of Document

The Contractor shall furnish all plant, labor, material, equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in the contract to include all attachments thereto.

The term "Job", which appears on the Pricing Schedule (Section 00 10 00) under “Unit” for Bid Item No. 0001 shall be considered as a Lump Sum. The Variation in Estimated Quantities contract clause, FAR 52.211-18, shall not apply to Bid Item No. 0001.

BASIS of AWARD: The contract will be awarded in accordance with FAR 52.214-19 Contract Award – Sealed Bidding – Construction. Award will include BASE plus OPTION. OPTIONS will be evaluated based on FAR 52.217-4 Evaluation of Options exercised at the time of contract award.

The Government reserves the right to direct the Contractor to place dredged material at an environmentally acceptable alternate disposal site in accordance with the Change Clause FAR 52.243-4.

SECTION 00 10 00 Page 2 of 2

Revised Section 00 72 00

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 1 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 134 calendar days later.

The time stated for completion shall include final cleanup of the premises.

(End of clause)

San Rafael Creek FY22 Maintenance Dredging W912P722B0003

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00

SUMMARY OF WORK

08/11

PART 1 GENERAL

1.1 PROJECT DESCRIPTION

1.1.1 Requirements

1.1.2 Constraints

1.2 MEETINGS

1.2.1 Preconstruction Conference

1.2.2 USACE Command Safety Meeting

1.2.3 Weekly Meetings

1.3 CONTRACTOR PERFORMANCE EVALUATIONS

1.4 PERMITS

1.5 PUBLIC SAFETY

1.5.1 General

1.6 PUBLIC UTILITIES AND PRIVATE IMPROVEMENTS

1.7 LAYOUT OF WORK

1.8 SAFETY OF STRUCTURES

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 11 00 Page 1 June 13, 2022

SECTION 01 11 00

SUMMARY OF WORK

08/11

PART 1 GENERAL

1.1 PROJECT DESCRIPTION

The work includes maintenance dredging of the federal navigation channel in San Rafael Creek and Across the Flats, which cannot begin before 1 June in any year.

1.1.1 Requirements

a. Dredge the San Rafael Creek Channel to -6-ft MLLW and the San Rafael Across the Flats to -8-ft MLLW for acceptance.

b. The environmental window is from 1 June to 30 November. The environmental window is from 1 June to 30 November. The period of performance allotted for this project is expected to allow for the completion within the environmental window. If the Contractor determines and documents that completion cannot be accomplished within the window the Contractor shall notify the COR in writing, and the Contracting Officer or delegated representative will make a determination if dredging past the window is allowed. The Contracting Officer or delegated representative shall approve or deny the extension in writing.

c. The contractor shall place dredged material from Reaches 0, 1, 2 and 3 at the Government-furnished in-bay disposal site SF-10.

d. If optional bid item 0004 is exercised, then the contractor shall place dredge material from reach 4 at the Government furnished ocean disposal site (SF-DODS).

e. The Contractor shall attend a meeting with the USEPA Region 9 representative prior to the start of dredging operations regarding the use of the Government-furnished deep ocean disposal site SF-DODS unless the Contractor has attended a similar meeting within the previous 3 years.

f. Scow Certification is required for ocean disposal operations. The Contractor shall complete the Scow Certification Checklist and have it certified by the Government.

1.1.2 Constraints

a. Hopper dredging is prohibited for this project.

b. Regular working hours for reaches 3 and 4 (San Rafael Creek) are between 7 a.m. and 7:00 p.m., Monday through Saturday. Regular working hours for reaches 0, 1 and 2 (San Rafael Across the Flats) are 24 hours a day, 7 days a week.

SECTION 01 11 00 Page 2 June 13, 2022

1.2 MEETINGS

1.2.1 Preconstruction Conference

After award of contract, a pre-dredging conference will be held at such time and location as determined by the Contracting Officer or delegated representative for purposes of discussing and developing mutual understanding between the Contracting Officer or delegated representative and the Contractor's Representatives regarding the terms, conditions, and requirements of the contract. Members of the conference from the Government will include the quality assurance staff, the Contracting Officer or delegated representative, the Government Environmental Manager and construction staff. Members from the Contractor shall include the Project Superintendent, SSHO, QC Rep and the quality control staff. The discussion will include, but will not be limited to, the following:

-Contractor supervisory and quality control project staff

-Correspondence procedures

-Accident Prevention Plan

-Environmental Protection Plan and Pollution control program

-Quality Control and Hydrographic Surveying

-Project scheduling and payment procedures

-Resident Management System (RMS-QC)

-Other subjects that may be of interest to the contracting parties

-Schedule of Weekly Meeting

1.2.2 USACE Command Safety Meeting

Prior to dredge operation commencing, a "USACE Command Safety Meeting" must be scheduled and be held on a project dredge vessel. Attendees for this safety meeting will be the Contractor's management, the District Engineer, the Construction representative, and other personnel that play an active role on the project.

1.2.3 Weekly Meetings

Weekly construction/survey/coordination/progress meetings shall be held between the Contractor, Contracting Officer or delegated representative, and Government personnel. Provide weekly progress meeting agenda at least one day before the scheduled meeting. Minutes of the weekly meeting shall be prepared by the Contactor's CQC Manager and submitted to the Contracting Officer or delegated representative within 24 hrs.

1.3 CONTRACTOR PERFORMANCE EVALUATIONS

The Contractor's performance shall be evaluated using the Construction Performance Assessment Reporting System (CPARS) in accordance with Subpart

36.201 (Evaluation of Contractor Performance) of the Federal Acquisition Regulation and Engineering Regulation 415-1-17. The Contractor may access, review, and comment on the evaluation for a period of 60 days. Accessing

SECTION 01 11 00 Page 3 June 13, 2022 and using CPARS requires Public Key Infrastructure (PKI) certification.

The certification is a Department of Defense requirement and was implemented to provide security in electronic transactions. This certification is purchased from an External Certificate Authorities (ECA) vendor. Contractor access to CPARS is required for Contractor to participate in the performance evaluation process. PKI certification is the sole responsibility of the Contractor. Current information about the PKI certification process and known PKI vendors can be found at the following link: http://www.cpars.gov/.

1.4 PERMITS

The Contractor shall obtain and comply with all licenses and permits required by Federal, State, and local laws, codes, and regulations unless otherwise specified in these contract documents. The Government has provided the requirements of the 2020-2024 Water Quality Certification in accordance with the Clean Water Act, the requirements of the 2020-2024 Coastal Zone Management Act (CZMA)Consistency Notification and the LTMS Biological Opinion and Essential Fish Habitat consultation. The Contractor shall comply with these requirements and provisions in these contract specifications included in Sections 01 57 19.01 43 TEMPORARY ENVIRONMENTAL CONTROLS FOR DREDGING IN SAN FRANCISCO BAY and 35 20 23 DREDGING. The Water Quality Certification, CZMA Consistency Notification, and Site Use Conditions for Ocean Disposal are available upon request.

1.5 PUBLIC SAFETY

1.5.1 General

The Contractor shall provide guard personnel as required to provide protection in the interest of public safety. Whenever the Contractor's operations create a condition hazardous to the public, he shall furnish at his own expense and without cost to the Government, such guards as are necessary to give adequate warning to the public of any dangerous conditions to be encountered, and he shall furnish, erect, or maintain such lights, signs and other devices as are necessary to prevent accidents and to avoid damage or injury to the public. Flagmen and guards, while on duty and assigned to give warning to the public that the dredging is being accomplished, and of any dangerous conditions to be encountered as a result thereof, shall be equipped with appropriate safety equipment and a red flag. Signs, flags, lights, and other warning and safety devices shall conform to applicable city, county, and state requirements. Should the Contractor appear to be negligent in furnishing adequate warning and protective measures, the Contracting Officer or delegated representative will direct attention to the existence of a hazard, and the necessary warning and protective measures shall be furnished and installed by the Contractor without additional cost to the Government. The installation of any general illumination shall not relieve the Contractor of his responsibility for furnishing and maintaining all devices necessary to provide protection to all parties concerned. As part of the best practices, the contractor is highly encouraged to hold a safety meeting, open to the general public, at a venue frequented by the boating community to proactively inform and receive feedback from the public of the upcoming dreging work and task timelines.

1.6 PUBLIC UTILITIES AND PRIVATE IMPROVEMENTS

The Contractor's attention is directed to the possible existence of

SECTION 01 11 00 Page 4 June 13, 2022 pipelines or public utilities or private improvements shown or not shown on the drawings which may be buried within the limits of the work or adjacent thereto. The Contractor shall take care to preserve and protect any such improvements from injury or damage during construction operations.Utilities or improvements, whether buried or not, which cannot be determined to exist through visual inspection by the Contractor, if inadvertently damaged by the Contractor's operations, shall be promptly repaired or replaced by the Contractor, and an equitable adjustment in the amount due under the contract will be made as provided in the contract.

The Contractor shall notify the Contracting Officer or delegated representative immediately if any utility or structure has been damaged by the Contractor. The Contractor shall assume full responsibility for reimbursing the owners for any damage to their properties, utilities, or improvements, or interference with their services caused through the dredging operations. The Contractor is not relieved from the responsibility set forth in "FAR 52.236-3, Site Investigation and Conditions Affecting the Work" except as provided above.

1.7 LAYOUT OF WORK

The Contractor shall lay out his work from Government established monuments and gages as shown on the drawings and shall be responsible for all measurements in connection therewith. The Contractor shall furnish, at his own expense, all templates, platforms, equipment, markers and labor as may be required in laying out any part of the work from the gages established by the Government. Contractor is responsible for the execution of the work to such lines, grades and gages as may be established or indicated by Government. Contractor shall maintain and preserve all monuments and other marks established by Government until authorized to remove them. Contractor shall check the accuracy of monuments as the Government does not guarantee their accuracy.

1.8 SAFETY OF STRUCTURES

The Contractor shall use reasonable and proper care in the prosecution of the work to assure the stability of piers and other structures lying on or adjacent to the site of work, insofar as they may be jeopardized by the dredging operations and on account of moving or mooring of equipment. The Contractor shall make good all damages resulting from the moving and mooring of his equipment and from dredging operations insofar as such damages may be caused by variations in locations and/or depth of dredging below that ordered by the Contracting Officer or delegated representative.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 5 June 13, 2022

ACCEPTANCE REACHES:

SAN RAFAEL ACROSS THE FLATS

REACH 0: STA -5+00 TO STA 0+00

REACH 1: STA 0+00 TO STA 57+00

REACH 2: STA 57+00 TO STA 118+84

SAN RAFAEL CREEK

REACH 3: STA 118+84 TO STA 168+00

REACH 4: STA 168+00 TO STA 200+71

SHEET SHEET

NUMBER ID DESCRIPTION

01 G-01 COVERSHEET

02 G-02 SCHEDULE OF DRAWINGS, DISPOSAL SITE,

GENERAL NOTES, AND TYPICAL DREDGING SECTION

03 G-03 KEYPLAN AND CHANNEL CONTROL POINT TABLES

04 C-01 DREDGING PLAN

STA 174+00 TO STA 200+71

05 C-02 DREDGING PLAN

STA 145+50 TO STA 174+00

06 C-03 DREDGING PLAN

STA 116+00 TO STA 145+50

07 C-04 DREDGING PLAN

STA 87+00 TO STA 116+00

08 C-05 DREDGING PLAN

STA 58+50 TO STA 87+00

09 C-06 DREDGING PLAN

STA 29+00 TO STA 58+00

10 C-07 DREDGING PLAN

STA 0+00 TO STA 29+00

11 C-08 DREDGING PLAN

STA -5+00 TO STA 0+00

SCHEDULE OF DRAWINGSGENERAL NOTES:

1. BATHYMETRIC SURVEYS WERE COMPLETED BY THE U.S ARMY CORPS OF

ENGINEERS, SAN FRANCISCO DISTRICT FOR SAN RAFAEL CREEK ON 12 APRIL 2022.

2. BATHYMETRIC SURVEY SOUNDINGS ARE BASED ON THE DATUM OF MEAN LOWER

LOW WATER (MLLW) AT THE LOCALITY.

3. DRAWINGS ARE NOT TO BE USED AS NAVIGATION CHARTS.

4. INFORMATION SHOWN ON THE DRAWINGS IS BASED ON BATHYMETRIC SURVEYS

MADE ON THE DATES INDICATED AND CAN ONLY BE CONSIDERED FOR THE

GENERAL CONDITIONS EXISTING AT THAT TIME.

5. BATHYMETRIC SURVEY SOUNDINGS WERE TAKEN BY FATHOMETER (MULTI-BEAM

SURVEY EQUIPMENT) AND ARE SHOWN TO THE NEAREST TENTH OF A FOOT.

6. COORDINATES ARE BASED ON THE CALIFORNIA STATE PLANE COORDINATE

SYSTEM OF 1983 (CCS83), LAMBERT CONFORMAL PROJECTION ZONE III, AS

DESCRIBED IN SPECIAL PUBLICATION NO. 253, PUBLISHED BY NATIONAL OCEAN

SURVEY.

7. THE PROJECT DEPTHS ARE -8 FT MLLW (SAN RAFAEL ACROSS THE FLATS) AND

-6FT MLLW (SAN RAFAEL CREEK).

8. THE DISPOSAL SITE FOR REACHES 1-3 IS THE GOVERNMENT-FURNISHED DEEP

IN-BAY DISPOSAL SITE (SF-10). THE DISPOSAL SITE FOR REACH 4 IS SF-DODS.

9. AERIAL IMAGE COURTESY OF ESRI, DIGITALGLOBE, GEOEYE, EARTHSTAR

GEOGRAPHICS, CNES/AIRBUS DS, USDA, USGS, AEX, GETMAPPING, AEROGRID,

IGN, IGP, SWISSTOPO, AND THE GIS USER COMMUNITY.

10. THE LOCATION OF ALL NAVIGATION AIDS ARE BASED ON INFORMATION PROVIDED

BY THE U.S. COAST GUARD. BUOY LOCATION REPRESENTS THE POSITION OF THE

SINKER ONLY.

11. SEDIMENT SAMPLING AND TESTING DATA AVAILABLE UPON REQUEST.

ABBREVIATIONS:

MLLW MEAN LOW LOWER WATER

NAD83 NORTH AMERICAN DATUM OF 1983

M

AR

K

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

C:\users\l3ecealk\documents\pwwork\spn\d0189621\ San_Rafael_Creek_G-01-G-02.dwg 10 Jun 2022 - 2:37pm

D

ES

C R

IP

TI

O N

2 43 65 87 109 1211 1413 1615 1817 2019

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

AN

SI

D

D

AT

E

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

PR

O

JE

C

T N

O

: SR

-1 -1

TB

D

W

2P

2B

M

AY

S.

H

A

A.

L

AI

KR

AM

A.

K

IR

SC

H

F.

S

U N

SO

LI

C

IT

AT

IO

N

A

B

C

D

E

F

G

H

J

K

L

M

N

P

M

AR

IN

C

O U

N

TY

, C

AL

IF

O

R N

IA

SA

N

R

AF

AE

L

C R

EE

K

FY

M

AI

N

TE

N

AN

C E

D R

ED

G

IN

G

P R

O

JE

C T

G-02

SC

H

ED

U

LE

O

F D

R

AW

IN

G

S, D

IS

PO

SA

L

SI

TE

G

EN

ER

AL

N

O

TE

S, A

N D

T

YP

IC

AL

S

EC

TI

O

N

San Francisco Bay

SF-DODS DISPOSAL SITE

NOT TO SCALE

0 10 20km

Monterey Bay National Marine Sanctuary

Pigeon Pt.

Half Moon Bay

Gulf of The Farrallones National Marine Sanctuary

37°30'

37°45'

38°00' 123°45' 123°30' 123°15' 123°00' 122°45' 122°30'

37°15'

37°00'

Farallon Islands

EPA SECTION 102

OCEAN DISPOSAL SITE

SF-DODS

CENTER COORDINATES OF

OVAL SHAPED SITE:

37°39.0'N 123°29.0'W

4 NAUTICAL MILES(NM) LONG

(NORTH / SOUTH) AXIS

2.5 NAUTICAL MILES SHORT

(EAST / WEST) AXIS

2' ALLOWABLE OVERDEPTH

(PAID AND NON-PAID)

EL. 0.00 FEET MLLW

1' ALLOWABLE (PAID) OVERDEPTH

PROJECT DEPTH

NOTE:

FOR ALLOWABLE DREDGING LIMITS, SEE SPECIFICATION SECTION 35 20 23 (DREDGING).

1' ALLOWABLE OVERDEPTH (NON-PAID)

VARIES

TYPICAL DREDGING SECTION

NOT TO SCALE

MATERIAL TO BE DREDGED (PAID)

NO DREDGING ON SIDE SLOPES

(SEE SPECIFICATIONS)

CHARACTERIZATION DEPTH

EXISTING CHANNEL BOTTOM

SIDE-SLOPE PRISM

CHANNEL WIDTH VARIES

SEE PLAN

AM

EN

D M

EN

T

M

AY

VERTICAL CONTROL

VERTICAL DATUM

MLLW (VDATUM, GEOID12B)

CONTROL:

941 4892 A TIDAL (PID BBDK66) MLLW: 9.324 FT (VDATUM)

B.M. TIDAL 17 (1951) MLLW: 9.73 FT (DESTROYED)

L 551 (1956) MLLW: 15.61 FT (LEGACY)

HORIZONTAL CONTROL:

HORIZONTAL REFERENCE FRAME:

NAD83 (2011) EPOCH 2010.000

PROJECTED STATE PLANE COORDINATES:

CALIFORNIA ZONE 3 (CA0403)

AM

EN

D M

EN

T

JU

N E

SAN RAFAEL CREEK AND

ATF ANGLE POINTS

Point #

∠I-1

∠I-2

∠I-3

∠I-4

∠I-5

∠I-6

∠I-7

∠I-8

∠I-9

∠I-10

∠I-11

∠I-12

∠I-13

∠I-14

∠I-15

∠I-16

∠I-17

∠I-18

Easting

5,986,637.57

5,987,101.87

5,987,110.07

5,998,383.49

5,998,342.09

5,987,068.67

5,987,076.97

5,986,606.07

5,986,637.57

5,986,341.67

5,986,084.97

5,985,874.27

5,985,365.97

5,984,921.77

5,984,410.57

5,983,853.17

5,983,720.27

5,983,227.77

Northing

2,181,930.55

2,181,719.45

2,181,737.65

2,176,611.90

2,176,520.90

2,181,646.65

2,181,664.85

2,181,878.95

2,181,930.55

2,182,065.05

2,182,084.85

2,182,021.75

2,181,755.85

2,181,484.65

2,181,241.65

2,181,087.55

2,181,037.35

2,180,660.75

SAN RAFAEL CREEK AND

ATF ANGLE POINTS

Point #

∠I-19

∠I-20

∠I-21

∠I-22

∠I-23

∠I-24

∠I-25

∠I-26

∠I-27

∠I-28

∠I-29

∠I-30

∠I-31

∠I-32

∠I-33

∠I-34

∠I-35

∠I-36

Easting

5,983,015.77

5,982,762.27

5,982,489.47

5,982,285.67

5,981,993.57

5,981,912.57

5,981,732.57

5,981,482.97

5,980,180.57

5,979,689.27

5,979,668.87

5,979,972.37

5,979,945.57

5,980,138.27

5,980,165.07

5,981,470.57

5,981,713.67

5,981,880.67

Northing

2,180,571.65

2,180,543.75

2,180,632.75

2,180,782.65

2,181,111.65

2,181,172.85

2,181,264.65

2,181,305.55

2,181,641.55

2,181,778.35

2,181,721.75

2,181,637.25

2,181,540.95

2,181,487.25

2,181,583.65

2,181,246.85

2,181,206.95

2,181,121.75

SAN RAFAEL CREEK AND

ATF ANGLE POINTS

Point #

∠I-37

∠I-38

∠I-39

∠I-40

∠I-41

∠I-42

∠I-43

∠I-44

∠I-45

∠I-46

∠I-47

∠I-48

∠I-49

∠I-50

Easting

5,981,952.57

5,982,244.97

5,982,461.67

5,982,755.97

5,983,030.97

5,983,258.17

5,983,749.77

5,983,871.87

5,984,431.57

5,984,950.27

5,985,395.57

5,985,896.97

5,986,091.47

5,986,326.57

Northing

2,181,067.35

2,180,738.05

2,180,578.65

2,180,482.65

2,180,512.95

2,180,608.45

2,180,984.35

2,181,030.45

2,181,185.15

2,181,431.85

2,181,703.65

2,181,965.95

2,182,024.15

2,182,006.05

SAN RAFAEL CREEK AND ATF

CENTERLINE CONTROL POINTS

Point #

C-1

C-2

C-3

C-4

C-5

C-6

C-7

C-8

C-9

C-10

C-11

Easting

5,998,362.79

5,987,089.37

5,986,334.07

5,986,088.27

5,985,885.57

5,985,380.77

5,984,935.97

5,984,421.07

5,983,862.47

5,983,735.07

5,983,242.97

Northing

2,176,566.40

2,181,692.15

2,182,035.55

2,182,054.45

2,181,993.85

2,181,729.75

2,181,458.25

2,181,213.45

2,181,058.95

2,181,010.85

2,180,634.65

SAN RAFAEL CREEK AND ATF

CENTERLINE CONTROL POINTS

Point #

C-12

C-13

C-14

C-15

C-16

C-17

C-18

C-19

C-20

C-21

Easting

5,983,023.37

5,982,759.17

5,982,475.57

5,982,265.37

5,981,973.07

5,981,896.67

5,981,723.17

5,981,476.77

5,980,172.77

5,979,679.07

Northing

2,180,542.35

2,180,513.25

2,180,605.75

2,180,760.35

2,181,089.55

2,181,147.35

2,181,235.75

2,181,276.25

2,181,612.05

2,181,750.05

C-01

C-02

C-03

C-04

C-05

C-06

C-07

C-1

C-2

C-3C-4C-5

C-6

C-7

C-8

C-9 C-10

C-11 C-12

C-13

C-14

C-15

C-16

C-17 C-18

C-19

C-20

C-21

∠I-1

∠I-2 ∠I-3

∠I-4

∠I-5

∠I-6 ∠I-7

∠I-8

∠I-9

∠I-10∠I-11 ∠I-12

∠I-13

∠I-14

∠I-15 ∠I-16

∠I-17

∠I-18 ∠I-19∠I-20

∠I-21

∠I-22

∠I-23

∠I-24 ∠I-25∠I-26

∠I-27 ∠I-28

∠I-29 ∠I-30 ∠I-31

∠I-32 ∠I-33

∠I-34 ∠I-35 ∠I-36

∠I-37

∠I-38

∠I-39 ∠I-40 ∠I-41

∠I-42

∠I-43 ∠I-44

∠I-45

∠I-46

∠I-47

∠I-48 ∠I-49∠I-50

C-08

-5 +0

-4 +0

-2 +0

0+ 002+

004+ 006+

008+

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

0+

2+

4+

6+

8+

0+

2+

4+

6+

8+

0+

2+

4+

6+

8+

0+

00132+00

134+00

136+00

138+00

140+00

142+00

144+00

146+00

148+00

0+

2+

4+

156+00

158+00

160+00

162+00

164+00

6+

8+

0+

2+

4+

6+

8+

0+

2+

4+

6+

8+

0+

2+

4+

6+

8+

0+

0+

M

AR

K

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

C:\users\l3ecealk\documents\pwwork\spn\d0189621\ San_Rafael_Creek_G-03_KeyPlan.dwg 10 Jun 2022 - 2:47pm

D

ES

C R

IP

TI

O N

2 43 65 87 109 1211 1413 1615 1817 2019

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

AN

SI

D

D

AT

E

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

PR

O

JE

C

T N

O

: SR

-1 -1

TB

D

W

2P

2B

M

AY

S.

H

A

A.

L

AI

KR

AM

A.

K

IR

SC

H

F.

S

U N

SO

LI

C

IT

AT

IO

N

A

B

C

D

E

F

G

H

J

K

L

M

N

P

M

AR

IN

C

O U

N

TY

, C

AL

IF

O

R N

IA

SA

N

R

AF

AE

L

C R

EE

K

FY

M

AI

N

TE

N

AN

C E

D R

ED

G

IN

G

P R

O

JE

C T

700'700' 0' 1,400'

GRAPHIC SCALE

SAN RAFAEL CREEK

SAN RAFAEL ACROSS THE FLATS

G-03

KE

YP

LA

N

A N

D C

H

AN

N

EL

C O

N

TR

O L

PO

IN

T

TA

BL

ES

PLAN

NORTH

KEYPLAN

SCALE: 1"=700'

AM

EN

D M

EN

T

JU

N E

AM

EN

D

M

EN

T

M

AY

-5 +0

-4 +0

-3 +0

-2 +0

-1 +0

0+

1+

2+

3+

4+

5+

.46

.44

.49

.46

.50

.48

.49

.47

.51

.47

.45

.48

.48

.48

.40

.48

.48

.47

.46

.46

.46

.48

.47

.51

.40

.49

.48

.48

.46

.44

.47

.47

.48

.50

.51

.50

.52

.52

.47

.48

.48

.40

.51

.52

.51

.49

N: 2175500.00

N: 2175000.00

N: 2176000.00

N: 2176500.00

E: 5998000.00

E: 5997500.00

E: 5998500.00

E: 5999000.00

E: 5999500.00

E: 5998500.00

E: 5998000.00

E: 5999000.00

E: 5999500.00

E: 6000000.00

E: 6000500.00

N: 2176500.00

N: 2177500.00

REACH 0

STA 0+00 TO STA -5+00

.47

.46

.48

.46

.47

.47

.47

.47

.48

.46

.45

.47

.42

.44

.46

.46 .46

.45

.48

.47

.46

.45

.51

.48

.46

.46

.46

.49

.48

.45

.49

.44

.46

.46

.53

.47

.45

.47

.50

.54

.51

.55

.51

.52

.55

.49

.53

.52

.52

.49

.48

.61

.59

.58

.50

.50

.50

.60

.60

.61

.62

.60

.61

.58

.55

.58

.59

.59

.78

.78

.77

.78

.78

.76

.76

.77

.75

.74

.78

.74

.72

.72

.72

.73

.73

.126

.128

.125

.122

.122

.117

.118

.116

.114

.110

.109

.110

.111

.109

.111

.114

.113

N: 2177000.00

M

AR

K

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

C:\Users\L3ECEALK\AppData\Local\Temp\AcPublish_17932\ San_Rafael_Creek_DredgingFY22.dwg 10 Jun 2022 - 2:56pm

D

ES

C R

IP

TI

O N

2 43 65 87 109 1211 1413 1615 1817 2019

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

: AN

SI

D D

AT

E

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

PR

O

JE

C

T N

O

SR

-1

-1

TB

D

W

2P

2B

M

AY

S.

H

A

A.

L

AI

KR

AM

A.

K

IR

SC

H

F.

S

U N

SO

LI

C

IT

AT

IO

N

A

B

C

D

E

F

G

H

J

K

L

M

N

P

M

AR

IN

C

O U

N

TY

, C

AL

IF

O

R N

IA

SA

N

R

AF

AE

L

C R

EE

K

FY

M

AI

N

TE

N

AN

C E

D R

ED

G

IN

G

P R

O

JE

C T

C-08

D R

ED

G

IN

G

P

LA

N S

TA

-5

+0

TO

S

TA

+0

LEGEND

-6.0 FEET

-7.0 FEET

0 TO -6.0

-6.0 TO -7.0

-7.0 TO -8.0

100'100' 0' 200'

GRAPHIC SCALE

PLAN

NORTH

NORTH

KEY PLAN

NTS

DREDGING PLAN

SCALE: 1"=100'

AM

EN

D M

EN

T

JU

N E

AM

EN

D

M

EN

T

M

AY

Wage Determination SAM.gov https://sam.gov/wage-determination/CA20220007/9 1/59

"General Decision Number: CA20220007 06/03/2022

Superseded General Decision Number: CA20210007

State: California

Construction Types: Building, Heavy (Heavy and Dredging) and Highway

Counties: Alpine, Amador, Butte, Colusa, El Dorado, Glenn, Lassen, Marin, Modoc, Napa, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Siskiyou, Solano, Sonoma, Sutter, Tehama, Trinity, Yolo and Yuba Counties in California.

BUILDING CONSTRUCTION PROJECTS (excluding Amador County only);

DREDGING CONSTRUCTION PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); AND HIGHWAY CONSTRUCTION PROJECTS

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all|

6/16/22, 1:58 PM SAM.gov https://sam.gov/wage-determination/CA20220007/9 2/59

|extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.

Modification Number Publication Date 0 01/07/2022 1 01/14/2022 2 01/21/2022 3 01/28/2022 4 02/04/2022 5 02/18/2022 6 02/25/2022 7 03/25/2022 8 04/01/2022 9 06/03/2022

ASBE0016-001 01/01/2021

AREA 1: MARIN, NAPA, SAN BENITO, SAN FRANCISCO, SOLANO, &

SONOMA COUNTIES

AREA 2: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,

MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA,

SISKIYOU, SUTTER, TEHEMA, TRINITY, YOLO, & YUBA COUNTIES

Rates Fringes

Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, https://sam.gov/wage-determination/CA20220007/9 3/59

Coatings, and Finishes to all types of mechanical systems) Area 1......................$ 74.16 23.58 Area 2......................$ 46.81 33.50

ASBE0016-007 01/01/2021

AREA 1 : ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,

LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA,

SIERRA, SISKIYOU, SOLANO, SONOMA, SUTTER, TEHAMA, TRINITY, YOLO

& YUBA COUNTIES

AREA 2: MARIN & NAPA COUNTIES

Rates Fringes

Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)

AREA 1......................$ 30.45 10.60

AREA 2......................$ 36.53 9.27

BOIL0549-002 01/01/2021

Rates Fringes

BOILERMAKER

(1) Marin & Solano Counties.$ 49.62 41.27

(2) Remaining Counties......$ 45.60 38.99

BRCA0003-001 08/01/2021

Rates Fringes

MARBLE FINISHER..................$ 37.72 17.64

BRCA0003-004 05/01/2021

AREA 1: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,

LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA,

SIERRA, SUTTER, TEHAMA, YOLO AND YUBA COUNTIES

https://sam.gov/wage-determination/CA20220007/9 4/59

AREA 2: MARIN, NAPA, SISKIYOU, SOLANO, SONOMA AND TRINITY

COUNTIES

Rates Fringes

BRICKLAYER

AREA 1......................$ 47.24 22.13

AREA 2......................$ 49.78 27.34

SPECIALTY PAY:

(A) Underground work such as tunnel work, sewer work, manholes, catch basins, sewer pipes and telephone conduit shall be paid $1.25 per hour above the regular rate. Work in direct contact with raw sewage shall receive $1.25 per hour in addition to the above.

(B) Operating a saw or grinder shall receive $1.25 per hour above the regular rate.

(C) Gunite nozzle person shall receive $1.25 per hour above the regular rate.

BRCA0003-008 07/01/2021

Rates Fringes

TERRAZZO FINISHER................$ 39.95 18.46

TERRAZZO WORKER/SETTER...........$ 53.03 28.34

BRCA0003-010 04/01/2019

Rates Fringes

TILE FINISHER

Area 1......................$ 27.31 14.75 Area 2......................$ 27.10 16.50 Area 3......................$ 29.94 16.38 Area 4......................$ 28.06 15.82 Tile Layer Area 1......................$ 45.51 17.64 Area 2......................$ 45.15 19.06 Area 3......................$ 49.90 19.16 Area 4......................$ 46.77 19.08

AREA 1: Butte, Colusa, El Dorado, Glenn, Lassen, Modoc, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Sutter, Tehema, Yolo, Yuba AREA 2: Alpine, Amador https://sam.gov/wage-determination/CA20220007/9 5/59

AREA 3: Marin, Napa, Solano, Siskiyou AREA 4: Sonoma

BRCA0003-014 08/01/2021

Rates Fringes

MARBLE MASON.....................$ 53.17 29.10

CARP0034-001 07/01/2021

Rates Fringes

Diver Assistant Tender, ROV Tender/Technician...........$ 54.10 34.69 Diver standby...............$ 60.51 34.69 Diver Tender................$ 59.51 34.69 Diver wet...................$ 103.62 34.69 Manifold Operator (mixed gas)........................$ 64.51 34.69 Manifold Operator (Standby).$ 59.51 34.69

DEPTH PAY (Surface Diving):

050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot 221 ft.-deeper $5.00 per foot

SATURATION DIVING:

The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.

DIVING IN ENCLOSURES:

Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48"" in height, the premium will be $1.00 per foot.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift https://sam.gov/wage-determination/CA20220007/9 6/59 are paid in the classification with the highest rate for that shift.

CARP0034-003 07/01/2021

Rates Fringes

Piledriver.......................$ 54.10 34.69

CARP0035-001 08/01/2020

AREA 1: MARIN, NAPA, SOLANO & SONOMA

AREA 3: SACRAMENTO, WESTERN EL DORADO (Territory west of an including highway 49 and the territory inside the city limits of Placerville), WESTERN PLACER (Territory west of and including highway 49), & YOLO

AREA 4: ALPINE, BUTTE, COLUSA, EASTERN EL DORADO, GLENN,

LASSEN, MODOC, NEVADA, EASTERN PLACER, PLUMAS, SHASTA, SIERRA,

SISKIYOU, SUTTER, TEHAMA, TRINITY, & YUBA

Rates Fringes

Drywall Installers/Lathers:

Area 1......................$ 52.65 31.26 Area 3......................$ 47.27 31.26 Area 4......................$ 45.92 31.26 Drywall Stocker/Scrapper Area 1......................$ 26.33 18.22 Area 3......................$ 23.64 18.22 Area 4......................$ 22.97 18.22

CARP0035-009 07/01/2020

Marin County

Rates Fringes

CARPENTER

Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 https://sam.gov/wage-determination/CA20220007/9 7/59

Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41

CARP0035-010 07/01/2020

AREA 1: Marin, Napa, Solano & Sonoma Counties

AREA 2: Monterey, San Benito and Santa Cruz

AREA 3: Alpine, Butte, Colusa, El Dorado, Glenn, Lassen, Modoc, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Siskiyou, Sutter, Tehama, Trinity, Yolo & Yuba counties

Rates Fringes

Modular Furniture Installer Area 1 Installer..................$ 28.76 22.53 Lead Installer.............$ 32.21 23.03 Master Installer...........$ 36.43 23.03 Area 2 Installer..................$ 26.11 22.53 Lead Installer.............$ 29.08 23.03 Master Installer...........$ 32.71 23.03 Area 3 Installer..................$ 25.16 22.53 Lead Installer.............$ 27.96 23.03 Master Installer...........$ 31.38 23.03

CARP0046-001 07/01/2021

El Dorado (West), Placer (West), Sacramento and Yolo Counties

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 49.12 31.49 Journeyman Carpenter........$ 48.97 31.49 Millwright..................$ 51.47 33.08

Footnote: Placer County (West) includes territory West of and including Highway 49 and El Dorado County (West) includes https://sam.gov/wage-determination/CA20220007/9 8/59 territory West of and including Highway 49 and territory inside the city limits of Placerville.

CARP0046-002 07/01/2021

Alpine, Colusa, El Dorado (East), Nevada, Placer (East), Sierra, Sutter and Yuba Counties

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 47.77 31.49 Journeyman Carpenter........$ 47.62 31.49 Millwright..................$ 50.12 33.08

CARP0152-003 07/01/2020

Amador County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 45.57 30.82 Journeyman Carpenter........$ 45.42 30.82 Millwright..................$ 47.92 32.41

CARP0180-001 07/01/2021

Solano County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 https://sam.gov/wage-determination/CA20220007/9 9/59

Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 55.00 31.49 Journeyman Carpenter........$ 54.85 31.49 Millwright..................$ 54.95 33.08

CARP0751-001 07/01/2021

Napa and Sonoma Counties

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 55.00 31.49 Journeyman Carpenter........$ 54.85 31.49 Millwright..................$ 54.95 33.08

CARP1599-001 07/01/2020

Butte, Glenn, Lassen, Modoc, Plumas, Shasta, Siskiyou, Tehama and Trinity Counties

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 45.57 30.82 Journeyman Carpenter........$ 45.42 30.82 Millwright..................$ 47.92 32.41

ELEC0180-001 06/01/2021

NAPA AND SOLANO COUNTIES

Rates Fringes https://sam.gov/wage-determination/CA20220007/9 10/59

CABLE SPLICER....................$ 59.69 3%+24.38

ELECTRICIAN......................$ 53.06 3%+24.38

ELEC0180-003 12/01/2021

NAPA AND SOLANO COUNTIES

Rates Fringes

Sound & Communications Installer...................$ 43.71 3%+22.65 Technician..................$ 50.27 3%+22.65

SCOPE OF WORK INCLUDES-

SOUND & VOICE TRANSMISSION (Music, Intercom, Nurse Call, Telephone); FIRE ALARM SYSTEMS [excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS

SYSTEMS that transmit or receive information and/or control systems that are intrinsic to the above.

EXCLUDES-

Excludes all other data systems or multiple systems which include control function or power supply; excludes installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excludes energy management systems.

ELEC0340-002 02/01/2018

ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN,

NEVADA, PLACER, PLUMAS, SACRAMENTO, TRINITY, YOLO, YUBA COUNTIES

Rates Fringes

Communications System Sound & Communications Installer...................$ 29.35 3%+15.35 Sound & Communications Technician..................$ 33.75 3%+15.35

SCOPE OF WORK

https://sam.gov/wage-determination/CA20220007/9 11/59

Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.

A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS

Background foreground music Intercom and telephone interconnect systems, Telephone systems, Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide.

B. FIRE ALARM SYSTEMS

Installation, wire pulling and testing

C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems, Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV

D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems Sonar/infrared monitoring equipment

E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE

INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO

THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems Digital Data Systems Broadband and Baseband and Carriers Point of Sale Systems VSAT Data Systems Data Communication Systems RF and Remote Control Systems Fiber Optic Data Systems WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems). Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways (including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two https://sam.gov/wage-determination/CA20220007/9 12/59

(2) conditions apply:

1. The project involves new or major remodel building trades construction.

2. The conductors for the fire alarm system are installed in conduit.

ELEC0340-003 06/01/2021

ALPINE (West of Sierra Mt. Watershed), AMADOR, BUTTE, COLUSA, EL DORADO (West of Sierra Mt. Watershed), GLENN, LASSEN, NEVADA (West of Sierra Mt. Watershed), PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA (West of Sierra Mt. Watershed), SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES

Rates Fringes

ELECTRICIAN

Remaining area..............$ 41.56 32.49 Sierra Army Depot, Herlong..$ 48.83 18.54 Tunnel work.................$ 41.01 18.54

CABLE SPLICER: Receives 110% of the Electrician basic hourly rate.

ELEC0401-005 01/01/2022

ALPINE (east of the main watershed divide), EL DORADO (east of the main watershed divide), NEVADA (east of the main watershed), PLACER (east of the main watershed divide) and SIERRA (east of the main watershed divide) COUNTIES:

Rates Fringes

ELECTRICIAN....................

This is the start of the file's text. The full file is on GovTribe.