NAV312 Crown Pt Site Assessment Support

Pricing Schedule

Task NumberTask Description Unit Cost

Unit of

Measure Quantity Total

Task 1 Data Review $____________ ea 1 $____________

Task 2.1 IPP/AHA Work Plans and Permits $____________ ea 1 $____________

Task 2.2 Boring and Sampling 50lf units $____________ lf 3 (50lf) $____________

Task 2.3 Well Completion and Water Sampling $____________ lf 3(75lf) $____________

Task 3 Draft and Final Report $____________ ea 1 $____________

Total $____________

Option for Increased Quantity Unit Cost

Unit of

Measure Quantity Total

Task 2.2 Boring and Sampling $____________ lf 6 (25lf) $____________

Task 2.3 Well Completion and Water Sampling $____________ lf 3 (25lf) $____________

Total $____________

3 borings to max 50 ft complete 3 wells to max 75 ft

6 options to add 25 ft 3 options to add 25 ft the intent of the boring options would be to take the borings in the base to 100 ft if requried. it is not expected that any boring or well will extend past 100 ft. 6 options of 25 ft would mean 2 options per well for a total depth of 100 ft per well the intent of the well completion options would be to extend the well completions from 75 ft to 100ft the options are worst case if we need to go to 100 ft on every well.