NAV312 Crown Pt Site Assessment Support Price Schedule.pdf
PDF 449 KB Posted
- Solicitation number
- W912P720R0003
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAV312 Crown Pt Site Assessment Support
Pricing Schedule
Task NumberTask Description Unit Cost
Unit of
Measure Quantity Total
Task 1 Data Review $____________ ea 1 $____________
Task 2.1 IPP/AHA Work Plans and Permits $____________ ea 1 $____________
Task 2.2 Boring and Sampling 50lf units $____________ lf 3 (50lf) $____________
Task 2.3 Well Completion and Water Sampling $____________ lf 3(75lf) $____________
Task 3 Draft and Final Report $____________ ea 1 $____________
Total $____________
Option for Increased Quantity Unit Cost
Unit of
Measure Quantity Total
Task 2.2 Boring and Sampling $____________ lf 6 (25lf) $____________
Task 2.3 Well Completion and Water Sampling $____________ lf 3 (25lf) $____________
Total $____________
3 borings to max 50 ft complete 3 wells to max 75 ft
6 options to add 25 ft 3 options to add 25 ft the intent of the boring options would be to take the borings in the base to 100 ft if requried. it is not expected that any boring or well will extend past 100 ft. 6 options of 25 ft would mean 2 options per well for a total depth of 100 ft per well the intent of the well completion options would be to extend the well completions from 75 ft to 100ft the options are worst case if we need to go to 100 ft on every well.
File details come from the government source that posted it. Updated .