AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1) This Amendment added and deleted requirements in the SF1442, Pricing Schedule Section 00 10 00, specification Section 01 11 00 - Paragraphs 1.1.1 Requirements, and Paragraph -1.1.2 Constraints , Section 01 57 19 Temporary Environmental Controls Paragraph 3.1.6 Herring Spawning Observers, Paragraph 3.2.5 Municipal Separate Storm Sewer System, Paragraph 3.5.1 Preconstruction Air Permit, Section 35 20 23 Dredging Paragraph 1.4 Quantity of Material. Paragraph 1.5.5 – Payment Quantity, Paragraph 1.5.6 – Final Payment Quantities, Paragraph 1.5.7 - Method of Measurement, Paragraph 1.7 –Charges, Paragraph 1.8 – Basis for Bids, Paragraph 3.2.1 Order of Work, Paragraph 3.2.6 –Disposal of Excavated Material, Paragraph 3.2.6.1 - Method of Disposal, Paragraph 3.2.6.2 – Disposal in Indicated Fill Areas, Paragraph 3.2.6.3 –Submerged Pipeline, Paragraph 3.2.7 –Navigation Warnings, Paragraph 3.3.1-Measurement, Paragraph 3.3.1 - Method of Measurement, Dredging Sheet G-03.

The purpose of this amendment is to clarify the dredge material from Reaches 1 and 2 is to be disposed of at upland disposal sites.

1. CONTRACT ID CODE PAGE OF PAGES

1 60

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P719B0001

X 9B. DATED (SEE ITEM 11)

03-Apr-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

OAKLAND INNER AND OUTER HABOR CHANNEL MAINTENANCE DREDGING PROJECT, ALAMEDA COUNTY, CALIFORNIA

THE BID OPENING DATE HAS BEEN POSTPONDED TO MAY 8, 2019 AT 10:00 A.M. PACIFIC TIME

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

1-May-2019

CODE

US ARMY ENGINEER DISTRICT, SAN FRANCISCO

CONTRACTING DIVISION

450 GOLDEN GATE AVE, 4TH FLOOR, SUITE 0134

SAN FRANCISCO CA 94102-3406

W912P7 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

Continuation page of SF 30 Amendment of Solicitation/Modification of Contract Changes - Added and Deleted Requirements

SF Form 1442

• Attached SF 1442.

Section 00 10 00 PRICING SCHEDULE

• Line Item 0001 – Changed the year.

Section 01 11 00 SUMMARY OF WORK

• Paragraph 1.1.1 Requirements –

- Added four bullets points in bold

- Fifth bullet deleted requirements in the first, second, and third sentence

- Edited bullet point seven (7)

- Deleted bullet points ten (10) and eleven (11)

- Deleted last sentence in bullet point twelve (12)

• Paragraph 1.1.2 Constraints –

- Deleted bullet point one (1) and three (3).

Section 01 57 19 – TEMPORARY ENVIRONMENTAL CONTROLS

• Paragraph 3.1.6 – Herring Spawning Observers - Deleted Requirements in the first and second sentence

• Paragraph 3.2.5 – Municipal Separate Storm Sewer System (MS4) Management - Deleted Requirement in response to Contractors Questions.

• Paragraph 3.5.1 – Preconstruction Air Permit - Deleted Requirement in response to Contractors Questions.

Section 35 20 23 DREDGING

• Paragraph 1.4 – Quantity of Material – Paragraph Deleted.

• Paragraph 1.5.5 – Payment Quantity – Deleted Requirement in the second sentence

• Paragraph 1.5.6 – Final Payment Quantities – Deleted Requirements in the first and second sentence

• Paragraph 1.5.7 - Method of Measurement – Added a sentence at the beginning of the paragraph.

• Paragraph 1.7 – Charges – Paragraph Deleted.

• Paragraph 1.8 – Basis for Bids – Deleted Requirement in the first sentence.

• Paragraph 3.2.1 – Order of Work – Paragraph Deleted.

• Paragraph 3.2.6 – Disposal of Excavated Material - Deleted Requirement in the first sentence.

• Paragraph 3.2.6.1 - Method of Disposal – Deleted the second sentence in the paragraph.

• Paragraph 3.2.6.2 – Disposal in Indicated Fill Areas - Deleted Paragraph.

• Paragraph 3.2.6.3 – Submerged Pipeline – Deleted Paragraph.

• Paragraph 3.2.7 – Navigation Warnings – Deleted Paragraph.

• Paragraph 3.3.1 - MEASUREMENT – Deleted previous two sentences and Added a new paragraph

• Paragraph 3.3.1 - Method of Measurement – Deleted Requirements in the second and fourth sentence in the paragraph.

DREDGING PLAN (Drawing)

Sheet G-03 (Sheet 03 OF 11) – Removed Reference to Section 35 20 23 DREDGING, paragraph 3.2.9.

OAKLAND INNER AND OUTER HARBOR CHANNEL MAINTENANCE DREDGING PROJECT, ALAMEDA COUNTY, CALIFORNIA

Project Description: The work includes annual maintenance dredging for the Oakland Inner and Outer Harbor federal navigation channel in Alameda County. This project will dredge a total estimated 756,000 cubic yards of material to a depth of -50-ft MLLW plus 1-foot of allowable paid overdepth. The first of 456,000 cubic yards excavated from the Inner and Outer Harbor shall be transported and placed at a Contractor-furnished permitted beneficial use upland site and the remaining estimated 300,000 cubic yards of material may be dredged and disposed at the Government-furnished deep ocean disposal site SF-DODS, or at the Contractor-furnished beneficial use upland site. All dredging must be completed before 15 November 2019.

This requirment is for an Unrestricted Competition. It will be issued as an Invitation for Bids (IFB) which will result in the award of a single Firm Fixed Price (FFP) contract.

The North American Industry Classif ication System (NAICS) Code applicable to this acquisition is: 237990

ESTIMATED COST RANGE IS BETWEEN: $25,000,000 - $100,000,000

X

JAMES E GARROR

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

415-503-6988

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

3-Apr-2019

(RFP)

(IFB)

CALL:

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local t ime 8 May 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY ENGINEER DISTRICT, SAN FRANCISCO

CONTRACTING DIVISION

450 GOLDEN GATE AVENUE, 4TH FLOOR SUITE 4511

SAN FRANCISCO CA 94102-3406

W912P7

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

11. The Contractor shall begin performance within _______5 calendar days and complete it within ________180 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (S 52.211-10ee _________________________ .)

12B. CALENDAR DAYS

10:00 AM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912P719B0001 136

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

SECTION 00 10 00

PRICING SCHEDULE

OPTIONS WILL BE EVALUATED IN ACCORDANCE WITH FAR 52.217-5

THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL,

EQUIPMENT, NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE

WITH THE TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO

INCLUDE ALL ATTACHMENTS THERETO.

Item Description *Quantity Unit Unit Price Amount

BID ITEMS – OAKLAND INNER AND OUTER HARBOR FY19 MAINTENANCE DREDGING WITH

DISPOSAL AT A CONTRACTOR-FURNISHED PERMITTED BENEFICIAL REUSE UPLAND SITE

AND AT THE GOVERNMENT-FURNISHED DEEP OCEAN DISPOSAL SITE (SF-DODS)

0001 Mobilization and Demobilization, FY189 Dredging Cycle 1 Job $_________ $__________

0002 Dredging, Reach 1 to -50-ft (MLLW) including 1-foot of Paid Overdepth with disposal at a Beneficial Reuse

Upland site.

0002AA Required Dredging to -50-ft

MLLW at Oakland Harbor 58,000 CY $______ $________

0002AB Overdepth Dredging to -51-ft

MLLW at Oakland Harbor 140,000 CY $______ $________

0003 Dredging, Reach 2 to -50-ft (MLLW) including 1-foot of Paid Overdepth with disposal at a Beneficial Reuse

Upland site.

0003AA Required Dredging to -50-ft

MLLW at Oakland Harbor 168,000 CY $______ $________

0003AB Overdepth Dredging to -51-ft

MLLW at Oakland Harbor 90,000 CY $______ $________

0004 Dredging, Reach 3 to -50-ft (MLLW) including 1-foot of Paid Overdepth with disposal at SF-DODS.

0004AA Required Dredging to -50-ft

MLLW at Oakland Harbor 3,000 CY $______ $________

0004AB Overdepth Dredging to -51-ft

MLLW at Oakland Harbor 43,000 CY $______ $________

0005 Dredging, Reach 4 to -50-ft (MLLW) including 1-foot of Paid Overdepth with disposal at SF-DODS.

0005AA Required Dredging to -50-ft

MLLW at Oakland Harbor 3,000 CY $______ $________

0005AB Overdepth Dredging to -51-ft

MLLW at Oakland Harbor 42,000 CY $______ $________

0006 Dredging, Reach 5 to -50-ft (MLLW) including 1-foot of Paid Overdepth with disposal at SF-DODS.

0006AA Required Dredging to -50-ft

MLLW at Oakland Harbor 4,000 CY $______ $________

0006AB Overdepth Dredging to -51-ft

MLLW at Oakland Harbor 28,000 CY $______ $________

0007 Dredging, Reach 6 to -50-ft (MLLW) including 1-foot of Paid Overdepth with disposal at SF-DODS.

0007AA Required Dredging to -50-ft

MLLW at Oakland Harbor 3,000 CY $______ $________

0007AB Overdepth Dredging to -51-ft

MLLW at Oakland Harbor 28,000 CY $______ $________

0008 Dredging, Reach 7 to -50-ft (MLLW) including 1-foot of Paid Overdepth with disposal at SF-DODS.

0008AA Required Dredging to -50-ft

MLLW at Oakland Harbor 35,000 CY $______ $________

0008AB Overdepth Dredging to -51-ft

MLLW at Oakland Harbor 10,000 CY $______ $________

0009 Dredging, Reach 8 to -50-ft (MLLW) including 1-foot of Paid Overdepth with disposal at SF-DODS.

0009AA Required Dredging to -50-ft

MLLW at Oakland Harbor 18,000 CY $______ $________

0009AB Overdepth Dredging to -51-ft

MLLW at Oakland Harbor 15,000 CY $______ $________

0010 Dredging, Reach 9 to -50-ft (MLLW) including 1-foot of Paid Overdepth with disposal at SF-DODS.

0010AA Required Dredging to -50-ft

MLLW at Oakland Harbor 1,000 CY $______ $________

0010AB Overdepth Dredging to -51-ft

MLLW at Oakland Harbor 27,000 CY $______ $________

0011 Dredging, Reach 10A to -50-ft (MLLW) including 1-foot of Paid Overdepth with disposal at SF-DODS.

0011AA Required Dredging to -50-ft

MLLW at Oakland Harbor 5,000 CY $______ $________

0011AB Overdepth Dredging to -51-ft

MLLW at Oakland Harbor 20,000 CY $______ $________

0012 Dredging, Reach 10B to -50-ft (MLLW) including 1-foot of Paid Overdepth with disposal at SF-DODS.

0012AA Required Dredging to -50-ft

MLLW at Oakland Harbor 3,000 CY $______ $________

0012AB Overdepth Dredging to -51-ft

MLLW at Oakland Harbor 12,000 CY $______ $________

TOTAL BID PRICE (Item 0001 + Item 0002 + Item 0003 +

Item 0004 + Item 0005 + Item 0006 + Item 0007 +

Item 0008 + Item 0009 + Item 0010 + item 0011 +

Item 0012) $________________

Notes:

* ALL QUANTITIES ARE ESTIMATES. SEE FAR 52.211-18, SECTION 00 72 00 (GENERAL

CONDITION) OF THE CONTRACT.

1. To be considered responsive, prices must be submitted on all individual items within the Bid Schedule. Failure to do so may be cause for rejection of bids.

2. Bidders must complete and submit attached “Dredging Plant and Equipment

Schedule”, forms Page 1 and Page 2 as part of their solicitation package for bid evaluation. Failure to do so may cause the bid to be considered nonresponsive. The Contractor shall demonstrate that all necessary equipment will be available and committed to this contract.

3. The term "Job", which appears on the Pricing Schedule (Section 00 10

00) under “Unit” for BID ITEM 0001 shall be considered as a Lump Sum. The

Variation in Quantity contract clause, FAR 52.211-18, shall not apply to

BID ITEM 0001.

4. BASIS of AWARD: The contract will be awarded in accordance with FAR

52.214-19 Contract Award – Sealed Bidding – Construction.

5. The Government reserves the right to direct the Contractor to place dredged material at an environmentally acceptable alternate disposal site in accordance with the Change Clause FAR 52.243-4.

6. This contract is subject to the FAR Clause 52.232-18 Availability of

Funds in Section 00 72 00.

- End of Document –

Oakland Inner and Outer Harbor FY19 O&M Dredging Project

Section 01 11 00 – Page 1 of 5

SECTION TABLE OF CONTENTS

DIVISION 01 – GENERAL REQUIREMENTS

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 PROJECT DESCRIPTION

1.1.1 Requirements

1.1.2 Constraints

1.2 MEETINGS

1.2.1 Pre-Construction Conference

1.2.2 Weekly Meetings

1.3 CONTRACTOR PERFORMANCE EVALUATIONS

1.4 PERMITS

1.5 PUBLIC SAFETY

1.6 PUBLIC UTILITIES AND PRIVATE IMPROVEMENTS

1.7 LAYOUT OF WORK

1.8 SAFETY OF STRUCTURES

1.9 LOCATION OF UNDERGROUND FACILITIES

PART 2 PRODUCTS

NOT USED

PART 3 EXECUTION

NOT USED

Section 01 11 00 – Page 2 of 5

SECTION 01 11 00

SUMMARY OF WORK

1 PART 1 GENERAL

1.1 PROJECT DESCRIPTION

The work includes annual maintenance dredging of the federal navigation channel in Oakland Inner and Outer Harbor, which cannot begin before 1 June in any year.

1.1.1 Requirements

Dredge Oakland Inner and Outer Harbor Channel to -50-ft MLLW for acceptance.

The environmental window is from 1 June to 30 November.

It is anticipated that the Government will issue Notice to Proceed in time to allow dredging to complete by 30 November 2019.

After 30 November if work is not completed, then Liquidated Damages may be imposed.

The Contractor shall place the first 456,000 cubic yards of dredged material from Reaches 1 and 2 1-9 and 10B, (including paid and non-paid overdepth) at the Contractor-furnished permitted beneficial use upland site as cover, within the environmental window. before 15 November.

After the Government and the Contractor agree in writing that 456,000 cubic yards of dredged material have been placed at the Contractor-furnished permitted beneficial use upland site as cover, the remainder of the dredged material may be disposed at the Government-furnished deep ocean disposal site SF-DODS, or at the Contractor-furnished beneficial use upland site. Dredged material from Reach 3-9, 10A, and 10B shall be disposed at SF-DODS within the environmental window only before 15 November 2019.

If by 1 November, it is anticipated that dredging will not be complete within the environmental window, the Contractor must notify COR in writing and obtain approval from the Contracting Officer (KO). If the KO approves dredging outside of the environmental window, all material must be placed at a permitted beneficial use upland site.

The Contractor shall dredge the project reaches in an order as directed by the Contracting Officer. in accordance with Section dredging 35 20 23-3.2.1 Order of Work.

The Contractor shall decant water from scows during dredging operations in accordance with Section TEMPORARY ENVIRONMENTAL CONTROLS 01 57 19-

1.5 and 3.1.4 while the Government is performing water quality monitoring of the mandatory decanting for data collection purposes. The Contractor shall comply with the restrictions, requirements, and conditions identified in Section TEMPORARY ENVIRONMENTAL CONTROLS 01 57 19-1.5 and 3.1.5 whenever dredging operations are within a 250-meter boundary surrounding the essential eelgrass beds shown in the drawing sheets of the Oakland Inner and Outer Harbor Channels.

Contractor shall submit Dredged Material Disposal Site Logs on a weekly basis in accordance with Section DREDGING 35 20 23-1.2.1.4.2.

Contractor’s CQC manager shall provide a weekly meeting agenda in RMS 24 hours prior to each weekly meeting.

Section 01 11 00 – Page 3 of 5

• Independent third-party Scow Certification is required for ocean disposal operations, or as ocean disposal is otherwise directed by the COR, in accordance with Section DREDGING 35 20 23-1.2.1.4.4.

• Contractor shall attend a pre-construction meeting with EPA regarding the use of the Government-furnished deep ocean disposal site SF-DODS unless the Contractor has attended a similar meeting within the previous 3 years. Herring Observer resumes must be submitted to the COR and Stephen Willis (Stephen.M.Willis2@usace.army.mil) no later than COB 14 November 2019.

1.1.2 Constraints

• If the Contracting Officer authorizes dredging operations to continue past November 30, all dredged material must be placed at a permitted beneficial use upland site unless otherwise directed by the COR.

• Hopper dredging is prohibited for this project.

• All dredging operations after November 30 must include herring observers in accordance with Section TEMPORARY ENVIRONMENTAL CONTROLS 01 57 19-3.1.6.

1.2 MEETINGS

1.2.1 Preconstruction Conference

After award of contract, a pre-dredging conference will be held at such time and location as determined by the Contracting Officer for purposes of discussing and developing mutual understanding between the Contracting Officer or the authorized Contracting Officer's Representative and the Contractor's Representatives regarding the terms, conditions, and requirements of the contract. Members of the conference from the Government will include the quality assurance staff, the Contracting Officer, or an authorized representative, and construction staff. Members from the Contractor shall include the dredge master, chief hydrographic surveyor, and the quality control staff. The discussion will include, but will not be limited to, the following:

-Contractor supervisory and quality control project staff -Correspondence procedures -Accident Prevention Plan -Pollution control program -Quality Control and Hydrographic Surveying -Project scheduling and payment procedures -Resident Management System (RMS-QC) -Other subjects that may be of interest to the contracting parties -Schedule of Weekly Meeting

1.2.2 Weekly Meetings

Weekly construction/survey/coordination/progress meetings shall be held between the Contractor, Contracting Officer or authorized representative, and Government personnel. Minutes of the weekly meeting shall be prepared by the Contactor’s CQC Manager and submitted to the Contracting Officer within 24 hrs.

mailto:Stephen.M.Willis2@usace.army.mil

Section 01 11 00 – Page 4 of 5

1.3 CONTRACTOR PERFORMANCE EVALUATIONS

The Contractor's performance shall be evaluated using the Construction Performance Assessment Reporting System (CPARS) in accordance with Subpart

36.201 (Evaluation of Contractor Performance) of the Federal Acquisition Regulation and Engineering Regulation 415-1-17. The Contractor may access, review, and comment on the evaluation for a period of 60 days. Accessing and using CPARS requires Public Key Infrastructure (PKI) certification. The certification is a Department of Defense requirement and was implemented to provide security in electronic transactions. This certification is purchased from an External Certificate Authorities (ECA) vendor. Contractor access to CPARS is required for Contractor to participate in the performance evaluation process. PKI certification is the sole responsibility of the Contractor. Current information about the PKI certification process and known PKI vendors can be found at the following link: http://www.cpars.gov/.

1.4 PERMITS

The Contractor shall obtain and comply with all licenses and permits required by Federal, State, and local laws, codes, and regulations unless otherwise specified in these contract documents. The Government has provided the requirements of the 2015-2019 Water Quality Certification in accordance with the Clean Water Act, and the requirements of the Coastal Zone Management Act (CZMA) Consistency Notification for 2018-2019. The Contractor shall comply with these requirements and provisions in these contract specifications included in Sections ENVIRONMENTAL PROTECTION 01 57 20.00 10 and DREDGING 35 20 23. The Water Quality Certification and the CZMA Consistency Notification will be provided upon request.

1.5 PUBLIC SAFETY

The Contractor shall provide guard personnel as required to provide protection in the interest of public safety. Whenever the Contractor's operations create a condition hazardous to the public, he shall furnish at his own expense and without cost to the Government, such guards as are necessary to give adequate warning to the public of any dangerous conditions to be encountered, and he shall furnish, erect, or maintain such lights, signs and other devices as are necessary to prevent accidents and to avoid damage or injury to the public. Flagmen and guards, while on duty and assigned to give warning to the public that the dredging is being accomplished, and of any dangerous conditions to be encountered as a result thereof, shall be equipped with appropriate safety equipment and a red flag.

Signs, flags, lights, and other warning and safety devices shall conform to applicable city, county, and state requirements. Should the Contractor appear to be negligent in furnishing adequate warning and protective measures, the Contracting Officer will direct attention to the existence of a hazard, and the necessary warning and protective measures shall be furnished and installed by the Contractor without additional cost to the Government. The installation of any general illumination shall not relieve the Contractor of his responsibility for furnishing and maintaining all devices necessary to provide protection to all parties concerned.

http://www.cpars.gov/

Section 01 11 00 – Page 5 of 5

1.6 PUBLIC UTILITIES AND PRIVATE IMPROVEMENTS

The Contractor's attention is directed to the possible existence of pipelines or public utilities or private improvements shown or not shown on the drawings which may be buried within the limits of the work or adjacent thereto. The Contractor shall take care to preserve and protect any such improvements from injury or damage during construction operations. Utilities or improvements, whether buried or not, which cannot be determined to exist through visual inspection by the Contractor, if inadvertently damaged by the Contractor's operations, shall be promptly repaired or replaced by the Contractor, and an equitable adjustment in the amount due under the contract will be made as provided in the contract. The Contractor shall notify the Contracting Officer immediately if any utility or structure has been damaged by the Contractor. The Contractor shall assume full responsibility for reimbursing the owners for any damage to their properties, utilities, or improvements, or interference with their services caused through the dredging operations. The Contractor is not relieved from the responsibility set forth in "FAR 52.236-3, Site Investigation and Conditions Affecting the Work" except as provided above.

1.7 LAYOUT OF WORK

The Contractor shall lay out his work from Government‐established monuments and gages as shown on the drawings and shall be responsible for all measurements in connection therewith. The Contractor shall furnish, at his own expense, all templates, platforms, equipment, markers and labor as may be required in laying out any part of the work from the gages established by the Government. Contractor is responsible for the execution of the work to such lines, grades and gages as may be established or indicated by Government. Contractor shall maintain and preserve all monuments and other marks established by Government until authorized to remove them. Contractor shall check the accuracy of monuments as the Government does not guarantee their accuracy.

1.8 SAFETY OF STRUCTURES

The Contractor shall use reasonable and proper care in the prosecution of the work to assure the stability of piers and other structures lying on or adjacent to the site of work, insofar as they may be jeopardized by the dredging operations and on account of moving or mooring of equipment. The Contractor shall make good all damages resulting from the moving and mooring of his equipment and from dredging operations insofar as such damages may be caused by variations in locations and/or depth of dredging below that ordered by the Contracting Officer.

2 PART 2 PRODUCTS

Not used.

3 PART 3 EXECUTION

Not used.

-- End of Section --

Section 01 57 19 - Page 1 of 34

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 57 19

TEMPORARY ENVIRONMENTAL CONTROLS

11/15

1.1 REFERENCES

1.2 DEFINITIONS

1.2.1 Class I and II Ozone Depleting Substance (ODS)

1.2.2 Contractor Generated Hazardous Waste

1.2.3 Electronics Waste

1.2.4 Environmental Pollution and Damage

1.2.5 Environmental Protection

1.2.6 Hazardous Debris

1.2.7 Hazardous Materials

1.2.8 Hazardous Waste

1.2.9 Installation Pest Management Coordinator

1.2.10 Land Application

1.2.11 Municipal Separate Storm Sewer System (MS4) Permit

1.2.12 National Pollutant Discharge Elimination System (NPDES)

1.2.13 Oily Waste

1.2.14 Pesticide

1.2.15 Pesticide Treatment Plan

1.2.16 Pests

1.2.17 Project Pesticide Coordinator

1.2.18 Regulated Waste

1.2.19 Sediment

1.2.20 Solid Waste

1.2.20.1 Debris

1.2.20.2 Green Waste

1.2.20.3 Material not regulated as solid waste

1.2.20.4 Non-Hazardous Waste

1.2.20.5 Recyclables

1.2.20.6 Surplus Soil

1.2.20.7 Scrap Metal

1.2.20.8 Wood

1.2.21 Surface Discharge

1.2.22 Wastewater

1.2.22.1 Stormwater

1.2.23 Waters of the United States

1.2.24 Wetlands

1.2.25 Universal Waste

1.3 SUBMITTALS

1.4 ENVIRONMENTAL PROTECTION REQUIREMENTS

1.4.1 Training in Environmental Compliance Assessment Training and Tracking System (ECATTS)

1.4.1.1 Personnel Requirements

1.4.1.2 Certification

1.4.1.3 Refresher Training

1.4.2 Conformance with the Environmental Management System

1.5 SPECIAL ENVIRONMENTAL REQUIREMENTS

1.6 QUALITY ASSURANCE

Section 01 57 19 - Page 2 of 34

1.6.1 Preconstruction Survey and Protection of Features

1.6.2 Regulatory Notifications

1.6.3 Environmental Brief

1.6.4 Environmental Manager

1.6.5 Employee Training Records

1.6.5.1 Pest Control Training

1.6.6 Non-Compliance Notifications

1.7 ENVIRONMENTAL PROTECTION PLAN

1.7.1 General Overview and Purpose

1.7.1.1 Descriptions

1.7.1.2 Duties

1.7.1.3 Procedures

1.7.1.4 Communications

1.7.1.5 Contact Information

1.7.2 General Site Information

1.7.2.1 Drawings

1.7.2.2 Work Area

1.7.2.3 Documentation

1.7.3 Management of Natural Resources

1.7.4 Protection of Historical and Archaeological Resources

1.7.5 Stormwater Management and Control

1.7.6 Protection of the Environment from Waste Derived from

Contractor Operations

1.7.7 Prevention of Releases to the Environment

1.7.8 Regulatory Notification and Permits

1.7.9 Clean Air Act Compliance

1.7.9.1 Haul Route

1.7.9.2 Pollution Generating Equipment

1.7.9.3 Stationary Internal Combustion Engines

1.7.9.4 Refrigerants

1.7.9.5 Air Pollution-engineering Processes

1.7.9.6 Monitoring

1.7.9.7 Compliant Materials

1.8 LICENSES AND PERMITS

1.9 ENVIRONMENTAL RECORDS BINDER

1.10 PESTICIDE DELIVERY, STORAGE, AND HANDLING

1.10.1 Delivery and Storage

1.10.2 Handling Requirements

1.11 SOLID WASTE MANAGEMENT PERMIT

1.11.1 Solid Waste Management Report

1.12 FACILITY HAZARDOUS WASTE GENERATOR STATUS

PART 2 PRODUCTS

3.1 PROTECTION OF NATURAL RESOURCES

3.1.1 Flow Ways

3.1.2 Vegetation

3.1.3 Streams

3.1.4 Water Quality Monitoring

3.1.5 Light Monitoring

3.2 STORMWATER

3.2.1 Construction General Permit

3.2.1.1 Stormwater Pollution Prevention Plan

3.2.1.2 Stormwater Notice of Intent for Construction Activities

3.2.1.3 Inspection Reports

Section 01 57 19 - Page 3 of 34

3.2.1.4 Stormwater Pollution Prevention Plan Compliance Notebook

3.2.1.5 Stormwater Notice of Termination for Construction

Activities

3.2.2 Erosion and Sediment Control Measures

3.2.2.1 Erosion Control

3.2.2.2 Sediment Control Practices

3.2.3 Work Area Limits

3.2.4 Contractor Facilities and Work Areas

3.2.5 Municipal Separate Storm Sewer System (MS4) Management

3.3 SURFACE AND GROUNDWATER

3.3.1 Cofferdams, Diversions, and Dewatering

3.3.2 Waters of the United States

3.4 PROTECTION OF CULTURAL RESOURCES

3.4.1 Archaeological Resources

3.4.2 Historical Resources

3.5 AIR RESOURCES

3.5.1 Preconstruction Air Permits

3.5.2 Oil or Dual-fuel Boilers and Furnaces

3.5.3 Burning

3.5.4 Class I [and II ]ODS Prohibition

3.5.5 Accidental Venting of Refrigerant

3.5.6 EPA Certification Requirements

3.5.7 Dust Control

3.5.7.1 Particulates

3.5.7.2 Abrasive Blasting

3.5.8 Odors

3.6 WASTE MINIMIZATION

3.6.1 Salvage, Reuse and Recycle

3.6.2 Nonhazardous Solid Waste Diversion Report

3.7 WASTE MANAGEMENT AND DISPOSAL

3.7.1 Waste Determination Documentation

3.7.1.1 Sampling and Analysis of Waste

3.7.1.1.1 Waste Sampling

3.7.1.1.2 Laboratory Analysis

3.7.1.1.3 Analysis Type

3.7.2 Solid Waste Management

3.7.2.1 Solid Waste Management Report

3.7.2.2 Control and Management of Solid Wastes

3.7.3 Control and Management of Hazardous Waste

3.7.3.1 Hazardous Waste/Debris Management

3.7.3.2 Waste Storage/Satellite Accumulation/90 Day Storage Areas

3.7.3.3 Hazardous Waste Disposal

3.7.3.3.1 Responsibilities for Contractor's

Disposal 3.7.3.3.1.1 Services

3.7.3.3.1.2 Samples

3.7.3.3.1.3 Analysis

3.7.3.3.1.4 Labeling

3.7.3.3.2 Contractor Disposal Turn-In Requirements

3.7.3.4 Universal Waste Management

3.7.3.5 Electronics End-of-Life Management

3.7.3.6 Disposal Documentation for Hazardous and Regulated Waste

3.7.4 Releases/Spills of Oil and Hazardous Substances

3.7.4.1 Response and Notifications

3.7.4.2 Clean Up

3.7.5 Mercury Materials

3.7.6 Wastewater

3.7.6.1 Disposal of wastewater must be as specified below.

3.7.6.1.1 Treatment

Section 01 57 19 - Page 4 of 34

3.7.6.1.2 Surface Discharge

3.7.6.1.3 Land Application

3.8 HAZARDOUS MATERIAL MANAGEMENT

3.8.1 Contractor Hazardous Material Inventory Log

3.9 PREVIOUSLY USED EQUIPMENT

3.10 CONTROL AND MANAGEMENT OF ASBESTOS-CONTAINING MATERIAL (ACM)

3.11 CONTROL AND MANAGEMENT OF LEAD-BASED PAINT (LBP)

3.12 CONTROL AND MANAGEMENT OF POLYCHLORINATED BIPHENYLS (PCBS)

3.13 CONTROL AND MANAGEMENT OF LIGHTING BALLAST AND LAMPS CONTAINING

PCBS

3.14 MILITARY MUNITIONS

3.15 PETROLEUM, OIL, LUBRICANT (POL) STORAGE AND FUELING

3.15.1 Used Oil Management

3.15.2 Oil Storage Including Fuel Tanks

3.16 INADVERTENT DISCOVERY OF PETROLEUM-CONTAMINATED SOIL OR HAZARDOUS

WASTES

3.17 PEST MANAGEMENT

3.17.1 Application

3.17.2 Pesticide Treatment Plan

3.18 CHLORDANE

3.19 SOUND INTRUSION

3.20 POST CONSTRUCTION CLEANUP

-- End of Section Table of Contents --

Section 01 57 19 - Page 1 of 29

SECTION 01 57 19

TEMPORARY ENVIRONMENTAL CONTROLS

11/15

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)

EPA SW-846 (Third Edition; Update IV) Test Methods for

Evaluating Solid Waste: Physical/Chemical Methods

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.120 Hazardous Waste Operations and Emergency

Response

40 CFR 112 Oil Pollution Prevention

40 CFR 122.26 Storm Water Discharges (Applicable to State

NPDES Programs, see section 123.25)

40 CFR 152 Pesticide Registration and Classification

Procedures

40 CFR 152 - 186 Pesticide Programs

40 CFR 241 Guidelines for Disposal of Solid Waste

40 CFR 243 Guidelines for the Storage and Collection of

Residential, Commercial, and Institutional Solid Waste

40 CFR 258 Subtitle D Landfill Requirements

40 CFR 260 Hazardous Waste Management System: General

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 261.7 Residues of Hazardous Waste in Empty

Containers

40 CFR 262 Standards Applicable to Generators of

Hazardous Waste

40 CFR 262.31 Standards Applicable to Generators of

Hazardous Waste-Labeling

40 CFR 262.34 Standards Applicable to Generators of

Hazardous Waste-Accumulation Time

Section 01 57 19 - Page 2 of 29

40 CFR 263 Standards Applicable to Transporters of

Hazardous Waste

40 CFR 264 Standards for Owners and Operators of

Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 265 Interim Status Standards for Owners and

Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 266 Standards for the Management of Specific

Hazardous Wastes and Specific Types of Hazardous Waste Management Facilities

40 CFR 268 Land Disposal Restrictions

40 CFR 273 Standards For Universal Waste Management

40 CFR 273.2 Standards for Universal Waste Management -

Batteries

40 CFR 273.3 Standards for Universal Waste Management -

Pesticides

40 CFR 273.4 Standards for Universal Waste Management -

Mercury Containing Equipment

40 CFR 273.5 Standards for Universal Waste Management -

Lamps

40 CFR 279 Standards for the Management of Used Oil

40 CFR 300 National Oil and Hazardous Substances

Pollution Contingency Plan

40 CFR 300.125 National Oil and Hazardous Substances

Pollution Contingency Plan - Notification and Communications

40 CFR 355 Emergency Planning and Notification

40 CFR 403 General Pretreatment Regulations for Existing and New Sources of Pollution

40 CFR 50 National Primary and Secondary Ambient Air

Quality Standards

40 CFR 60 Standards of Performance for New Stationary

Sources

40 CFR 61 National Emission Standards for Hazardous Air

Pollutants

40 CFR 63 National Emission Standards for Hazardous Air

Pollutants for Source Categories

Section 01 57 19 - Page 3 of 29

40 CFR 64 Compliance Assurance Monitoring

40 CFR 745 Lead-Based Paint Poisoning Prevention in

Certain Residential Structures

40 CFR 761 Polychlorinated Biphenyls (PCBs)

Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions

49 CFR 171 General Information, Regulations, and

Definitions

49 CFR 172 Hazardous Materials Table, Special

Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements

49 CFR 172.101 Hazardous Material Regulation-Purpose and Use of Hazardous Material Table

49 CFR 173 Shippers - General Requirements for Shipments and Packagings

49 CFR 178 Specifications for Packagings

1.2 DEFINITIONS

1.2.1 Class I and II Ozone Depleting Substance (ODS)

Class I ODS is defined in Section 602(a) of The Clean Air Act. A list of Class I ODS can be found on the EPA website at the following weblink.

http://www.epa.gov/ozone/science/ods/classone.html.

Class II ODS is defined in Section 602(s) of The Clean Air Act. A list of Class II ODS can be found on the EPA website at the following weblink.

http://www.epa.gov/ozone/science/ods/classtwo.html.

1.2.2 Contractor Generated Hazardous Waste

Contractor generated hazardous waste is materials that, if abandoned or disposed of, may meet the definition of a hazardous waste. These waste streams would typically consist of material brought on site by the Contractor to execute work, but are not fully consumed during the course of construction. Examples include, but are not limited to, excess paint thinners (i.e. methyl ethyl ketone, toluene), waste thinners, excess paints, excess solvents, waste solvents, excess pesticides, and contaminated pesticide equipment rinse water.

1.2.3 Electronics Waste

Electronics waste is discarded electronic devices intended for salvage, recycling, or disposal.

http://www.epa.gov/ozone/science/ods/classone.html http://www.epa.gov/ozone/science/ods/classtwo.html

Section 01 57 19 - Page 4 of 29

1.2.4 Environmental Pollution and Damage

Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life;

affect other species of importance to humankind; or degrade the environment aesthetically, culturally or historically.

1.2.5 Environmental Protection

Environmental protection is the prevention/control of pollution and habitat disruption that may occur to the environment during construction. The control of environmental pollution and damage requires consideration of land, water, and air; biological and cultural resources; and includes management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material as well as other pollutants.

1.2.6 Hazardous Debris

As defined in paragraph SOLID WASTE, debris that contains listed hazardous waste (either on the debris surface, or in its interstices, such as pore structure) in accordance with 40 CFR 261. Hazardous debris also includes debris that exhibits a characteristic of hazardous waste in accordance with

40 CFR 261.

1.2.7 Hazardous Materials

Hazardous materials as defined in 49 CFR 171 and listed in 49 CFR 172.

Hazardous material is any material that: Is regulated as a hazardous material in accordance with 49 CFR 173; or requires a Safety Data Sheet (SDS) in accordance with 29 CFR 1910.120; or during end use, treatment, handling, packaging, storage, transportation, or disposal meets or has components that meet or have potential to meet the definition of a hazardous waste as defined by 40 CFR 261 Subparts A, B, C, or D. Designation of a material by this definition, when separately regulated or controlled by other sections or directives, does not eliminate the need for adherence to that hazard-specific guidance which takes precedence over this section for "control" purposes. Such material includes ammunition, weapons, explosive actuated devices, propellants, pyrotechnics, chemical and biological warfare materials, medical and pharmaceutical supplies, medical waste and infectious materials, bulk fuels, radioactive materials, and other materials such as asbestos, mercury, and polychlorinated biphenyls (PCBs).

1.2.8 Hazardous Waste

Hazardous Waste is any material that meets the definition of a solid waste and exhibit a hazardous characteristic (ignitability, corrosivity, reactivity, or toxicity) as specified in 40 CFR 261, Subpart C, or contains a listed hazardous waste as identified in 40 CFR 261, Subpart D.

1.2.9 Installation Pest Management Coordinator

Not Used.

Section 01 57 19 - Page 5 of 29

1.2.10 Land Application

Land Application means spreading or spraying discharge water at a rate that allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, discharge into defined drainage areas, or discharge into the "waters of the United States" must occur. Comply with federal, state, and local laws and regulations.

1.2.11 Municipal Separate Storm Sewer System (MS4) Permit

MS4 permits are those held by installations to obtain NPDES permit coverage for their stormwater discharges.

1.2.12 National Pollutant Discharge Elimination System (NPDES)

The NPDES permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States.

1.2.13 Oily Waste

Oily waste are those materials that are, or were, mixed with Petroleum, Oils, and Lubricants (POLs) and have become separated from that POLs. Oily wastes also means materials, including wastewaters, centrifuge solids, filter residues or sludges, bottom sediments, tank bottoms, and sorbents which have come into contact with and have been contaminated by, POLs and may be appropriately tested and discarded in a manner which is in compliance with other state and local requirements.

This definition includes materials such as oily rags, "kitty litter" sorbent clay and organic sorbent material. These materials may be land filled provided that: It is not prohibited in other state regulations or local ordinances; the amount generated is "de minimus" (a small amount); it is the result of minor leaks or spills resulting from normal process operations;

and free-flowing oil has been removed to the practicable extent possible.

Large quantities of this material, generated as a result of a major spill or in lieu of proper maintenance of the processing equipment, are a solid waste. As a solid waste, perform a hazardous waste determination prior to disposal. As this can be an expensive process, it is recommended that this type of waste be minimized through good housekeeping practices and employee education.

1.2.14 Pesticide

1.2.15 Pesticide Treatment Plan

1.2.16 Pests

1.2.17 Project Pesticide Coordinator

Section 01 57 19 - Page 6 of 29

1.2.18 Regulated Waste

Regulated waste are solid wastes that have specific additional federal, state, or local controls for handling, storage, or disposal.

1.2.19 Sediment

Sediment is soil and other debris that have eroded and have been transported by runoff water or wind.

1.2.20 Solid Waste

Solid waste is a solid, liquid, semi-solid or contained gaseous waste. A solid waste can be a hazardous waste, non-hazardous waste, or non-Resource Conservation and Recovery Act (RCRA) regulated waste. Types of solid waste typically generated at construction sites may include:

1.2.20.1 Debris

Debris is non-hazardous solid material generated during the construction, demolition, or renovation of a structure that exceeds 2.5-inch particle size that is: a manufactured object; plant or animal matter; or natural geologic material (for example, cobbles and boulders), broken or removed concrete, masonry, and rock asphalt paving; ceramics; roofing paper and shingles.

Inert materials may be reinforced with or contain ferrous wire, rods, accessories and weldments. A mixture of debris and other material such as soil or sludge is also subject to regulation as debris if the mixture is comprised primarily of debris by volume, based on visual inspection.

1.2.20.2 Green Waste

Green waste is the vegetative matter from landscaping, land clearing and grubbing, including, but not limited to, grass, bushes, scrubs, small trees and saplings, tree stumps and plant roots. Marketable trees, grasses and plants that are indicated to remain, be re-located, or be re-used are not included.

1.2.20.3 Material not regulated as solid waste

Material not regulated as solid waste is nuclear source or byproduct materials regulated under the Federal Atomic Energy Act of 1954 as amended;

suspended or dissolved materials in domestic sewage effluent or irrigation return flows, or other regulated point source discharges; regulated air emissions; and fluids or wastes associated with natural gas or crude oil exploration or production.

1.2.20.4 Non-Hazardous Waste

Non-hazardous waste is waste that is excluded from, or does not meet, hazardous waste criteria in accordance with 40 CFR 263.

1.2.20.5 Recyclables

Recyclables are materials, equipment and assemblies such as doors, windows, door and window frames, plumbing fixtures, glazing and mirrors that are recovered and sold as recyclable, wiring, insulated/non-insulated copper wire cable, wire rope, and structural components. It also includes

Section 01 57 19 - Page 7 of 29 commercial-grade refrigeration equipment with Freon removed, household appliances where the basic material content is metal, clean polyethylene terephthalate bottles, cooking oil, used fuel oil, textiles, high-grade paper products and corrugated cardboard, stackable pallets in good condition, clean crating material, and clean rubber/vehicle tires. Metal meeting the definition of lead contaminated or lead based paint contaminated may not be included as recyclable if sold to a scrap metal company. Paint cans that meet the definition of empty containers in accordance with 40 CFR

261.7 may be included as recyclable if sold to a scrap metal company.

1.2.20.6 Surplus Soil

Surplus soil is existing soil that is in excess of what is required for this work, including aggregates intended, but not used, for on-site mixing of concrete, mortars, and paving. Contaminated soil meeting the definition of hazardous material or hazardous waste is not included and must be managed in accordance with paragraph HAZARDOUS MATERIAL MANAGEMENT.

1.2.20.7 Scrap Metal

This includes scrap and excess ferrous and non-ferrous metals such as reinforcing steel, structural shapes, pipe, and wire that are recovered or collected and disposed of as scrap. Scrap metal meeting the definition of hazardous material or hazardous waste is not included.

1.2.20.8 Wood

Wood is dimension and non-dimension lumber, plywood, chipboard, hardboard.

Treated or painted wood that meets the definition of lead contaminated or lead based contaminated paint is not included. Treated wood includes, but is not limited to, lumber, utility poles, crossties, and other wood products with chemical treatment.

1.2.21 Surface Discharge

Surface discharge means discharge of water into drainage ditches, storm sewers, creeks or "waters of the United States". Surface discharges are discrete, identifiable sources and require a permit from the governing agency. Comply with federal, state, and local laws and regulations.

1.2.22 Wastewater

Wastewater is the used water and solids from a community that flow to a treatment plant.

1.2.22.1 Stormwater

Stormwater is any precipitation in an urban or suburban area that does not evaporate or soak into the ground, but instead collects and flows into storm drains, rivers, and streams.

1.2.23 Waters of the United States

Waters of the United States means federally jurisdictional waters,…