W912P718B0003_Amendment_0003_7-11-2018.pdf
PDF 221 KB Posted
- Attached to
- OAKLAND INNER AND OUTER HARBOR CHANNEL MAINTENANCE DREDGING PROJECT, ALAMEDA COUNTY, CALIFORNIA
- Solicitation number
- W912P7-18-B-0003
About this file
W912P718B0003 Amendment 0003 7-11-2018.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Abstract_Oakland_Inner_and_Outer_Harbor_Dredging.pdf | ||
| Oakland_Harbor_O&M_Plans_Amendment_0003_11Jul18.pdf | ||
| plot.log | LOG file | |
| Questions_and_Answers__Oakland_Inner_and_Outer__July-11-2018.pdf | ||
| SF_21_OIH_20180614_BD_S&C.DXF | DXF file | |
| Oakland_Harbor_O&M_G-03.pdf | ||
| SF_21_OIH_20180614_BD_SORTED15.xyz | XYZ file | |
| SF_21_OOH_20180615_BD_SORTED15.xyz | XYZ file | |
| Oakland_InnerOuter_O&M_G-02_General.pdf | ||
| SF_21_OOH_20180615_BD_S&C.DXF | DXF file | |
| Oakland_Harbor_O&M_C-07_OUTER.pdf | ||
| W912P718B0003_Amendment_0002.pdf | ||
| W912P718B0003_Amendment_0001_7-3-2018.pdf | ||
| W912P7-18-B-0003_13Jun18.pdf | ||
| Oakland_Harbor_O&M BartTube.dwg | DWG drawing | |
| OI_FY16&17_BD_SND.DXF | DXF file | |
| Oakland_Harbor_O&M C-01_C-07.dwg | DWG drawing | |
| Oakland_Harbor_Dredging Plans_Solicitation_23May2018.pdf | ||
| OO_FY16&17_BD.XYZ | XYZ file | |
| OO_FY16&17_BD_SND.DXF | DXF file | |
| OI_FY16&17_BD.XYZ | XYZ file | |
| Oakland_InnerOuter_O&M G-01 - G-02.dwg | DWG drawing | |
| Oakland_Harbor_O&M G-03.dwg | DWG drawing |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
OAKLAND INNER AND OUTER HARBOR CHANNEL MAINTENANCE DREDGING PROJECT, ALAMEDA COUNTY, CALIFORNIA
BID OPENING DATE HAS BEEN POSTPONED TO 17 JULY 2018
ENCL): This Amendment: (1) revises SF1442 Bid Opening date, (2) revises CLINs 0003 description, (3) revises Section 01 11 00 Summary of Work paragraph 1.1.1 Requirements, and paragraph 1.1.2 Constraints, (4) revises Section 01 50 00 Temporary Construction Facilities and Controls paragraph
1.4 Construction Site Plan, (5) revises Section 01 57 19 Temporary Environmental Controls paragraph 3.2.5 Municipal Separate Storm Sewer System (MS4) Management, and pargraph 3.5.1 Preconstruction Air Permits, (6) revises Section 35 20 23 Dredging paragraph 1.3.2.2 Dredge Material Disposal Site Log (DMDSL), and Para 1.4 Quantity of Material, paragraph 1.3.2.4 Scow Certification, paragraph 1.6 Side Slopes, paragraph 1.7 Permit, paragraph
3.2.6 Disposal of Excavated Material, and 3.2.6.1 Method of Disposal, (7) revises Drawing Sheet G-02 Typical Dredging Section detail, (8) revises Drawing Sheet G-03 Note referring to Section 35 20 23, (9) revises Drawing Sheet C-04 Reach number.
1. CONTRACT ID CODE PAGE OF PAGES
1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P718B0003
X 9B. DATED (SEE ITEM 11)
13-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Jul-2018
CODE
US ARMY ENGINEER DISTRICT, SAN FRANCISCO
CONTRACTING DIVISION
1455 MARKET ST., 17TH FLOOR SUITE 1741
SAN FRANCISCO CA 94103-1398
W912P7 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
x
Contra Costa County. This project has a Base for the FY18 Dredge Cycle to dredge the Inner and Outer Harbor to -50-f t (MLLW) plus 1-ft of paid over-depth to be transported and placed at a Contractor-furnished permitted beneficial use upland site and a portion of Reach 10 in the Outer harbor to be transported and disposed at the Government-furnished deep ocean disposal site SF-DODS.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
W912P718B0003
2. TYPE OF SOLICITATION 3. DATE ISSUED
12-Jun-2018
PAGE OF PAGES
X SEALED BID (IFB)
NEGOTIATED (RFP)
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
7. ISSUED BY CODE W912P7 8. ADDRESS OFFER TO (If Other Than Item 7) CODE
US ARMY ENGINEER DISTRICT, SAN FRANCISCO
CONTRACTING DIVISION
1455 MARKET ST., 17TH FLOOR SUITE 1741
SAN FRANCISCO CA 94103-1398
TEL: FAX:
See Item 7
TEL: FAX:
9. FOR INFORMATION
CALL:
A. NAME
JAMES E GARROR
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
415-503-6988
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
OAKLAND INNER AND OUTER HARBOR MAINTENANCE DREDGING PROJECT, ALAMEDA COUNTY, CALIFORNIA
PROJECT DESCRIPTION: The work includes annual maintenance dredging for the Oakland Inner and Outer Harbor federal navigation channel in
This requirement is for an Unrestricted Competition. It will be issued as an Invitation for Bids (IFB) which will result in the award of a single
Firm Fixed price (FFP) contract.
The North American Industry Classification System (NAICS) Code applicable to this acquisition is: 237990
ESTIMATED COST RANGE IS BETWEEN: $25,000,000 - $100,000,000
11. The Contractor shall begin performance within 5 calendar days and complete it within 140 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See 52.211-10 .)
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12B. CALENDAR DAYS
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed of fers in original and 1 copies to perf orm the work required are due at the place specified in Item 8 by 10:00 AM (hour) local time 17 Jul 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing of fers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An of fer guarantee X is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Off ers providing less than 60 calendar days f or Government acceptance af ter the date off ers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912P718B0003
SECTION 00 10 00
PRICING SCHEDULE
THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL,
EQUIPMENT, NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE
WITH THE TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO
INCLUDE ALL ATTACHMENTS THERETO.
Item Description Quantity Unit Unit Price Amount
BASE BID ITEMS – OAKLAND INNER AND OUTER HARBOR FY18 DREDGING CYCLE WITH
DISPOSAL AT A CONTRACTOR-FURNISHED PERMITTED BENEFICIAL REUSE UPLAND SITE
AND AT THE GOVERNMENT-FURNISHED DEEP OCEAN DISPOSAL SITE (SF-DODS)
0001 Mobilization and Demobilization, FY18 Dredging Cycle 1 Job $_______ $________
0002 Dredging, FY18 Dredging Cycle, Reaches 1-10A (cover) to -50-ft (MLLW) including 1-foot of Paid Overdepth with disposal at Beneficial Reuse Upland site.
0002AA Required Dredging to -50-ft MLLW at Oakland Harbor 405,000 CY $______ $_______
0002AB Overdepth Dredging to -51-ft MLLW at Oakland Harbor 200,000 CY $______ $_______
0003 Dredging, FY18 Dredging Cycle, Reaches 1-10AB (cover) & Reach 10B (non-cover) to -50-ft (MLLW) including 1-foot of Paid Overdepth with disposal at SF-DODS.
0003AA Required Dredging to -50-ft MLLW at Oakland Harbor 75,000 CY $______ $_______
0003AB Overdepth Dredging to -51-ft MLLW at Oakland Harbor 70,000 CY $______ $_______
TOTAL BID PRICE (Item 0001 + Item 0002 + Item 0003) $______________
W912P718B0003
Notes:
*QUANTITY IS AN ESTIMATED AMOUNT, SEE SECTION 00 72 00, FAR 52.211-18.
1. To be considered responsive, prices must be submitted on all individual items within the Bid Schedule. Failure to do so may be cause for rejection of bids.
2. Bidders must complete and submit attached “Dredging Plant and Equipment Schedule”, forms Page 1 and Page 2 as part of their solicitation package for bid evaluation. Failure to do so may cause the bid to be considered nonresponsive. The Contractor shall demonstrate that all necessary equipment will be available and committed to this contract.
3. The term "Job", which appears on the Pricing Schedule (Section 00 10
00) under “Unit” for BASE BID ITEM 0001, shall be considered as a Lump Sum. The Variation in Quantity contract clause, FAR 52.211-18, shall not apply to BASE BID ITEM 0001.
4. BASIS of AWARD: The contract will be awarded in accordance with FAR 52.214-19 Contract Award – Sealed Bidding – Construction.
5. The Government reserves the right to direct the Contractor to place dredged material at an environmentally acceptable alternate disposal site in accordance with the Change Clause FAR 52.243-4.
- End of Document –
Section 01 11 00
SECTION 01 11 00
SUMMARY OF WORK
1 PART 1 GENERAL
1.1 PROJECT DESCRIPTION
The work includes annual maintenance dredging of the federal navigation channel in Oakland Inner and Outer Harbor, which cannot begin before 1 August in any year.
1.1.1 Requirements
• Dredge Oakland Inner and Outer Harbor Channel to -50-ft MLLW for acceptance.
• The Contractor shall place all Base FY18 Dredging Episode dredged material, up to a maximum ofthe first 605,000 cubic yards (including paid and non-paid overdepth) from Reaches 1-10A at the Contractor-furnished permitted beneficial use upland site. All remainingAny additional dredged material mayshall be disposed at SF-DODS, or at a Contractor-furnished upland site that is permitted to receive non-cover )foundation) dredged material.
• The Government will be performing water quality monitoring of the mandatory decanting from scows in accordance with Section TEMPORARY ENVIRONMENTAL CONTROLS 01 57 19-1.9 and 3.1.4. The Contractor shall coordinate with the Government-appointed monitoring contractor on a daily basis while monitoring is occurring.
• The Government will be performing light monitoring while dredging operations are within a 250-meter boundary surrounding eelgrass beds shown in the drawing sheets of the Oakland Inner and Outer Harbor Channel, and in accordance with Section TEMPORARY ENVIRONMENTAL CONTROLS 01 57 19-1.9 and 3.1.5. The Contractor shall coordinate with the Government-appointed monitoring contractor on a daily basis while monitoring is occurring.
• Contractor shall submit Dredged Material Disposal Site Logs on a weekly basis in accordance with Section DREDGING 35 20 23-1.2.1.4.2.
• Independent Scow Certification is required for ocean disposal operations if Alternative 1 Option is awarded, or as ocean disposal is otherwise directed by the COR, in accordance with Section DREDGING 35 20 23-1.2.1.4.4.
1.1.2 Constraints
• Hopper dredging is prohibited for this project.
• All dredging operations after November 30 must include herring observers in accordance with Section TEMPORARY ENVIRONMENTAL CONTROLS 01 57 19-3.1.6.
Section 01 11 00 otherwise specified in these contract documents. The Government has provided the requirements of the Water Quality Certification in accordance with the Clean Water Act, and the requirements of the Coastal Zone Management Act Consistency Notification. The Contractor shall comply with these requirements and provisions in these contract specifications included in Sections TEMPPORARY ENVIRONMENTAL CONTROLSPROTECTION 01 57 1920.00 10 and
DREDGING 35 20 23.
1.5 PUBLIC SAFETY
The Contractor shall provide guard personnel as required to provide protection in the interest of public safety. Whenever the Contractor's operations create a condition hazardous to the public, he shall furnish at his own expense and without cost to the Government, such guards as are necessary to give adequate warning to the public of any dangerous conditions to be encountered, and he shall furnish, erect, or maintain such lights, signs and other devices as are necessary to prevent accidents and to avoid damage or injury to the public. Flagmen and guards, while on duty and assigned to give warning to the public that the dredging is being accomplished, and of any dangerous conditions to be encountered as a result thereof, shall be equipped with appropriate safety equipment and a red flag.
Signs, flags, lights, and other warning and safety devices shall conform to applicable city, county, and state requirements. Should the Contractor appear to be negligent in furnishing adequate warning and protective measures, the Contracting Officer will direct attention to the existence of a hazard, and the necessary warning and protective measures shall be furnished and installed by the Contractor without additional cost to the Government. The installation of any general illumination shall not relieve the Contractor of his responsibility for furnishing and maintaining all devices necessary to provide protection to all parties concerned.
1.6 PUBLIC UTILITIES AND PRIVATE IMPROVEMENTS
The Contractor's attention is directed to the possible existence of pipelines or public utilities or private improvements shown or not shown on the drawings which may be buried within the limits of the work or adjacent thereto. The Contractor shall take care to preserve and protect any such improvements from injury or damage during construction operations. Utilities or improvements, whether buried or not, which cannot be determined to exist through visual inspection by the Contractor, if inadvertently damaged by the Contractor's operations, shall be promptly repaired or replaced by the Contractor, and an equitable adjustment in the amount due under the contract will be made as provided in the contract. The Contractor shall notify the Contracting Officer immediately if any utility or structure has been damaged by the Contractor. The Contractor shall assume full responsibility for reimbursing the owners for any damage to their properties, utilities, or improvements, or interference with their services caused through the dredging operations. The Contractor is not relieved from the responsibility set forth in "FAR 52.236-3, Site Investigation and Conditions Affecting the Work" except as provided above.
Section 01 50 00
SECTION 01 50 00
TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
1 PART 1 GENERAL
1.1 SUMMARY
Requirements of this Section apply to, and are a component of, each section of the specifications.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP 310-1-6a (2006) Sign Standards Manual, Volume 1
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals having an "I" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Construction site plan; G 01 50 00-1.4
1.4 CONSTRUCTION SITE PLAN
Prior to the start of work, submit a site plan showing the locations and dimensions of temporary facilities (including layouts and details, equipment and material storage area (onsite and offsite), and access and haul routes, avenues of ingress/egress to the fenced area and details of the fence installation. Identify any areas which may have to be graveled to prevent the tracking of mud. Indicate if the use of a supplemental or other staging area is desired. Show locations of safety and construction fences, site trailers, construction entrances, trash dumpsters, temporary sanitary facilities, and worker parking areas. The Port of Oakland is providing a site where a project trailer can be placed temporarily. The site is located near Berth 40 on 7th Street. Conditions for use:
1) The Contractor will need to sign a Temporary Space Assignment with the Port of Oakland. The Port will provide a copy if needed.
2) Contractor will need to pay the rental fee and provide insurance.
3) The Port of Oakland point of contact is Ralph Reynoso, 510-627-1313 or rreynoso@portoakland.com.
file://Spn-fs1sfo.spn.ds.usace.army.mil/cespn/BRANCH_FOLDERS/ENGINEERING/Civil_Design/Oakland2012_Inner&Outer_O&M/01%2033%2000.doc
Section 01 50 00
4) Other conditions may apply depending on use.
2 PART 2 PRODUCTS
2.1 TEMPORARY SIGNAGE
2.1.1 Bulletin Board
2.1.1.1 General
Construct and erect a bulletin board that is accessible to all employees at all times, contains a copy of wage rates, equal opportunity notice, and other such items required to be posted. Mount the bulletin board at a highly visible location on the dredge(s), or erect at the location directed by the Contracting Officer. The bulletin boards shall be erected as soon as possible and within 5 days after date of receipt of notice to proceed.
The Bulletin Boards may also contain the Section 01 35 26 GOVERNMENTAL
SAFETY REQUIREMENTS.
2.1.1.2 Construction
The bulletin boards shall be weatherproof, approximately 36 inches wide and 30 inches high, with hinged glass door. Bulletin board shall be painted or have approved factory finish. (Detail information about specifications for materials, fabrication techniques, and installation of signs and posts, please refer to http://www.publications.usace.army.mil/Portals/76/Publications/EngineerPamp hlets/EP_310-1-6b.pdf, Appendix B).
2.1.1.3 Maintenance and Disposal
Maintain the bulletin boards in good condition throughout the life of the contract. The bulletin boards shall remain the property of the Contractor and upon completion the contract, remove from the site.
2.1.2 Project and Signs
The construction site, dredge(s) and survey boat(s) shall each have a project sign mounted at a highly visible location at the site and on the dredge(s) and the survey boat(s) as designated by the Contracting Officer Representative. The construction package signs shall be constructed in accordance with USACE Engineer Pamphlets, EP 310-1-6a, Section 16.
Construction Project Signs and can be found at the website http://www.publications.usace.army.mil/Portals/76/Publications/EngineerPamph lets/EP_310-1-6_A.pdf
Figure 1 is "Project Identification Sign" and Figure 2 shows on-the-job "Safety Performance Sign" of the contractor. These two signs are to be displayed side by side and mounted for reading by passing viewers. The panel sizes and graphic formats have been standardized for visual consistency throughout all Corps operations. Panels are fabricated using HDO (High Density Overlaid) plywood with dimensional lumber uprights and bracing. The sign faces are non-reflective vinyl. All legends are to be die-out or computer-cut in the sizes and typefaces specified and applied to file://Spn-fs1sfo.spn.ds.usace.army.mil/cespn/BRANCH_FOLDERS/ENGINEERING/Civil_Design/Oakland2012_Inner&Outer_O&M/01%2035%2026.doc http://www.publications.usace.army.mil/Portals/76/Publications/EngineerPamphlets/EP_310-1-6b.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerPamphlets/EP_310-1-6b.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerPamphlets/EP_310-1-6_A.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerPamphlets/EP_310-1-6_A.pdf
Section 01 57 19
3.2.1.2 Stormwater Notice of Intent for Construction Activities
Not Used.
3.2.1.3 Inspection Reports
3.2.1.4 Stormwater Pollution Prevention Plan Compliance Notebook
3.2.1.5 Stormwater Notice of Termination for Construction Activities
3.2.2 Erosion and Sediment Control Measures
3.2.2.1 Erosion Control
3.2.2.2 Sediment Control Practices
3.2.3 Work Area Limits
Mark the areas that need not be disturbed under this Contract prior to commencing construction activities. Mark or fence isolated areas within the general work area that are not to be disturbed. Protect monuments and markers before construction operations commence. Where construction operations are to be conducted during darkness, any markers must be visible in the dark. Personnel must be knowledgeable of the purpose for marking and protecting particular objects.
3.2.4 Contractor Facilities and Work Areas
Place field offices, staging areas, stockpile storage, and temporary buildings in areas designated on the drawings or as directed by the Contracting Officer. Move or relocate the Contractor facilities only when approved by the Government. Provide erosion and sediment controls for onsite borrow and spoil areas to prevent sediment from entering nearby waters. Control temporary excavation and embankments for plant or work areas to protect adjacent areas.
3.2.5 Municipal Separate Storm Sewer System (MS4) Management
Not UsedComply with the Installation's MS4 permit requirements.
3.3 SURFACE AND GROUNDWATER
3.3.1 Cofferdams, Diversions, and Dewatering
3.3.2 Waters of the United States
Do not enter, disturb, destroy, or allow discharge of contaminants into waters of the United States. The protection of waters of the United States shown on the drawings in accordance with paragraph LICENSES AND PERMITS is the Contractor's responsibility. Authorization to enter specific waters of the United States identified does not relieve the Contractor from any obligation to protect other waters of the United States within, adjacent to, or in the vicinity of the construction site and associated boundaries.]
3.4 PROTECTION OF CULTURAL RESOURCES
3.4.1 Archaeological Resources
Existing archaeological resources within the work area are shown on the drawings. Protect these resources and be responsible for their preservation during the life of the Contract. If, during excavation or other construction activities, any previously unidentified or unanticipated historical, archaeological, and cultural resources are discovered or found, activities that may damage or alter such resources will be suspended.
Resources covered by this paragraph include, but are not limited to: any human skeletal remains or burials; artifacts; shell, midden, bone, charcoal, or other deposits; rock or coral alignments, pavings, wall, or other constructed features; and any indication of agricultural or other human activities. Upon such discovery or find, immediately notify the Contracting Officer so that the appropriate authorities may be notified and a determination made as to their significance and what, if any, special disposition of the finds should be made. Cease all activities that may result in impact to or the destruction of these resources. Secure the area and prevent employees or other persons from trespassing on, removing, or otherwise disturbing such resources. The Government retains ownership and control over archaeological resources.
In the unlikely event that any of the resources listed above are discovered during maintenance dredging in the federal channels, USACE will immediately cease dredging, notify Water Board staff, and consult a qualified expert for the particular resource discovered (e.g., archeologist, paleontologist, local coroner, Native American Heritage Commission).
3.4.2 Historical Resources
3.5 AIR RESOURCES
Equipment operation, activities, or processes will be in accordance with 40 CFR 64 and state air emission and performance laws and standards.
3.5.1 Preconstruction Air Permits
Notify the Air Program Manager, through the Contracting Officer, at least 6 months prior to bringing equipment, assembled or unassembled, onto the Installation, so that air permits can be secured. Necessary permitting time must be considered in regard to construction activities. Clean Air Act (CAA) permits issued by the California Air Resource Board must be obtained prior to bringing equipment, assembled or unassembled, onto the Installation.
Confirm that these permits have been obtained.
3.5.2 Oil or Dual-fuel Boilers and Furnaces
Provide product data and details for new, replacement, or relocated fuel fired boilers, heaters, or furnaces to the Installation Environmental Office (Air Program Manager) through the Contracting Officer. Data to be reported include: equipment purpose (water heater, building heat, process), manufacturer, model number, serial number, fuel type (oil type, gas type) size (MMBTU heat input). Provide in accordance with paragraph
PRECONSTRUCTION AIR PERMITS.
3.5.3 Burning
Burning is prohibited on the Government premises.
3.5.4 Class I and II ODS Prohibition
Class I and II ODS are Government property and must be returned to the Government for appropriate management. Coordinate with the Installation Environmental Office to determine the appropriate location for turn in of all reclaimed refrigerant.
3.5.5 Accidental Venting of Refrigerant
Accidental venting of a refrigerant is a release and must be reported immediately to the Contracting Officer.
3.5.6 EPA Certification Requirements
Heating and air conditioning technicians must be certified through an EPA-approved program. Maintain copies of certifications at the employees' places of business; technicians must carry certification wallet cards, as provided by environmental law.
3.5.7 Dust Control
Keep dust down at all times, including during nonworking periods. Dry power brooming will not be permitted. Instead, use vacuuming, wet mopping, wet sweeping, or wet power brooming. Air blowing will be permitted only for cleaning nonparticulate debris such as steel reinforcing bars. Only wet cutting will be permitted for cutting concrete blocks, concrete, and bituminous concrete. Do not unnecessarily shake bags of cement, concrete mortar, or plaster.
3.5.7.1 Particulates
Dust particles, aerosols and gaseous by-products from construction activities, and processing and preparation of materials (such as from asphaltic batch plants) must be controlled at all times, including weekends, holidays, and hours when work is not in progress. Maintain excavations, stockpiles, haul roads, permanent and temporary access roads, plant sites, spoil areas, borrow areas, and other work areas within or outside the project boundaries free from particulates that would exceed 40 CFR 50, Section 35 20 23
1.3.2.2 Dredge Material Disposal Site Log (DMDSL)
Submit a DMDSL on a weekly basis by noon Monday that enumerates work accomplished during the preceding week. Every Monday, the Contractor shall email the prior week's DMDSL data to the COR, and Chris Eng Christopher.K.Eng@usace.army.mil and Stephen Willis Stephen.M.Willis@usace.army.mil.
Include the Corps permit number and dredge episode number. Maintain a DMDSL using the "Dredge Material Disposal Site Log" form in Attachment 2 at the end of this section.
1.3.2.3 DDLS Report/Data
Submit electronic copies of the DDLS positional data for all dredge equipment and all disposal/fill vessels utilized; and dredged quantity, sediment type and GPS positional data on the dredge and disposal or fill locations for all scows and barges. This electronic data shall be included in the daily CQC Report submitted in RMS.
1.3.2.4 Scow Certification for Disposal at SF-DODS (Where Applicable)
The Contractor shall acquire the services of a third party to complete the checklist included in the Scow Certification Checklist (Attachment 3 at the end of this section) and certify it prior to departing the dredging site for deep ocean disposal only. All completed scow certification checklists shall be submitted to the Contracting Officer at the end of each week as part of the CQC Report. No vessel shall commence transit without such verification and notation in the daily quality control report.
1.4 QUANTITY OF MATERIAL
The total estimated amount of material to be removed from within the specified limits, including side slopes, but excluding overdepths, is 480,000 cubic yards for the FY18 dredging episode. The maximum amount of allowable overdepth dredging is estimated to be 540,000 cubic yards for the FY18 dredging episode. The estimated quantity for bidding purposes and for application of the FAR 52.211-18 Variation in Estimated Quantity shall be 750,000 cubic yards for the FY18 dredging episode, which is the total quantity, including overdepth. The quantities listed are estimates only. Within the limits of available funds, complete the work specified whether the quantities involved are greater or less than those estimated.
1.5 OVERDEPTH DREDGING
To cover unavoidable inaccuracies of dredging processes, material actually removed to a depth of 1 foot below the depth specified and within the dredging limits will be measured and paid for at full contract price. The Contractor is allowed to dredge to not more than 2 feet below the depth specified and within the dredging limits.
mailto:Christopher.K.Eng@usace.army.mil mailto:Stephen.M.Willis@usace.army.mil
1.6 SIDE SLOPES
Dredging on side slopes is prohibited. Material that sloughs from side slope into channel and is removed will be paid as evidenced by before- and after-dredge surveys.
1.7 PERMIT
All work shall be performed in accordance with the conditions and requirements included in the state and federal permits applicable to this project. Copies of the 2017-2019 San Francisco Bay Regional Water Quality Control Board Waste Discharge Requirements and the 2015-2019 Consistency Determination Consistency Notification will be made available upon request.
1.8 CHARGES (Where Applicable)
The Contractor will pay charges imposed by the permitted beneficial use upland site for disposal of material in the beneficial use placement area.
1.9 ENVIRONMENTAL PROTECTION REQUIREMENTS
Provide and maintain during the life of the contract, environmental protective measures. Also, provide environmental protective measures required to correct conditions, such as oil spills or debris, which occur during the dredging operations. Comply with Federal, State, and local regulations pertaining to water, air, and noise pollution.
1.10 BASIS FOR BIDS
For unit price bid, see Section 00 10 00 "Pricing Schedule".
Payment will be at the contract unit price per cubic yard, multiplied by total cubic yards of acceptable dredging. Base bids on total cubic yards of dredging. Include a bid unit price per cubic yard of dredging based on the quantity as specified or indicated. If the Contracting Officer requires an increase or a decrease in total volume of dredging, the contract price will be adjusted in accordance with the FAR 52.211-18 Variation in Estimated Quantity. Dredging conditions specified and indicated describe conditions which are known. However, the Contractor is responsible for other conditions encountered which are not unusual when compared to conditions recognized in the dredging business as usual in dredging activities such as those required under this contract.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 INSPECTION
3.2.3 Lights
Each night, between sunset and sunrise and during periods of restricted visibility, provide lights for floating plants, pipelines, ranges, and markers. Also, provide lights for buoys that could endanger or obstruct navigation. When night work is in progress, maintain lights from sunset to sunrise for the observation of dredging operations. Lighting shall conform to United States Coast Guard requirements for visibility and color.
3.2.4 Ranges, Gages, and Lines
Furnish, set, and maintain ranges, buoys, and markers needed to define the work and to facilitate inspection. Establish and maintain gages in locations observable from each part of the work so that the depth may be determined. Suspend dredging when the gages or ranges cannot be seen or followed. The Contracting Officer will furnish, upon request by the Contractor, survey lines, points, and elevations necessary for the setting of ranges, gages, and buoys.
3.2.5 Plant
Maintain the plant, scows, coamings, barges, pipelines, and associated equipment to meet the requirements of the work. Promptly repair leaks or breaks along pipelines. Remove dredged material placed due to leaks and breaks.
3.2.6 Disposal of Excavated Material
Provide for safe transportation and disposal of dredged materials. Transport and dispose of dredged material at the Contractor-furnished permitted beneficial use upland site for the Base contract FY18 dredging episode, unless otherwise directed by the Contracting Officer. Transport and dispose dredged material at the awarded Alternative Option FY19 dredging episode disposal site, unless otherwise directed by the Contracting Officer. The deposit of dredged materials in unauthorized places is forbidden. Comply with rules and regulations of local port and harbor governing authorities.
3.2.6.1 Method of Disposal
Deposit dredged material at Contractor-furnished beneficial use upland placement site by scow or barge, and using an appropriate method to unload scow/barge to place material within the upland site. If directed by the Contracting Officer under FAR 52.243-4, or if awarded Alternative Option 1 FY19 dredging episode, deposit dredged material at the Government-furnished deep ocean disposal site SF-DODS, using self-dumping scows or barge.
3.2.6.2 Disposal in Indicated Fill Areas
In depositing excavated material for fill, uniformly grade and allow for shrinkage. Provide and maintain necessary bulkheads, dikes, ditches, weirs, spillways, and other construction necessary to confine and retain the fill in the dredge fill area.
3.2.6.3 Submerged Pipeline
| Amendment_01 11 00_SUMMARY OF WORK_11Jul18.pdf |
| 1 PART 1 GENERAL |
| 1.1 PROJECT DESCRIPTION |
| 1.1.1 Requirements |
| 1.1.2 Constraints |
| 1.5 PUBLIC SAFETY |
| 1.6 PUBLIC UTILITIES AND PRIVATE IMPROVEMENTS |
| Amendment_01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS_10Jul18.pdf |
| 1.1 SUMMARY |
| 1.2 REFERENCES |
| 1 PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 CONSTRUCTION SITE PLAN |
| 2 PART 2 PRODUCTS |
| 2.1 TEMPORARY SIGNAGE |
| 2.1.1 Bulletin Board |
| 2.1.1.1 General |
| 2.1.1.2 Construction |
| 2.1.1.3 Maintenance and Disposal |
2.1.2 Project and Signs
3 PART 3 EXECUTION
| Amendment_01 57 19_TEMPORARY ENVIRONMENTAL CONTROLS_10Jul18.pdf |
| 11/15 |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 Class I and II Ozone Depleting Substance (ODS) |
| 1.2.2 Contractor Generated Hazardous Waste |
| 1.2.3 Electronics Waste |
| 1.2.4 Environmental Pollution and Damage |
| 1.2.5 Environmental Protection |
| 1.2.6 Hazardous Debris |
| 1.2.7 Hazardous Materials |
| 1.2.8 Hazardous Waste |
| 1.2.9 Installation Pest Management Coordinator |
| 1.2.10 Land Application |
| 1.2.11 Municipal Separate Storm Sewer System (MS4) Permit |
| 1.2.12 National Pollutant Discharge Elimination System (NPDES) |
| 1.2.13 Oily Waste |
| 1.2.14 Pesticide |
| 1.2.15 Pesticide Treatment Plan |
| 1.2.16 Pests |
| 1.2.17 Project Pesticide Coordinator |
| 1.2.18 Regulated Waste |
| 1.2.19 Sediment |
| 1.2.20 Solid Waste |
| 1.2.20.1 Debris |
| 1.2.20.2 Green Waste |
| 1.2.20.3 Material not regulated as solid waste |
| 1.2.20.4 Non-Hazardous Waste |
| 1.2.20.5 Recyclables |
| 1.2.20.6 Surplus Soil |
| 1.2.20.7 Scrap Metal |
| 1.2.20.8 Wood |
| 1.2.21 Surface Discharge |
| 1.2.22 Wastewater |
| 1.2.22.1 Stormwater |
| 1.2.23 Waters of the United States |
| 1.2.24 Wetlands |
| 1.2.25 Universal Waste |
| 1.3 SUBMITTALS |
| 1.4 ENVIRONMENTAL PROTECTION REQUIREMENTS |
| 1.4.1 Training in Environmental Compliance Assessment Training and Tracking System (ECATTS) |
| 1.4.2 Conformance with the Environmental Management System |
| 1.5 SPECIAL ENVIRONMENTAL REQUIREMENTS |
| 1.6 QUALITY ASSURANCE |
| 1.6.1 Preconstruction Survey and Protection of Features |
| 1.6.2 Regulatory Notifications |
| 1.6.3 Environmental Brief |
| 1.6.4 Environmental Manager |
| 1.6.5 Employee Training Records |
| 1.6.5.1 Pest Control Training |
1.6.6 Non-Compliance Notifications
| 1.7 ENVIRONMENTAL PROTECTION PLAN |
| 1.7.1 General Overview and Purpose |
| 1.7.1.1 Descriptions |
| 1.7.1.2 Duties |
| 1.7.1.3 Procedures |
| 1.7.1.4 Communications |
| 1.7.1.5 Contact Information |
| 1.7.2 General Site Information |
| 1.7.2.1 Drawings |
| 1.7.2.2 Work Area |
| 1.7.2.3 Documentation |
| 1.7.3 Management of Natural Resources |
| 1.7.4 Protection of Historical and Archaeological Resources |
| 1.7.5 Stormwater Management and Control |
| 1.7.6 Protection of the Environment from Waste Derived from Contractor Operations |
| 1.7.7 Prevention of Releases to the Environment |
| 1.7.8 Regulatory Notification and Permits |
| 1.7.9 Clean Air Act Compliance |
| 1.7.9.1 Haul Route |
| 1.7.9.2 Pollution Generating Equipment |
| 1.7.9.3 Stationary Internal Combustion Engines |
| 1.7.9.4 Refrigerants |
| 1.7.9.5 Air Pollution-engineering Processes |
| 1.7.9.6 Monitoring |
| 1.7.9.7 Compliant Materials |
| 1.8 LICENSES AND PERMITS |
| 1.9 ENVIRONMENTAL RECORDS BINDER |
| 1.10 PESTICIDE DELIVERY, STORAGE, AND HANDLING |
| 1.11 SOLID WASTE MANAGEMENT PERMIT |
| 1.11.1 Solid Waste Management Report |
1.12 FACILITY HAZARDOUS WASTE GENERATOR STATUS
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 PROTECTION OF NATURAL RESOURCES |
| 3.1.1 Flow Ways |
| 3.1.2 Vegetation |
| 3.1.3 Streams |
| 3.2 STORMWATER |
| 3.2.1 Construction General Permit |
| 3.2.1.1 Stormwater Pollution Prevention Plan |
| 3.2.1.2 Stormwater Notice of Intent for Construction Activities |
| 3.2.1.3 Inspection Reports |
| 3.2.1.4 Stormwater Pollution Prevention Plan Compliance Notebook |
| 3.2.1.5 Stormwater Notice of Termination for Construction Activities |
| 3.2.2 Erosion and Sediment Control Measures |
| 3.2.2.1 Erosion Control |
| 3.2.2.2 Sediment Control Practices |
| 3.2.3 Work Area Limits |
| 3.2.4 Contractor Facilities and Work Areas |
| 3.2.5 Municipal Separate Storm Sewer System (MS4) Management |
| 3.3 SURFACE AND GROUNDWATER |
| 3.3.1 Cofferdams, Diversions, and Dewatering |
| 3.3.2 Waters of the United States |
| 3.4 PROTECTION OF CULTURAL RESOURCES |
| 3.4.1 Archaeological Resources |
| 3.4.2 Historical Resources |
| 3.5 AIR RESOURCES |
| 3.5.1 Preconstruction Air Permits |
| 3.5.2 Oil or Dual-fuel Boilers and Furnaces |
| 3.5.3 Burning |
| 3.5.4 Class I and II ODS Prohibition |
| 3.5.5 Accidental Venting of Refrigerant |
| 3.5.6 EPA Certification Requirements |
| 3.5.7 Dust Control |
| 3.5.7.1 Particulates |
| 3.5.7.2 Abrasive Blasting |
3.5.8 Odors
| 3.6 WASTE MINIMIZATION |
| 3.6.1 Salvage, Reuse and Recycle |
| 3.6.2 Nonhazardous Solid Waste Diversion Report |
| 3.7 WASTE MANAGEMENT AND DISPOSAL |
| 3.7.1 Waste Determination Documentation |
| 3.7.1.1 Sampling and Analysis of Waste |
| 3.7.1.1.1 Waste Sampling |
| 3.7.1.1.2 Laboratory Analysis |
| 3.7.1.1.3 Analysis Type |
| 3.7.2 Solid Waste Management |
| 3.7.2.1 Solid Waste Management Report |
| 3.7.2.2 Control and Management of Solid Wastes |
| 3.7.3 Control and Management of Hazardous Waste |
| 3.7.3.1 Hazardous Waste/Debris Management |
| 3.7.3.2 Waste Storage/Satellite Accumulation/90 Day Storage Areas |
| 3.7.3.3 Hazardous Waste Disposal |
| 3.7.4 Releases/Spills of Oil and Hazardous Substances |
| 3.7.4.1 Response and Notifications |
| 3.7.4.2 Clean Up |
| 3.7.5 Mercury Materials |
| 3.7.6 Wastewater |
| 3.7.6.1 Disposal of wastewater must be as specified below. |
| 3.7.6.1.1 Treatment |
| 3.7.6.1.2 Surface Discharge |
| 3.7.6.1.3 Land Application |
| 3.8 HAZARDOUS MATERIAL MANAGEMENT |
| 3.9 PREVIOUSLY USED EQUIPMENT |
| 3.10 CONTROL AND MANAGEMENT OF ASBESTOS-CONTAINING MATERIAL (ACM) |
| 3.11 CONTROL AND MANAGEMENT OF LEAD-BASED PAINT (LBP) |
| 3.12 CONTROL AND MANAGEMENT OF POLYCHLORINATED BIPHENYLS (PCBS) |
| 3.13 CONTROL AND MANAGEMENT OF LIGHTING BALLAST AND LAMPS CONTAINING PCBS |
| 3.14 MILITARY MUNITIONS |
| 3.15 PETROLEUM, OIL, LUBRICANT (POL) STORAGE AND FUELING |
| 3.15.1 Used Oil Management |
| 3.15.2 Oil Storage Including Fuel Tanks |
| 3.16 INADVERTENT DISCOVERY OF PETROLEUM-CONTAMINATED SOIL OR HAZARDOUS WASTES |
| 3.17 PEST MANAGEMENT |
| 3.18 CHLORDANE |
| 3.19 SOUND INTRUSION |
| 3.20 POST CONSTRUCTION CLEANUP |
| Amendmnet_35 20 23_DREDGING(Updated)_9Jul18.pdf |
| 1.1 DEFINITIONS |
| 1.2 SUBMITTALS |
| 1.3 MATERIAL TO BE REMOVED |
| 1.3.2.3 DDLS Report/Data |
| 3.2.2.1 Compensation for Interruption of Operations |
| PART 1 GENERAL |
| 1.1 DEFINITION |
| 1.2 SUBMITTALS |
| 1.3 MATERIAL TO BE REMOVED |
| 1.3.1 Hard Material |
| 1.4 QUANTITY OF MATERIAL |
| 1.5 OVERDEPTH DREDGING |
| 1.6 SIDE SLOPES |
| 1.7 PERMIT |
| 1.8 CHARGES (Where Applicable) |
| 1.9 ENVIRONMENTAL PROTECTION REQUIREMENTS |
| 1.10 BASIS FOR BIDS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 INSPECTION |
| 3.2 CONDUCT OF DREDGING WORK |
| 3.2.1 Order of Work |
| 3.2.2 Interference with Navigation |
| 3.2.3 Lights |
| 3.2.4 Ranges, Gages, and Lines |
| 3.2.5 Plant |
| 3.2.6 Disposal of Excavated Material |
| 3.2.6.1 Method of Disposal |
| 3.2.6.2 Disposal in Indicated Fill Areas |
| 3.2.6.3 Submerged Pipeline |
| Barring, dragging and all other methods of bed leveling are prohibited. |
| 3.2.7 Navigation Warnings |
| 3.2.8 Method of Communication |
| 3.2.9 Salvaged Material |
| 3.2.10 Safety of Structures |
| 3.2.11 Plant Removal |
| 3.3 MEASUREMENT |
| 3.3.1 Method of Measurement |
| 3.3.2 Surveys During Progress of Work |
3.4 FINAL EXAMINATION AND ACCEPTANCE