W912P718B0001 AMENDMENT 0002

View the file

Other files

File Type Posted
Bid_Results_Richmond_Inner_Harbor.pdf PDF
Questions_and_Answers__Richmond__Inner_Harbor_August_8-21-2017.pdf PDF
SF_07_RIH_20170609_BD_SORTED15.xyz XYZ file
DWF6 ePlot.pc3 —
RI-1b.jpg JPG image
DWG To PDF.pc3 —
Richmond_O&M_2018_Plans_Amendment.pdf PDF
Richmond O&M 2018 TXT text file
Richmond O&M 2018 —
Arial.ttf TTF file
Richmond_Inner_O&M_2018 —
SF_07_RIH_20170609_BD_S&C.dxf DXF file
monochrome 2.ctb —
SF_07_RIH_20180803_CS_R4&11_SORTED15.XYZ XYZ file
Richmond_Inner_O&M_2018-LK REVISED.dwg DWG drawing
RI-2b.jpg JPG image
acad.fmp —
ariali.ttf TTF file
DWG To PDF 600 dpi image.pc3 —
arialbd.ttf TTF file
RI-3b.jpg JPG image
calibri.ttf TTF file
arialbi.ttf TTF file
ltypeshp.shx —
SF_07_RIH_20170609_BD_SORTED15.xyz XYZ file
romans.shx —
SF_07_RIH_20180803_CS_R4&11_SOUNDINGS.dxf DXF file
txt.shx —
ariblk.ttf TTF file
architectural imperial.dwt —
Richmond_O&M_2018_(Amendment)_-_Standard.zip ZIP file
W912P718B0001_AMENDMENT_0001.pdf PDF
SF_07_RIH_20170609_BD_S&C.dxf DXF file
Solicitation Drawings.pdf PDF
Richmond_Inner_O&M_2018 —
Richmond_Inner_O&M_2018.dwg DWG drawing
W912P7-18-B-0001_JULY_18_2018.pdf PDF
SF_07_RIH_20170609_BD_SORTED15.xyz XYZ file
Richmond_Inner_O&M_2018_(G01_-_G03).dwg DWG drawing
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

RICHMOND INNER HABOR CHANNEL MAINTENANCE DREDGING PROJECT, CONTRA COSTA COUNTY, CALIFORNIA

BID OPENING DATE HAS BEEN POSTPONED TO 27 AUGUST 2018.

THIS AMENDMENT (1) revises see Continuation page of SF 30 Amendment of Solicitation/Modification of Contract Changes.

1. CONTRACT ID CODE PAGE OF PAGES

1 110

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P718B0001

X 9B. DATED (SEE ITEM 11)

18-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Aug-2018

CODE

US ARMY ENGINEER DISTRICT, SAN FRANCISCO

CONTRACTING DIVISION

1455 MARKET ST., 17TH FLOOR SUITE 1741

SAN FRANCISCO CA 94103-1398

W912P7 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P7-18-B-0001

Continuation page of SF 30 Amendment of Solicitation/Modification of Contract Changes

SF Form 1442

• Revised Block 10, Project Description.

• Revised Block11, period of performance.

• Revised Block 13, Bid Open date.

Section 00 00 10 Pricing Schedule

• Revised Base bid Item quantities and depth.

• Deleted Options 1 and 2.

• Renamed Option 3 to Option 1 and revised bid item quantities.

• Revised Note 4.

Section 00 21 00

• Para 1.1, Revised Project Description.

Section 00 72 00 General Conditions

• Revised FAR Clause 52.211-10, Commencement, Prosecution, and Completion of

Work.

• Revised UAI 5152.211-9000, Evaluation of Subdivided Items.

• Revised UAI 5152.211-9001, Variations in Estimated Quantities, Subdivided Items.

• Revised UAI 5152.211-9001(b) and (c).

Section 00 73 00 Special Contract Requirements

• Updates the Wage Determination to replace it with the most recently issued version of General Decision Number CA29.

Section 01 10 00 Summary of Work

• Page 2, revised Para 1.1.1 Requirements.

Section 01 32 01.00 10 Project Schedule

• Para 3.3.20.1 Time Extensions for Unusually Severe Weather, revised table in (B).

• Para 3.4.1, Preliminary Project Schedule Submission, revised submittal period.

• Para 3.4.2, Initial Project Schedule Submission, revised submittal period.

Section 01 32 23 Hydrographic Survey

• Table of Contents, deleted “Progress” from 1.3.1, added 1.3.2 Quality Control (QC)

Survey.

• Para 1.1, Introduction, revised text.

• Para 1.3.1, revised Payment Survey language.

• Added Para 1.3.2 Quality Control (QC) Survey.

• Renumbered 1.3.2, 1.3.3 and revised text.

• Deleted Progress form 1.4.2.

• Deleted “Progress” from 1.4.3 text.

Section 01 33 00 Submittal Procedures

• Para 1.6.1 Transmittal Form, Deleted and revised text.

Section 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM)

• Para 1.3.2 Other Factors, corrected FAR Clause 52.232-5.

• Para 3.10, Deleted Para.

Section 35 20 23 Dredging

• Para 1.3.2.2 DMDSL, added POC

• Para 1.3.2.4, Revised paragraph title.

• Para 1.4, Quantity of Material, updated quantities.

• Para 1.8, Revised paragraph title.

Drawing Sheet G-02

• Revised Bathymetric Survey dates in General Notes.

• Revised Reach 11 Acceptance Stations.

• Deleted reference to optional excavation at channel toes.

Drawing Sheets C-01, C-02, C-04

• Revised soundings for Reaches 4 and 11.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

W912P718B0001

2. TYPE OF SOLICITATION 3. DATE ISSUED

PAGE OF PAGES

X SEALED BID (IFB)

NEGOTIATED (RFP)

IMPORTANT - The "offer" section on the rev erse mus t be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

7. ISSUED BY CODE W912P7 8. ADDRESS OFFER TO (If Other Than Item 7) CODE

US ARMY ENGINEER DISTRICT, SAN FRANCISCO

CONTRACTING DIVISION

1455 MARKET ST., 17TH FLOOR SUITE 1741

SAN FRANCISCO CA 94103-1398

TEL: FAX:

See Item 7

TEL: FAX:

9. FOR INFORMATION

CALL:

A. NAME

JAMES E GARROR

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

415-503-6988

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Ti tl e, identifyi ng no., date):

RICHMOND INNER HARBOR CHANNEL MAINTENANCE DREDGING, CONTRA COSTA COUNTY, CALIFORNIA

JOB DESCRIPTION: The work consists of annual maintenance dredging for Reaches 4 and 11 of the Richmond Inner Harbor federal navigation channel in Contra Costa County. This project has a Base contract for Reach 11 to provide a project depth of -386 feet plus 1 foot allow able paid over-depth, an Option 1 to provide a depth of -37 feet plus 1 foot of allow able paid over-depth, an Option 2 to provide a depth of 38 feet plus 1 foot of allow able paid over-depth, and an Option 13 for a portion of Reach 4 to provide a project depth of -38 feet plus 1 foot of allow able over-depth. Dredged material excavated from Reach 11 shall be transported and disposed at the Government-furnished deep ocean disposal site SF-DODS, or at a Contractor-furnished upland site permitted to receive non-cover material. Dredged material excavated from Reach 4 of the Richmond Inner Harbor Channel shall be transported and disposed at the SF-DODS, or at a Contractor-furnished beneficial use upland placement site. All dredging material transportation and material placement shall be in accordance with the project plans, specifications permits, regulatory guidance and applicable contract clauses.

This requirement is for Small Business Set Aside competition. It wil l be issued as an invitation for bid (IFB) which will result in the award of a single Firm Fixed Price (FFP) contract.

The North American Industry Classification System (NAICS) Code applicable to this acquisition is: 237990

ESTIMATED COST RANGE IS BETWEEN: $1,000,000.00 - $5,000,000.00

11. The Contractor shall begin performance within 5 calendar days and complete it within 4672 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See 52.211-10 .)

12 A . THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12B. CALENDAR DAYS

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed of fers in original and 1 copies to perf orm the work required are due at the place specified in Item 8 by 10:00 AM (hour) local time 17 27 Aug 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes c ontaining off ers shall be marked to show the of feror's name and address, the solicitation number, and the date and time offers are due.

B. An of fer guarantee X is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days f or Government acceptance af ter the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

18 JULY 2018

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Document 001000 Page 1

SECTION 00 10 00

PRICING SCHEDULES

THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL,

EQUIPMENT, ETC., NECESSARY TO PERFORM ALL WORK IN STRICT

ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN THE

CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

RICHMOND INNER HARBOR – DREDGING WITH DISPOSAL AT A CONTRACTOR-

FURNISHED BENEFICIAL USE UPLAND SITE, AND/OR AT THE GOVERNMENT-

FURNISHED DEEP OCEAN DISPOSAL SITE SF-DODS

Item Description Estimated Unit Quantity Unit Price Amount

BASE BID ITEMS – REACH 11 TO 386-FT WITH DISPOSAL AT GOVERNMENT-

FURNISHED SITE SF-DODS

0001 Mobilization and Demobilization 1 JOB $_________ $__________

0002 Dredging, Richmond Inner Harbor Reach 11 to -386-ft (MLLW) including 1-foot of paid Overdepth with disposal at Government-furnished SF-DODS.

0002AA Required Dredging to -386-ft MLLW In Richmond Inner Harbor 656,000 CY $______ $_________

0002AB Overdepth Dredging to -397-ft MLLW in Richmond Inner Harbor 4212,000 CY $_______ $________

TOTAL BASE BID ITEMS (Item 0001 + Item 0002AA + Item 0002AB) $____________

OPTION 1 BID ITEMS – REACH 11 ADDITIONAL DREDGING FROM -36-FT TO -37-

FT WITH DISPOSAL AT GOVERNMENT-FURNISHED DISPOSAL SITE SF-DODS

0003 Additional Dredging, Richmond Inner Harbor Reach 11 from CLIN 0002 to -37-ft (MLLW) including 1-foot of paid overdepth with disposal at Government-furnished SF-DODS.

0003AA Required Additional Dredging to -37-ft MLLW in Richmond Inner Harbor 142,000 CY $_______ $________

Document 001000 Page 2

0003AB Overdepth Dredging to -38-ft MLLW MLLW in Richmond Inner Harbor 108,000 CY $_______ $________

TOTAL OPTION 1 BID ITEMS (Item 0003AA + Item 0003AB) $_______________

OPTION 2 BID ITEMS – REACH 11 ADDITIONAL DREDGING FROM -37-FT TO -38-

FT WITH DISPOSAL AT GOVERNMENT-FURNISHED SITE SF-DODS

0004 Additional Dredging, Richmond Inner Harbor Reach 11 from CLIN 0003 to -38-ft (MLLW) including 1-foot of paid Overdepth with disposal at Government-furnished SF-DODS.

0004AA Required Additional Dredging to -38-ft MLLW in Richmond Inner Harbor 232,0500 CY $_______ $________

0004AB Overdepth Dredging to -39-ft MLLW MLLW in Richmond Inner Harbor 132,0500 CY $_______ $________

TOTAL OPTION 2 BID ITEMS (Item 0004AA + Item 0004AB) $_______________

OPTION 31 BID ITEMS – REACH 4 (STA 76+00 to STA 81+00) TO -38-FT WITH

DISPOSAL AT CONTRACTOR-FURNISHED DISPOSAL SITE, OR AT GOVERNMENT-

FURNISHED SITE SF-DODS

00053 Additional Dredging, Richmond Inner Harbor Reach 4 (STA 76+00 to STA 81+00) to -38-ft (MLLW) including 1-foot of paid Overdepth with disposal at a Contractor-furnished disposal site, or at Government-furnished SF-DODS.

00053AA Required Dredging to -38-ft MLLW In Richmond Inner Harbor 4022,000 CY $_______ $________

00053AB Overdepth Dredging to -39-ft MLLW MLLW in Richmond Inner Harbor 3511,000 CY $_______ $________

TOTAL OPTION 31 BID ITEMS (Item 00053AA + Item 00053AB) $_______________

TOTAL EVALUATED BID AMOUNT (Item 0001 + Item 0002 + Option 1 Item 0003 + Item 0004

Document 001000 Page 3

+ Item 0005) $________________

Notes:

*QUANTITY IS AN ESTIMATED AMOUNT, SEE SECTION 00 72 00, FAR 52.211-18.

1. Prices must be submitted on all individual items within Pricing Schedule.

Failure to do so may render the bid non-responsive, in accordance with contract clause FAR 52.214-18.

2. Bidders must complete and submit attached “Dredging Plant and Equipment Schedule”, forms P.1 and P.2 as part of their solicitation package for bid evaluation. Failure to do so may cause the bid to be considered nonresponsive. The Contractor shall demonstrate that all necessary equipment will be available and committed to this contract.

3. The term "Job", which appears on the Pricing Schedule (Section 00 01 00) under “Unit” for Bid Item No. 0001 shall be considered as a Lump Sum. The Variation in Estimated Quantities contract clause, FAR 52.211-18, shall not apply to BASE ITEM, Bid Item No. 0001.

4. BASIS of AWARD: Exercise of Options: The Government may require the performance of the numbered line items identified in the Schedule as option items, to the depth and at the price stated in the Schedule. The Contracting Officer may exercise the options by written notice to the Contractor at the time of award. The Contracting Officer may only exercise Option 2 if he has also exercised Option 1. The Contracting Officer may exercise Option3 independently of exercising Options 1 and 2. The contract will be awarded in accordance with FAR 52.214-19 Contract Award – Sealed Bidding – Construction.

The Ooptions will be evaluated and awarded in accordance with FAR 52.217-4.

5. The Government reserves the right to direct the Contractor to place dredged material at an environmentally acceptable alternate disposal site in accordance with the Change Clause FAR 52.243-4.

- End of Document –

SECTION 00 21 00

INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS/

OFFERORS AND EVALUATION CRITERIA FOR AWARD

1 .1 GENERAL

The work consists of annual maintenance dredging for Reaches 4 and 11 of the Richmond Inner Harbor federal navigation channel in Contra Costa County. This project has Base contract for Reach 11 to provide a project depth of -386 feet plus 1 foot allowable paid over-depth, an Option 1 to provide a depth of -37 feet plus 1 foot of allowable paid over-depth, an Option 2 to prove a depth of -38 feet plus 1 foot of allowable paid over depth, and an Option 1 for a portion of Reach 4 to provide a project depth of -38 feet plus 1 foot of allowable over depth. Dredged material excavated from Reach 11 shall be transported and disposed at the Government-furnished deep ocean disposal site SF-DODS, or at a Contractor-furnished upland site permitted to receive non-cover material. Dredged material excavated from Reach 4 of the Richmond Inner Harbor Channel shall be transported and disposed at the site SF-DODS. Dredged material excavated from Reach 4 of the Richmond Inner Harbor Channel Shall be transported and disposed at the SF- DODS, or at a Contractor-furnished beneficial use upland placement site. All dredging material transportation and material placement shall be in accordance with the project plans, specifications, permits, regulatory guidance and applicable contract clauses. This requirement is for a Total Small Business Set-Aside in accordance with FAR 19.502.2(b) which will be awarded with a single Firm Fixed Price (FFP) contract. Bids received from offerors that are not Small Business concerns will not be considered.

1.2 BID EXPENSES AND PRE-CONTRACT COSTS

This Invitation for Bid (IFB) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a bid.

1.3 ACCURACY IN BIDS

Bids must set forth full, accurate, and complete information as required by this IFB (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.

1.4 BIDDER QUESTIONS

Questions relating to this solicitation and technical inquiries will be submitted via email to the assigned contract specialist, James E. Garror, via email at james.e.garror@usace.army.mil.

Please include the solicitation number, the project title, the location of the project together with the company name, email address, and telephone number in your correspondence. Inquiries must be received no later than 14 calendar days prior to the date set for bid opening.

Answers to pertinent questions will be posted on the Federal Business Opportunities (FBO) website (www.fbo.gov); however, changes to the solicitation will be made by amendment only. Solicitation Amendments will be posted to FBO separately.

1.5 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

Copies of the solicitation are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the Federal Business Opportunities (FedBizOpps) website https://www.fbo.gov/.

mailto:james.e.garror@usace.army.mil http://www.fbo.gov/

52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) - Alternate I

APR 1984

52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.244-6 Subcontracts for Commercial Items NOV 2017 52.246-12 Inspection of Construction AUG 1996 52.248-3 Value Engineering-Construction OCT 2015 52.249-2 Alt I Termination for Convenience of the Government (Fixed-

Price) (Apr 2012) - Alternate I

SEP 1996

52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General DEC 2012 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of Terrorism

OCT 2015

252.219-7003 Small Business Subcontracting Plan (DOD Contracts)--Basic MAR 2016 252.223-7004 Drug Free Work Force SEP 1988 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.225-7031 Secondary Arab Boycott Of Israel JUN 2005 252.226-7001 Utilization of Indian Organizations and Indian-Owned

Economic Enterprises, and Native Hawaiian Small Business Concerns

SEP 2004

252.227-7025 Limitations on the Use or Disclosure of Government- Furnished Information Marked with Restrictive Legends

MAY 2013

252.227-7033 Rights in Shop Drawings APR 1966 252.231-7000 Supplemental Cost Principles DEC 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7002 Obstruction of Navigable Waterways DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7023 Transportation of Supplies by Sea APR 2014 252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the

5W912P7-18-B-0001

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 4672 days after receipt of notice to proceed (NTP) for the base period of performance. If option 1 is exercised, the period of performance is increased to 53 calendar days after NTP. If option 1 and 2 are exercised, the period of performance is increased to 65 calendar days after NTP. If option 31 is exercised, the period of performance is increased by an additional 2513 calendar days, i.e., to 7185 calendar days after NTP. if neither Option 1 2 is exercised; to 78 calendar days after NTP if Option 1 is exercised, and to 90 calendar days after NTP if Option 2 is exercised. The time stated for completion shall include final cleanup of the premises.

(End of clause)

Base Bid Items (CLINS 0001, 0002AA, 0002AB) 72 calendar days Option 1 (CLINS 0003AA, 0003AB) 13 calendar days

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $3,400 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

UAI 5152.211-9000 EVALUATION OF SUBDIVIDED ITEMS (MAR 1995)

Item Nos. 0002, 0003, 0004, 0005 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.

UAI 5152.211-9001 VARIATIONS IN ESTIMATED QUANTITIES, SUBDIVIDED ITEMS

(MAR 1995)—EFARS

This variation in estimated quantities clause is applicable only to Items Nos. 0002, 0003, 0004, 0005.

(a) Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.

(b) Where the actual quantity of work performed for Items Nos. 0002AA, 0002AB, 0003AA, 0003AB, 0004AA, 0004AB, 0005AA, 0005AB is less than 85% of the quantity of the first sub-item listed under such item, the contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause FAR 52.212-11, Variation in Estimated Quantities.

(c) If the actual quantity of work performed under Items Nos. 0002AA, 0002AB, 0003AA, 0003AB, 0004AA, 0004AB, 0005AA, 0005AB exceeds 115% or is less than 85% of the total estimated quantity of the sub-item under that item and/or if the quantity of the work performed under the second sub-item or any subsequent sub-item under Items Nos. 0002AA, 0002AB 0003AA, 0003AB, 0004AA, 0004AB, 0005AA, 0005AB exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR 52.212-11, Variation in Estimated Quantities.

W912P718B0001

General Decision Number: CA180029 08/17/2018 CA29

Superseded General Decision Number: CA20170029

State: California

Construction Types: Building, Heavy (Heavy and Dredging) and Highway

Counties: Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus and Tuolumne Counties in California.

BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 01/19/2018 3 01/26/2018 4 02/09/2018 5 03/02/2018 6 04/06/2018 7 04/13/2018 8 05/04/2018 9 06/01/2018 10 06/15/2018 11 06/29/2018 12 07/06/2018 13 07/13/2018 14 07/20/2018 15 07/27/2018

16 08/17/2018

ASBE0016-004 06/25/2018

AREA 1: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED,

MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS &

TOULMNE COUNTIES

AREA 2: ALAMEDA, CONTRA COSTA, SAN FRANSICO, SAN MATEO & SANTA

CLARA COUNTIES

Rates Fringes

Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) Area 1......................$ 30.81 22.71 Area 2......................$ 31.81 22.71

ASBE0016-008 01/01/2018

AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN

FRANSICO, SAN MATEO, SANTA CLARA, & SANTA CRUZ

AREA 2: CALAVERAS, COLUSA, FRESNO, KINGS, MADERA, MARIPOSA,

MERCED, SAN JOAQUIN, STANISLAU, & TUOLUMNE

Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1......................$ 35.36 22.98 Area 2......................$ 49.46 22.98

BOIL0549-001 10/01/2016

AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA

CLARA COUNTIES

AREA 2: REMAINING COUNTIES

BOILERMAKER

Area 1......................$ 43.28 37.91 Area 2......................$ 39.68 35.71

BRCA0003-001 08/01/2017

Rates Fringes

MARBLE FINISHER..................$ 32.60 15.31

BRCA0003-003 08/01/2017

Rates Fringes

MARBLE MASON.....................$ 44.60 26.83

BRCA0003-005 05/01/2017

Rates Fringes

BRICKLAYER

( 1) Fresno, Kings, Madera, Mariposa, Merced....$ 38.45 21.22 ( 7) San Francisco, San Mateo.......................$ 42.34 25.83 ( 8) Alameda, Contra Costa, San Benito, Santa Clara.......................$ 44.16 21.71 ( 9) Calaveras, San Joaquin, Stanislaus, Toulumne....................$ 39.66 20.76

(16) Monterey, Santa Cruz...$ 39.51 23.49

BRCA0003-008 09/01/2017

Rates Fringes

TERRAZZO FINISHER................$ 35.14 16.87

TERRAZZO WORKER/SETTER...........$ 44.11 26.36

BRCA0003-011 04/01/2018

AREA 1: Alameda, Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz

AREA 2: Calaveras, San Joaquin, Stanislaus, Tuolumne

AREA 3: Fresno, Kings, Madera, Mariposa, Merced

TILE FINISHER

Area 1......................$ 28.56 15.87 Area 2......................$ 25.60 14.30

Area 3......................$ 25.88 15.17 Tile Layer Area 1......................$ 47.77 18.29 Area 2......................$ 42.67 16.81 Area 3......................$ 38.15 17.70

CARP0022-001 07/01/2018

San Francisco County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 48.55 29.32 Journeyman Carpenter........$ 48.40 29.32 Millwright..................$ 48.50 30.91

CARP0034-001 07/01/2018

Rates Fringes

Diver Assistant Tender, ROV Tender/Technician...........$ 47.65 32.52 Diver standby...............$ 52.61 32.52 Diver Tender................$ 51.82 32.52 Diver wet...................$ 97.17 32.52 Manifold Operator (mixed gas)........................$ 56.82 32.52 Manifold Operator (Standby).$ 51.82 32.52

DEPTH PAY (Surface Diving):

050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot

SATURATION DIVING:

The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.

DIVING IN ENCLOSURES:

Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48" in height, the premium will be

$1.00 per foot.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

CARP0034-003 07/01/2017

Rates Fringes

Piledriver.......................$ 46.65 31.91

CARP0035-007 07/01/2017

AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties

AREA 2: Monterey, San Benito, Santa Cruz Counties

AREA 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, Tuolumne Counties

Modular Furniture Installer Area 1 Installer I................$ 25.61 20.42 Installer II...............$ 22.18 20.42 Lead Installer.............$ 29.06 20.92 Master Installer...........$ 33.28 20.92 Area 2 Installer I................$ 22.96 20.42 Installer II...............$ 20.01 20.42 Lead Installer.............$ 25.93 20.92 Master Installer...........$ 29.56 20.92 Area 3 Installer I................$ 22.01 20.42 Installer II...............$ 19.24 20.42 Lead Installer.............$ 24.81 20.92 Master Installer...........$ 31.83 20.92

* CARP0035-008 08/01/2018

AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties

AREA 2: Monterey, San Benito, Santa Cruz Counties

AREA 3: San Joaquin

AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Stanislaus, Tuolumne Counties

Drywall Installers/Lathers:

Area 1......................$ 48.40 29.76 Area 2......................$ 42.52 29.76 Area 3......................$ 41.02 29.15 Area 4......................$ 41.67 29.76 Drywall Stocker/Scrapper Area 1......................$ 24.20 17.29 Area 2......................$ 21.26 17.29 Area 3......................$ 20.51 16.88 Area 4......................$ 20.84 17.29

CARP0152-001 07/01/2018

Contra Costa County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 48.55 29.32 Journeyman Carpenter........$ 48.40 29.32 Millwright..................$ 48.50 30.91

CARP0152-002 07/01/2018

San Joaquin County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 42.67 29.32 Journeyman Carpenter........$ 42.52 29.32 Millwright..................$ 45.02 30.91

CARP0152-004 07/01/2018

Calaveras, Mariposa, Merced, Stanislaus and Tuolumne Counties

Carpenters

Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 41.32 29.32 Journeyman Carpenter........$ 41.17 29.32 Millwright..................$ 43.67 30.91

CARP0217-001 07/01/2018

San Mateo County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 48.55 29.32 Journeyman Carpenter........$ 48.40 29.32 Millwright..................$ 48.50 30.91

CARP0405-001 07/01/2018

Santa Clara County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 48.55 29.32 Journeyman Carpenter........$ 48.40 29.32 Millwright..................$ 48.50 30.91

CARP0405-002 07/01/2018

San Benito County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold &

Steel Shoring Erector, Saw Filer.......................$ 42.58 29.32 Journeyman Carpenter........$ 42.52 29.32 Millwright..................$ 45.02 30.91

CARP0505-001 07/01/2018

Santa Cruz County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 42.67 29.32 Journeyman Carpenter........$ 42.52 29.32 Millwright..................$ 45.02 30.91

CARP0605-001 07/01/2018

Monterey County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 42.67 29.32 Journeyman Carpenter........$ 42.52 29.32 Millwright..................$ 45.02 30.91

CARP0701-001 07/01/2018

Fresno and Madera Counties

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 41.32 29.32 Journeyman Carpenter........$ 41.17 29.32 Millwright..................$ 43.67 30.91

CARP0713-001 07/01/2018

Alameda County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 48.55 29.32 Journeyman Carpenter........$ 48.40 29.32 Millwright..................$ 48.50 30.91

CARP1109-001 07/01/2018

Kings County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 41.32 29.32 Journeyman Carpenter........$ 41.17 29.32 Millwright..................$ 43.67 30.91

ELEC0006-004 12/01/2017

SAN FRANCISCO COUNTY

Rates Fringes

Sound & Communications Installer...................$ 38.52 3%+18.05 Technician..................$ 44.30 3%+18.05

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0006-007 06/01/2017

SAN FRANCISCO COUNTY

Rates Fringes

ELECTRICIAN......................$ 66.00 3%+43.40

ELEC0100-002 03/01/2018

FRESNO, KINGS, AND MADERA COUNTIES

Rates Fringes

ELECTRICIAN......................$ 37.50 22.18

ELEC0100-005 12/01/2016

FRESNO, KINGS, MADERA

Rates Fringes

Communications System Installer...................$ 30.64 3%+17.86 Technician..................$ 34.89 3%+17.86

SCOPE OF WORK

Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.

A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS

Background foreground music, Intercom and telephone interconnect systems, Telephone systems Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage, master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide, B. FIRE ALARM SYSTEMS Installation, wire pulling and testing

C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV

D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems, Sonar/infrared monitoring equipment

E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE

INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO

THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems, Digital Data Systems Broadband and Baseband and Carriers Point of Sale Systems, VSAT Data Systems Data Communication Systems RF and Remote Control Systems, Fiber Optic Data Systems

WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems).

Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways (including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two

(2) conditions apply:

1. The project involves new or major remodel building trades construction.

2. The conductors for the fire alarm system are installed in conduit.

ELEC0234-001 06/01/2018

MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES

Rates Fringes

ELECTRICIAN

Zone A......................$ 46.15 25.48 Zone B......................$ 50.77 25.48

Zone A: All of Santa Cruz, Monterey, and San Benito Counties within 25 air miles of Highway 1 and Dolan Road in Moss Landing, and an area extending 5 miles east and west of Highway 101 South to the San Luis Obispo County Line

Zone B: Any area outside of Zone A

ELEC0234-003 12/01/2017

MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES

Sound & Communications Installer...................$ 38.02 18.69 Technician..................$ 43.72 18.86

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0302-001 01/01/2018

CONTRA COSTA COUNTY

Rates Fringes

CABLE SPLICER....................$ 56.17 26.59

ELECTRICIAN......................$ 49.76 26.59

ELEC0302-003 12/01/2017

CONTRA COSTA COUNTY

Rates Fringes

Sound & Communications Installer...................$ 37.22 18.66 Technician..................$ 42.80 18.83

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0332-001 05/29/2017

SANTA CLARA COUNTY

Rates Fringes

CABLE SPLICER....................$ 69.60 34.318

ELECTRICIAN......................$ 60.52 34.046

FOOTNOTES: Work under compressed air or where gas masks are required, orwork on ladders, scaffolds, stacks, "Bosun's chairs," or other structures and where the workers are not protected by permanent guard rails at a distance of 40 to 60 ft. from the ground or supporting structures: to be paid one and one-half times the straight-time rate of pay.

Work on structures of 60 ft. or over (as described above):

to be paid twice the straight-time rate of pay.

ELEC0332-003 12/01/2017

SANTA CLARA COUNTY

Rates Fringes

Sound & Communications Installer...................$ 38.02 18.69 Technician..................$ 43.72 18.86

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0595-001 06/01/2018

ALAMEDA COUNTY

Rates Fringes

CABLE SPLICER....................$ 61.03 3%+35.72

ELECTRICIAN......................$ 54.25 3%+35.72

ELEC0595-002 06/01/2018

CALAVERAS AND SAN JOAQUIN COUNTIES

Rates Fringes

CABLE SPLICER....................$ 42.55 7.45%+24.58

ELECTRICIAN

(1) Tunnel work.............$ 38.85 7.45%+24.58

(2) All other work.........$ 37.00 7.45%+24.58

ELEC0595-006 12/01/2017

ALAMEDA COUNTY

Rates Fringes

Sound & Communications Installer...................$ 38.02 3%+17.96 Technician..................$ 43.72 3%+17.96

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0595-008 12/01/2017

CALAVERAS AND SAN JOAQUIN COUNTIES

Rates Fringes

Communications System Installer...................$ 38.02 3%+17.96 Technician..................$ 43.72 3%+17.96

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0617-001 06/01/2018

SAN MATEO COUNTY

Rates Fringes

ELECTRICIAN......................$ 61.00 34.62

ELEC0617-003 12/01/2017

SAN MATEO COUNTY

Sound & Communications Installer...................$ 38.02 19.27 Technician..................$ 43.72 19.27

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire…