W912P7-15-B-0004_Amendment_0001_August_21_2015.pdf

PDF 3 MB Posted

Attached to
RICHMOND INNER AND OUTER HARBOR CHANNEL MAINTENANCE DREDGING PROJECT, CONTRA COSTA COUNTY, CALIFORNIA
Solicitation number
W912P7-15-B-0004
Issued by

About this file

W912P7-15-B-0004 Amendment 0001 August 21_2015.pdf

View the file

Other files

File Type Posted
B01_-_1_Abstract_of_Bids_Richmond_Inner_and_Outer_Harobr_Dredging_Project.pdf PDF
Questions_and_Answers__Richmond_Inner_and_Outer_Harbor_Dredging_8-26-15.pdf PDF
W912P7-15-B-0004_Amendment_0002.pdf PDF
Pre-Bid_Meeting_Minutes_20Aug15.pdf PDF
Richmond_O M_Sheet 3 of 10.cal —
Richmond_O M_Sheet 5 of 10.cal —
Richmond_O M_Sheet 7 of 10.cal —
_Readme.txt TXT text file
Richmond_Cover Sheet 1 of 10.cal —
Richmond_O M_Sheet 2 of 10.cal —
Richmond_O M_Sheet 6 of 10.cal —
SF_07_RIH_20150723-24_CON_SORTED15.xyz XYZ file
Richmond_O M_Sheet 8 of 10.cal —
ROH_LW_20150727_CON_100_Sorted 15.xyz XYZ file
Richmond_O M_Sheet 4 of 10.cal —
Richmond_O M_Sheet 9 of 10.cal —
ROH_SHS_20150728_CON_100'_Sorted 15.xyz XYZ file
maxview513.exe EXE file
Richmond_O M_Sheet 10 of 10.cal —
Richmond_Pre_Bid_Meeting.pdf PDF
Richmond_Pre_Bid_Meeting.pdf PDF
Richmond_Inner_O M_Sheet 4 of 10.cal —
Richmond_Outer_O M_Sheet 9 of 10.cal —
(R9)SF_07_RIH_20150114_BD_R8 9_3x3Avg_MLLW.xyz XYZ file
W912P7-15-B-0004_Richmond_Final_Solicitation_and_Technical_Specifications_28Jul15.pdf PDF
(R8)SF_07_RIH_20150114_BD_R8 9_3x3Avg_MLLW.xyz XYZ file
Richmond_Outer_O M_Sheet 10 of 10.cal —
maxview513.exe EXE file
(R7)SF_07_RIH_R7BD_20141230_3x3Avg_MLLW.xyz XYZ file
_Readme.txt TXT text file
SF_07_ROH_20150220-23_CON_3x3Avg_MLLW_filled.XYZ XYZ file
(R6)20141125 Etrac RI R6 BD.xyz XYZ file
Richmond_Inner_O M_Sheet 5 of 10.cal —
Richmond_Outer_O M_Sheet 8 of 10.cal —
Richmond_Inner_O M_Sheet 6 of 10.cal —
Richmond_LongWharf Sheet 7 of 10.cal —
(R10)SF_07_RIH_20150126_R10_BD_3x3.xyz XYZ file
Richmond_Inner_O M_Sheet 3 of 10.cal —
Richmond_Reference_Sheet 2 of 10.cal —
(R2)SF_07_RIH_20150107_BD_R1-3_3x3Avg_MLLW.xyz XYZ file
(R4)RES_141125_Richmond_R4_3x3.xyz XYZ file
Richmond_Cover2015-Sheet 1 of 10.cal —
(R1)SF_07_RIH_20150107_BD_R1-3_3x3Avg_MLLW.xyz XYZ file
(R5)SF_07_RIH_20150114_BD_R5_3x3Avg_MLLW.xyz XYZ file
(R3)SF_07_RIH_20150107_BD_R1-3_3x3Avg_MLLW.xyz XYZ file
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W62A2B51772873

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04 EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

RICHMOND INNER AND OUTER HARBOR CHANNEL MAINTENANCE DREDGING PROJECT, CONTRA COSTA COUNTY, CALIFORNIA

ENCL) Standard Form 1442 Pages 1 and 2, Section 00 10 00 Pricing Schedule, Section 00 21 00 Page 11 Paragraph 1.1, Section 01 11 00, Summary of Work, Section 01 22 00.00 10 Measurement and Payment, Section 01 32 01.00 10 Project Schedule, Section 01 32 23 Hydrographic Survey, Section 01 45 0.00 10 Quality Control, Section 01 50 00 Temporary Construction Facilities and Controls, Section 01 57 20.00 10 Environmental Protection, Section 35 20 23 Dredging, Section 35 20 24 Aquatic Disposal, Appendix 8 SF-DODS Conditions, Drawing Sheets, Wage Determination dated August 14, 2015.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 164

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer) (Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P7-15-B-0004

X 9B. DATED (SEE ITEM 11)

28-Jul-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Aug-2015

CODE

US ARMY ENGINEER DISTRICT, SAN FRANCISCO

CONTRACTING DIVISION

1455 MARKET ST., 17TH FLOOR SUITE 1741

SAN FRANCISCO CA 94103-1398

W912P7 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODE CODE

EMAIL: TEL:

W912P7-15-B-0004

Continuation page of SF 30 Amendment of Solicitation/Modification of Contract Changes

Standard Form 1442

• Page 1 Block 10 Job Description, corrected depth for Option 1.

Section 00 10 00 Pricing Schedule

• Page 6 of 521, added “OR PERMITTED BENEFICIAL USE UPLAND SITE”.

• Page 8 of 521, added “BENEFICIAL USE”.

• Page 9 of 521, revised quantities for Alternative 2 Base Items CLINS 0002AA, 0002AB, 0003AA, and 0003AB.

Section 00 21 00 Instructions, Conditions, and Notices to Bidders/Offerors and Evaluation Criteria for Award

• Page 11, Para 1.1, revised project depth and quantities, and added information.

Section 01 11 00 Summary of Work

• Page 1, added Paras 1.5.2.1, 1.5.2.2, 1.5.2.3, 1.5.2.4, and 1.5.2.5 to Table of

Contents.

• Page 2, Para 1.1.1, Revised depth and added information.

• Page 3, Para 1.5.2.1, added sentence.

• Page 3, Para 1.5.2.3, added information.

• Page 4, added Para 1.5.2.5.

Section 01 22 00.00 10 Measurement and Payment

• Page 1, added Paras 1.2, 1.2.1, and 1.2.2 to Table of Contents.

• Page 4, revised Para titles for Paras 1.2.1 and 1.2.2.

Section 01 32 01.00 10 Project Schedule

• Page 3, Para 1.2, revised title of SD-01 Submittals

Section 01 32 23 Hydrographic Survey

• Page 1, deleted Para 1.4.6 from Table of Contents.

• Page 3, Para 1.1, added “Third Party”, additional equipment requirement, and deleted sentence.

• Page 3, Para 1.2, deleted sentence.

• Page 5, Para 1.3.2.3, revised Government survey crew daily rate.

• Page 5, Para 1.3.3, added “Third Party”.

• Page 6, Para 1.4, deleted submittal.

• Page 9, deleted Para 1.4.6.

Section 01 45 0.00 10 Quality Control

• Page 2, Para 1.3, revised title of SD-01 Submittals.

• Page 3, Para 3.2, deleted sentence.

Section 01 50 00 Temporary Construction Facilities and Controls

• Page 3, Para 2.1.2, added new website links for signage guidance and instructions.

Section 01 57 20.00 10 Environmental Protection

• Page 5, Para 1.6, revised title of SD-01 Submittals.

• Page 5, Para 1.7, deleted sentence.

• Pages 12 & 13, Para 3.7.1, deleted sentence and added new sentence.

• Page 14, Para 3.11, deleted sentence.

Section 35 20 23 Dredging

• Page 1, revised title for Para 1.2.1.

• Page 3, Para 1.2, revised submittal title and added two submittals.

• Page 3, Para 1.2.1, revised title of paragraph and deleted sentence.

• Page 4, Para 1.2.1.1, added new information and deleted information.

• Page 9, Para 3.2.2.2, deleted sentence.

• Page 12, Para 3.2.6.1, revised paragraph.

Section 35 20 24 Aquatic Disposal

• Page 4, Para 3.4.5, added sentence.

• Page 4, Para 3.6.1, added information.

• Page 7, Para 3.6.6, added information.

Appendix 8 SF-DODS Conditions

• Added new Appendix 8 SF-DODS Conditions

Drawing Sheets

• Revised hydrographic survey soundings on sheets 3 thru 10.

Wage Determination

• Dated August 14, 2014

W62A2B51772873

RICHMOND INNER AND OUTER HARBOR CHANNEL MAINTENANCE DREDGING PROJECT, CONTRA COSTA COUNTY, CALIFORNIA

Job Description: The work consists of maintenance dredging of 100,000165,000 cubic yards of dredged material to provide an authorized project depth of -3738-feet plus 1-foot of allowable paid over-depth in the Richmond Inner Harbor Reaches 1 through 10, and an Option to dredge up to 150,000 200,000 cubic yards of dredged material to provide an authorized project depth of -45-feet plus 1-foot of allowable paid over-depth in the Long Wharf area and the South Hampton Shoal Channel of the Richmond Outer Harbor. Dredged material excavated from the Richmond Inner Harbor shall be trans-ported and disposed at the Government-furnished deep ocean disposal site, SF-DODS, or a permitted beneficial use upland site of the Contractor’s choosing. Dredged material excavated from the Richmond Outer Harbor shall be transported and disposed at the Government-furnished in-bay disposal site, SF-10. Due to environmental constraints all material dredged from the Inner and Outer Harbor after 30 November, will be placed at a fully permitted beneficial use upland site of the Contractor’s choosing.

This requirement is set aside for Small Business competition. It will be issued as an invitation for bid (IFB) which will result in the award of a single Firm Fixed Price (FFP) contract.

The North American Industry Classification System (NAICS) Code applicable to this acquisition is: 237990.

ESTIMATED COST RANGE IS BETWEEN: $5,000,000.00 - $10,000,000.00

X

JAMES E GARROR 415-503-6988

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

28-Jul-2015

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance within _______ 5 calendar days and complete it within ________ 100 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________ 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ 1 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ 27 Aug 2015 (date).

If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______ 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY ENGINEER DISTRICT, SAN FRANCISCO

CONTRACTING DIVISION

1455 MARKET ST., 17TH FLOOR SUITE 1741

SAN FRANCISCO CA 94103-1398

W912P7

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

11:00 AM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX: TEL: TEL: FAX:

W912P7-15-B-0004 115

20B. SIGNATURE

(REV. 4-85) STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE 27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code) 14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14) 16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.

governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this 28. NEGOTIATED AGREEMENT

(Must be fully completed by offeror) OFFER

Section 00 10 00 Page 5

SECTION 00 10 00

PRICING SCHEDULES

OPTION WILL BE EVALUATED IN ACCORDANCE WITH FAR 52.217-5

THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL,

EQUIPMENT, ETC., NECESSARY TO PERFORM ALL WORK IN STRICT

ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN THE

CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

ALTERNATIVE 1 – DREDGING RICHMOND INNER HARRBOR WITH DISPOSAL AT SF-DODS

AND IN ACCORDANCE WITH NOTE 7, AT PERMITTED BENEFICIAL USE UPLAND SITE

Item Description Estimated Unit

Quantity Unit Price Amount

BASE ITEMS

0001 Mobilization and Demobilization 1 JOB $______ $______

0002 Dredging, Richmond Inner Harbor

Reaches 1 thru 10 to -378-ft

(MLLW) including 1-foot of Paid Overdepth with disposal at SF-DODS.

0002AA Required Dredging to -378-ft

MLLW in Richmond Inner Harbor 4055,000 CY $______ $______

0002AB Overdepth Dredging to -389-ft

MLLW in Richmond Inner Harbor 60110,000 CY $______ $______

BASE BID PRICE (Item 0001 + Item 0002) $________________

ADJUSTMENT TO BASE BID PRICE – Foreseeable Costs

To Government $_____183,589.00

(Please see Section 00 21 00, paragraph 2.5)

TOTAL ALTERNATIVE 1 EVALUATED BASE BID PRICE

(Item 0001 + Item 0002 + $183,589.00) $_______________

Section 00 10 00 Page 6

ALTERNATIVE 2 – DREDGING RICHMOND INNER HARBOR WITH PLACEMENT AT PERMITTED

BENEFICAL USE UPLAND SITE

Item Description Estimated Unit

Quantity Unit Price Amount

BASE ITEMS

0001 Mobilization and Demobilization 1 JOB $______ $______

0002 Dredging Richmond Inner Harbor

Reaches 1 thru 10 to -378-ft

(MLLW) including 1-foot of Paid

Overdepth with placement at upland site.

0002AA Required Dredging to -378-ft

MLLW In Richmond Inner Harbor 4055,000 CY $______ $______

0002AB Overdepth Dredging to -389-ft

MLLW in Richmond Inner Harbor 60110,000 CY $______ $______

ALTERNATIVE 2 EVALUATED BASE BID

PRICE (Item 0001 + Item 0002) $_______________

OPTION – DREDGING RICHMOND OUTER HARBOR WITH DISPOSAL AT SF-10 OR SF-11,

AND IN ACCORDANCE WITH NOTE 7, AT PERMITTED BENFICIAL USE UPLAND SITE

0003 Dredging, Richmond Outer Harbor to

-45-ft (MLLW) including 1-foot of Paid

Overdepth with disposal at SF-10.

0003A Required Dredging to -45-ft MLLW

In Richmond Outer Harbor 6579,000 CY $______ $______

0003B Overdepth Dredging to -46-ft

MLLW in Richmond Outer Harbor 85121,000 CY $______ $______

Section 00 10 00 Page 7

TOTAL OPTION BID PRICE

(Item 0003AA + Item 0003AB) $_______________

ALTERNATIVE 1 - TOTAL EVALUATED BID PRICE

(Item 0001 + Item 0002 + $183,589.00 + Option

Bid Price) $_______________

ALTERNATIVE 2 - TOTAL EVALUATED BID PRICE

(Item 0001 + Item 0002 + Option Bid Price) $_______________

Section 00 10 00 Page 8

Notes:

*QUANTITY IS AN ESTIMATED AMOUNT, SEE SECTION 00700, FAR 52.211-18.

1. Prices must be submitted on all individual items within Pricing Schedule.

Failure to do so may be cause for rejection of bids.

2. If a modification to a price based on unit price is submitted which provides for a lump sum adjustment to the total estimated price, the applications of the lump sum adjustment to each unit price in the Pricing Schedule must be stated. If it is not stated, the bidder/offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the Pricing Schedule.

3. Bidders must complete and submit attached “Dredging Plant and Equipment

Schedule”, forms P.1 and P.2 as part of their solicitation package for bid evaluation. Failure to do so may cause the bid to be considered nonresponsive. The

Contractor shall demonstrate that all necessary equipment will be available and committed to this contract.

4. The term "Job", which appears on the Pricing Schedule (Section 00 01 00) under

“Unit” for Bid Item No. 0001 shall be considered as a Lump Sum. The Variation in

Estimated Quantities contract clause, FAR 52.211-18, shall not apply to BASE ITEM, Bid Item No. 0001.

5. BASIS of AWARD: The contract will be awarded in accordance with FAR 52.214-19

Contract Award – Sealed Bidding – Construction. Additional foreseeable costs to the Government resulting from dredging with disposal at SF-DODS will be considered in evaluating the bid amount provided for the base and options of Alternative 1.

Please see Section 00 21 00, paragraph 2.5 for an explanation. The lowest total evaluated bid amount as between Alternative 1 and Alternative 2 will be considered the most advantageous to the Government; however, the awarded contract price will not include the price adjustment that reflects the Government’s additional foreseeable costs.

6. The Government reserves the right to direct the Contractor to place dredged material at an environmentally acceptable alternate disposal site prior to 1

December 2015, including the possibility of disposal at the Government–furnished deep ocean disposal site (SF-DODS) in accordance with the Change Clause FAR 52.243-

4.

7. To the extent disposal operations continue after 30 November, disposal of the dredged material will be in accordance with Technical Specifications, Section 01 11

00 Summary of Work, Para 1.5.2 Time Restrictions.

- End of Document –

Section 00 21 00

INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS/

OFFERORS AND EVALUATION CRITERIA FOR AWARD

INSTRUCTIONS TO BIDDERS

1 .1 GENERAL

The scope of this an Unrestricted Invitation for Bid (IFB) is for Richmond Inner and Outer Harbor Channel Maintenance Dredging Project, Contra Costa County, California. The work consists of maintenance dredging of 165,000 cubic yards of dredged material to provide an authorized project depth of -38-feet plus 1 foot allowable paid over-depth in the Richmond Inner Harbor Reaches 1 through 10, and an Option to dredge up to 200,000 cubic yards of dredged material to provide an authorized project depth of -45-feet plus 1 foot allowable paid over-depth in the Long Wharf area and the Richmond Outer Harbor. Dredged material excavated from the Richmond Inner Harbor shall be transported and disposed at the Government-furnished deep ocean disposal site, SF-DODS, or a permitted beneficial use upland site of the Contractor’s choosing. Dredged material excavated from the Richmond Outer Harbor shall be transported and disposed at the Government-furnished in-bay disposal site, SF-10. Due to environmental constraints all material dredged from the Inner and Outer Harbor after 30 November, will be placed at a fully permitted beneficial use upland site of the Contractor’s choosing. This requirement is for solicitation using Full and Open Competition in accordance with FAR Subpart 6.1, which will be awarded with a single Firm-Fixed Price (FFP) contract.

1.2 BID EXPENSES AND PRE-CONTRACT COSTS

This Invitation for Bid (IFB) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a bid.

1.3 ACCURACY IN BIDS

Bids must set forth full, accurate, and complete information as required by this IFB (including attachments).

The penalty for making false statements is prescribed in 18 U.S.C. 1001.

1.4 BIDDER QUESTIONS

Questions relating to this solicitation and technical inquiries will be submitted via email to the assigned contract specialist, James E. Garror, via email at james.e.garror@usace.army.mil.

Please include the solicitation number, the project title, the location of the project together with the company name, email address, and telephone number in your correspondence. Inquiries must be received no later than 14 calendar days prior to the date set for bid opening.

Answers to pertinent questions will be posted on the Federal Business Opportunities (FBO) website (www.fbo.gov); however, changes to the solicitation will be made by amendment only. Solicitation Amendments will be posted to FBO separately.

1.5 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

Copies of the solicitation are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the Federal Business Opportunities (FedBizOpps) website https://www.fbo.gov /.

All amendments will be posted to the FedBizOpps website. It shall be the contractor's responsibility to check the websites for any amendments. The Bidder shall submit in the bid all requested information specified in this section of the Invitation for Bid (IFB) solicitation.

mailto:james.e.garror@usace.army.mil

L3ET9DVD

Highlight

L3ET9DVD

Highlight

L3ET9DVD

Highlight

L3ET9DVD

Highlight

L3ET9DVD

Highlight

L3ET9DVD

Highlight

L3ET9DVD

Highlight

L3ET9DVD

Highlight

L3CT9JEG

Highlight

L3CT9JEG

Highlight

L3CT9JEG

Highlight

ATTACHMENT 1 WAGE DETERMINATION

General Decision Number: CA150029 08/14/2015 CA29

Superseded General Decision Number: CA20140029

State: California

Construction Types: Building, Heavy (Heavy and Dredging) and Highway

Counties: Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus and Tuolumne Counties in California.

BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS

Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/02/2015 1 01/16/2015 2 01/23/2015 3 01/30/2015 4 02/13/2015 5 02/20/2015 6 02/27/2015 7 03/13/2015 8 03/27/2015 9 04/10/2015 10 04/17/2015 11 04/24/2015 12 05/01/2015 13 05/08/2015 14 05/29/2015 15 06/05/2015 16 06/19/2015 17 07/10/2015 18 07/17/2015 19 07/31/2015 20 08/07/2015 21 08/14/2015

ASBE0016-004 01/01/2015

AREA 1: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED,

MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS &

TOULMNE COUNTIES

AREA 2: ALAMEDA, CONTRA COSTA, SAN FRANSICO, SAN MATEO & SANTA

CLARA COUNTIES

Rates Fringes Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) Area 1......................$ 28.30 7.75 Area 2......................$ 32.38 7.75

ASBE0016-008 01/01/2015

AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN

FRANSICO, SAN MATEO, SANTA CLARA, & SANTA CRUZ

AREA 2: CALAVERAS, COLUSA, FRESNO, KINGS, MADERA, MARIPOSA,

MERCED, SAN JOAQUIN, STANISLAU, & TUOLUMNE

Rates Fringes Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1......................$ 59.38 19.83 Area 2......................$ 44.05 18.62

BOIL0549-001 01/01/2013

AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA

CLARA COUNTIES

AREA 2: REMAINING COUNTIES

Rates Fringes

BOILERMAKER

Area 1......................$ 42.06 33.43 Area 2......................$ 38.37 31.32

BRCA0003-001 08/01/2013

Rates Fringes

MARBLE FINISHER..................$ 28.05 14.01

BRCA0003-003 08/01/2013

Rates Fringes

MARBLE MASON.....................$ 39.30 22.48

BRCA0003-005 05/01/2013

Rates Fringes

BRICKLAYER

( 1) Fresno, Kings, Madera, Mariposa, Merced....$ 35.41 19.92 ( 7) San Francisco, San Mateo.......................$ 39.96 23.79 ( 8) Alameda, Contra Costa, San Benito, Santa Clara.......................$ 40.98 20.49 ( 9) Calaveras, San Joaquin, Stanislaus, Toulumne....................$ 36.48 19.59

(16) Monterey, Santa Cruz...$ 37.80 22.46

BRCA0003-008 07/01/2013

Rates Fringes

TERRAZZO FINISHER................$ 33.15 13.93

TERRAZZO WORKER/SETTER...........$ 39.95 24.39

BRCA0003-011 04/01/2014

AREA 1: Alameda, Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz

AREA 2: Calaveras, San Joaquin, Stanislaus, Tuolumne

AREA 3: Fresno, Kings, Madera, Mariposa, Merced

TILE FINISHER

Area 1......................$ 22.76 12.37 Area 2......................$ 22.58 12.50 Area 3......................$ 22.40 11.58 Tile Layer Area 1......................$ 39.42 13.77 Area 2......................$ 36.43 13.74 Area 3......................$ 29.78 13.10

CARP0022-001 07/01/2014

San Francisco County

Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 40.35 27.53 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 40.50 27.53 Journeyman Carpenter........$ 40.35 27.53 Millwright..................$ 40.45 29.12

CARP0034-001 07/01/2014

Rates Fringes Diver Assistant Tender, ROV Tender/Technician...........$ 39.60 30.73 Diver standby...............$ 44.56 30.73 Diver Tender................$ 43.56 30.73 Diver wet...................$ 89.12 30.73 Manifold Operator (mixed gas)........................$ 48.56 30.73 Manifold Operator (Standby).$ 43.56 30.73

DEPTH PAY (Surface Diving):

050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot

SATURATION DIVING:

The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.

DIVING IN ENCLOSURES:

Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48" in height, the premium will be $1.00 per foot.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

CARP0034-003 07/01/2014

Rates Fringes

Piledriver.......................$ 40.60 30.73

CARP0035-007 07/01/2014

AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa

Clara counties

AREA 2: Monterey, San Benito, Santa Cruz Counties

AREA 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, Tuolumne Counties

Modular Furniture Installer Area 1 Installer I................$ 23.36 18.31 Installer II...............$ 19.93 18.31 Lead Installer.............$ 26.81 18.81 Master Installer...........$ 31.03 18.81 Area 2 Installer I................$ 20.71 18.31 Installer II...............$ 17.76 18.31 Lead Installer.............$ 23.68 18.81 Master Installer...........$ 27.31 18.81 Area 3 Installer I................$ 19.76 18.31 Installer II...............$ 16.99 18.31 Lead Installer.............$ 22.56 18.81 Master Installer...........$ 25.98 18.81

CARP0035-008 08/01/2014

AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties

AREA 2: Monterey, San Benito, Santa Cruz Counties

AREA 3: San Joaquin

AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Stanislaus, Tuolumne Counties

Rates Fringes Drywall Installers/Lathers:

Area 1......................$ 40.35 27.97 Area 2......................$ 34.47 27.97 Area 3......................$ 34.97 27.97 Area 4......................$ 33.62 27.97 Drywall Stocker/Scrapper Area 1......................$ 20.18 16.30 Area 2......................$ 17.24 16.30 Area 3......................$ 17.49 16.30 Area 4......................$ 16.81 16.30

CARP0152-001 07/01/2014

Contra Costa County

Carpenters Bridge Builder/Highway Carpenter...................$ 40.35 27.53 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 40.50 27.53 Journeyman Carpenter........$ 40.35 27.53 Millwright..................$ 40.45 29.12

CARP0152-002 07/01/2014

San Joaquin County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 40.35 27.53 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 34.62 27.53 Journeyman Carpenter........$ 34.47 27.53 Millwright..................$ 34.97 29.12

CARP0152-004 07/01/2014

Calaveras, Mariposa, Merced, Stanislaus and Tuolumne Counties

Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 40.35 27.53 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 33.27 27.53 Journeyman Carpenter........$ 33.12 27.53 Millwright..................$ 35.62 29.12

CARP0217-001 07/01/2014

San Mateo County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 40.35 27.53 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 40.50 27.53 Journeyman Carpenter........$ 40.35 27.53

Millwright..................$ 40.45 29.12

CARP0405-001 07/01/2014

Santa Clara County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 40.35 27.53 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 40.50 27.53 Journeyman Carpenter........$ 40.35 27.53 Millwright..................$ 40.45 29.12

CARP0405-002 07/01/2014

San Benito County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 40.35 27.53 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 34.53 27.53 Journeyman Carpenter........$ 34.47 27.53 Millwright..................$ 36.97 29.12

CARP0505-001 07/01/2014

Santa Cruz County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 40.35 27.53 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 34.62 27.53 Journeyman Carpenter........$ 34.47 27.53 Millwright..................$ 36.97 29.12

CARP0605-001 07/01/2014

Monterey County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 40.35 27.53 Hardwood Floorlayer, Shingler, Power Saw

Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 34.62 27.53 Journeyman Carpenter........$ 34.47 27.53 Millwright..................$ 36.97 29.12

CARP0701-001 07/01/2014

Fresno and Madera Counties Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 40.35 27.53 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 33.27 27.53 Journeyman Carpenter........$ 33.12 27.53 Millwright..................$ 35.62 29.12

CARP0713-001 07/01/2014

Alameda County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 40.35 27.53 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 40.50 27.53 Journeyman Carpenter........$ 40.35 27.53 Millwright..................$ 40.45 29.12

CARP1109-001 07/01/2014

Kings County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 40.35 27.53 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 33.27 27.53 Journeyman Carpenter........$ 33.12 27.53 Millwright..................$ 35.62 29.12

ELEC0006-004 06/01/2015

SAN FRANCISCO COUNTY

Sound & Communications Installer...................$ 33.82 16.82 Technician..................$ 38.51 16.96

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0006-007 06/01/2015

SAN FRANCISCO COUNTY

Rates Fringes

ELECTRICIAN......................$ 61.25 29.80

ELEC0100-002 06/01/2015

FRESNO, KINGS, AND MADERA COUNTIES

Rates Fringes

ELECTRICIAN......................$ 34.50 20.09

ELEC0100-005 06/01/2015

FRESNO, KINGS, MADERA

Rates Fringes

Communications System Installer...................$ 29.10 16.18 Technician..................$ 32.13 16.26

SCOPE OF WORK

Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.

A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS

Background foreground music, Intercom and telephone interconnect systems, Telephone systems Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage, master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide, B. FIRE ALARM SYSTEMS Installation, wire pulling and testing

C. TELEVISION AND VIDEO SYSTEMS: Television monitoring and surveillance systems Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV

D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems, Sonar/infrared monitoring equipment

E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR

CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS SCADA

(Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems, Digital Data Systems Broadband and Baseband and Carriers Point of Sale Systems, VSAT Data Systems Data Communication Systems RF and Remote Control Systems, Fiber Optic Data Systems

WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems). Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways (including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two

(2) conditions apply:

1. The project involves new or major remodel building trades construction.

2. The conductors for the fire alarm system are installed in conduit.

ELEC0234-001 05/25/2015

MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES

Rates Fringes

ELECTRICIAN

Zone A......................$ 42.15 23.36 Zone B......................$ 46.37 23.50

Zone A: All of Santa Cruz, Monterey, and San Benito Counties within 25 air miles of Highway 1 and Dolan Road in Moss Landing, and an area extending 5 miles east and west of Highway 101 South to the San Luis Obispo County Line

Zone B: Any area outside of Zone A

ELEC0234-003 06/01/2015

MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES

Rates Fringes Sound & Communications Installer...................$ 33.32 16.30 Technician..................$ 37.94 16.30

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0302-001 06/01/2015

CONTRA COSTA COUNTY

Rates Fringes

CABLE SPLICER....................$ 52.92 26.19

ELECTRICIAN......................$ 46.51 26.00

ELEC0302-003 12/01/2014

CONTRA COSTA COUNTY

Rates Fringes Sound & Communications Installer...................$ 32.32 16.27 Technician..................$ 36.80 16.40

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0332-001 06/01/2014

SANTA CLARA COUNTY

Rates Fringes

CABLE SPLICER....................$ 62.41 32.102

ELECTRICIAN......................$ 54.27 31.858

FOOTNOTES: Work under compressed air or where gas masks are required, or work on ladders, scaffolds, stacks, "Bosun's chairs," or other structures and where the workers are not protected by permanent guard rails at a distance of 40 to 60 ft. from the ground or supporting structures: to be paid one and one-half times the straight-time rate of pay. Work on structures of 60 ft. or over (as described above): to be paid twice the straight-time rate of pay.

ELEC0332-003 06/01/2015

SANTA CLARA COUNTY

Rates Fringes Sound & Communications Installer...................$ 33.32 16.30 Technician..................$ 37.94 16.43

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testing’s of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0595-001 06/01/2015

ALAMEDA COUNTY

Rates Fringes

CABLE SPLICER....................$ 56.70 33.55

ELECTRICIAN......................$ 50.40 33.36

ELEC0595-002 06/01/2015

CALAVERAS AND SAN JOAQUIN COUNTIES

Rates Fringes

CABLE SPLICER....................$ 39.09 25.68

ELECTRICIAN

(1) Tunnel work.............$ 36.49 25.48

(2) All other work.........$ 34.75 25.35

ELEC0595-006 06/01/2015

ALAMEDA COUNTY

Rates Fringes Sound & Communications Installer...................$ 33.32 16.29 Technician..................$ 37.94 16.44

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0595-008 12/01/2014

CALAVERAS AND SAN JOAQUIN COUNTIES

Rates Fringes Communications System Installer...................$ 29.10 16.18 Technician..................$ 33.13 16.30

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0617-001 06/01/2015

SAN MATEO COUNTY

Rates Fringes

ELECTRICIAN......................$ 53.90 30.50

ELEC0617-003 06/01/2015

SAN MATEO COUNTY

Rates Fringes

Sound & Communications Installer...................$ 33.32 17.44 Technician..................$ 37.94 17.44

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0684-001 06/01/2015

MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES

Rates Fringes

ELECTRICIAN......................$ 35.75 20.66

CABLE SPLICER = 110% of Journeyman Electrician

ELEC0684-004 12/01/2011

MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES

Communications System Installer...................$ 30.12 3%+13.70 Technician..................$ 34.29 3%+13.70

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC1245-001 06/01/2015

Rates Fringes

LINE CONSTRUCTION

(1) Lineman; Cable splicer..$ 52.85 15.53

(2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)...........$ 42.21 14.32

(3) Groundman...............$ 32.28 14.03

(4) Powderman...............$ 47.19 14.60

HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day

ELEV0008-001 01/01/2015

Rates Fringes

ELEVATOR MECHANIC................$ 60.39 28.38

FOOTNOTE:

PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.

PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.

ENGI0003-008 07/01/2013

Rates Fringes Dredging: (DREDGING:

CLAMSHELL & DIPPER DREDGING;

HYDRAULIC SUCTION DREDGING:)

AREA 1:

(1) Leverman...............$ 40.53 27.81

(2) Dredge Dozer; Heavy duty repairman.............$ 35.57 27.81

(3) Booster Pump Operator; Deck Engineer; Deck mate;

Dredge Tender; Winch Operator...................$ 34.45 27.81

(4) Bargeman; Deckhand;

Fireman; Leveehand; Oiler..$ 31.15 27.81

AREA 2:

(1) Leverman...............$ 42.53 27.81

(2) Dredge Dozer; Heavy duty repairman.............$ 37.57 27.81

(3) Booster Pump Operator; Deck Engineer; Deck mate;

Dredge Tender; Winch Operator...................$ 36.45 27.81

(4) Bargeman; Deckhand;

Fireman; Leveehand; Oiler..$ 33.15 27.81

AREA DESCRIPTIONS

AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,

NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,

SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,

SUTTER, YOLO, AND YUBA COUNTIES

AREA 2: MODOC COUNTY

THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2

AS NOTED BELOW:

ALPINE COUNTY:

Area 1: Northernmost part Area 2: Remainder

CALAVERAS COUNTY:

Area 1: Remainder Area 2: Eastern part

COLUSA COUNTY:

Area 1: Eastern part Area 2: Remainder

ELDORADO COUNTY:

Area 1: North Central part Area 2: Remainder

FRESNO COUNTY:

Area 1: Remainder Area 2: Eastern part

GLENN COUNTY:

Area 1: Eastern part Area 2: Remainder

LASSEN COUNTY:

Area 1: Western part along the Southern portion of border with Shasta County Area 2: Remainder

MADERA COUNTY:

Area 1: Except Eastern part Area 2: Eastern part

MARIPOSA COUNTY

Area 1: Except Eastern part Area 2: Eastern part

MONTERREY COUNTY

Area 1: Except Southwestern part Area 2: Southwestern part

NEVADA COUNTY:

Area 1: All but the Northern portion along the border of Sierra County Area 2: Remainder

PLACER COUNTY:

Area 1: Al but the Central portion Area 2: Remainder

PLUMAS COUNTY:

Area 1: Western portion Area 2: Remainder

SHASTA COUNTY:

Area 1: All but the Northeastern corner Area 2: Remainder

SIERRA COUNTY:

Area 1: Western part Area 2: Remainder

SISKIYOU COUNTY:

Area 1: Central part Area 2: Remainder

SONOMA COUNTY:

Area 1:…