OAKLAND INNER AND OUTER HARBOR CHANNEL MAINTENANCE DREDGING PROJECT, ALAMEDA COUNTY, CALIFORNIA
Solicitation number
W912P7-15-B-0003
Issued by

About this file

Pre Bid Meeting Minutes.pdf

View the file

Other files

File Type Posted
B01_-_1_Abstract_of_Bids_Oakland_Inner_and_Outer_Harbor_Channel_Maintenance_Dredging.pdf PDF
Questions_and_Answers__Oakland_Inner_and_Outer_Harbor_Dredging_8-10-15.pdf PDF
W912P7-15-B-0003_Amendment_0003_Augus_10_2015.pdf PDF
aak09084 —
_Readme.txt TXT text file
maxview513.exe EXE file
REVISED_Oakland_InnerOuter_JUL_2015-3.cal —
plot.log LOG file
REVISED_Oakland_InnerOuter_JUL_2015-4.cal —
SF_21_OOH_20150708-10_CON_R7-10_COMP_sorted15.xyz XYZ file
REVISED_Oakland_InnerOuter_JUL_2015-G1-Cover.cal —
REVISED_Oakland_InnerOuter_JUL_2015-6.cal —
BART_Tube_Under_Channel_Detail-8.cal —
REVISED_Oakland_InnerOuter_JUL_2015-5.cal —
REVISED_Oakland_InnerOuter_JUL_2015-7.cal —
W912P7-15-B-0003_Amendment_0002_05Aug15(2).pdf PDF
REVISED_Oakland_InnerOuter_JUL_2015-2.cal —
SF_21_OH_20150709_CON_R1-6_COMP_sorted15.xyz XYZ file
REVISED_Oakland_InnerOuter_JUL_2015-1.cal —
W912P7-15-B-0003_Amendment_0001.pdf PDF
Pre-Bid_Meeting_-_Oakland_Inner_and_Outer_Harbor_Channel_Maintenance_Dredging_Project_July_29 _2015.pdf PDF
Pre-Bid_Meeting_-_Oakland_Inner_and_Outer_Harbor_Channel_Maintenance_Dredging_Project.pdf PDF
Oakland_InnerOuter_JUN_2015-G2- SHT REF.cal —
Oakland_InnerOuter_JUN_2015-8.cal —
OI_August Dec2014_BD_100'_sections_all.xyz XYZ file
Oakland_InnerOuter_JUN_2015-3.cal —
Oakland_InnerOuter_JUN_2015-6.cal —
Oakland_InnerOuter_JUN_2015-1.cal —
maxview513.exe EXE file
Oakland_InnerOuter_JUN_2015-5.cal —
Oakland_InnerOuter_JUN_2015-4.cal —
Oakland_InnerOuter_JUN_2015-7.cal —
Oakland_InnerOuter_JUN_2015-2.cal —
OO_BDaug nov2014_100'_sections_all.xyz XYZ file
W912P7-15-B-0003 Final Solicitation and Specifications 7-2-2015.pdf PDF
_Readme.txt TXT text file
Oakland_InnerOuter_JUN_2015-G1-Cover.cal —
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Oakland Inner and Outer Harbor Pre-Bid Meeting

6 August 2015

Attendees: Company Phone E-Mail

Kristen Odronic (sp) Manson Constr. (904) 821-0211 Rick Olejniczak GBA (707) 595-3492 RAOlejniczak@GBA-Inc.com JC Krause Dutra (415) 254-4443 JKrause@dutragroup.com Garret Lim Dutra (415) 300-5156 GLim@dutragroup.com Kyle Howell Manson Constr. (904) 821-2240 KHowell@mansonconstruction.com Winston Pak R.E. Staite Eng. (619)233-0178 WinstonP@restaite.net Eric McMann Manson Constr. (510) 774-8396 EMcMann@mansonconstruction.com Tim Ekren Dutra (415) 686-3526 TEkren@dutragroup.com

Questions:

1. Can dredging start before 1 August for Option 2 and Option 3?

Answer – No, dredging cannot begin before 1 August in any year, when the Environmental Work Windows open for steelhead and least terns. See Section 01 57 20.00 10 Environmental Protection, Para 3.7 for details.

2. What registration/certification is required in California for hydrographic survey contractor?

Answer – There is no requirement in California for licensure or certification of hydrographic survey contractors. USACE will amend solicitation to require a “Third Party” survey contractor with multi-beam equipment.

3. SF 1442 will be amended to correct required depth for Option 1.

4. Pricing Schedule CLINS 0002AA and 0002AB in Alternative 2 will be corrected to agree with CLINS 0002AA and 0002AB in Alternative 1.