This solicitation notice and bid package are for the construction project "Porter County Storm Sewer Improvements - Section 219, Valparaiso, Porter County, Indiana" issued by the United States Army Corps of Engineers - Chicago District. The project involves improvements to approximately 800 linear feet of roadside ditch and 1,200 linear feet of 54-inch storm sewer relief extending from the ditch to the South Haven Elementary School flood control basin.
Bids for the construction work are due by 2:00 p.m. Central Time on September 11, 2020. Competition is reserved exclusively for small business concerns with a size standard of $39.5 million. The estimated cost of construction is between $1-5 million. The solicitation and specification files are available as PDFs from the internet site. The point of contact is Ericka Hillard at the Chicago District office. Bidders must be registered in the System for Award Management at the time bids are submitted.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6600579182
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE: PORTER COUNTY STORM SEWER IMPROVEMENTS, VALPARAISO, INDIANA
A. This Amendment No. 0003 incorporates a Revised Bid Schedule, w herein correcting Line Items “0016” and “0021” to correspond w ith the intended revisions via Amendment No. 0002. Therefore, Bidders shall replace the previously furnished Bid Schedule w ith the Revised Bid Schedule enclosed hereunder.
B. The Bid Opening Date and Time is unchanged by this Amendment, therefore, Bids are due prior to 2:00 p.m. (Central Time) on September 11, 2020. -For further details regarding bid submission, please refer to Solicitation Section 00 22 13 - Supplementary Instructions to Bidders.
C. Point of Contact for this Amendment is Ericka Hillard at (312) 846-5378; email: ericka.d.hillard@usace.army.mil.
- AMENDMENT CONTINUES ON NEXT PAGES
1. CONTRACT ID CODE PAGE OF PAGES
J 1 21
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Sep-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P620B0006
X 9B. DATED (SEE ITEM 11)
07-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Sep-2020
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P620B0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
D. By way of this Amendment, the government provides the most recently published Department of Labor wage rates, which are attached hereto and follows the Revised Bid Schedule– see "General Decision Number:
IN20200001 09/04/2020.”
REVSIED (VIA AMENDMENT NO. 0003)
Section 00 10 00 - Solicitation
CONTRACT BID FORM BID SCHEDULE
THE BELOW BID FORM SERVES AS THE BID SCHEDULE AND SHALL BE USED BY THE BIDDER TO
ENTER ITS BID PRICING
DISTINCTION OF LINE ITEMS:
The below Bid Schedule contains a combination of Firm Fixed Price (FFP) and cost reimbursable line items.
Although “FFP” is shown in the description of the cost reimbursable line items, it is not to be construed as a Firm Fixed Price line item. In this case, the FFP represents the Contract Type, which is firm fixed price. Therefore, the contractor will be reimbursed as stated within the extended description of the cost reimbursable line items.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
MOBILIZATION
FFP
Under this line item, the contractor is required to perform mobilization activities.
The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.
Payment Provisions: The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
PURCHASE REQUEST NUMBER: W81G6600579182
PSC CD: Y1PZ
NET AMT
0002 1 Job
DEMOBILIZATION
FFP
Under this line item, the contractor is required to perform demobilization activities.
The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force from the project site.
Payment Provisions: The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
0003 1 Job
CLEARING RIGHT OF WAY
FFP
0004 80 Square
Yard
CONCRETE SIDEWALK, REMOVE
0005 2,670 Square
PAVEMENT, REMOVE
0006 1,628 Linear
Foot
CONCRETE CURB, REMOVE
0007 272 Square
PCCP DRIVEWAY, REMOVE
0008 614 Linear
PIPE, REMOVE
0009 3 Each
STRUCTURE, REMOVE
0010 1 Job
EXCAVATION, COMMON
0011 1 Job
EMBANKMENT
0012 1 Job
MAINTENANCE OF EROSION CONTROL DEVICES
0013 4,050 Square
GEOTEXTILE FOR SUBGRADE
0014 648 Net Ton
(2,000
LB).
COMPACTED AGGREGATE NO. 2, FOR UNDERCUT
BACKFILL (UNDISTRIBUTED)
0015 3,000 Net Ton
COMPACTED AGGREGATE NO. 53 BASE
0016 394 Net Ton
STRUCTURAL BACKFILL, TYPE 1
0017 355 Square
MILLING. ASPHALT, 1.5 IN
0018 25 Net Ton
HMA WEDGE AND LEVEL, TYPE B
(UNDISTRIBUTED)
0019 617 Net Ton
HMA INTERMEDIATE, TYPE B
0020 330 Net Ton
HMA SURFACE, TYPE B
0021 3,946 Square
ASPHALT FOR TACK COAT
0022 115 Square
SIDEWALK, CONCRETE, 4 IN
0023 7 Square
CURB RAMP, CONCRETE
0024 1,739 Linear
CURB AND GUTTER, ROLL CURB, CONCRETE
0025 97 Square
HMA FOR APPROACHES, 3 IN
0026 474 Square
PCCP FOR APPROACHES, 5 IN
0027 312 Square
PCCP FOR APPROACHES, 8 IN
0028 2,800 Square
EROSION CONTROL BLANKET
0029 1,833 Square
TOPSOIL, 4 IN & MULCHED SEEDING, U
0030 3,916 Square
MULCHED SEEDING, D
0031 3 Each
VALVE BOX, ADJUST TO GRADE,
FFP
(UNDISTRIBUTED)
0032 2 Each
SIGN ASSEMBLY RE-SET
0033 8 Each
MAILBOX ASSEMBLY, SINGLE (UNDISTRIBUTED)
0034 2,050 Square
ARTICULATING CONCRETE BLOCK MAT
0035 230 Square
TURF REINFORCEMENT MAT
0036 200 Linear
PIPE, UNDERDRAIN, 6 IN
0037 40 Linear
PIPE, TYPE 2, CONCRETE, CIRCULAR, 12 IN
0038 270 Linear
PIPE, TYPE 2, CONCRETE, CIRCULAR, 15 IN
0039 1,073 Linear
PIPE, TYPE 2, CONCRETE, CIRCULAR, 54 IN
0040 1 Each
DROP STRUCTURE
0041 15 Each
PIPE END SECTION, PRECAST CONCRETE,15 IN
0042 2 Each
MANHOLE, N (9')
0043 3 Each
MANHOLE, L (8')
0044 1 Each
MANHOLE, C (4')
0045 4 Each
INLET, TYPE J
0046 4 Each
CONCRETE BULKHEAD
0047 1 Job
PAVEMENT MARKINGS
0048 1 Job
TRAFFIC CONTROL
0049 1 Lot
PERFORMANCE AND PAYMENT BOND
FFP
This is a cost reimbursable line item for bond coverage for line items 0001 through
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions associated with contract price changes. re: FAR 52.232-5(g)
SUMMATION OF BID PRICES
OVERALL BID PRICE (ITEMS 0001 THROUGH 0049): $___________________
END OF REVISED BID SCHEDULE
END OF AMENDMENT NO. 0003
File details come from the government source that posted it. Updated .