AMENDMENT_0003_-_W912P619B0023_FB_PAVING_WITH_ATTACHMENTS.pdf
PDF 3 MB Posted
- Solicitation number
- W912P619B0023
About this file
This file contains Amendment No. 0003, which answers contractor's inquiries, and provides revised drawing sheets, the most current wage rates and the attendance sheet from the pre-bid meeting.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6691836006
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE INVITATION FOR BIDS NO. W912P619B0023, "SITE PAVING CONSTRUCTION SERVICES AT THE CHICAGO SANITARY AND SHIP
CANAL (FISH BARRIER), LOCKPORT, WILL COUNTY, ILLINOIS'
A. Due to a computer glitch, the Amendment numbering for this Solicitation advanced, thereby skipping Amendment No. 0002. Therefore, as of this date of this Amendment, only 2 Amendments w ill have been issued, that being the previously issued Amendment No. 0001 and this Amendment No. 0003. Accordingly, Bidders shall ensure to acknow ledge Amendment No. 0001 and Amendment 0003 and submit them along w ith all other items required by the Solicitation. More to the point, an Amendment No. 0002 w ill not be issued.
-- THIS AMENDMENT CONTINUES ON THE FOLLOWING PAGES --
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P619B0023
X 9B. DATED (SEE ITEM 11)
15-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Sep-2019
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P619B0023
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
B. BID OPENING DATE AND TIME: The Bid Opening Date for this Solicitation has not been extended by this Amendment. However, the time for the Bid Opening has changed from 2:00 p.m. (Central Time) to 3:00 p.m. (Central Time). Therefore, bids are due prior to 3:00 p.m. (Central Time) on September 17, 2019. Detailed information regarding the submission of bids is located at Section 00 22 13 of the Solicitation document – See “IMPORTANT BID NOTES.”
C. AMENDED DRAWING SHEETS: The following DRAWING SHEETS have been revised. Bidders shall remove and replace the previously issued sheets with the revised sheets enclosed hereunder.
SHEET REF. NO. TITLE AND DESCRIPTION
C-104 Proposed West Bank Paving Plan – Added additional details to existing call-outs C-105 Proposed East Bank Paving Plan – Added new notes and call-outs
D. CONTRACTOR’S INQUIRIES: By this Amendment, the Chicago District, USACE responds to Contractor’s inquiries (SEE THE FOLLOWING).
Q1. It is the Contractor's understanding that the proposed aggregate subgrade depicted beneath the pavement is required in the event the where the excavated subgrade does not pass field density testing.
Please confirm.
USACE Response Q1: Boring data is not available. The Contractor is responsible for meeting all contract requirements. Should the Contractor encounter a differing site condition, the appropriate contract action will be executed, wherein a remedy clause (e.g. FAR 52.236-2) can be invoked to address the differing site condition.
Q2. The proposed pavement around the Demonstration Building Barrier where it is isolated by the retaining wall is to be 8". The rock elevation at this location is high, and there are unidentified utilities in this area. Will the Government consider utilizing 5" pavement at this location since it will not be subjected to vehicular traffic? This will reduce rock excavation and potential conflicts with the proposed pavement and existing utilities.
USACE Response Q2: Changes to the depth of the pavement is included in this amendment. 5" inches will be allowed around the demo building on the interior side of the retaining wall and duct bank only, as shown on Sheet C-105.
Q3. Please confirm the width of the 6” x 6” Copper Mesh grounding system shown to go around the ComEd Substation, how wide is the mesh to be?
USACE Response Q3: The copper mesh is to be installed in the unpaved area around the ComEd substation as shown on sheets C-105 and ES-102. This area is 3 feet wide (information from note 3 on sheet C-105).
W912P619B0023
Q4. Can you provide a detail drawing of what you are requiring?
USACE Response Q4: No additional drawings are forth coming, please follow the installation instructions as described in notes 2 and 3 on sheet ES-102 and details described in Specification Section 28 05 26.00 40.
E. WAGE DETERMINATION: This Amendment encloses the most recent Wage Determination, General Decision IL20190009 08/30/2019.
F. PRE-BID MEETING ATTENDANCE: By this Amendment, the Chicago District is enclosing a copy of the Attendance Sheet from the pre-bid meeting held on September 4, 2019.
G. POINT OF CONTACT: The Point of Contact (POC) for this Amendment is Ericka Hillard at (312) 846-5378;
email: ericka.d.hillard@usace.army.mil.
END OF AMENDMENT NO. 0003
(The aforementioned Revised Drawing Sheets, Most Current Wage Determination and Pre-Bid Meeting Attendance Sheet follows)
70' 72'
74'
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
MATCH EXISTING GRADE
GRADUALLY SLOPE TO
PIPE @ 1.0% MIN SLOPE. SEE NOTES AND DETAIL.
INSTALL CATCH BASIN WITH 12" PVC DISCHARGE
CURB AND GUTTER
MATCH EXISTING GRADE
GRADUALLY SLOPE TO
CURB AND GUTTER
CURB AND GUTTER
CURB AND GUTTER
E = 1058731.15
N = 1811935.11
T/P 585.60
T/C 586.10 E = 1058734.65
N = 1812035.89
T/P 586.1
T/C 586.6
E=1058735.93
N=1812074.61
T/P 585.66
T/C 586.16
E = 1058727.43
N = 1812136.45
T/P 585.6
T/C 586.1
E = 1058719.39
N = 1812188.26
T/P 585.25
T/C 585.75 E = 1058707.61
N = 1812236.78
T/P 585.15
T/C 585.65
E = 1058705.95
N = 1812250.47
T/P 585.15
T/C 585.65 E = 1058711.08
N = 1812324.38
T/C 585.5
E = 1058765.45
N = 1812319.62
T/P 585.00
E = 1058819.83
N = 1812314.85
T/C 585.3
E = 1058814.53
N = 1812231.15
T/P 584.8
T/C 585.3
E = 1058792.61
N = 1812212.07
T/P 584.39
E = 1058790.14
N = 1812183.98
T/P 584.39
E = 1058808.27
N = 1812132.12
T/P 584.8
T/C 585.3
E = 1058776.08
N = 1812032.26
T/P 585.70
E = 1058795.11
N = 1812060.82
T/P 585.30E = 1058790.63
N = 1812000.61
T/P 585.30
E = 1058820.36
N = 1812058.76
T/C 585.39
E = 1058815.88
N = 1811998.55
T/C 585.43
E = 1058829.58
N = 1812112.46
T/P 584.60
E = 1058814.61
N = 1811927.80
T/P 584.69
T/C 585.02
INSTALL CURB & GUTTER
CURB & GUTTER
INSTALL
& R-102 FOR DETAILS
DUCT BANK, SEE SHEET R-101
EXISTING UNDERGROUND
SEE NOTES 4 AND 7.
INSTALL CATCH BASIN
D
D
PIPE @ 1.0% MIN SLOPE TO CANAL. SEE NOTES 5 AND 7.
INSTALL CATCH BASIN WITH 12" PVC DISCHARGE
WILL BE REPAIRED FREE OF CHARGE TO GOVERNMENT.
WILL BE REQUIRED. ANY DAMAGE TO DUCT BANK
DRILLING / BORING UNDER EXISTING DUCT BANK
STRUCTURE WITH NEW CATCH BASIN.
INSTALL 12" DRAINAGE PIPE TO CONNECT EXISTING
D
D
D
H H
H H
G R
A V E L
P
A T
H
BUILDING
CONC WALK
CONC WALK
CONC WALK
CONC WALK
G A
T E
GATE
GATE
GEN
PAVING LEGEND
X 500.2 EXISTING ELEVATIONS
EASTSIDE PAVING - APPROXIMATELY 26,063 SQUARE FEET
WESTSIDE PAVING - APPROXIMATELY 34,332 SQUARE FEET
THE REQUIREMENTS.
TO PLACING ANY PAVEMENT BY ANY COMPACTION MEANS NECESSARY TO MEET
RESPONSIBILITY TO COMPACT THE SUBGRADE TO THE REQUIRED DENSITY PRIOR
TO THE STANDARDS DEFINED IN THE SPECIFICATION. IT IS THE CONTRACTOR'S
IT IS ASSUMED THE EXISTING SUBGRADE IS CAPABLE OF BEING COMPACTED9.
FOR PAVEMENT JOINT DETAILS SEE SHEET C-503.8.
FOR MORE DETAILS ABOUT CATCH BASINS SEE SHEET C-501 AND C-502.7.
EXCAVATION TO NOT DAMAGE BURIED WIRE.
4/0 COPPER WIRE (NOT SHOWN IN DRAWING). USE CAUTION DURING
ALL EXISTING GROUND RODS ARE CONNECTED TO EACH OTHER BY6.
DRILLING / ROCK EXCAVATION MAYBE NECESSARY.5.
INSTALL 12" DIA. PVC PIPE @ 1.0% MIN SLOP.
CONCRETE STRUCTURE EXISTS, DISCHARGE OPENING LARGE ENOUGH TO4.
WITH COR FOR EXACT LOCATION.
TO ON SITE STOCKPILE LOCATION AS SHOWN ON C-101 COORDINATE
USE EXISTING GRAVEL AS BACKFILL. ANY SPOILS TO BE RELOCATED3.
GRADE TO FENCE LINE.
GUTTER. BACK OF CURB AREA SHOULD BE MATCHED TO EXISTING
PAVEMENT OFF SET 5' FROM FENCE ON WEST SIDE WITH CURB AND 2.
TOP OF PAVEMENT.
MANHOLES AND HANDHOLES SHALL BE BROUGHT FLUSH WITH
ALL EXISTING UNDERGROUND UTILITY OR GROUNDING ACCESS1.
NOTES:
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg1:13:32 PM 9/11/2019
...\Fish Barrier - Site Paving FY19\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\PROPOSED WESTBANK PLAN VIEW PAVING
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P
O J E
C T I
D
F
IL
E N
A M
E
O
M E
O V
IL
L E
IL
L
IN
O
IS
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
C-104C-104
A
S H
E E
D M
U H
A M
M A
D R
A S
H E
E D M
U H
A M
M A
D
C1
SCALE: 1" = 20' 20' 40'0
NORTH
PLAN
TRUE N
C -1
.d g n
W P -1
-C
W
IT
O L
D K
L U
Z A
A N
S I
D
W
IT
O L
D K
L U
Z A
S
IT
E P
A V
IN
G F
Y
E L E
C T
R
IC
F
IS
H D
IS
P E
R S
A L B
A R
R
IE
R
C H
IC
A G
O S
A N
IT
A R
Y S
H
IP
C
A N
A L
R A
N A M
IS
H
R A P
E
C
G
IA
C A
L O
N E
R A
N A M
IS
H
R A P
E
C
G
IA
C A
L O
N E
P R
O P
O S
E D W
E S
T B
A N
K P
L A
N V
IE
W P
A V
IN
G P
R O
P O
S E
D W
E S
T B
A N
K P
L A
N V
IE
W P
A V
IN
G
W P -1
-B -0
OPTION 1 - PROPOSED WESTBANK PLAN VIEW PAVING
O P
T
IO
N
O P
T
IO
N
A U
G U
S T
CERTIFIED FINAL DOCUMENTS - RTA
/5 /2
N O
T E
S A
D D
E D
/5 /2
N O
T E
S A
D D
E D
C -1
C -1
CATCH TRENCH BASIN
EXISTING STORM WATER
E = 1059141.10
N = 1813623.25
T/P 586.26
E = 1059182.88
N = 1813620.51
T/P 587.00
E = 1059230.36
N = 1813617.33
T/P 587.50
E = 1059224.78
N = 1813535.07
T/P 587.20
SEE NOTE
AROUND ComEd SUBSTATION
INSTALL CURB AND GUTTER
E = 1059214.50
N = 1813429.37
T/P 587.00
E = 1059207.59
N = 1813370.85
T/P 586.5
E = 1059197.55
N = 1813299.79
T/P 586.20
E = 1059187.73
N = 1813238.06
T/P 586.10
E = 1059151.90
N = 1813243.13
T/P 584.60
E = 1059175.44
N = 1813184.93
T/P 585.20 E = 1059148.64
N = 1813185.14
T/P 585.60
T/C 586.10
EXISTING PVC PIPE
CLEAR DEBRIS BLOCKAGE FROM
EXISTING RIM ELEVATION = 583.7
E = 1059116.78
N = 1813257.34
T/P 584.20
EXISTING RIM ELEVATION = 583.7
@ 1.0% MIN SLOPE
REPLACE 6" PVC PIPE WITH 12" PVC PIPE
EXISTING CATCH BASIN
E = 1059107.51
N = 1813299.68
T/P 586.05
E = 1059118.64
N = 1813441.36
T/P 586.10
E = 1059125.40
N = 1813503.78
T/P 586.20
SEE SHEET C-106
INSTALL RETAINING WALL
SEE NOTE
INSTALL BOLLADS (8)
SEE NOTE 11.
SEE SHEET C-106 FOR DETAILS
INSTALL RETAINING WALL
LOCATION TO BE COORDINATED WITH COR
TO THE WEST SIDE OF THE CANAL,
RELOCATE 5 JERSEY BARRIERS
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
E E E E E E
D
D
D
D
PARKING
BIT
CONC. WALK CONC. WALK
CONC. WALK
TOP OF RAILS
GATEGATE
GATE
GATE
GATE
G E
N E
R A
T O
R
G E
N E
R A
T O
R
SUBSTATION
COMED
(CGBP)
CONTROL GEAR BACKUP POWER
TR TR
BARRIER
BUILDING
DEMONSTRATION
DUCT BANK
TR
TR
ROAD
ROAD ROAD
AC
AC AC
G E
N
BUILDING
BARRIER 1
PERMANENT
PAVING LEGEND
X 500.2 EXISTING ELEVATIONS
EASTSIDE PAVING - APPROXIMATELY 26,063 SQUARE FEET
WESTSIDE PAVING - APPROXIMATELY 34,332 SQUARE FEET
THE REQUIREMENTS.
TO PLACING ANY PAVEMENT BY ANY COMPACTION MEANS NECESSARY TO MEET
RESPONSIBILITY TO COMPACT THE SUBGRADE TO THE REQUIRED DENSITY PRIOR
TO THE STANDARDS DEFINED IN THE SPECIFICATION. IT IS THE CONTRACTOR'S
IT IS ASSUMED THE EXISTING SUBGRADE IS CAPABLE OF BEING COMPACTED12.
RETAINING WALL AND DUCT BANK ONLY.
ALLOWED AROUND DEMO BUILDING ON THE INTERIOR SIDE WITHIN THE
11. TO AVOID CONFLICTS WITH UTILITIES 5" THICK CONCRETE PLACEMENT IS
EXCAVATION TO NOT DAMAGE BURIED WIRE.
4/0 COPPER WIRE (NOT SHOWN IN DRAWING). USE CAUTION DURING
ALL EXISTING GROUND RODS ARE CONNECTED TO EACH OTHER BY10.
EXISTING CONDITIONS.
BETWEEN CONCRETE PADS. SEE PHOTO 1 FOR MORE DETAILS SHOWING
ON BOTH SIDES OF EACH GENERATOR CONTRACTOR SHALL FILL AREAS9.
SHEET C-503.
INSTALL BOLLARDS ON EACH EXTERIOR CORNERS, FOR MORE DETAILS SEE8.
DRILLING / ROCK EXCAVATION MAYBE NECESSARY.7.
INSTALL 12" DIA. PVC PIPE @ 1.0% MIN SLOP.
CONCRETE STRUCTURE EXISTS, DISCHARGE OPENING LARGE ENOUGH TO6.
WITH COR FOR EXACT LOCATION.
TO ON SITE STOCKPILE LOCATION AS SHOWN ON C-101 COORDINATE
USE EXISTING GRAVEL AS BACKFILL. ANY SPOILS TO BE RELOCATED5.
GRADE TO FENCE LINE.
GUTTER. BACK OF CURB AREA SHOULD BE MATCHED TO EXISTING
PAVEMENT OFFSET 5' FROM FENCE ON WEST SIDE WITH CURB AND 4.
OFFSET BACK OF CURB 3' OFF ALL SIDES OF COMED FENCE.3.
SHOWN IN THE REFERENCE DRAWINGS.
REINSTALL FENCE TO MATCH FENCE PRIOR TO REMOVAL AND AS
AREA ONCE PAVING IS COMPLETE AND CONCRETE HAS CURED
DISASSEMBLE TYPE B FENCE AND MOVE TO DESIGNATED STORAGE2.
TOP OF PAVEMENT.
MANHOLES AND HANDHOLES SHALL BE BROUGHT FLUSH WITH
ALL EXISTING UNDERGROUND UTILITY OR GROUNDING ACCESS1.
NOTES:
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg1:13:04 PM 9/11/2019
...\Fish Barrier - Site Paving FY19\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\PROPOSED EASTBANK PLAN VIEW PAVING
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
S
P
O J E
C T I
D
F
IL
E N
A M
E
O
M E
O V
IL
L E
IL
L
IN
O
IS
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
C-105C-105
A
S H
E E
D M
U H
A M
M A
D R
A S
H E
E D M
U H
A M
M A
D
C1
SCALE: 1" = 20' 20' 40'0
NORTH
PLAN
TRUE N
W P -1
-C
C -1
.d g n
W
IT
O L
D K
L U
Z A
A N
S I
D
W
IT
O L
D K
L U
Z A
T/P 587.50
T/P 586.26
T/P 586.15T/P 586.10T/P 586.05
T/P 584.20
T/P 585.20
T/P 586.20 T/P 587.00
S
IT
E P
A V
IN
G F
Y
E L E
C T
R
IC
F
IS
H D
IS
P E
R S
A L B
A R
R
IE
R
C H
IC
A G
O S
A N
IT
A R
Y S
H
IP
C
A N
A L
R A
N A M
IS
H
R A P
E
C
G
IA
C A
L O
N E
R A
N A M
IS
H
R A P
E
C
G
IA
C A
L O
N E
P R
O P
O S
E D E
A S
T B
A N
K P
L A
N V
IE
W P
A V
IN
G P
R O
P O
S E
D E
A S
T B
A N
K P
L A
N V
IE
W P
A V
IN
G
PROPOSED EASTBANK PLAN VIEW PAVING
A2
SCALE: NTS
PHOTO 1 DETAIL
W P -1
-B -0
A U
G U
S T
CERTIFIED FINAL DOCUMENTS - RTA
/5 /2
N O
T E
S A
N D D
IM
A
D D
E D
/5 /2
N O
T E
S A
N D D
IM
A
D D
E D
C -1
C -1
"General Decision Number: IL20190011 08/30/2019
Superseded General Decision Number: IL20180011
State: Illinois
Construction Types: Heavy and Highway
Counties: Boone, De Kalb, Du Page, Kane, Kendall, Lake, McHenry and Will Counties in Illinois.
HEAVY AND HIGHWAY CONSTRUCTION PROJECTS (does not include landscape projects).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January
1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year
2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the
Page 1 of 38beta.SAM.gov
9/9/2019https://beta.sam.gov/wage-determination/IL20190011/12/document federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the
Davis-Bacon Related Acts, including those set forth at 29 CFR
5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/04/2019
1 03/15/2019
2 04/19/2019
3 05/10/2019
4 06/07/2019
5 06/14/2019
6 06/21/2019
7 06/28/2019
8 07/05/2019
9 07/19/2019
10 08/09/2019
11 08/23/2019
12 08/30/2019
CARP0555-003 06/01/2018
DUPAGE ANE LAKE COUNTIES
Rates Fringes
CARPENTER
Building....................$ 47.35 32.83
Heavy & Highway.............$ 47.35 32.83
CARP0555-008 06/01/2016
WILL COUNTY
Page 2 of 38beta.SAM.gov
Rates Fringes
Carpenter and Piledriver.........$ 45.35 32.30
CARP0555-011 06/01/2018
KANE, McHENRY (North of Hwy 52), AND KENDALL COUNTIES
Rates Fringes
Carpenter and Piledriver.........$ 47.35 32.84
CARP0790-003 05/01/2019
DE KALB COUNTY
Rates Fringes
CARPENTER........................$ 42.70 30.38
CARP0790-004 05/01/2019
CARROLL, JO DAVIESS, LEE, OGLE (Oregon and South thereof), STEPHENSON, and WHITESIDE COUNTIES
Rates Fringes
CARPENTER........................$ 42.70 30.38
CARP0792-003 05/01/2019
BOONE COUNTY
Rates Fringes
CARPENTER........................$ 45.10 27.98
Page 3 of 38beta.SAM.gov
ELEC0009-002 06/03/2018
WILL COUNTY
Rates Fringes
Line Construction
Groundman...................$ 40.48 61.52%
Lineman and Equipment
Operator....................$ 51.90 61.52%
ELEC0117-001 06/03/2019
KANE (Northern Half) and McHENRY (All) COUNTIES
Rates Fringes
ELECTRICIAN......................$ 49.99 34%+16.80
ELEC0150-001 07/01/2017
LAKE COUNTY
Rates Fringes
ELECTRICIAN......................$ 40.00 38.49
ELEC0176-011 06/01/2018
WILL COUNTY
Rates Fringes
ELECTRICIAN......................$ 43.50 39.26
ELEC0196-001 03/04/2019
Page 4 of 38beta.SAM.gov
BOONE, DEKALB, DUPAGE, KANE, KENDALL, LAKE, and MCHENRY COUNTIES
Line Construction
Equipment Operator..........$ 43.87 32.75%+6.00+A
Groundman Truck Driver......$ 35.05 32.75%+6.00+A
Groundman...................$ 33.85 32.75%+6.00+A
Lineman, Substation
Technician, Cable Splicing
Technician, Digger
Operator, Crane Operator
20 tons and above, and
Signal Technician...........$ 52.59 32.75%+6.00+A
FOOTNOTE: A. PAID HOLIDAYS: Memorial Day, Independence
Day, Labor Day, and Thanksgiving Day
ELEC0364-003 06/01/2019
BOONE (All) & DEKALB (Remainder) COUNTIES
Rates Fringes
ELECTRICIAN......................$ 47.89 35.14
ELEC0461-006 06/04/2018
DEKALB (Sandwich TWP), KANE (Southern Half) & KENDALL (All)
COUNTIES
Rates Fringes
ELECTRICIAN......................$ 47.72 32.39
Page 5 of 38beta.SAM.gov
ELEC0701-001 06/03/2019
DUPAGE COUNTY
Rates Fringes
ELECTRICIAN......................$ 41.00 105.86%
ENGI0150-015 06/01/2019
BOONE and DE KALB COUNTIES
Rates Fringes
OPERATOR: Power Equipment
Group 1.....................$ 46.65 40.20
Group 2.....................$ 46.10 40.20
Group 3.....................$ 44.80 40.20
Group 4.....................$ 43.35 40.20
Group 5.....................$ 41.90 40.20
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Plant; Asphalt Heater and Planer combination; Asphalt Spreader; Asphalt Silo Tender;
Autograder, GOMACO or similar; Belt Loader; Caisson Rigs;
Car Dumper, Central Redi-Mix Plant; Combination Backhoe
Front End Loader Machine (1 cu yd or over Backhoe bucket with attachments); Backhoe with Shear attachment; Concrete
Breaker (truck mounted); Concrete Conveyor; Concrete Paver over 27E cu ft; Concrete Placer; Concrete Tube Float;
Cranes, all attachments; Cranes, Hammerhead, Linden, Peco and machines of a like nature; Creter Crane; Crusher, stone; Derricks; Derrick Boats; Derricks, traveling;
Dredges; Field Mechanic Welder; Formless Curb and Gutter
Machine; Gradall and machines of a like nature; Grader, Page 6 of 38beta.SAM.gov
Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard Rail Post Driver mounted; Hoists, one, two, and three Drum; Hydraulic
Backhoes; Locomotive, all Mucking Machine; Pile Drivers and
Skid Rig; Pre-Stress Machine; Pump Cretes Dual Ram; Rock
Drill-Crawler or Skid Rig; Rock Drill truck mounted; Roto
Mill Grinder, 36"" and over; Roto Mill Grinder, less than
36""; Slip- Form Paver; Soil Test Drill Rig, truck mounted;
Straddle Buggies; GCI Crane and similar; Hydraulic
Telescoping Form (tunnel); Tie Back MAchine; Tractor Drawn
Belt Loader: Tractor Drawn Belt Loader with attached
Pusher; Tractor with boom; Tractaire with attachment;
Traffic Barrier Conveyor Machine; Raised or Blind Hoe Drill
(Tunnel & Shaft); Trenching Machine; Truck Mounted Concrete
Pump with boom; Truck mounted Concrete Conveyor;
Underground Boring and/or Mining Machines under 5 ft; Wheel
Excavator & Widener (Apsco)
GROUP 2: Batch Plant; Bituminous Mixer; Bobcats over .75 cu yd; Boiler and Throttle Valve; Bulldozer; Car Loader
Trailing Conveyors; Combination Backkhoe Front End Loader
Machine, less than 1 cu yd Backhoe Bucket with attachments;
Compressor and Throttle Valve; Compressor, common receiver
(3); Concrete Breaker or Hydro Hammer; Concrete Grinding
Machine; Concrete Mixer or Paver 7S series to and including
27 cu ft; Concrete Spreader; Concrete Curing Machine, Burlap Machine; Belting Machine and Sealing Machine;
Conveyor Muck Cars (Haglund or similar type); Finishing
Machine-Concrete; Greaser Engineer; Highlift Shovels or
Front End Loader; Hoist-Sewer Dragging Machine; Hydraulic
Boom Trucks, all attachments; Locomotives, Dinky; Pump
Cretes, Squeeze Cretes-Screw Type pumps, Gypsum Bulker and
Pump; Roller Asphalt; Rotary Snow Plows; Rototiller, Seaman, etc self-Propelled; Scoops-Tractor Drawn;
Self-propelled Compactor; Spreader-Chip- Stone etc;
Scraper; Scraper-Prime Mover in Tandem regardless of size
(add $1.00 to to Group 2 hourly rate for each hour and for
Page 7 of 38beta.SAM.gov each machine attached thereto); Tank Car Heater; Tractors, Push, pulling Sheeps Foot, Disc, or Compactor, etc; Tug
Boats
GROUP 3: Boilers; Brooms, all power propelled; Cement Supply
Tender; Compressor, Common Receiver (2); Concrete Mixer, two bag and over; Conveyor, Portable; Farm type Tractors used for mowing, seeding, etc; Fireman on Boilers; Forklift
Trucks; Grouting Machines; Hoists, Automatic; Hoists, all
Elevators; Hoists, Tugger single Drum; Jeep Diggers; Pipe
Jacking Machines; Post- hole Digger; Power Saw, Concrete, Power Driven; Pug Mills; Rollers, other than asphalt; Seed and Straw Blower; Steam Generators; Stump Machine; Winch
Trucks with A-Frame; Work Boats; Tamper-Form motor driven
GROUP 4: Air compressor - Small 185 and under (1 to 5 not to exceed a total of 300 ft); Air Compressor - Large over 185;
Asphalt Spreader Backend Man; Combination - Small Equipment
Operator; Generators - Small 50 kw and under; Generators -
Large , over 50 kw; Heaters, Mechanical; Hydraulic power unit (Pile Driving, Extracting or Drilling); Light Plants
All (1 to 5); Pumps, over 3"" (1 to 3, not to exceed a total of 300 ft); Pumps, Well Points; Tractaire; Welding Machines
(2 through 5); Winches, 4 small electric drill winches;
Bobcats up to and including .75 cu yd
GROUP 5: Oilers
PREMIUM PAY:
Long Boom :
Cranes & Derricks 90' to 150' including jib receive an extra
$.50 per hour. Cranes & Derricks over 150' including jib receive an extra $.50 per hour plus an additional $.10 for each additional 10' of boom or jib.
Capacity Pay: Cranes & Derricks with maximum capacity
Page 8 of 38beta.SAM.gov exceeding 50 ton with less than 90' of boom or jib shall be compensated $.01 per hour for each ton of the rated capacity in excess of 50 ton.
Long Boom pay and Capacity pay cannot be combined.
Crane mounted earth auger, raised and blind hole drills, and truck mounted drill rigs receive an extra $.50 per hour.
Creter Cranes:
When the Creter Crane is equipped with a conveyor system capable of extending 70' or more, the engineer shall receive an extra $.50 per hour.
Truck Mounted Concrete Pumps:
When the Truck Mounted Concrete Pump is equipped with a boom, which is capable of extending 90' or more, the engineer shall receive $.50 per hour extra.
Truck Mounted Concrete Conveyor:
Truck Mounted Concrete Conveyors equipped with conveyors that are capable of extending 90' or more, the engineer shall receive an extra $.50 per hour.
Underground Work:
Employees working in tunnels, shafts, etc. shall be paid an additional $.40 per hour. Employees working under air pressure 1/2 pound to 7 pounds shall receive an additional
$.50 per hour. Employees working under air pressure of 7 pounds or over shall receive $.65 per hour more.
Mining Machines- Boring Machines:
The crew operating and maintaining the Mining Machines shall be compensated an additional $.50 per hour.
* ENGI0150-024 06/01/2019
Page 9 of 38beta.SAM.gov
DUPAGE, KANE, KENDALL, LAKE, McHENRY, and WILL COUNTIES
OPERATOR: Power Equipment
GROUP 1.....................$ 49.30 41.00
GROUP 2.....................$ 48.75 41.00
GROUP 3.....................$ 46.70 41.00
GROUP 4.....................$ 45.30 41.00
GROUP 5.....................$ 44.10 41.00
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Plant*; Asphalt Heater and Planer combination; Asphalt Heater Scarfire*, Asphalt Spreader;
Autograder/ GOMACO or similar; ABG Paver*, Backhoes with
Caisson attachment*, Ballast Regulator, Belt Loader*;
Caisson Rigs*Car Dumper, Central Redi-Mix Plant*, Combination Backhoe; Front End Loader Machine (1 cu yd or over Backhoe bucket or with attachments); Concrete Breaker
(truck mounted); Concrete Conveyor; Concrete Paver over 27E cu ft*; Concrete Placer*; Concrete Tube Float; Cranes, all attachments*; Cranes, Hammerhead, Linden, Peco and machines of a like nature*; Creter Crane; Crusher, stone; All
Derricks; Derrick Boats; Derricks, traveling*; Dowell
Machine with Air Compressor ($1.00 above Class 1);
Dredges*; Field Mechanic Welder; Formless Curb and Gutter
Machine*; Gradall and machines of a like nature*; Grader, Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard Rail Post Driver mounted*; Hoists, one, two, and three Drum; Hydraulic
Backhoes*; Backhoes with Shear attachments*; Mucking
Machine; Pile Drivers and Skid Rig*; Pre-Stress Machine;
Pump Cretes Dual Ram (requires frequent lubrication and water)*; Rock Drill- Crawler or Skid Rig*; Rock Drill truck mounted*; Rock/ Track Tamper; Roto Mill Grinder, (36"" and
Page 10 of 38beta.SAM.gov over)*; Slip-Form Paver*; Soil Test Drill Rig, truck mounted*; Straddle Buggies; Hydraulic Telescoping Form
(tunnel); Tractor Drawn Belt Loader*; Tractor Drawn Belt
Loader with attached Pusher (two engineers); Tractor with boom; Tractaire with attachment; Traffic Barrier Transfer
Machine*; Trenching Machine; Truck Mounted Concrete Pump with boom*; Underground Boring and/or Mining Machines 5 ft in diameter and over tunnel, etc.*; Wheel Excavator* &
Widener (Apsco); Raised or Blind Hoe Drill, Tunnel & Shaft*
GROUP 2: Batch Plant*; Bituminous Mixer; Boiler and Throttle
Valve; Bulldozer; Car Loader Trailing Conveyors;
Combination Backkhoe Front End Loader Machine, (less than 1 cu yd Backhoe Bucket with attachments); Compressor and
Throttle Valve; Compressor, common receiver (3); Concrete
Breaker or Hydro Hammer; Concrete Grinding Machine;
Concrete Mixer or Paver 7S series to and including 27 cu ft; Concrete Spreader; Concrete Curing Machine; Burlap
Machine; Belting Machine and Sealing Machine; Concrete
Wheel Saw; Conveyor Muck Cars (Haglund or similar type);
Drills (all); Finishing Machine-Concrete; Greaser Engineer;
Highlift Shovels or Front End Loader; Hoist- Sewer Dragging
Machine; Hydraulic Boom Trucks, all attachments;
Hydro-Blaster (requires two operators); Laser Screed*;
Locomotives, Dinky; Off-Road Hauling Units (including articulating); Pump Cretes; Squeeze Cretes-Screw Type pumps, Gypsum Bulker and Pump; Roller Asphalt; Rotary Snow
Plows; Rototiller, Seaman, self-Propelled; Scoops-Tractor
Drawn; Self- propelled Compactor; Spreader-Chip-Stone;
Scraper; Scraper-Prime Mover in Tandem regardless of size
(add $1.00 to Group 2 hourly rate for each hour and for each machine attached thereto add $1.00 to Group 2 hourly rate for each hour); Tank Car Heater; Tractors, Push, pulling Sheeps Foot, Disc, or Compactor, etc; Tug Boats
GROUP 3: Boilers; Brooms, all power propelled; Cement Supply
Tender; Compressor, Common Receiver (2); Concrete Mixer, Page 11 of 38beta.SAM.gov two bag and over; Conveyor, Portable; Farm type Tractors used for mowing, seeding, etc; Fireman on Boilers; Forklift
Trucks; Grouting Machines; Hoists, Automatic; Hoists, all
Elevators; Hoists, Tugger single Drum; Jeep Diggers; Low
Boys; Pipe Jacking Machines; Post-hole Digger; Power Saw, Concrete, Power Driven; Pug Mills; Rollers, other than asphalt; Seed and Straw Blower; Steam Generators; Stump
Machine; Winch Trucks with A-Frame; Work Boats; Tamper-Form motor driven
GROUP 4: Air compressor - Small 250 and under (1 to 5 not to exceed a total of 300 ft); Air Compressor - Large over 250;
Combination - Small Equipment Operator; Directional Boring
Machine; Generators - Small 50 kw and under; Generators -
Large , over 50 kw; Heaters, Mechanical; Hydraulic power unit (Pile Driving, Extracting or Drilling); Light Plants
(1 to 5); Pumps, over 3"" (1 to 3, not to exceed a total of
300 ft); Pumps, Well Points; Tractaire; Welding Machines (2 through 5); Winches, 4 small electric drill winches;
GROUP 5: Bobcats (All); Brick Forklifts; Oilers; Directional
Boring
*Requires Oiler
* IRON0001-014 06/01/2019
DU PAGE (Eastern 1/4), LAKE, AND MCHENRY (Hebron, Woodstock, and East thereof) COUNTIES
Rates Fringes
IRONWORKER
Sheeter.....................$ 50.88 39.37
Structural and Reinforcing..$ 50.63 39.37
Page 12 of 38beta.SAM.gov
IRON0063-003 06/01/2018
LAKE, DUPAGE (Eastern 1/4) and McHENRY (HEBRON, WOODSTOCK &
EAST THEREOF) COUNTIES
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 48.05 35.93
IRON0393-003 06/01/2019
DEKALB (SOUTHEASTERN 2/3 including Sycamore and Dekalb), DUPAGE (REMAINDER), KANE, KENDALL (NORTHERN PART), and MCHENRY
(SOUTHEAST 1/4) COUNTIES
Rates Fringes
IRONWORKER.......................$ 47.00 36.79
IRON0444-006 06/01/2018
KENDALL (Southern Part) and WILL COUNTIES
Rates Fringes
IRONWORKER.......................$ 43.00 38.20
IRON0498-003 06/01/2019
BOONE, DEKALB (EXCEPT Southeast), and MCHENRY (Northwest)
COUNTIES
Rates Fringes
Page 13 of 38beta.SAM.gov
IRONWORKER.......................$ 40.25 40.53
LABO0002-004 06/01/2018
DUPAGE COUNTY
Rates Fringes
LABORER (SEWER CONSTRUCTION)
GROUP 1.....................$ 42.72 28.19
GROUP 2.....................$ 42.85 28.19
GROUP 3.....................$ 42.95 28.19
GROUP 4.....................$ 43.07 28.19
GROUP 5.....................$ 42.72 28.19
LABORER CLASSIFICATIONS
GROUP 1: Signalmen Top Laborers, and all other Laborers not
Mentioned.
GROUP 2: Concrete Laborers; Steel Setters.
GROUP 3: Cement Carriers; Cement Mixers; Concrete Repairmen;
Mortar Men; Scaffold Men; and Second Bottom Men.
GROUP 4: Bottom Men; Bracers-Bracing; Bricklayer's Tender;
Catch Basin Digger; Drainlayer; Dynamiter; Form Men;
Jackhammermen; Powerpac; Pipelayers; Rodders; Welders &
Burners; Well Point System Men.
GROUP 5: Asbestos Abatement Laborers, Toxic and Hazardous
Waste Removal Laborers & Dosimeter use (any device)
Monitoring Nuclear Exposure.
LABO0002-009 06/01/2018
Page 14 of 38beta.SAM.gov
DU PAGE COUNTY
LABORER (Compressed Air)
0 - 15 lbs..................$ 43.72 28.19
16 - 20 lbs.................$ 44.22 28.19
21 - 26 lbs.................$ 44.72 28.19
27 - 33 lbs.................$ 45.72 28.19
34 lbs and over.............$ 46.72 28.19
LABORER (Tunnel and Sewer)
GROUP 1.....................$ 42.72 28.19
GROUP 2.....................$ 42.85 28.19
GROUP 3.....................$ 42.95 28.19
GROUP 4.....................$ 43.07 28.19
GROUP 5.....................$ 42.72 28.19
LABORER CLASSIFICATIONS (TUNNEL)
GROUP 1: Cage tenders; Dumpmen; Flagmen; Signalmen; Top laborers
GROUP 2: Air hoist operator; Key board operator; concrete laborer; Grout; Lock tenders (Free Air Side); Steel setters; Tuggers; Switchmen; Car pusher
GROUP 3: Concrete repairmen; Lock tenders (pressure side);
Mortar men; Muckers; Grout machine operators; Track layers
GROUP 4: Air trac drill operator; Miner; Bricklayer tenders;
Concrete blower operator; Drillers; Dynamiters; Erector operator; Form men; Jackhammermen; Powerpac; Mining machine operators; Mucking machine operator; Laser beam operator;
Liner plate and ring setters; Shield drivers; Power knife operator; Welder- burners; Pipe jacking machine operator;
skinners; Maintenance technician
Page 15 of 38beta.SAM.gov
GROUP 5: Asbestos abatement laborer; Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure
LABORER CLASSIFICATIONS (SEWER)
GROUP 1: Signalmen; Top laborers and All other laborers
GROUP 2: Concrete laborers and Steel setters
GROUP 3: Cement carriers; Cement mixers; Concrete repairmen;
Mortar men; Scaffold men; Second Bottom men
GROUP 4: Air trac drill operator; Bottom men;
Bracers-bracing; Bricklayer tenders; Catch basin diggers;
Drainlayers; dynamiters; Form men; Jackhammermen; Powerpac;
Pipelayers; Rodders; Welder-burners; Well point systems men
GROUP 5: Asbestos abatement laborer, Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure
LABO0032-007 05/01/2019
DE KALB COUNTY
Rates Fringes
LABORER
General Laborer.............$ 36.13 33.13
Skilled Laborer.............$ 39.08 33.13
LABORER CLASSIFICATIONS
General Laborer: Carpenter Tender, Tool Cribman, Fireman or
Page 16 of 38beta.SAM.gov
Salamander Tender, Flagman, Gravel Box Man, Bumpman &
Spotter, Form Handler, Material Handler, Fencing Laborer, Cleaning Lumber, Pit Man, Material Checker, Landscaper, Unloading Explosives, Laying of Sod, Planting of Trees, Asphalt Workers With Machine & Layers, Asphalt Plant
Laborer, Wrecking, Fire-proofing, Driving Stakes, Stringlines for All Machinery, Window Cleaning, Demolition
Worker, Explosive Handling, Trimming & Removal of Trees, Multi-Plate Pipe, Pilot Cars for Traffic Control, Power
Rigging
Skilled Laborer: Asbestos Abatement Worker; Hazardous Waste
Worker Handling any Materials with any Foreign Matter
Harmful to Skin or Clothing, Track Labor, Cement Handler, Chloride Handler, Unloading & Laborers with Steel Workers &
Re-bars, Wet Concrete Workers, Tunnel Tenders in Free Air, Batch Dumper, Mason Tender, Kettle & Tar Man, Tank Cleaner, Plastic Installer, Scaffold Worker, Motorized Buggies or
Motorized Unit Used For Wet Concrete or Handling of
Building Materials, Laborers With De-Watering Systems, Sewer Workers Plus Depth, Vibrator Operator; Cement Silica, Clay, Fly Ash, Lime & Plasters Handlers (Bulk or Bag);
Cofferdam Worker Plus Depth, Concrete Paving, Placing, Cutting & Tying of Reinforcing, Deck Hand, Dredge Hand and
Shore Laborer, Bankman on Floating Plant, Grade Checker, Power Tools, Front End Man on Chip Spreader, Caisson Worker
Plus Depth, Gunnite Nozzleman, Leadman on Sewer Work, Welder, Cutter, Burner & Torchman, Chain Saw Operator, Jackhammer & Drill Operator, Layout Man and/or Tile Layer, Steel Form Setter - Street & Highway, Air Tamping
Hammerman, Signal Man On Crane, Concrete Saw Operator, Screenman on Asphalt Paver, Tending Masons with Hot
Material or Where Foreign Materials are used, Mortar Mixer
Operator, Multiple Concrete Duct - Leadman, Luteman, Asphalt Raker Curb Asphalt Machine Operator, Ready Mix
Scaleman Permanent Portable or Temporart Plant, Laborer
Handling Masterplate or Similar Materials, Laser Beam
Page 17 of 38beta.SAM.gov
Operator, Concrete Burning Machine Operator, Coring Machine
Operator, Plaster Tender, Underpinning & Shoring of
Buildings, Pump Man, Manhole & Catch Basin, Dirt & Stone
Tamper, Hoseman on Concrete Pump.
LABO0075-002 06/01/2017
WILL COUNTY
Rates Fringes
LABORER
GROUP 1.....................$ 41.20 27.47
GROUP 2.....................$ 41.55 27.47
GROUP 3.....................$ 41.20 27.47
GROUP 4.....................$ 41.55 27.47
GROUP 5.....................$ 41.40 27.47
GROUP 6.....................$ 41.55 27.47
GROUP 7.....................$ 41.40 27.47
LABORER CLASSIFICATIONS
GROUP 1 - Mortar mixers, handling asphalt shingles;
Scaffolds; Sewer and trench work (ground level down to 8 feet); Catch basin and manhole diggers, mesh handling on road work; Cement and mineral filler handler; Concrete puddlers; Batch dumpers (cement & asphalt); Vibrator operators; Sand and stone wheelers to mixer Handlers);
Concrete wheelers; Airtamping hammermen; Concrete & paving breakers; Rock drillers/Jackhammermen; Chipping hammermen
1-Bag mixer; Asphalt laborer; Chain and power saws; Pit men; Fencing laborers; Mason tenders (mortar and brick wheeler); Kettlemen & tarmen, tank cleaners; Scaffold and staging laborers; Pot Firemen (tarmen); Heaters tender for any purpose; Water pumps (portable water pumps shall be tended by laborers if the employer determines tending is
Page 18 of 38beta.SAM.gov required); Rip rap; Handling of slab steel road forms in any manner, except road form setting, setting center strips, Contraction and expansion joints (road work);
Unloading and handling of lumber, brick, transite materials, cast iron water pipe, reinforced concrete rods, sewer and drain tile, railroad tiles and all other creosoted materials; paving blocks and concrete forms;
Handling of insulation of any type; all work involving the unloading of materials, fixtures, or furnishing, whether crated or uncrated; all mortar and composition mixers of sewer work; track laborers; Chimney and silo laborers working at a height of 1 to 48 feet; All laborers working on swinging suspended, or any type or make of scaffolding 1 to 48 feet; All laborers working inside a sphere or any type or make of tank; Working inside a sphere or any type or make of tank from bottom to a height of 48 feet; Form strippers (any type); Mechanical or motorized buggies, for concrete or masons employers; Use of skid steer loads or any other machinery which replaces the wheelbarrow or buggy; Handling multiple concrete duct or any other type of pipe used in public utility work unless otherwise specified herein; Snapping of wall ties and removal of rods; drilling of anchor bolt holes; Concrete or asphalt clipper type saws and self-propelled saws; Shoulder and grade laborers; All hydraulic electric and air or any other type of tools;
Grouting and caulking; Cleaning lumber, Nail pulling, Deck hand; Dredgehand; Shore laborer; Bankmen on Floating Plant;
Tool and material checkers; Signalmen and Flagmen on all construction work; Cleaning of debris; Removal of trees;
Concrete curing, temporary concrete protection regardless of manner or materials used; Laborers on Apsco; Janitorial;
Wrecking and demolition laborers
GROUP 2 - Sewer and drain pipe layers and multiple concrete duct or any other type of pipe used, on public utility work
(ground level to 8 feet); Pumpcrete pipe handlers
Page 19 of 38beta.SAM.gov
GROUP 3 - Asphalt rakers; Hod carriers; Plasterer laborers;
Gunnite laborers, Slab for setters on roads, highways, streets, airport runaways, and radii (any type of form) stringline men for all aforementioned work; Wagon and tower drillers on land and floating plant used on dredging;
Asphalt gunners and plug men (undercoating on road work);
Mortar pump laborers; Plaster pump laborers
GROUP 4 - Tunnel miners, and all laborers inside tunnel; Air blow pipemen; Torchmen (burners); Mortaring men on sewer and drain pipe (the applying of mortar and composition mixes); All bottom men on sewer work-all sewer and drain pipelayers-multiple concrete duct or any other type of pipe used on public utility work-8 feet or more below ground level, and all other sewer and trench laborers 8 feet or more below ground level regardless of excavation area; All labor work inside cofferdam; Use of a 10 foot or more drill steel for hand held drills; Caisson laborers ground level down 15 feet; All air tools 8 feet or more below ground level; All laborers working on swinging-suspended or any type or make of scaffolds, 48 feet to 100 feet; All chimney and silo laborers working at a height of 48 to 100 feet;
All tamping hammers over 150 lbs.; All laborers working inside of a sphere or any type or make of tank at a height of 48 feet to 100 feet; all hydraulic, electric and air tools or any other type 8 feet or more below ground level;
Vibrators-any type-8 feet or more below ground level
GROUP 5 - Gunnite nozzle men; Caisson laborers and all tamping hammers from 150 lbs and over; from 15 feet below ground level down to 50 feet; and all laborers working inside of a sphere or any type of tank for every additional
50 feet or part thereof above 100 feet in height
GROUP 6 - All underground cavern laborers; Caisson laborers
50 feet or more below ground level; Laborers working under radio active conditions (suiting up); Blasting men
Page 20 of 38beta.SAM.gov
(Powdermen)
GROUP 7 - Dosimeter (any device) used for monitoring nuclear exposure; Asbestos abatement worker; Toxic and hazardous waste removal laborer; and chimney and silo laborers for every additional 50 feet or any part thereof above 100 feet high
LABO0149-002 06/01/2018
BOONE, KANE, KENDALL, AND McHENRY COUNTIES
Rates Fringes
LABORER
GROUP 1.....................$ 42.72 28.19
GROUP 2.....................$ 43.00 28.19
GROUP 3.....................$ 43.00 28.19
GROUP 4.....................$ 43.00 28.19
GROUP 5.....................$ 42.95 28.19
GROUP 6.....................$ 43.07 28.19
GROUP 7.....................$ 43.07 28.19
GROUP 8.....................$ 42.72 28.19
GROUP 9.....................$ 43.72 28.19
LABORER CLASSIFICATIONS
GROUP 1: Common laborer, Asphalt laborer, Asphalt plant laborer, Striping laborer, Clipper type concrete saw, Self-propelled saws
GROUP 2: Air tampers & Vibrators
GROUP 3: Mortar & Concrete mixers
GROUP 4: Stringline & form setter; Torchman (demolition), Sheeting & Cribbing, Black top rakers & lutemen, Machine
Page 21 of 38beta.SAM.gov screwmen
GROUP 5: Chain saw man, Jackhammer man, Drillman, Concrete breaders & air spade, GROUP 6: Tunnel laborers, Tile layers & bottom men
GROUP 7: Caisson diggers, Dynamiters
GROUP 8: Flagman
GROUP 9: Asbestos apatement laborers, Toxic & hazardous waste removal laborers & Dosimeter (any device) monitoring nuclear exposure
LABO0152-003 06/01/2017
LAKE COUNTY
Rates Fringes
LABORER
GROUP 1.....................$ 41.20 27.47
GROUP 2.....................$ 41.28 27.47
GROUP 3.....................$ 41.20 27.47
GROUP 4.....................$ 41.43 27.47
GROUP 5.....................$ 41.40 27.47
GROUP 6.....................$ 41.40 27.47
LABORER CLASSIFICATIONS
GROUP 1: General laborers; Asphalt
GROUP 2: Cement gun laborers
GROUP 3: Asphalt Tampers and Smoothers
Page 22 of 38beta.SAM.gov
GROUP 4: Rakers and Lutemen; Machine screwman; Kettlemen;
Mixermen, Drum-Men; Jackhammermen (Asphalt); Mite Box
Spreaders; Laborers on birch overman and similar spreader equipment; Laborers on apsco; Laborers on Air Compressors;
Paving Form Setters; Jackhammerman (Concrete); Power Drive
Concrete Saws
GROUP 5: Cement Gun Nozzle (Gunite)
GROUP 6: Asbestos abatement laborers; Toxic and hazardous waste removal laborers; Dosimeter (any device monitoring nuclear exposure)
PAIN0014-003 06/01/2018
LAKE and WILL COUNTIES
Rates Fringes
PAINTER: Brush Only.............$ 46.55 27.24
PAIN0030-001 06/01/2019
DE KALB, DU PAGE, KANE, KENDALL AND MCHENRY COUNTIES
Rates Fringes
PAINTER
Brush, Drywall
Taper/Finisher, Sandblaster, and Spray......$ 47.30 22.53
PAIN0030-004 06/01/2019
BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES
Page 23 of 38beta.SAM.gov
PAINTER
Brush, Roller, Spray, Sandblasting, Paperhanger, Drywall Finishing, Taper, and Spray Structural Steel..$ 40.65 23.66
PLAS0011-002 06/01/2019
WILL COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 43.00 38.16
PLAS0011-008 06/01/2019
DE KALB, KANE, KENDALL, AND McHENRY COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 47.01 34.10
PLAS0011-013 06/01/2019
LAKE COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 45.53 35.60
PLAS0011-015 06/01/2019
BOONE COUNTY
Page 24 of 38beta.SAM.gov
CEMENT MASON/CONCRETE FINISHER...$ 37.75 30.22
PLASTERER........................$ 34.78 31.33
PLAS0803-001 08/01/2010
DUPAGE COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 38.00 24.03
* TEAM0179-002 06/01/2017
KENDALL and WILL COUNTIES
Rates Fringes
TRUCK DRIVER
2 or 3 Axle Trucks..........$ 37.68 0.15+a
4 Axle Trucks...............$ 37.83 0.15+a
5 Axle Trucks...............$ 38.03 0.15+a
6 Axle Trucks...............$ 38.23 0.15+a
FOOTNOTES:
a. $733.20 per week.
b. Lowboy rate based on number of axles
An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
CLASSIFICATIONS:
Group 1 - Frame Truck when used for transportation purposes;
Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances;
Page 25 of 38beta.SAM.gov
Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters;
Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to
40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick
Change Barrier; Self-Propelled Chip Spreader; Shipping and
Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or
3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen and Dockmen; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site
Group 2 - Dispatcher; Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump
Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper
Operator; Winch Trucks, 2 Axles
Group 3 - Dump Crets and Adgetators, 7 yards and over;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump
Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer
Trucks 7 yards or over; Mobile Cranes while in transit; Oil
Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;
Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it has been a past area practice; Asphalt Plant Operators in areas where it has been past practice
Group 4 - Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories; Foreman; Master Mechanic;
Self-loading equipment like P.B. and trucks with scoops on
Page 26 of 38beta.SAM.gov the front
* TEAM0301-001 06/01/2017
LAKE AND MCHENRY COUNTIES
Rates Fringes
TRUCK DRIVER
2-3 AXLES...................$ 37.69 10.15+a
4 AXLES.....................$ 37.84 10.15+a
5 AXLES.....................$ 38.04 10.15+a
6 AXLES.....................$ 38.24 10.15+a
FOOTNOTES:
a. 325.20 per week.
b. Lowboy rate based on number of axles
An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
Paid Holidays: New Year's Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, and Christmas Day.
900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years -
2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.
CLASSIFICATIONS:
Group 1 - Frame Truck when used for transportation purposes;
Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances;
Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters;
Page 27 of 38beta.SAM.gov
Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to
40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick
Change Barrier; Self-Propelled Chip Spreader; Shipping and
Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or
3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen and Dockmen; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site
Group 2 - Dispatcher; Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump
Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper
Operator; Winch Trucks, 2 Axles
Group 3 - Dump Crets and Adgetators, 7 yards and over;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump
Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer
Trucks 7 yards or over; Mobile Cranes while in transit; Oil
Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;
Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications…
This is the start of the file's text. The full file is on GovTribe.