AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SUBJECT: VARIOUS REVISIONS TO THE PREVIOUSLY ISSUED AND ACTIVE INVITATION FOR BIDS NO. W912P619B0015, "CALUMET RIVER
DREDGING (USACE- CHICAGO DISTRICT ACQUISITION)
IMPORTANT ADMINISTRATIVE CORRECTION: BY THIS AMENDMENT, THE USACE-CHICAGO CORRECTS THE SOLICITATION NUMBER ENTERED ON THE COVER PAGE, TABLE OF CONTENTS, PROJECT SPECIFICATIONS AND PLAN SHEETS. THE SOLICITATION NUMBER SHOULD HAVE READ: W912P619B0015 IN LIEU OF W912P6189B0018. THIS CORRECTION DOES NOT RESULT IN ANY MATERIAL CHANGES TO THE SOLICITATION BID SET RELEASED AT THE FEDERAL BUSINESS OPPORTUNITIES WEBSITE.
-- THIS AMENDMENT CONTINUES ON THE FOLLOWING PAGES --
1. CONTRACT ID CODE PAGE OF PAGES
1 26
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Aug-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P619B0015
X 9B. DATED (SEE ITEM 11)
31-Jul-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Aug-2019
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P619B0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
a. BID OPENING DATE AND TIME: The bid Opening Date is hereby EXTENDED to 6 September 2019, and all bids are due by 3:00PM (Chicago Local Time). Detailed information regarding the submission of bids is located at Section 00 22 13 of the Solicitation document – See “IMPORTANT BID NOTES.”
b. REVISED BID SCHEDULE:
The government is providing a revised bid schedule (Section 00 10 00 – Solicitation Contract Form). Therefore, Bidders shall remove and replace the previously issued respective Section with the Revised Section 00 10 00 enclosed hereunder. Bidders shall provide their prices on the Revised Bidding Schedule. Option 4 and Option 5 Line Items have been added to the Revised Bid Schedule (CLINS 0005 THROUGH 0006AF, (includes all subitems).
c. AMENDED SECTION 00 22 13 – SUPPLEMENTARY INSTRUCTIONS TO BIDDERS
The OPTION PROVISIONS have been revised as follows:
OPTION PROVISIONS:
AWARD OF OPTION ITEMS: 0002AA through 0006AF. At the discretion of the government, any, all or none of the Option Items under the Bid Schedule may be exercised as follows:
PRIORITY OPTION CONTRACT LINE ITEMS (CLIN) NON-PRIORITY OPTION CONTRACT LINE ITEMS (CLIN)
CLIN #
NUMBER
PRIORITY
CLINS WILL
BE
EXERCISED
IN THE TIME
FRAME
BELOW
ADDITIONAL
PERFORMANCE
TIME (CALENDAR
DAYS AFTER NTP
IS
ACKNOWLEDGED
CLIN #
NUMBER
PRIORITY CLINS
WILL BE
EXERCISED IN
THE TIME FRAME
BELOW
(CALENDAR
DAYS AFTER NTP
IS
ACKNOWLEDGED
ADDITIONAL
PERFORMANCE
TIME
0002AB
(PRIORITY 1)
275 0 0002AA 275 0
0002C
(PRIORITY 2)
275 0 0002AE (MUST
BE
EXERCISED IF
0002 PRIORITY
SUBITEMS
ARE
EXERCISED.)
275 0
0002AD
(PRIORITY 3)
275 0 0003AA 275 0
0003AB
(PRIORITY 1)
275 0 0003AE (MUST
BE
EXERCISED IF
0002 PRIORITY
SUBITEMS
ARE
EXERCISED.)
275 0
0003AC
(PRIORITY 2)
275 0 0004AA 275 0
0003AD
(PRIORITY 3)
275 0 0004AB 275 0
0005AA 275 0
0005AB 275 0
0005AC 275 0
0006AA 400 365
0006AB 400 365
0006AC 400 365
0006AD 400 365
0006AE 400 365
0006AF 400 365
Additional bond coverage is required if any option is exercised. Refer to Clause 52.228-15 at section 00 70 00.
(END OF OPTION PROVISIONS)
The revision is stated above at paragraph 1 of this Amendment.
c. REVISION to SOLICITATION SECTION 00 45 00 – REPRESENTATIONS AND CERTIFICATIONS
The following FAR Clause delineated below, is a recently released Federal Acquisition Regulation (FAR) clause and is herein incorporated via this solicitation and resulting contract.
52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.
As prescribed in 4.2105(a), insert the following provision:
Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2019)
(a) Definitions. As used in this provision--
Covered telecommunications equipment or services, Critical technology, and Substantial or essential component have the meanings provided in clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Prohibition. Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Contractors are not prohibited from providing—
(1) A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(2) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(c) Representation. The Offeror represents that--
It [ ] will, [ ] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation.
(d) Disclosures. If the Offeror has responded affirmatively to the representation in paragraph (c) of this provision, the Offeror shall provide the following information as part of the offer--
(1) All covered telecommunications equipment and services offered (include brand; model number, such as original equipment manufacturer (OEM) number, manufacturer part number, or wholesaler number; and item description, as applicable);
(2) Explanation of the proposed use of covered telecommunications equipment and services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b) of this provision;
(3) For services, the entity providing the covered telecommunications services (include entity name, unique entity identifier, and Commercial and Government Entity (CAGE) code, if known); and
(4) For equipment, the entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known).
d. REVISION to SOLICITATION SECTION 00 70 00 – CONDITIONS OF THE CONTRACT
1. The options identified in the below clause have been revised as set forth herein and are incorporated into the bid schedule accordingly.
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR
1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated BELOW. The Contracting Officer may exercise the option by written notice to the Contractor AND in accordance with the below option provisions.
Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree. AWARD OF OPTION ITEMS: 0002AA through 0006AF. At the discretion of the government, any, all or none of the Option Items under the Bid Schedule may be exercised as follows:
When exercised, option(s) will be awarded within the order of priority, beginning with Option Priority 1 Line Items 0002AB and 0003AB, then Option Priority 2 Line Items 0002AC and 0003AC, ending with Option Priority 3 Line Items 0002AD and 0003AD. However, the government is under no obligation to award each and every option item under any designed Priority group.
A
PRIORITY OPTION CONTRACT LINE ITEMS (CLIN) NON-PRIORITY OPTION CONTRACT LINE ITEMS
(CLIN)
CLIN #
NUMBER
PRIORITY CLINS
WILL BE
EXERCISED IN
THE TIME FRAME
BELOW
(CALENDAR
DAYS AFTER NTP
IS
ACKNOWLEDGED
ADDITIONAL
PERFORMANCE
TIME
CLIN #
NUMBER
PRIORITY CLINS
WILL BE
EXERCISED IN
THE TIME FRAME
BELOW
(CALENDAR
DAYS AFTER NTP
IS
ACKNOWLEDGED
ADDITIONAL
PERFORMANCE
TIME
0002AB
(PRIORITY
1)
275 0 0002AA 275 0
0002C
(PRIORITY
2)
275 0 0002AE
(MUST BE
EXERCISED
IF 0002
PRIORITY
SUBITEMS
ARE
EXERCISED.)
275 0
0002AD
(PRIORITY
3)
275 0 0003AA 275 0
0003AB
(PRIORITY
1)
275 0 0003AE
(MUST BE
EXERCISED
IF 0002
PRIORITY
SUBITEMS
ARE
EXERCISED.)
275 0
0003AC
(PRIORITY
2)
275 0 0004AA 275 0
0003AD
(PRIORITY
3)
275 0 0004AB 275 0
0005AA 275 0
0005AB 275 0
0005AC 275 0
0006AA 400 365
0006AB 400 365
0006AC 400 365
0006AD 400 365
0006AE 400 365
0006AF 400 365
Additional bond coverage is required if any option is exercised. Refer to Clause 52.228-15 at section 00 70 00.
(End of clause)
2. The following FAR Clause delineated below, is a recently released Federal Acquisition Regulation (FAR) clause and is herein incorporated via this solicitation and resulting contract.
- 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
As prescribed in 4.2105(b), insert the following clause:
Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2019)
(a) Definitions. As used in this clause--
Covered foreign country means The People's Republic of China.
Covered telecommunications equipment or services means—
(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities);
(2) For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities);
(3) Telecommunications or video surveillance services provided by such entities or using such equipment; or
(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.
Critical technology means--
(1) Defense articles or defense services included on the United States Munitions List set forth in the International Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations;
(2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export Administration Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled--
(i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or
(ii) For reasons relating to regional stability or surreptitious listening;
(3) Specially designed and prepared nuclear equipment, parts and components, materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);
(4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal Regulations (relating to export and import of nuclear equipment and material);
(5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such Code, or part 73 of title 42 of such Code; or
(6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control Reform Act of 2018 (50 U.S.C. 4817). Substantial or essential component means any component necessary for the proper function or performance of a piece of equipment, system, or service.
(b) Prohibition. Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. The Contractor is prohibited from providing to the Government any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in Federal Acquisition Regulation 4.2104.
(c) Exceptions. This clause does not prohibit contractors from providing--
(1) A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(2) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(d) Reporting requirement. (1) In the event the Contractor identifies covered telecommunications equipment or services used as a substantial or essential component of any system, or as critical technology as part of any system, during contract performance, or the Contractor is notified of such by a subcontractor at any tier or by any other source, the Contractor shall report the information in paragraph (d)(2) of this clause to the Contracting Officer, unless elsewhere in this contract are established procedures for reporting the information; in the case of the Department of Defense, the Contractor shall report to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.
(2) The Contractor shall report the following information pursuant to paragraph (d)(1) of this clause:
(i) Within one business day from the date of such identification or notification: The contract number; the order number(s), if applicable; supplier name; supplier unique entity identifier (if known); supplier Commercial and Government Entity (CAGE) code (if known); brand; model number (original equipment manufacturer number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.
(ii) Within 10 business days of submitting the information in paragraph (d)(2)(i) of this clause: Any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of covered telecommunications equipment or services, and any additional efforts that will be incorporated to prevent future use or submission of covered telecommunications equipment or services.
(e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial items.
e. REVISED DRAWING SHEETS: The following Drawing Sheets have been revised. Bidders shall remove the previously issued sheet with the respective revised sheets hereunder.
SHEET REF.NO. TITLE MARK AND DESCRIPTION
G-001 Title Sheet 1 - Index Sheet Revised G-002 Site Access Info. 1 - Updated Document Status V-001 Survey Control 1 - Updated Document Status
2 - Updated Note Two C-101 CDF Information 1 - Updated Document Status
2 - Updated Note Nine C-102 Dredge Area 1 1 - Updated Document Status
2 - Federal Channel Quarter Lines Added C-103 Dredge Area 2 1 - Updated Document Status 2 -Added Note Six C-104 Dredge Area 3 1 - Updated Document Status 2-AddedNote Six C-105 Dredge Area 4 1-New Sheet C-106 Dredge Area 4 Continued 1-New Sheet https://dibnet.dod.mil/ https://dibnet.dod.mil/
f. AMENDED SPECIFICATION SECTIONS: The following Specification Sections and Submittal Register have been revised. The revised sections and register are enclosed hereunder and replace the previously furnished sections.
- SECTION 01 11 00, Summary of Work, language was added to include dredging in the harbor as well.
- SECTION 01 22 00, Measurement and Payment, CLINS were added for harbor dredging.
- SECTION 35 20 23, Dredging, requirements for harbor dredging was added.
- SECTION 35 21 00.03, Water Quality Monitoring, additional requirement for data validation was added.
g. PRE-AWARD SURVEY:
Pre-award Survey Questionnaire Form: By way of this Amendment, the government is providing a pre-award Survey form to be completed by the Bidder and submitted along with all other items called out in the Solicitation (Refer to Solicitation Section 00 22 13 – Supplementary Instructions to Bidders, as specifically described at Paragraph 3. “Submission of Bids”). The information will aid in surveying the business in accordance with the responsibility requirements set forth by the Federal Acquisition Regulation, Subpart 9.
The preaward survey will not be conducted for each bidder, only the winning bidder.
h. POINT OF CONTACT: Anita R. Simpkins at (312) 846-5370; email:
anita.r.simpkins@usace.army.mil.
(END OF AMENDMENT NO. 0001)
REVISED BID SCHEDULE
AMENDMENT 0001
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
BASE WORK DREDGE AREA 1 AND 2
FFP
Line item 0001 is the parent Line Item linked to the below SubClins 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, and 0001AF
NET AMT
0001AA 1 Job
MOBILIZATION
FFP
Under this CLIN, the contractor is required to perform mobilization activities. The Contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.
0001AB 1 Job
DEMOBILIZATION
FFP
Under this CLIN, the contractor is required to perform demobilization activities.
The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.
Payment Provisions:
The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the unit price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
0001AC 1 Job
WATER QUALITY MONITORING
FFP
0001AD 1 Job
SCOW SILENT INSPECTOR
0001AE 35,000 Cubic
Yard
MAINTENANCE DREDGING AND DISPOSAL
0001AF 1 Lot
PERFORMANCE AND PAYMENT BONDS
FFP
BONDS FOR BASE WORK - LINE ITEMS 0001AA THROUGH 0001AE
- THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.
Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.
OPTION OPTION 1 ITEMS - DREDGE AREA 1 AND 2
FFP
Line item 0002 is the parent Line Item linked to the below SubClins 0002AA, 0002AB, 0002AC,0002AD and 0002AE
0002AA 1 Job
OPTION WATER QUALITY MONITORING
0002AB 10,000 Cubic
OPTION MAINTENANCE DREDGING AND DISPOSAL
PRIORITY 1
0002AC 5,000 Cubic
PRIORITY 2
0002AD 5,000 Cubic
PRIORITY 3
0002AE 1 Job
OPTION PERFORMANCE AND PAYMENT BONDS
FFP
BONDS FOR OPTION LINE ITEMS 0002AA THROUGH 0002AD
- THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.
OPTION OPTION 2 BID ITEMS - DREDGE AREA 3
FFP
Line item 0003 is the parent Line Item linked to the below SubClins 0003AA, 0003AB, 0003AC, 0003AD, 0003AE
0003AA 1 Job
0003AB 10,000 Cubic
PRIORITY 1
0003AC 5,000 Cubic
PRIORITY 2
0003AD 5,000 Cubic
PRIORITY 3
0003AE 1 Lot
OPTION PERFORMANCE AND PAYMENT BONDS
FFP
BONDS FOR OPTION LINE ITEMS 0003AA THROUGH 0003AD
- THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.
OPTION OPTION 3 ITEMS
FFP
Line item 0004 is the parent Line Item linked to the below SubClins 0004AA and
0004AB
0004AA 1 Job
OPTION REPLACE FILTER CELL MEDIA
0004AB 1 Lot
OPTION PERFORMANCE AND PAYMENT BONDS
FFP
BONDS FOR OPTION LINE ITEM 0004AA
- THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.
OPTION OPTION 4 ITEMS - DREDGE AREA 4
FFP
This is a Parent Line Item linking Sub-items 0005AA through 0005AC under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number, which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or priced for payment purposes. Accordingly, delivery, shipment and pricing, all apply to the quantities delineated at the sub-item level.
0005AA 1 Job
0005AB 30,000 Cubic
HARBOR DREDGING AND DISPOSAL PRIORITY 1
0005AC 1 Lot
OPTION PERFORMANCE AND PAYMENT BONDS
FFP
BONDS FOR OPTION LINE ITEMS 0005AA AND 0005AB
- THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.
OPTION OPTION 5 ITEMS - DREDGE AREA 4
FFP
This is a Parent Line Item linking Sub-items 0006AA through 0006AF under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number, which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or priced for payment purposes. Accordingly, delivery, shipment and pricing, all apply to the quantities delineated at the sub-item level.
0006AA 1 Job
OPTION MOBILIZATION
0006AB 1 Job
OPTION DEMOBILIZATION
0006AC Job
WATER QUALITY MONITORING
0006AD Job
SCOW SILENT INSPECTOR
0006AE 30,000 Cubic
HARBOR DREDGING AND DISPOSAL PRIORITY 1
0006AF 1 Lot
OPTION PERFORMANCE AND PAYMENT BONDS
FFP
BONDS FOR OPTION LINE ITEMS 0005AA THROUGH 0005AE
- THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.
SUMMATION OF BID PRICES
BID AMOUNT BASE WORK (ITEMS 0001AA THROUGH 0001AF): $__________________________
BID AMOUNT OPTION 1 ITEMS (ITEMS 0002AA THROUGH 0002AE): $_______________________
BID AMOUNT OPTION 2 ITEMS (ITEMS 0003AA THROUGH 0003AE): $_______________________
BID AMOUNT OPTION 3 ITEMS (ITEMS 0004AA AND 0004AB): $_____________________________
BID AMOUNT OPTION 4 ITEMS (ITEMS 0005AA THROUGH 0005AC): $________________________
BID AMOUNT OPTION 5 ITEMS (ITEMS 0006AA THROUGH AND 0006AF): $____________________
OVERALL BID AMOUNT (ITEMS 0001AA THROUGH 0006AF): $______________________________
ATTACHMENT A
PREAWARD SURVEY INFORMATION -
(RE: Subparts 9.104-1 and 9.105-1 of the Federal Acquisition Regulation)
CONTRACTOR: _______________________________________
SOLICITATION W912P619B0015, “CALUMET RIVER DREDGING (CHICAGO DISTRICT ACQUISITION)”
Please complete the below form to assist in the completion of a Pre-award Survey:
1. Month and Year started in business:
2. Year and State Incorporated:
3. Key Personnel:
President/Owner:
Vice President/Partner:
Secretary/Treasurer:
4. Number of Full-Time Employees:
5. Surety -
Agency:
Agent:
Address, City & State:
Telephone#:
6. Insurance Company -
Agency:
Agent:
7. Financial Institution Information -
Name of Bank:
Contact Person:
8. References: Provide the names and contact information of three references. Information obtained from references will be used to determine if you have been diligent in the following areas: a) Quality of Work; b) Timely Performance; c) Effectiveness of Management; d) Compliance with Safety Standards; and e) Compliance with Labor Standards.
9. Does your company have any ongoing projects that may cause a problem with completing or beginning performance of the subject project?
END OF FORM
Calumet Harbor and River Dredging Fiscal Year 2019 W912P619B0015
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
1.1.2 Location
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
-- End of Section Table of Contents --
SECTION 01 11 00 Page 1 Amendment #001 - 08/26/19
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The work includes the provision of all plant, labor, equipment, and materials necessary to mechanically dredge sediment from Calumet River and Calumet Harbor to specified and indicated depths, elevations, and side slopes and incidental related work. This project will dredge 70,000 cubic yards of sediment from the Calumet River to project depth. Including base work and all options, this project calls for up to 75,000 cubic yards of sediment to be dredged at the Calumet River and up to 60,000 cubic yards of sediment to be dredged at the Calumet Harbor to project depth.
Contract Dredging: No dredging can occur before January 1, 2020.
1.1.2 Location
The work is located in the Calumet River and Harbor located on the Lake Michigan shore of Illinois, as indicated. The exact dredging locations within the Calumet River will be provided to the Contractor prior to dredging with the Government's pre-dredge survey data.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
-- End of Section --
SECTION 01 11 00 Page 2
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 10
PRICE AND PAYMENT PROCEDURES
08/15
PART 1 GENERAL
1.1 SUBMITTALS
1.2 SINGLE JOB PAYMENT ITEMS
1.2.1 Mobilization (Base Bid Item 0001AA and Optional Bid Item
0006AA)
1.2.1.1 Payment
1.2.1.2 Unit of Measure
1.2.2 Demobilization (Base Bid Item 0001AB and Optional Bid Item
0006AB)
1.2.2.1 Payment
1.2.2.2 Unit of Measure
1.2.3 Water Quality Monitoring (Base Bid Item 0001AC; Option Bid
Items 0002AA, 0003AA, 0005AA and 0006AC)
1.2.3.1 Payment
1.2.3.2 Unit of Measure
1.2.4 Scow Silent Inspector (Base Bid Item 0001AD and Optional Bid
Item 0006AC)
1.2.4.1 Payment
1.2.4.2 Unit of Measure
1.2.5 Performance and Payment Bonds (Base Bid Item 0001AF; Option
Bid Items 0002AE, 0003AE, 0004AB 0005AC, and 0006AF)
1.2.5.1 Payment
1.2.5.2 Unit of Measure
1.2.6 Replace Filter Cells Media Gravel and Anthracite (Option Bid
Item 0004AA)
1.2.6.1 Payment
1.2.6.2 Unit of Measure
1.3 UNIT PRICE PAYMENT ITEMS
1.3.1 Maintenance Dredging and Disposal (Base Bid Item 0001AE;
Option Bid Items 0002AB, 0002AC, 0002AD, 0003AB, 0003AC, and
0003AD)
1.3.1.1 Payment
1.3.1.2 MEASUREMENT
1.3.1.3 Unit of Measure
1.3.2 Harbor Dredging and Disposal (Option Bid Items 0005AB and
0006AE)
1.3.2.1 Payment
1.3.2.2 Measurement
1.3.2.3 Unit of Measure
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
SECTION 01 22 00.00 10 Page 1
3.1 CONTRACT COST BREAKDOWN
-- End of Section Table of Contents --
SECTION 01 22 00.00 10 Page 2
SECTION 01 22 00.00 10
PRICE AND PAYMENT PROCEDURES
08/15
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
1.2 SINGLE JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract job payments will be made are listed in the SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.2.1 Mobilization (Base Bid Item 0001AA and Optional Bid Item 0006AA )
1.2.1.1 Payment
Payment will be made for costs associated with mobilization. The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site. The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the job price for this item. The Contracting Officer Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual cost, which is not subject to appeal.
1.2.1.2 Unit of Measure
Unit of Measure: JOB
1.2.2 Demobilization (Base Bid Item 0001AB and Optional Bid Item 0006AB )
1.2.2.1 Payment
Payment will be made for costs associated with demobilization. The contractor will be compensated for the totality of its activities needed
SECTION 01 22 00.00 10 Page 3 to demobilize its equipment and labor force to the project site. The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the job price for this item. The Contracting Officer Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual cost, which is not subject to appeal.
1.2.2.2 Unit of Measure
Unit of Measure: JOB
1.2.3 Water Quality Monitoring (Base Bid Item 0001AC; Option Bid Items 0002AA and , 0003AA, 0005AA and 0006AC )
1.2.3.1 Payment
Payment at the applicable job price includes all costs for water quality monitoring during all activities that result in material being placed into the CDF. Water quality monitoring must be in accordance with Section 35 21 00.03 WATER QUALITY MONITORING. Payment constitutes full compensation for all plant, labor, equipment, and incidentals associated with performing water quality monitoring.
1.2.3.2 Unit of Measure
Unit of Measure: JOB
1.2.4 Scow Silent Inspector (Base Bid Item 0001AD and Optional Bid Item
0006AC)
1.2.4.1 Payment
Payment will be made at the contract price for the payment item "Silent Inspector" and the price must constitute full compensation for all labor, equipment, tools, and incidentals necessary to install, operate and maintain the system including data transmissions as specified in Section 35 21 23.13 NATIONAL DREDGING QUALITY MANAGEMENT (DQM) PROGRAM SCOW, Scow Tracking Profile for the duration of the dredging operations including Option Bid Items. Fifty percent of the JOB bid must be for providing the necessary equipment and 50 percent of the amount bid must be for operating and maintaining the system. Any down time due to fault of the Contractor or Contractor's equipment will be an amount determined by percentage of time deducted from 50 percent of the bid amount.
1.2.4.2 Unit of Measure
Unit of Measure: JOB
1.2.5 Performance and Payment Bonds (Base Bid Item 0001AF; Option Bid Items 0002AE, 0003AE, and 0004AB 0005AC, and 0006AF )
1.2.5.1 Payment
Payment will be made for the performance and payment bonds that are required as part of this contract. The Government will pay the actual
SECTION 01 22 00.00 10 Page 4 cost of the bonds or the Contractor's bid price, whichever is less, after receiving evidence of payment (paid invoice) from the bonding company or agency.
1.2.5.2 Unit of Measure
Unit of Measure: LOT
1.2.6 Replace Filter Cells Media Gravel and Anthracite (Option Bid Item
0004AA)
1.2.6.1 Payment
Payment for placing new filter cell media materials as well as removing, handling and disposing of existing filter cell media materials into the Chicago Area Confined Disposal Facility and will be made at the contract TASK unit price and as described in Section 35 20 23 DREDGING. All costs associated with the removal, handling and disposing of the existing filter media must be incidental to this bid item. Payment constitutes all labor, equipment and materials necessary to perform this work.
1.2.6.2 Unit of Measure
Unit of Measure: JOB
1.3 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract unit price payments will be made are listed in the SCHEDULE and described below. The unit price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
1.3.1 Maintenance Dredging and Disposal (Base Bid Item 0001AE; Option Bid Items 0002AB, 0002AC, 0002AD, 0003AB, 0003AC, and and 0003AD)
Maintenance dredging and optional maintenance dredging process must be mechanical dredging with the use of a clamshell bucket that minimizes leakage during dredging operations. Submit Dredging, Conveyance and Placement plan for selected dredging process in accordance with Section
35 20 23 DREDGING.
1.3.1.1 Payment
Payment for dredging, handling and disposal of dredged materials will be made at the contract unit price per cubic yard as described in Section 35 20 23 DREDGING. Payment constitutes all labor, equipment and materials necessary to perform this work. Existing conditions shown on the drawings indicate conditions at the time of survey. Actual conditions may vary.
Monthly partial payments will be based on approximate quantities determined by the progress payment quantity surveys taken by the Contractor or other means acceptable to the COR. Perform all surveys for progress payments in accordance with Section 01 10 00 GENERAL PROVISIONS.
The contractor's final payment will be based on the Government's prior and after dredge survey.
SECTION 01 22 00.00 10 Page 5
1.3.1.2 MEASUREMENT
The Contractor must, in the presence of the COR, take soundings after dredging to confirm that the proposed dredging depths have been completed for progress payments. Perform surveys in accordance to Section 35 20 23 , DREDGING. The program and methods for calculating quantities for progress payments must be submitted in the dredging plans and agreed to prior to pre-dredging survey by the Contractor. The Contractor should note that the river dredge areas shown on the plans are possible areas to be dredged and are for bidding purposes. The actual area(s) selected to be dredged will be determined utilizing the pre-dredge survey completed by the Government.
(a) Method of Measurement. The total amount of materials removed and to be paid for under the contract will be measured by the cubic yard in place by computing, within the limits of the allowances and tolerances the volume between the bottom surfaces shown by the prior and after survey soundings. The Government shall complete the final "after dredging survey" as soon as practicable after all work specified has been completed. Results of soundings will be the basis for final payment.
(b) During Progress of Work. The contract drawings are believed to accurately represent the conditions existing at the time of survey, however, all soundings of the proposed dredging areas shown on the drawings shall be verified and corrected by a "prior dredging survey" taken by the Government before dredging occurs. The contract depth will be determine by soundings or sweeping taken behind the dredge as work progresses. The Contractor shall take progress soundings or sweepings. The measurement and computation of payable quantities within the allowances and tolerances described in this section after having once been made, will not be reopened, except on evidence of collusion, fraud, or obvious error.
(c) Excessive Dredging. Material taken from beyond the limits specified in paragraphs "Allowable Dredging Prism" and "Side Slope" of Section 35 20 23 DREDGING, will be deducted as excessive channel or sideslope dredging, from the total amount dredged for which payment will not be made. The final determination of the amounts of excessive dredging will be based wholly on the surveys made for final examination and acceptance.
(d) Progress Payment Quantity Surveys. Progress Payment Quantity Surveys shall be performed in accordance with the class I Contract Payment Survey as specified in EM 1110-2-1003 . Additional soundings will be taken as the COR may deem necessary.
(e) Monthly Estimate. Monthly estimates of work completed will be based on the result of soundings taken during the progress of the work based on an estimated percent of completion. Deductions will be made for dredging and disposal not in accordance with the specifications.
1.3.1.3 Unit of Measure
Unit of Measure: Cubic Yard (CY)
1.3.2 Harbor Dredging and Disposal (Option Bid Items 0005AB and 0006AE)
Optional Calumet Outer Harbor maintenance dredging process must be
SECTION 01 22 00.00 10 Page 6 mechanical dredging; the dredging of the harbor does not require the use of a clamshell bucket that minimizes leakage. Submit Dredging, Conveyance and Placement plan for selected dredging process in accordance with Section 35 20 23 DREDGING.
1.3.2.1 Payment
Same as Paragraph "1.3.1.1 Payment" for Maintenance Dredging and Disposal.
1.3.2.2 Measurement
Same as Paragraph "1.3.1.2 Measurement" for Maintenance Dredging and Disposal.
1.3.2.3 Unit of Measure
Unit of Measure: Cubic Yard (CY)
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 CONTRACT COST BREAKDOWN
The Contractor must furnish within 30 calendar days after the date of Notice to Proceed, and prior to the submission of its first partial payment estimate, a breakdown of its single job pay item or items which will be reviewed by the Contracting Officer as to propriety of distribution of the total cost to the various accounts. Any unbalanced items as between early and late payment items or other discrepancies will be revised by the Contracting Officer to agree with a reasonable cost of the work included in the various items. This contract cost breakdown will then be utilized as the basis for progress payments to the Contractor.
-- End of Section --
SECTION 01 22 00.00 10 Page 7
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 20 23
DREDGING
01/19
PART 1 GENERAL
1.1 SCOPE
1.2 DEFINITIONS
1.2.1 Hard Material
1.2.2 Dredging Limits
1.2.3 Required Dredging Prism Depth
1.2.4 Required Dredging Prism Line
1.2.5 Required Dredging Prism
1.2.6 Allowable Dredging Prism Line
1.2.7 Allowable Dredging Prism Depth
1.2.8 Allowable Dredging Prism
1.3 REFERENCES
1.4 SUBMITTALS
1.5 MATERIAL TO BE REMOVED
1.5.1 Calumet River Material
1.5.2 Calumet Harbor Material
1.5.3 Material Handling
1.5.4 Hard Material
1.6 SOUNDING EQUIPMENT DESCRIPTION AND CALIBRATION DATA
1.7 UTILITY PLAN
1.8 DREDGING DEPTH
1.9 DREDGING, CONVEYANCE AND PLACEMENT PLAN
1.10 DAILY REPORT OF DREDGING OPERATIONS
1.11 DISPOSAL AREA CONDITIONS
1.12 PLACEMENT AREA CONDITIONS
1.13 DELIVERY OF PLANT AND ORDER OF WORK
1.14 ARTIFICIAL OBSTRUCTIONS
1.15 SHOAL REMOVAL
1.16 SOUNDINGS
1.17 VOLUME CALCULATIONS
1.18 MONTHLY PARTIAL PAYMENTS
1.19 CONTINUITY OF WORK
1.20 ALLOWABLE PAY OVERDEPTH AND SIDESLOPES
1.20.1 Overdepth Dredging
1.20.2 Excessive Dredging
1.20.3 Sideslopes
1.21 PUMPING FACILITIES
1.22 PERMITS
1.23 ENVIRONMENTAL PROTECTION REQUIREMENTS
1.24 BASIS FOR BIDS
1.25 FILTER CELL MEDIA
PART 2 PRODUCTS
2.1 MECHANICAL DREDGING EQUIPMENT
SECTION 35 20 23 Page 1
2.2 OTHER EQUIPMENT
2.3 PUMPING EQUIPMENT
2.4 MATERIALS AND EQUIPMENT
2.4.1 Pump Assembly Unit Description
2.4.2 Pump Assembly Unit and Appurtenances
2.5 FLOATING WEIR INTAKE
2.6 PUMPING FACILITY
PART 3 EXECUTION
3.1 CHARACTER OF MATERIALS
3.2 DREDGING
3.3 OBSTRUCTIONS
3.4 INSPECTION
3.5 CONDUCT OF DREDGING WORK
3.5.1 Order of Work
3.5.2 Dredging Sites
3.5.3 Lights
3.5.4 Ranges, Gages, and Lines
3.5.5 Plant
3.5.6 Disposal of Dredged Material
3.5.6.1 Method of Disposal
3.5.6.2 Disposal in Indicated Disposal Areas
3.5.6.3 Misplaced Material
3.5.7 Confined Disposal Facility (CDF) Disposal
3.5.8 Condition of Scows, Hoppers, and Pipelines
3.5.9 Unloading of Scows
3.5.10 Navigation Warnings
3.5.11 Method of Communication
3.5.12 Salvaged Material
3.5.13 Safety of Structures
3.5.14 Plant Removal
3.6 CHICAGO AREA CONFINED DISPOSAL FACILITY (CDF)
3.6.1 Calumet Harbor
3.6.2 CDF Dike
3.6.3 Stone on CDF Dike
3.6.4 Equipment
3.7 PLACEMENT OF DREDGED MATERIAL
3.7.1 Disposal Limits
3.7.2 Placement
3.7.3 Dredged Material Management
3.7.3.1 Relocation of Existing Materials Within Disposal Area
3.7.3.2 Placement Restrictions
3.7.3.3 Dike Protection
3.7.3.4 Sand Blanket Coverage
3.7.3.5 Balance of Volumes
3.8 CDF DEWATERING
3.8.1 Pump
3.8.2 Force Main Line
3.8.3 CDF Operational Tests
3.8.4 Retesting
3.9 FILTER CELL OPERATION AND MAINTENANCE
3.9.1 Filter Cell Description
3.9.1.1 Filter Cell Maintenance
3.9.2 Suspended Solids
3.9.3 Monitoring
3.9.4 Maintenance
3.9.5 Sludge Accumulation
3.10 CONTRACTOR QUALITY CONTROL
SECTION 35 20 23 Page 2
3.11 GOVERNMENT INSPECTION
3.11.1 Gauge Maintenance
3.11.2 Facilities
3.11.3 Transportation
3.11.4 Compliance
3.12 MEASUREMENT
3.12.1 Method of Measurement
3.12.2 Government Utilization of Multi-beam and Single Beam Sounders for Quantity and Clearance Surveys
3.13 FINAL EXAMINATION AND ACCEPTANCE
3.13.1 Examination
3.13.2 Acceptance
-- End of Section Table of Contents --
SECTION 35 20 23 Page 3
SECTION 35 20 23
DREDGING
01/19
PART 1 GENERAL
1.1 SCOPE
The work covered under this section includes furnishing all plant, labor, and equipment, required for dredging. This section also covers transportation and disposal of all dredged materials from Calumet Harbor and River to the proposed depths, elevations, and side slopes shown on the drawings. All transporting and disposal of dredged material will be completed by Marine Plant. The dredged material shall be transported and deposited in the Government furnished Chicago Area Confined Disposal Facility (CDF) by mechanical means only. Government has obtained the Illinois Environmental Protection Agency (IEPA) Water Pollution Control Permit. See Section 01 57 20.01 03 ENVIRONMENTAL PROTECTION FOR ILLINOIS for permit and Stormwater Pollution Prevention Plan requirements.
1.2 DEFINITIONS
1.2.1 Hard Material
Hard material is defined as material requiring the use of special equipment for economical removal, and includes boulders or fragments too large to be removed in one piece by the dredge.
1.2.2 Dredging Limits
The dredging limits are shown on the drawings. As required, these limits will be adjusted when the pre-dredge soundings are conducted.
1.2.3 Required Dredging Prism Depth
Synonymous with dredging depth.
1.2.4 Required Dredging Prism Line
Synonymous with dredging depth with side and end slopes of 1 vertical on 2 horizontal.
1.2.5 Required Dredging Prism
All materials lying within the dredging limits and between the existing bottom surface and the required dredging prism line.
1.2.6 Allowable Dredging Prism Line
1 foot below the required dredging prism line with one vertical on two horizontal side and end slopes.
1.2.7 Allowable Dredging Prism Depth
Synonymous with allowable dredging prism line.
SECTION 35 20 23 Page 4
1.2.8 Allowable Dredging Prism
Allowable dredging prism is defined as the volume of material between the required dredging prism and the allowable dredging prism line. There is a one foot allowable dredging prism directly below the required dredging prism for areas within the specified work limits that have material above the dredging depth. Areas with no required dredging do not have an allowable dredging prism.
1.3 REFERENCES
The following publications of issues listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 1110-2-1003 (2013) Engineering and Design -- Hydrographic Surveying Manual
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
S…
This is the start of the file's text. The full file is on GovTribe.