AMENDMENT_0005_MCCOOK_LEVEE_W912P619B0010_RGB.pdf

PDF 751 KB Posted

Attached to
McCook and West Lyons Levee, McCook and West Lyons, Cook County, Illinois (USACE Acquisition)
Solicitation number
W912P619B0010
Issued by

About this file

THIS FILE CONTAINS AMENDMENT NO. 0005

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6690654875

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

REFERENCE INVITATION FOR BIDS NO. W912P619B0010, "MCCOOK AND WEST LYONS LEVEE, MCCOOK AND WEST LYONS, COOK

COUNTY, ILLINOIS (USACE ACQUISITION)

-- THIS AMENDMENT CONTINUES ON THE FOLLOWING PAGES --

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Sep-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P619B0010

X 9B. DATED (SEE ITEM 11)

05-Aug-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Sep-2019

CODE

U.S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P619B0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

A. BID OPENING DATE AND TIME:

The Bid Opening Date and time remains September 17, 2019 at 2:00 p.m. (Central Time); therefore, bids must be received prior to 2:00 p.m. (Central Time) on September 17, 2019. Detailed information regarding the submission of bids is located at Section 00 22 13 of the Solicitation document – See “IMPORTANT

BID NOTES.”

B. AMENDED SPECIFICATION SECTION: The following Specification Section have been revised. The revised sections are enclosed hereunder and replace the previously furnished sections.

SECTION NUMBER AND

TITLE

PARAGRAPH AND DESCRIPTION OF CHANGE

01 22 00.00 10 PRICE AND

PAYMENT PROCEDURES

Paragraph 1.3.1.1 was revised to remove the statement that 'refilling of holes resulting from clearing & grubbing will not be measured for payment but will be considered as an incidental under the above item.'

C. CONTRACTOR’S INQUIRIES: By this Amendment, the Chicago District, USACE responds to Contractor’s inquiries (SEE THE FOLLOWING).

Q1. Per Amendment 4 USACE response to Q43, the fill quantity required for backfilling after tree removal is payable under the clay fill bid item 011AB,0021 and 0032. Per Sec 01 22 00.00 10 paragraph 1.3.1.1 Payment, it states refilling of holes resulting from clearing & grubbing will not be measured for payment but will be considered as an incidental under the above item. Which of these items is correct?

USACE Response Q1: The fill quantity required for backfilling after tree removal is payable under the clay fill bid item 011AB, 0021 and 0032. Specification Section 01 22 00.00 10 paragraph 1.3.1.1 Payment, has been revised to remove the statement that 'refilling of holes resulting from clearing & grubbing will not be measured for payment but will be considered as an incidental under the above item.'

Q2. Per Sec 31 00 00 Paragraph 3.15 says unsatisfactory material is to be removed from site, Sec 31 00 00 paragraph 3.10 says all unsatisfactory material must remain within project limits. Can you please clarify as to what happens to unsatisfactory material?

USACE Response Q2: Unsatisfactory material must be removed from the site per paragraph 3.15 in Specification Section 31 00 00. Procedures and locations for disposal of unused satisfactory material should be submitted per Paragraph 3.10 of Specification Section 31 00 00.

Q3. Q43 on Amendment 4 was answered with: “The fill quantity required for backfilling after tree removal is payable under the Clay Fill bid items 0011AB, 0021, and 0032.”, yet the revised Measurement and Payment item still says “The refilling of holes resulting from clearing and

W912P619B0010 grubbing will not be measured for payment but will be considered as a incidental under the above item.” That is a direct conflict. Please resolve and let us know which one is correct.

USACE Response Q3: Please see USACE Response Q2 above.

D. POINT OF CONTACT: The Point of Contact (POC) for this Amendment is Ericka Hillard at (312) 846- 5378; email: ericka.d.hillard@usace.army.mil.

END OF AMENDMENT NO. 0004

(AMENDED SPECIFICATION SECTIONS FOLLOW)

McCook and West Lyons Levee Project W912P619B0010

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 10

PRICE AND PAYMENT PROCEDURES

08/15

PART 1 GENERAL

1.1 SUBMITTALS

1.2 SINGLE JOB PAYMENT ITEMS

1.2.1 Mobilization (Base Bid Item 0001, Option 1 Bid Item 0017 and Option 2 Bid Item 0028)

1.2.1.1 Payment

1.2.1.2 Unit of Measure

1.2.2 Demobilization (Base Bid Item 0002, Option 1 Bid Item 0018 and Option 2 Bid Item 0029)

1.2.2.1 Payment

1.2.2.2 Unit of Measure

1.2.3 Temporary Construction Facilties (Base Bid Item 0003)

1.2.3.1 Payment

1.2.3.2 Unit of Measure

1.2.4 Maintenance of Traffic (Base Bid Item 0004)

1.2.4.1 Payment

1.2.4.2 Unit of Measure

1.2.5 Debris Removal (Base Bid Item 0005)

1.2.5.1 Payment

1.2.5.2 Unit of Measure

1.2.6 Site Preparation, Invasive Species Control, and Establishment Activities (Base Bid Item 0007, Option 1 Bid Item 0022 and Option 2 Bid Item 0034)

1.2.6.1 Payment

1.2.6.2 Unit of Measure

1.2.7 Repair Sheetpile Holes(Base Bid Item 0011AD)

1.2.7.1 Payment

1.2.7.2 Unit of Measure

1.2.8 Repair Road at North Tieback (Base Bid Item 0011AE)

1.2.8.1 Payment

1.2.8.2 Unit of Measure

1.2.9 Headwall Structure (Base Bid Item 0012AA)

1.2.9.1 Payment

1.2.9.2 Unit of Measure

1.2.10 Performance and Payment Bonds (Base Bid Item 0015, Option 1 Bid Item 0027, Option 2 Bid Item 0036, Option 3 Bid Item 0038, and Option 4 Bid Item 0041)

1.2.10.1 Payment

1.2.10.2 Unit of Measure

1.2.11 Flood Water Control and Management (Option 3 Bid Item 0037)

1.2.11.1 Payment

1.2.11.2 Unit of Measure

1.2.12 Flood Fight Plan (Base Bid Item 0015)

1.2.12.1 Payment

1.2.12.2 Unit of Measure

SECTION 01 22 00.00 10 Page 1

AMD #0005 - 09/13/19

McCook and West Lyons Levee Pr oj ect W912P619B0010

1. 3 UNI T PRI CE PAYMENT I TEMS

1. 3. 1 Cl ear i ng and Gr ubbi ng ( Base Bi d I t em 0006, Opt i on 1 Bi d I t em

0019 and Opt i on 2 Bi d I t em 0030)

1. 3. 1. 1 Payment

1. 3. 1. 2 Measur ement

1. 3. 1. 3 Uni t of Measur e

1. 3. 2 Seedi ng ( Base Bi d I t em 0008, Opt i on 1 Bi d I t em 0023, Opt i on 2

Bi d I t em 0035, and Opt i on 4 Bi d I t em 0039)

1. 3. 2. 1 Payment

1. 3. 2. 2 Measur ement

1. 3. 2. 3 Uni t of Measur e

1. 3. 3 Pl ugs ( Base Bi d I t em 0009, Opt i on 1 Bi d I t em 0024, and Opt i on

4 Bi d I t em 0040)

1. 3. 3. 1 Payment

1. 3. 3. 2 Measur ement

1. 3. 3. 3 Uni t of Measur e

1. 3. 4 Toe Pr ot ect i on St one ( Base Bi d I t em 0010)

1. 3. 4. 1 Payment

1. 3. 4. 2 Measur ement

1. 3. 4. 3 Uni t of Measur e

1. 3. 5 St r i p and Repl ace Topsoi l ( Base Bi d I t em 0011AA, Opt i on 1 Bi d

I t em 0020, Opt i on 2 Bi d I t em 0031)

1. 3. 5. 1 Payment

1. 3. 5. 2 Measur ement

1. 3. 5. 3 Uni t of Measur e

1. 3. 6 Cl ay Fi l l ( Base Bi d I t em 0011AB, Opt i on 1 Bi d I t em 0021)

1. 3. 6. 1 Payment

1. 3. 6. 2 Measur ement

1. 3. 6. 3 Uni t of Measur e

1. 3. 7 Ti eback Levee Cl ay Fi l l ( Opt i on 2 Bi d I t em 0033)

1. 3. 7. 1 Payment

1. 3. 7. 2 Measur ement

1. 3. 7. 3 Uni t of Measur e

1. 3. 8 Aggr egat e Ser vi ce Road ( Base Bi d I t em 0011AC, and Opt i on 1 Bi d

I t em 0026)

1. 3. 8. 1 Payment

1. 3. 8. 2 Measur ement

1. 3. 8. 3 Uni t of Measur e

1. 3. 9 60 I nch RCP Pi pe ( Base Bi d I t em 0012AB)

1. 3. 9. 1 Payment

1. 3. 9. 2 Measur ement

1. 3. 9. 3 Uni t of Measur e

1. 3. 10 Sl ui ce Gat e ( Base Bi d I t em 0012AC)

1. 3. 10. 1 Payment

1. 3. 10. 2 Measur ement

1. 3. 10. 3 Uni t of Measur e

1. 3. 11 Sat i sf act or y Fi l l ( Base Bi d I t em 0012AD)

1. 3. 11. 1 Payment

1. 3. 11. 2 Measur ement

1. 3. 11. 3 Uni t of Measur e

1. 3. 12 48 I nch RCP Pi pe ( Base Bi d I t em 0013AA)

1. 3. 12. 1 Payment

1. 3. 12. 2 Measur ement

1. 3. 12. 3 Uni t of Measur e

1. 3. 13 Ri pr ap ( Type A) and Beddi ng St one ( Base Bi d I t ems 0013AB and

0014AB)

1. 3. 13. 1 Payment

1. 3. 13. 2 Measur ement

1. 3. 13. 3 Uni t of Measur e

SECTI ON 01 22 00. 00 10 Page 2

AMD #0005 - 09/ 13/ 19

1. 3. 14 48 I nch Fl ap Gat e ( Base Bi d I t em 0013AC)

1. 3. 14. 1 Payment

1. 3. 14. 2 Measur ement

1. 3. 14. 3 Uni t of Measur e

1. 3. 15 24 I nch RCP Pi pe ( Base Bi d I t em 0014AA)

1. 3. 15. 1 Payment

1. 3. 15. 2 Measur ement

1. 3. 15. 3 Uni t of Measur e

1. 3. 16 24 I nch Fl ap Gat e ( Base Bi d I t em 0014AC)

1. 3. 16. 1 Payment

1. 3. 16. 2 Measur ement

1. 3. 16. 3 Uni t of Measur e

1. 3. 17 Bi ke Pat h Repl acement ( Opt i on 1 Bi d I t em 0025)

1. 3. 17. 1 Payment

1. 3. 17. 2 Measur ement

1. 3. 17. 3 Uni t of Measur e

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON

3. 1 CONTRACT COST BREAKDOWN

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 22 00. 00 10 Page 3

SECTI ON 01 22 00. 00 10

PRI CE AND PAYMENT PROCEDURES

08/15

PART 1 GENERAL

1. 1 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 03 Pr oduct Dat a

Cost - Rei mbur sabl e Suppor t i ng Document at i on; G, CN

SD- 07 Cer t i f i cat es

Bi l l Of Mat er i al Del i ver y

Ar mor St one Wei ght Cer t i f i cat es

Ri pr ap St one Wei ght Cer t i f i cat es

1. 2 SI NGLE JOB PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act j ob payment s wi l l be made ar e l i s t ed i n t he SCHEDULE and descr i bed bel ow.

Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, ar e i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se provided.

1. 2. 1 Mobi l i zat i on ( Base Bi d I t em 0001, Opt i on 1 Bi d I t em 00167 and Opt i on 2 Bi d I t em 00278)

1. 2. 1. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h mobi l i zat i on. The cont r act or wi l l be compensat ed f or t he t ot al i t y of i t s act i v i t i es needed t o mobi l i ze i t s equi pment and l abor f or ce t o t he pr oj ect s i t e. The Gover nment wi l l pay al l cost s f or t he mobi l i zat i on of al l of t he Cont r act or ' s pl ant and equi pment at t he j ob pr i ce f or t hi s i t em. The Cont r act i ng Of f i cer Repr esent at i ve may r equi r e t he Cont r act or t o f ur ni sh cost dat a t o j ust i f y i t s bi d pr i ce f or t hi s i t em i f t he Cont r act i ng Of f i cer deems t her e i s no r easonabl e r el at i onshi p t o t he cost of t he wor k i n t hi s cont r act . Fai l ur e t o j ust i f y t he l i ne i t em pr i ce t o t he sat i sf act i on of t he Cont r act i ng Of f i cer wi l l r esul t i n payment det er mi ned

SECTI ON 01 22 00. 00 10 Page 4 by t he Cont r act i ng Of f i cer of t he act ual cost , whi ch i s not subj ect t o appeal.

1. 2. 1. 2 Uni t of Measur e

Uni t of Measur e: JOB

1. 2. 2 Demobi l i zat i on ( Base Bi d I t em 0002, Opt i on 1 Bi d I t em 00178 and Opt i on 2 Bi d I t em 00289)

1. 2. 2. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h demobi l i zat i on. The cont r act or wi l l be compensat ed f or t he t ot al i t y of i t s act i v i t i es needed t o demobi l i ze i t s equi pment and l abor f or ce t o t he pr oj ect s i t e. The Gover nment wi l l pay al l cost s f or t he demobi l i zat i on of al l of t he Cont r act or ' s pl ant and equi pment at t he j ob pr i ce f or t hi s i t em. The Cont r act i ng Of f i cer Repr esent at i ve may r equi r e t he Cont r act or t o f ur ni sh cost dat a t o j ust i f y i t s bi d pr i ce f or t hi s i t em i f t he Cont r act i ng Of f i cer deems t her e i s no r easonabl e r el at i onshi p t o t he cost of t he wor k i n t hi s cont r act . Fai l ur e t o j ust i f y t he l i ne i t em pr i ce t o t he sat i sf act i on of t he Cont r act i ng Of f i cer wi l l r esul t i n payment det er mi ned by t he Cont r act i ng Of f i cer of t he act ual cost , whi ch i s not subj ect t o appeal.

1. 2. 2. 2 Uni t of Measur e

Uni t of Measur e: JOB

1. 2. 3 Tempor ar y Const r uct i on Faci l t i es ( Base Bi d I t em 0003)

1. 2. 3. 1 Payment

Payment wi l l be made at t he cont r act l ump sum pr i ce f or al l l abor , equi pment and mat er i al s f or t he cont r act or ' s t empor ar y f i el d of f i ce, t empor ar y f enci ng and gat es, r est or at i on, pr oj ect and saf et y s i gns, and ot her i nci dent al i t ems as descr i bed i n Sect i on 01 52 02 TEMPORARY CONSTRUCTI ON FACI LI TI ES and Sect i on 01 58 00 PROJECT I DENTI FI CATI ON.

1. 2. 3. 2 Uni t of Measur e

Uni t of Measur e: JOB

1. 2. 4 Mai nt enance of Tr af f i c ( Base Bi d I t em 0004)

1. 2. 4. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h mai nt enance of t r af f i c .

1. 2. 4. 2 Uni t of Measur e

Uni t of Measur e: JOB

1. 2. 5 Debr i s Removal ( Base Bi d I t em 0005)

1. 2. 5. 1 Payment

Payment wi l l be made at t he cont r act l ump sum pr i ce f or al l l abor , equi pment and mat er i al s t o r emove debr i s f r om t he l evee ar ea and di spose

SECTI ON 01 22 00. 00 10 Page 5 of f s i t e. Thi s i t em shal l be seper at e f r om cl ear i ng cost s cover ed i n t he Cl ear i ng and Gr ubbi ng bi d i t ems.

1. 2. 5. 2 Uni t of Measur e

Uni t of Measur e: JOB

1. 2. 6 Si t e Pr epar at i on, I nvasi ve Speci es Cont r ol , and Est abl i shment Act i v i t i es ( Base Bi d I t em 0007, Opt i on 1 Bi d I t em 00212 and Opt i on 2 Bi d I t em 00334)

1. 2. 6. 1 Payment

Payment wi l l be made f or al l cost s associ at ed wi t h s i t e pr epar at i on, i nvasi ve speci es cont r ol , and est abl i shment of seeded and pl ant ed ar eas i ncl udi ng soi l pr epar at i on f or pl ant i ng, her bi c i di ng, mowi ng, i nspect i ons, wat er i ng, any necessar y pr edat or cont r ol , and ot her act i v i t i es as descr i bed i n Spec Sect i on 32 92 19. 10 NATI VE PLANT I NSTALLATI ON. Payment s wi l l be made year l y and based on t he per f or mance cr i t er i a descr i bed i n t he above sect i on; however , mont hl y pr ogr ess payment s wi l l be al l owed wi t h pr i or appr oval by t he COR and af t er a mont hl y I nvasi ve Cont r ol Repor t has been appr oved as descr i bed i n Spec Sect i on 32 92 19. 10 NATI VE PLANT I NSTALLATI ON. I f t he Cont r act or f ai l s t o est abl i sh t he per f or mance cr i t er i a i n any year , none of t he payment per cent age wi l l be pai d t o t he cont r act or . The bal ance wi t hhel d f r om t he pr evi ous year wi l l t hen be pai d t he f ol l owi ng year , i f t he per f or mance cr i t er i a i s met .

1. 2. 6. 2 Uni t of Measur e

Uni t of Measur e: JOB

1. 2. 7 Repai r Sheet pi l e Hol es( Base Bi d I t em 0011AD)

1. 2. 7. 1 Payment

Payment wi l l be made f or al l cost s associ at ed wi t h r epai r i ng hol es i n t he sheet pi l e. Payment const i t ut es f ul l compensat i on f or al l pl ant , l abor , mat er i al s, equi pment , t ool s, and i nci dent al s necessar y t o compl et e t he work.

1. 2. 7. 2 Uni t of Measur e

Uni t of Measur e: JOB

1. 2. 8 Repai r Road at Nor t h Ti eback ( Base Bi d I t em 0011AE)

1. 2. 8. 1 Payment

Payment wi l l be made f or al l cost s associ at ed wi t h t he r epai r of t he exi st i ng r oadway at t he nor t h t i eback l evee t o pr e- const r uct i on st at e.

Payment const i t ut es f ul l compensat i on f or al l pl ant , l abor , mat er i al s, equi pment , t ool s, and i nci dent al s necessar y t o compl et e t he wor k. Payment i ncl udes al l wor k r equi r ed f or excavat i on, backf i l l , and seedi ng.

1. 2. 8. 2 Uni t of Measur e

Uni t of Measur e: JOB

SECTI ON 01 22 00. 00 10 Page 6

1. 2. 9 Headwal l St r uct ur e ( Base Bi d I t em 0012AA)

1. 2. 9. 1 Payment

Payment wi l l be made f or al l cost s associ at ed wi t h t he pl acement of a headwal l at t he l ocat i on near Lawndal e Avenue as shown on t he cont r act dr awi ngs. Payment const i t ut es f ul l compensat i on f or al l pl ant , l abor , mat er i al s, equi pment , t ool s, and i nci dent al s necessar y t o compl et e t he wor k. Payment i ncl ues al l wor k r equi r ed f or excavat i on, backf i l l , and seeding.

1. 2. 9. 2 Uni t of Measur e

Uni t of Measur e: JOB

1. 2. 10 Per f or mance and Payment Bonds ( Base Bi d I t em 0015, Opt i on 1 Bi d I t em 00267, Opt i on 2 Bi d I t em 00356, Opt i on 3 Bi d I t em 0038, and Opt i on 4 Bi d I t em 004139)

1. 2. 10. 1 Payment

Payment wi l l be made f or t he per f or mance and payment bonds t hat ar e r equi r ed as par t of t hi s cont r act . The Gover nment wi l l pay t he act ual cost of t he bonds or t he Cont r act or ' s bi d pr i ce, whi chever i s l ess, af t er r ecei v i ng evi dence of payment ( pai d i nvoi ce) f r om t he bondi ng company or agency.

1. 2. 10. 2 Uni t of Measur e

Uni t of Measur e: LOT

1. 2. 11 Fl ood Wat er Cont r ol and Management Gover nment Pr i ce Al l owance ( Opt i on 3 Bi d I t em 00367)

1. 2. 11. 1 Payment

Payment wi l l be made f or al l cost s associ at ed wi t h i ni t i at i ng a Fl ood Cont i ngency Pl an f l ood wat er cont r ol and management as descr i bed i n Section 01 10 00 GENERAL PROVI SI ONS. Thi s i ncl udes l abor , equi pment , mat er i al s, and ot her i nci dent al i t ems r el at ed t o f l ood f i ght i ng f or one f l ood event . As wor k associ at ed wi t h t hi s i t em must be i ni t i at ed i mmedi at el y f ol l owi ng t he Des Pl ai nes r i ver l evel r i s i ng t o t he poi nt desi gnat ed i n t he Fl ood Cont i ngency Pl an, a pr i ce pr oposal f or each Fl ood Cont i ngency Pl an event wi t h cost - r ei mbur sabl e suppor t i ng document at i on shal l be submi t t ed t o t he COR f or r evi ew and appr oval f ol l owi ng each event .

1. 2. 11. 2 Uni t of Measur e

Uni t of Measur e: LOTJOB

1. 2. 12 Fl ood Fi ght Pl an ( Base Bi d I t em 0015)

1. 2. 12. 1 Payment

Payment wi l l be made f or al l cost s associ at ed wi t h pr epar i ng a Fl ood Fi ght Pl an as descr i bed i n Sect i on 01 10 00 GENERAL PROVI SI ONS.

SECTI ON 01 22 00. 00 10 Page 7

1. 2. 12. 2 Uni t of Measur e

Uni t of Measur e: JOB

1. 3 UNI T PRI CE PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.

1. 3. 1 Cl ear i ng and Gr ubbi ng ( Base Bi d I t em 0006, Opt i on 1 Bi d I t em 00189 and Opt i on 2 Bi d I t em 002930)

1. 3. 1. 1 Payment

Cl ear i ng and gr ubbi ng wi t hi n t he t r ee cl ear i ng l i mi t s as i ndi cat ed on t he cont r act dr awi ngs, and di sposal , i n accor dance t o Sect i on 31 11 00 CLEARI NG AND GRUBBI NG. Payment const i t ut es f ul l compensat i on f or al l pl ant , l abor , mat er i al s, equi pment , t ool s, and i nci dent al s necessar y t o compl et e t he wor k. The r ef i l l i ng of hol es r esul t i ng f r om cl ear i ng and gr ubbi ng wi l l not be measur ed f or payment but wi l l be consi der ed as a i nci dent al under t he above i t em. Cl ear i ng and di sposal of s i t e f eat ur es such as t he exi st i ng r et ai ni ng wal l and spl i t r ai l f ence shal l be i ncl uded under t hi s i t em.

1. 3. 1. 2 Measurement

The payment wi l l be made per acr e of l and cl ear ed.

1. 3. 1. 3 Uni t of Measur e

Uni t of Measur e: Acr e ( AC)

1. 3. 2 Seedi ng ( Base Bi d I t em 0008, Opt i on 1 Bi d I t em 00223, Opt i on 2 Bi d I t em 00345, and Opt i on 4 Bi d I t em 00379)

1. 3. 2. 1 Payment

Payment f or seedi ng shal l be made at t he cont r act uni t and shal l i ncl ude f ul l compensat i on f or al l pl ant , l abor , mat er i al s, and ot her component s appr opr i at e t o compl et e t he wor k as descr i bed i n Sect i on 32 92 19. 10 NATI VE PLANT I NSTALLATI ON. The Cont r act or shal l r euse st r i pped on- si t e t opsoi l f or seedi ng i n accor dance wi t h Sect i on 32 92 19. 10 NATI VE PLANT I NSTALLATI ON. Associ at ed cost s f or t opoi l pl acement wi l l be cover ed under cont r act l i ne i t em number s ( CLI Ns) 0011AA, 0019, and 0030.

1. 3. 2. 2 Measurement

Pl acement r at e of seeds ar e pr ovi ded i n Sect i on 32 92 19. 10 NATI VE PLANT I NSTALLATI ON. A Bi l l of Mat er i al Del i ver y must accompany t he seeds t o ver i f y and subst ant i at e t he quant i t y of seeds del i ver ed t o t he s i t e.

Copi es of t he bi l l s of del i ver y shal l be submi t t ed t o t he COR.

Seed pl ant i ngs wi l l be measur ed by ar ea of seed and pound of seed i nst al l ed per pl acement r at e and accept ed by t he Cont r act i ng Of f i cer ' s

SECTI ON 01 22 00. 00 10 Page 8

Repr esent at i ve ( COR) . Accept ance cr i t er i a i s cont ai ned i n Sect i on 32 92 19. 10 NATI VE PLANT I NSTALLATI ON. However , not wi t hst andi ng t hi s or any ot her cont r act r equi r ement , t he cont r act or shal l not be pai d f or any quant i t y of nat i ve seeds t hat exceeds t he quant i t y l i s t ed i n Sect i on 32 92 19. 10 NATI VE PLAN I NSTALLATI ON. The Cont r act or shal l bear t he cost of any nat i ve seeds i nst al l ed i n excess of t he quant i t y l i s t ed.

1. 3. 2. 3 Uni t of Measur e

Uni t of Measur e: Ounce ( OZ)

1. 3. 3 Pl ugs ( Base Bi d I t em 0009, Opt i on 1 Bi d I t em 00234, and Opt i on 4 Bi d I t em 003408)

1. 3. 3. 1 Payment

Payment wi l l be made at t he cont r act uni t pr i ce f or pl ugs pl ant ed as descr i bed i n Spec Sect i on 32 92 19. 10 NATI VE PLANT I NSTALLATI ON t o i ncl ude handl i ng, st or i ng, l oadi ng, haul i ng, pl aci ng, wat er i ng, et c. , as wel l as l abor , mat er i al s, equi pment , t ool s, and i nci dent al s necessar y t o compl et e t he wor k. Af t er al l pl ant i ngs have been i nst al l ed, t he Cont r act or shal l not i f y t he COR and r equest an i nspect i on. As soon as pr act i cabl e t her eaf t er , at l east one mont h af t er al l pl ant i ngs have been i nst al l ed f or t hat par t i cul ar year , t he COR wi l l make an i nspect i on, at whi ch t i me al l ar eas pl ant ed i n accor dance wi t h Spec Sect i on 32 92 19. 10 NATI VE PLANT I NSTALLATI ON wi l l be accept ed.

1. 3. 3. 2 Measurement

A bi l l of mat er i al del i ver y must accompany t he mat er i al t o ver i f y and subst ant i at e t he quant i t y of pl ugs del i ver ed t o t he s i t e. Copi es of t he bi l l s of del i ver y shal l be submi t t ed t o t he COR and a USACE, Chi cago Di st r i ct bot ani st or ecol ogi st . Pl ant i ng wi l l be measur ed by t he number of pl ugs i nst al l ed and accept ed by t he COR at l east one mont h af t er al l pl ant i ngs have been i nst al l ed f or t hat par t i cul ar year . Per f or mance cr i t er i a i s cont ai ned i n Spec Sect i on 32 92 19. 10 NATI VE PLANT I NSTALLATI ON. The Cont r act or wi l l be pai d f or t he act ual quant i t y of nat i ve pl ugs i nst al l ed and accept ed. However , not wi t hst andi ng t hi s or any ot her cont r act r equi r ement , t he Cont r act or shal l not be pai d f or any quant i t y of nat i ve pl ugs t hat exceeds t he quant i t y l i s t ed i n t he bi d schedul e. The Cont r act or shal l bear t he cost of any nat i ve pl ugs i nst al l ed i n excess of t he quant i t y l i s t ed i n t he bi d schedul e.

1. 3. 3. 3 Uni t of Measur e

Uni t of Measur e: Each ( EA)

1. 3. 4 Toe Pr ot ect i on St one ( Base Bi d I t em 0010)

1. 3. 4. 1 Payment

Payment wi l l be made at t he cont r act uni t pr i ce f or t oe pr ot ect i on st one, bot h r i pr ap and beddi ng st one, pl aced as i ndi cat ed on t he dr awi ngs.

Payment const i t ut es f ul l compensat i on f or al l l abor , mat er i al s, equi pment , t ool s, and i nci dent al s necessar y t o compl et e t he wor k. Any r egr adi ng of t he under l y i ng s l ope t o meet spec r equi r ement s and beddi ng st one shal l be i nci dent al t o t hi s wor k. Al l wor k shal l be i n accor dance wi t h t he dr awi ngs and Sect i on 31 37 16. 00 03 RI PRAP FOR EROSI ON CONTROL.

SECTI ON 01 22 00. 00 10 Page 9

1. 3. 4. 2 Measurement

St ones wi l l be measur ed f or payment by t he t on. Quant i t i es wi l l be comput ed t o t he near est t ent h of Ton. The Cont r act or shal l submi t armor st one wei ght cer t i f i cat es al ong wi t h payment i nvoi ce f or payment .

1. 3. 4. 3 Uni t of Measur e

Uni t of Measur e: Ton ( TN) ( 2, 000 pounds)

1. 3. 5 St r i p and Repl ace Topsoi l ( Base Bi d I t em 0011AA, Opt i on 1 Bi d I t em 00 1920, Opt i on 2 Bi d I t em 00301)

1. 3. 5. 1 Payment

Ful l compensat i on f or al l l abor , equi pment and mat er i al s f or st r i ppi ng t opsoi l , st ockpi l i ng, and pl aci ng soi l mat er i al necessar y f or pl ant i ng as descr i bed on t he dr awi ngs must be i ncl uded at t he cont r act uni t pr i ce f or t hi s bi d i t em of t he Bi ddi ng Schedul e. Al l wor k shal l be i n accor dance wi t h t he dr awi ngs and Sect i on 31 00 00 EARTHWORK

1. 3. 5. 2 Measurement

Measur ement wi l l be made per cubi c yar d of mat er i al st i pped and pl aced.

The means of measur ement must be appr oved by t he COR.

1. 3. 5. 3 Uni t of Measur e

Uni t of Measur e: Cubi c Yar d ( CY)

1. 3. 6 Cl ay Fi l l ( Base Bi d I t em 0011AB, Opt i on 1 Bi d I t em 00201, and Opt i on 2 Bi d I t em 0031)

1. 3. 6. 1 Payment

Ful l compensat i on f or al l l abor , equi pment and mat er i al s f or pl acement of f i l l al ong t he l evee f r om of f s i t e soi l sour ce wi l l be i ncl uded at t he cont r act uni t pr i ce f or t hi s bi d i t em of t he Bi ddi ng Schedul e. Al l wor k shal l be i n accor dance wi t h t he cont r act dr awi ngs and Sect i on 31 00 00 EARTHWORK. Pl acement of er osi on cont r ol measur es wi l l be i nci dent al t o t hi s bi d i t em.

1. 3. 6. 2 Measurement

Measur ement wi l l be made per cubi c yar d of soi l pl aced f or l evee f i l l .

The means of measur ement must be appr oved by t he COR.

1. 3. 6. 3 Uni t of Measur e

Uni t of Measur e: Cubi c Yar d ( CY)

1. 3. 7 Ti eback Levee Cl ay Fi l l ( Opt i on 2 Bi d I t em 0033)

1. 3. 7. 1 Payment

Ful l compensat i on f or al l l abor , equi pment and mat er i al s f or pl acement of f i l l al ong t he l evee f r om of f s i t e soi l sour ce wi l l be i ncl uded at t he cont r act uni t pr i ce f or t hi s bi d i t em of t he Bi ddi ng Schedul e. Al l wor k

SECTI ON 01 22 00. 00 10 Page 10 shal l be i n accor dance wi t h t he cont r act dr awi ngs and Sect i on 31 00 00 EARTHWORK. Pl acement of er osi on cont r ol measur es wi l l be i nci dent al t o t hi s bi d i t em. I nci dent al t o t hi s i t em wi l l be any speci al const r uct i on condi t i ons r equi r ed by BNSF Rai l r oad and CN Rai l r oad t o compl et e wor k wi t hi n t hei r r i ght - of - way. These condi t i ons may i ncl ude but ar e not l i mi t ed t o r equi r ement s f or t he Cont r act or t o mai nt ai n cer t ai n saf et y cer t i f i cat i ons, i nsur ances ( beyond i nsur ance r equi r ement s speci f i ed i n Section 01 10 00 GENERAL PROVI SI ONS) , t i me r est r i ct i ons, and saf et y per sonnel dur i ng per i ods when access or wor k occur s wi t hi n t he r ai l r oad r i ght of way.

1. 3. 7. 2 Measurement

Measur ement wi l l be made per cubi c yar d of soi l pl aced f or l evee f i l l .

The means of measur ement must be appr oved by t he COR.

1. 3. 7. 3 Uni t of Measur e

Uni t of Measur e: Cubi c Yar d ( CY)

1. 3. 8 Aggr egat e Ser vi ce Road ( Base Bi d I t em 0011AC, and Opt i on 1 Bi d I t em 00256)

1. 3. 8. 1 Payment

Payment wi l l be made at t he cont r act uni t pr i ce f or t he pl acement of t he aggr egat e ser vi ce r oad pl aced al ong t he l evee as descr i bed on t he dr awi ngs and Sect i on 32 15 40 CRUSHED STONE SURFACI NG. Payment const i t ut es f ul l compensat i on f or al l l abor , mat er i al s, equi pment , t ool s, and i nci dent al s necessar y t o compl et e t he wor k.

1. 3. 8. 2 Measurement

Aggr egat e ser vi ce r oad wi l l be measur e by t he sur f ace ar ea of r oad pl aced and accept ed.

1. 3. 8. 3 Uni t of Measur e

Uni t of Measur e: Sqaur e Yar d ( SY)

1. 3. 9 60 I nch RCP Pi pe ( Base Bi d I t em 0012AB)

1. 3. 9. 1 Payment

Payment wi l l be made at t he cont r act uni t pr i ce f or t he 60 i nch RPCP pi pe pl aced at t he l ocat i on shown on t he dr awi ngs and as descr i bed i n Sect i on 33 40 00 STORM DRAI NAGE UTI LI TI ES. The cont r act uni t pr i ce shal l const i t ut e f ul l compensat i on f or pl ant , l abor , mat er i al s, and i nci dent al s r equi r ed t o compl et e wor k, i ncl udi ng al l excavat i on, beddi ng, backf i l l , and ot her i nci dent al i t ems.

1. 3. 9. 2 Measurement

Pi pe shal l be measur ed per t he l i naer f oot of pi pe pl aced and accept ed.

1. 3. 9. 3 Uni t of Measur e

Uni t of Measur e: Li near Foot ( LF)

SECTI ON 01 22 00. 00 10 Page 11

1. 3. 10 Sl ui ce Gat e ( Base Bi d I t em 0012AC)

1. 3. 10. 1 Payment

Payment wi l l be made f or al l cost s associ at ed wi t h t he pl acement of a s l ui ce gat e at t he l ocat i on shown on t he cont r act dr awi ngs. Payment const i t ut es f ul l compensat i on f or al l pl ant , l abor , mat er i al s, equi pment , t ool s, and i nci dent al s necessar y t o compl et e t he wor k.

1. 3. 10. 2 Measurement

Payment wi l l be made per s l ui ce gat e i nst al l ed and accept ed.

1. 3. 10. 3 Uni t of Measur e

Uni t of Measur e: Each ( EA)

1. 3. 11 Sat i sf act or y Fi l l ( Base Bi d I t em 0012AD)

1. 3. 11. 1 Payment

Ful l compensat i on f or al l l abor , equi pment and mat er i al s f or pl acement of sat i sf act or y f i l l r equi r ed f or t he i nsat l l at i on of t he headwal l st r uct ur e and 60 i nch pi pe wi l l be i ncl uded at t he cont r act uni t pr i ce f or t hi s bi d i t em of t he Bi ddi ng Schedul e. Al l wor k shal l be i n accor dance wi t h t he cont r act dr awi ngs and Sect i on 31 00 00 EARTHWORK. Pl acement of er osi on cont r ol measur es wi l l be i nci dent al t o t hi s bi d i t em.

1. 3. 11. 2 Measurement

Measur ement wi l l be made per cubi c yar d of soi l pl aced f or f i l l . The means of measur ement must be appr oved by t he COR.

1. 3. 11. 3 Uni t of Measur e

Uni t of Measur e: Cubi c Yar d ( CY)

1. 3. 12 48 I nch RCP Pi pe ( Base Bi d I t em 0013AA)

1. 3. 12. 1 Payment

Payment wi l l be made at t he cont r act uni t pr i ce f or t he 48 i nch RPCP pi pe pl aced at t he l ocat i on shown on t he dr awi ngs and as descr i bed i n Sect i on 33 40 00 STORM DRAI NAGE UTI LI TI ES. The cont r act uni t pr i ce shal l const i t ut e f ul l compensat i on f or pl ant , l abor , mat er i al s, and i nci dent al s r equi r ed t o compl et e wor k, i ncl udi ng al l excavat i on, beddi ng, backf i l l , and ot her i nci dent al i t ems, i ncl udi ng t he f l ar ed end sect i on. Al l cost s associ at ed wi t h t he Fl ood Cont i ngency Pl an as descr i bed i n Sect i on 01 10 00 GENERAL PROVI SI ONS ar e consi der ed i nci dent al t o t hi s wor k.

1. 3. 12. 2 Measurement

Pi pe shal l be measur ed per t he l i near f oot of pi pe pl aced and accept ed.

1. 3. 12. 3 Uni t of Measur e

Uni t of Measur e: Li near Foot ( LF)

SECTI ON 01 22 00. 00 10 Page 12

1. 3. 13 Ri pr ap ( Type A) and Beddi ng St one ( Base Bi d I t ems 0013AB and 0014AB)

1. 3. 13. 1 Payment

Payment wi l l be made at t he cont r act uni t pr i ce f or r i pr ap pl aced as descr i bed on t he dr awi ngs and Sect i on 31 37 16. 00 03 RI PRAP FOR EROSI ON CONTROL. Payment const i t ut es f ul l compensat i on f or al l l abor , mat er i al s, equi pment , t ool s, and i nci dent al s necessar y t o compl et e t he wor k, i ncl udi ng under l y i ng f i l t er f abr i c.

1. 3. 13. 2 Measurement

St ones wi l l be measur ed f or payment by t he t on. Quant i t i es wi l l be comput ed t o t he near est t ent h of Ton. The Cont r act or shal l submi t riprap st one wei ght cer t i f i cat esal ong wi t h payment i nvoi ce f or payment .

1. 3. 13. 3 Uni t of Measur e

Uni t of Measur e: Ton ( TN) ( 2, 000 pounds)

1. 3. 14 48 I nch Fl ap Gat e ( Base Bi d I t em 0013AC)

1. 3. 14. 1 Payment

Payment wi l l be made f or al l cost s associ at ed wi t h t he pl acement of a f l ap gat e at t he l ocat i on shown on t he cont r act dr awi ngs, i ncl udi ng al l wor k f or t he headwal l st r uct ur e t o suppor t f l ap gat e. Payment const i t ut es f ul l compensat i on f or al l pl ant , l abor , mat er i al s, equi pment , t ool s, and i nci dent al s necessar y t o compl et e t he wor k.

1. 3. 14. 2 Measurement

Payment wi l l be made per s l ui ce gat e i nst al l ed and accept ed.

1. 3. 14. 3 Uni t of Measur e

Uni t of Measur e: Each ( EA)

1. 3. 15 24 I nch RCP Pi pe ( Base Bi d I t em 0014AA)

1. 3. 15. 1 Payment

Payment wi l l be made at t he cont r act uni t pr i ce f or t he 24 i nch RPCP pi pe pl aced at t he l ocat i on shown on t he dr awi ngs and as descr i bed i n Sect i on 33 40 00 STORM DRAI NAGE UTI LI TI ES. The cont r act uni t pr i ce shal l const i t ut e f ul l compensat i on f or pl ant , l abor , mat er i al s, and i nci dent al s r equi r ed t o compl et e wor k, i ncl udi ng al l excavat i on, beddi ng, backf i l l , and ot her i nci dent al i t ems i ncl udi ng t he f l ar ed end sect i on. Al l cost s associ at ed wi t h t he Fl ood Cont i ngency Pl an as descr i bed i n Sect i on 01 10 00 GENERAL PROVI SI ONS ar e consi der ed i nci dent al t o t hi s wor k.

1. 3. 15. 2 Measurement

Pi pe shal l be measur ed per t he l i near f oot of pi pe pl aced and accept ed.

1. 3. 15. 3 Uni t of Measur e

Uni t of Measur e: Li near Foot ( LF)

SECTI ON 01 22 00. 00 10 Page 13

1. 3. 16 24 I nch Fl ap Gat e ( Base Bi d I t em 0014AC)

1. 3. 16. 1 Payment

Payment wi l l be made f or al l cost s associ at ed wi t h t he pl acement of a f l ap gat e at t he l ocat i on shown on t he cont r act dr awi ngs, i ncl udi ng al l wor k f or t he headwal l st r uct ur e t o suppor t f l ap gat e. Payment const i t ut es f ul l compensat i on f or al l pl ant , l abor , mat er i al s, equi pment , t ool s, and i nci dent al s necessar y t o compl et e t he wor k.

1. 3. 16. 2 Measurement

Payment wi l l be made per f l ap gat e i nst al l ed and accept ed.

1. 3. 16. 3 Uni t of Measur e

Uni t of Measur e: Each ( EA)

1. 3. 17 Bi ke Pat h Repl acement ( Opt i on 1 Bi d I t em 00245)

1. 3. 17. 1 Payment

Payment wi l l be made at t he cont r act uni t pr i ce f or t he pl acement of t he asphal t pavement f or t he asphal t bi ke pat h as descr i bed i n t he dr awi ngs and Sect i on 32 12 16 HOT- MI X ASPHALT ( HMA) FOR ROADS. Payment const i t ut es f ul l compensat i on f or al l l abor , mat er i al s, equi pment , t ool s, and i nci dent al s necessar y t o compl et e t he wor k.

1. 3. 17. 2 Measurement

Asphal t pavi ng wi l l be measur ed per t he squar e yar d i nst al l ed and accept ed.

1. 3. 17. 3 Uni t of Measur e

Uni t of Measur e: Squar e Yar d ( SY)

1. 3. 18 Ti eback Levee Cl ay Fi l l ( Opt i on 2 Bi d I t em 0032)

1. 3. 18. 1 Payment

Ful l compensat i on f or al l l abor , equi pment and mat er i al s f or pl acement of f i l l al ong t he l evee f r om of f s i t e soi l sour ce wi l l be i ncl uded at t he cont r act uni t pr i ce f or t hi s bi d i t em of t he Bi ddi ng Schedul e. Al l wor k shal l be i n accor dance wi t h t he cont r act dr awi ngs and Sect i on 31 00 00 EARTHWORK. Pl acement of er osi on cont r ol measur es wi l l be i nci dent al t o t hi s bi d i t em.

1. 3. 18. 2 Measurement

Measur ement wi l l be made per cubi c yar d of soi l pl aced f or l evee f i l l .

The means of measur ement must be appr oved by t he COR.

1. 3. 18. 3 Uni t of Measur e

Uni t of Measur e: Cubi c Yar d ( CY)

SECTI ON 01 22 00. 00 10 Page 14

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON

3. 1 CONTRACT COST BREAKDOWN

The Cont r act or must f ur ni sh wi t hi n 30 cal endar days af t er t he dat e of Not i ce t o Pr oceed, and pr i or t o t he submi ssi on of i t s f i r st par t i al payment est i mat e, a br eakdown of i t s s i ngl e j ob pay i t em or i t ems whi ch wi l l be r evi ewed by t he Cont r act i ng Of f i cer as t o pr opr i et y of di st r i but i on of t he t ot al cost t o t he var i ous account s. Any unbal anced i t ems as bet ween ear l y and l at e payment i t ems or ot her di scr epanci es wi l l be r evi sed by t he Cont r act i ng Of f i cer t o agr ee wi t h a r easonabl e cost of t he wor k i ncl uded i n t he var i ous i t ems. Thi s cont r act cost br eakdown wi l l t hen be ut i l i zed as t he basi s f or pr ogr ess payment s t o t he Cont r act or .

- - End of Sect i on - -

SECTI ON 01 22 00. 00 10 Page 15

File details come from the government source that posted it.