AMENDMENT_0002_MC_BREAKWATER_AND_EAST_PIER_RPRS_W912P619B0004.pdf
PDF 1 MB Posted
- Solicitation number
- W912P6-19-B-0004
About this file
This file contains the full Amendment No. 0002
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6681912025
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Reference: Solicitation No. W912P619B0004
THE BID OPENING FOR THE REFERENCED SOLICITATION REMAINS UNCHANGED BY THIS AMENDMENT; THEREFORE, BIDS ARE DUE PRIOR
TO 3:00 P.M. (CENTRAL TIME) ON APRIL 4, 2019.
- See the follow ing pages for the particulars of this Amendment 0002.
(USACE Point of Contact: Ms. Simpkins at 312-846-5370.)
1. CONTRACT ID CODE PAGE OF PAGES
1 36
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Mar-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P619B0004
X 9B. DATED (SEE ITEM 11)
26-Feb-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Mar-2019
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P619B0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
A. AMENDED SOLICITATION SECTIONS –
(1) SECTION 00 10 00 – SOLICITATION: At Block 11, the number of calendar days has increased from 300 to 650 calendar days. Note the revisions to the Commencement Clause 52.211-10.
(2) SECTION 00 22 13, IMPORTANT BID NOTES: Under paragraph 4a, the Bid Opening Room location is revised to read as follows:
4. BID OPENING ROOM:
a. The designated Bid Opening Room is located on the 16th floor at 231 South LaSalle Street, Chicago, Illinois 60604. Bidders will be escorted accordingly.
(3) SECTION 00 70 00 - CONDITIONS OF THE CONTRACT: The following two FAR Clauses contain changes to the USACE’s performance time and the manner by which liquidated damages will be e assessed.
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days following its acknowledgement of the notice to proceed, (b) prosecute the work diligently, and (c) complete the Outer Breakwater work within 650 calendar days following its acknowledgment of the notice to proceed. The Contractor must complete the work at the East Pier by December 31, 2019 regardless of when it acknowledges the Notice to Proceed. This is not meant to infer that the Contractor will be allowed to commence any work without a Notice to Proceed being issued and subsequently acknowledged by it.
Note: Separate Notice to Proceeds “will not” be issued. Thus, only one Notice to Proceed will be issued for the entire work required by the contract.
The aforementioned times stated for completion of the work shall include final cleanup of the premises.
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work at the East Pier as described at the FAR Clause 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984), the Contractor shall pay liquidated damages to the Government in the amount of $1,606.46 for each calendar day of delay until the work is completed or accepted. If the Contractor fails to complete the work at the Outer Breakwater as described at the FAR Clause 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984), the Contractor shall pay liquidated damages to the Government in the amount of $1,606.46 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
B. AMENDED SPECIFICATION SECTIONS: The Bidder shall remove and replace the respective Sections with the Revised Sections attached hereto.
SECTION
NUMBER AND
TITLE
PARAGRAPH AND DESCRIPTION OF CHANGE
01 10 00 1.10 Add Site Plan Submittal
1.16 Update with additional event dates
1.33 Add Milestone Events
01 57 20.02 03 3.1 Include Section 401 Certification
1.9 Clarify that fish windows apply to in-water work only
C. The most current Davis Bacon Wage Determination Number IN190001 dated 03/08/2019 and Davis Bacon Wage Determination Number IL190018 dated 03/08/2019 are included in this Amendment 0002.
D. USACE’S RESPONSES TO CONTRACTOR’S INQUIRES FOLLOW:
Question #1: The solicitation currently has a performance period of 300 calendar days. The stone suppliers listed in “attachment A – stone sources” are quoting long lead times that make it very difficult if not impossible to complete within the 300 calendar days. Can the performance period be extended to allow construction later in 2020?
USACE Response to Question #1: Refer to the revised Commencement Clause see below:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days following its acknowledgement of the notice to proceed, (b) prosecute the work diligently, and (c) complete the Outer Breakwater work within 650 calendar days following its acknowledgment of the notice to proceed. The Contractor must complete the work at the East Pier by December 31, 2019 regardless of when it acknowledges the Notice to Proceed. This is not meant to infer that the Contractor will be allowed to commence any work without a Notice to Proceed being issued and subsequently acknowledged by it.
Note: Separate Notice to Proceeds “will not” be issued. Thus, only one Notice to Proceed will be issued for the entire work required by the contract.
The aforementioned times stated for completion of the work shall include final cleanup of the premises.
Question #2: The staging area provided on sheet C-104 is too far from the concrete work to allow pumping of the concrete. Can we load concrete trucks onto our barges at this location?
USACE Response to Question #2: The Staging area shown may be used as necessary by the contractor to complete the work, which includes the work in question.
Question #3: Would we be allowed to drive concrete trucks and concrete pump out the existing concrete pier which is located North of the Boat Ramp shown on sheet C-104? This pier is approx.. 1,000 ft long and would allow us to get the trucks and concrete pump closer to the placement areas.
USACE Response to Question #3: The East Breakwater described is USACE owned property.
Specification Section 01 10 00 General Provisions Paragraph 1.10 ‘Site Plan’ has been added to the contract. It requires a submittal from the contractor detailing the methods and locations proposed to be used for concrete placement at the East Pier. Port facilities as well as USACE owned property may be used for these activities, but must be approved by USACE via the site plan submittal to ensure no negative impacts are experienced to USACE property without proper repair.
Question #4: Would we be allowed to pump concrete from parking lot near the Boat Ramp shown on sheet C-104?
USACE Response to Question #4: Specification Section 01 10 00 General Provisions Paragraph 1.10 ‘Site Plan’ has been added to the contract. It requires a submittal from the contractor detailing the methods and locations proposed to be used for concrete placement at the East Pier. Port facilities as well as USACE owned property may be used for these activities, but must be coordinated with the Port and approved by USACE to ensure minimal impacts to other beach users.
Question #5: The local Port Authority mentioned the harbor being very busy in the summer. Can you provide a list of scheduled events in the project vicinity?
USACE Response to Question #5: Specification Section 01 10 00 General Provisions Paragraph 1.17 ‘Coordination with Others’ has been revised to include all known events at the Harbor at this time.
Contact information for the Harbormaster is provided for any additional information needed prior to or during construction.
Question #6: Under “Special Environmental Requirements” No work is allowed between April 1 and June
30. Would the concrete work be allowed during these dates? Could these “no work” dates be waived for the stone portion of the work?
USACE Response to Question #6: Specification Section 01 57 20.02 03 Paragraph 1.9 ‘Special Environmental Requirements’ has been revised to read “No work in Lake Michigan shall be conducted between April 1 and June 30, all dates inclusive.”. Out of water work including the repairs to the East Pier would therefore not be covered by this work exclusion.
General Decision Number: IL190018 03/08/2019 IL18
Superseded General Decision Number: IL20180018
State: Illinois
Construction Types: Heavy (Dredging and Marine)
Counties: Illinois Statewide.
MECHANICAL DREDGING (CLAMSHELL, DRAGLINE, AND BACKHOE) AND
MARINE CONSTRUCTION):
ILLINOIS, INDIANA, MICHIGAN, MINNESOTA, NEW YORK, OHIO,
PENNSYLVANIA AND WISCONSIN DREDGING AND MARINE CONSTRUCTION
Dredging and Marine Construction Projects: floating/land equipment engaged in clamshell, backhoe and dragline dredging, marine construction, bridges,salvage operations and cranes, loaders, dozers, or other equipment used for disposal of dredge spoils or marine construction materials on land at the slip or dock, at the project site, where the above material/spoils is being handled, and all equipment utilized on breakwall/breakwater structures on the Great Lakes, Islands therein, their connecting and tributary waters, including the Illinois Waterway to the Lock at Lockport, Illinois, the New York State Barge Canal System between Tonawanda, New York and Waterford, New York and Oswego, New York, the Duluth-Superior area to the Fond du Lac Bridge Crossing (Minnesota State Highway 23) on the St. Louis River and on the St. Lawrence River eastward to the International Boundary near St. Regis, New York.
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/04/2019 1 03/08/2019
* SUIL2003-001 01/01/2019
MECHANICAL DREDGING (CLAMSHELL, DRAGLINE, AND BACKHOE) AND
MARINE CONSTRUCTION):
Rates Fringes
Dredging:
Fireman, Oiler, Deckhand, & Scowman (with dipper, hydraulic or other floating equipment engaged in hydraulic and dipper dredging operations) Pipeline men (both afloat & ashore including loading, unloading, maintaining, and handling pipelines for hydraulic dredges and sandboats Rangeman, Tankerman, Sweepman and service Truck Driver......................$ 22.51 7.61+a+b Lead Deckhand...............$ 29.68 7.61+a+b
Hydraulic Dredging LAUNCH OPERATOR - Vessel 800 Horse- Power Or Less....$ 25.15 7.61+a+b TUG ENGINEER................$ 26.49 7.61+a+b TUG OPERATOR - Vessel Over 800 Horse-Power.............$ 26.49 7.61+a+b TUG WORKERS: Fireman, Lineman, Oiler, Deckhand, Tankerman. Scowman, (on/or with tugboats, launches, or other self-propelled boats)......................$ 22.51 7.61+a+b
MECHANIC (Undefined)
FLOATING EQUIPMENT:
Illinois Class I....................$ 55.90 34.85+b&c Class II-A.................$ 54.40 34.85+b&c Class II-B.................$ 57.40 34.85+b&c Class III..................$ 48.40 34.85+b&c Class IV...................$ 40.25 34.85+b&c FLOATING EQUIPMENT: Indiana Class I....................$ 47.50 30.80+b&c Class II-A.................$ 46.00 30.80+b&c Class II-B.................$ 46.00 30.80+b&c Class III..................$ 40.95 30.80+b&c Class IV...................$ 34.05 30.80+b&c
FLOATING EQUIPMENT:
Michigan Class I....................$ 43.00 29.32+b&c Class II-A.................$ 41.50 29.32+b&c Class II-B.................$ 43.00 29.32+b&c Class III..................$ 36.95 29.32+b&c Class IV...................$ 30.75 29.32+b&c
FLOATING EQUIPMENT:
Minnesota
Class I....................$ 43.00 18.90+b&c Class II-A.................$ 41.50 18.90+b&c Class II-B.................$ 42.00 18.90+b&c Class III..................$ 36.95 18.90+b&c Class IV...................$ 30.75 18.90+b&c
FLOATING EQUIPMENT:
New York:(Cattaraugus, Chautauga, Erie and Orleans Counties) Class I....................$ 44.35 28.69+b&c Class II-A.................$ 42.85 28.69+b&c Class II-B.................$ 45.85 28.69+b&c Class III..................$ 38.10 28.69+b&c Class IV...................$ 31.70 28.69+b&c
FLOATING EQUIPMENT:
New York:(Cayuga, Jefferson, Oswego, and St.
Lawrence Counties) Class I....................$ 46.35 24.90+b&c Class II-A.................$ 44.85 24.90+b&c Class II-B.................$ 47.85 24.90+b&c Class III..................$ 39.90 24.90+b+c Class IV...................$ 33.15 24.90+b&c
FLOATING EQUIPMENT:
New York:(Monroe and Wayne Counties and the City of Rochester) Class I....................$ 46.80 26.05+b&c Class II-A.................$ 45.30 26.05+b&c Class II-B.................$ 48.30 26.05+b&c Class III..................$ 40.30 26.05+b&c Class IV...................$ 33.50 26.05+b&c
FLOATING EQUIPMENT:
New York:(Niagara) Class I....................$ 43.25 28.10+b&c Class II-A.................$ 41.75 28.10+b&c Class II-B.................$ 44.75 28.10+b&c Class III..................$ 37.15 28.10+b&c Class IV...................$ 30.90 28.10+b&c
FLOATING EQUIPMENT:
Ohio:(Ashtabula, Cuyahoga, Erie,Lake, and Lorain Counties) Class I....................$ 43.00 14.41+b&c Class II-A.................$ 41.50 14.41+b&c Class II-B.................$ 41.50 14.41+b&c Class III..................$ 36.95 14.41+b&c Class IV...................$ 30.75 14.41+b&c
FLOATING EQUIPMENT:
Ohio:(Lucas, Henry, Ottawa, Wood and Sandusky Counties) Class I....................$ 43.00 14.41+b&c Class II-A.................$ 41.50 14.41+b&c Class II-B.................$ 41.50 14.41+b&c Class III..................$ 36.95 14.41+b+c
Class IV...................$ 30.75 14.41+b&c
FLOATING EQUIPMENT:
Pennsylvania:(Erie County):
Class I....................$ 43.00 21.09+b&c Class II-A.................$ 41.50 21.09+b&c Class II-B.................$ 41.50 21.09+a&b Class III..................$ 36.95 21.09+b&c Class IV...................$ 30.75 21.09+b&c
FLOATING EQUIPMENT:
Wisconsin:Includes all marine/floating type work on projects in the Superior/Duluth Harbor, Lake Superior.
Class I....................$ 48.35 22.18+b&c Class II-A.................$ 46.85 22.18+b&c Class II-B.................$ 47.35 22.18+b&c Class III..................$ 41.70 22.18+b&c Class IV...................$ 34.65 22.18+b&c
PAID HOLIDAYS (WHERE APPLICABLE):
A- NEW YEAR'S DAY
B- MEMORIAL DAY
C- INDEPENDENCE DAY
D- LABOR DAY
E- THANKSGIVING DAY
F- CHRISTMAS DAY
G- PRESIDENT'S DAY
H- VETERAN'S DAY.
FOOTNOTES:
a. $30.10 per day per employee for medical
b. Eight paid holidays: A thru H
c. Hazardous/Toxic Waste Material:
*Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour
Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency.
CLASSIFICATION DESCRIPTIONS
Class I - Master Mechanic - assist and direct Class II, Class III, and Class IV, diver/wet tender, engineer (hydraulic dredge) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender Class II-B Friction, Lattice Boom, or any Crane Certifications Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc.
Class IV - Deck Equipment Operator(Machineryman/Fireman)
(Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
General Decision Number: IN190001 03/08/2019 IN1
Superseded General Decision Number: IN20180001
State: Indiana
Construction Types: Building, Heavy and Highway
Counties: La Porte, Lake, Porter and St Joseph Counties in Indiana.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories, HEAVY AND
HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/04/2019 1 01/18/2019 2 01/25/2019 3 02/08/2019 4 03/08/2019
ASBE0017-002 06/01/2017
LAKE AND PORTER COUNTIES
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 50.50 25.80
HAZARDOUS MATERIAL HANDLER
(INCLUDES PREPARATION,
WETTING, STRIPPING REMOVAL
SCRAPPING, VACUUMING, BAGGING
AND DISPOSAL OF ALL
INSULATION MATERIALS, WHETHER
THEY CONTAIN ASBESTOS OR NOT,
FROM MECHANICAL SYSTEMS).........$ 37.80 24.54
ASBE0075-001 06/01/2017
REMAINING COUNTIES
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 31.50 20.79
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal, scrapping, vaccuming, bagging, and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 23.00 14.40
BOIL0001-005 05/01/2017
LAKE COUNTY, City of Hammond; North of 114th Street
Rates Fringes
BOILERMAKER......................$ 46.18 29.58
BOIL0374-003 03/01/2018
Rates Fringes
BOILERMAKER......................$ 37.22 27.65
BRIN0004-011 06/01/2018
LAKE, LAPORTE AND PORTER COUNTIES
Rates Fringes
BRICKLAYER
Bricklayer; Stone Mason;
Pointer, Cleaner, Caulker...$ 37.80 23.42 Marble Finisher; Tile Finisher....................$ 29.00 15.54 Marble Mason; Terrazzo Worker; Tile Layer..........$ 37.05 21.64 Terrazzo Finisher...........$ 30.00 15.54
BRIN0004-018 06/01/2018
SOUTH BEND: ST. JOSEPH COUNTY
Rates Fringes
BRICKLAYER
BRICKLAYER; STONE MASON;
POINTER, CAULKER, CLEANER...$ 29.00 15.96
MARBLE AND TILE FINISHER....$ 29.00 15.54
MARBLE AND TILE LAYER.......$ 30.57 18.36
TERRAZZO FINISHER...........$ 30.00 15.54
TERRAZZO WORKER.............$ 31.57 18.36
CARP0413-002 06/01/2018
St. Joseph County
Rates Fringes
CARPENTER........................$ 26.98 19.81
CARP0765-001 06/01/2018
LAKE, LAPORTE AND PORTER COUNTIES
Rates Fringes
CARPENTER........................$ 37.63 27.05
MILLWRIGHT.......................$ 37.73 26.85
CARP1029-001 06/01/2018
ADAMS, ALLEN, CASS, DEKALB, ELKHART, FULTON, GRANT, HOWARD,
HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, ST.
JOSEPH, STEUBEN, TIPTON, WABASH, WELLS and WHITLEY COUNTIES
MILLWRIGHT.......................$ 26.63 23.76
ELEC0153-001 06/04/2018
ST JOSEPH COUNTY
Rates Fringes
Communication Technician.........$ 26.15 17.36
ELECTRICIAN......................$ 34.25 22.96
Includes the installation, operation, inspection, modification, maintenance and repair of systems used for the transmission and reception of signals of any nature, for any purpose, including but not limited to, sound and voice transmission/transference systems, communication systems that transmit or receive information and/or control systems, television and video systems, micro-processor controlled fire alarm systems, and security systems and the performance of any task directly related to such installation or service. The scope of work shall exclude the installation of electrical power wiring and the installation of conduit raceways exceeding fifteen (15) feet in length.
ELEC0531-001 05/28/2018
LAPORTE and PORTER COUNTIES
ELECTRICIAN......................$ 39.60 25.73
ELEC0697-001 05/28/2018
LAKE COUNTY
Rates Fringes
ELECTRICIAN......................$ 41.00 63.88%+3.18
ELEC0697-004 08/28/2017
LAKE COUNTY
Rates Fringes
Telecommunication Technician.....$ 31.00 24.95
Work covers low voltage installation, maintenance and removal of telecommunication facilities (voice, sound, data and video) including, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V/SAT, bypass, CATV, WAN (WIDE AREA NETWORKS), LAN (local area networks), and ISDN (integrated system digital network).
Does not cover any work which properly comes under the work description of Inside JW (Journeyman Wireman), but shall cover the pulling of wire in raceways, but not the installation of raceways.
ELEC1393-003 01/01/2019
LAKE & PORTER COUNTIES
(Calumet Area, North of U.S. Hwy 30)
Rates Fringes
Line Construction:
EQUIPMENT OPERATOR 1:
(Diggers 5th wheel type trucks, crawler type, D-4 and smaller, bucket trucks and live boom type line trucks).....................$ 34.69 16.21
EQUIPMENT OPERATOR 3
(Backhoe over 1/2 yard bucket capacity, cranes rated at 15 ton or more capacity) 95% of J.L. Rate..$ 43.00 18.62
GROUNDMAN...................$ 25.44 13.53
GROUNDMAN-TRUCK DRIVER......$ 30.79 15.08
LINEMAN.....................$ 44.40 19.03
ELEV0002-005 01/01/2019
ELEVATOR CONSTRUCTION
LAKE AND PORTER COUNTIES
ELEVATOR MECHANIC................$ 56.61 33.705+a+b
FOOTNOTES:
a) Eight Paid Holidays: New Year's Day; Veterans Day, Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day.
b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service, and 6% of regular hourly rate for less than 5 years of service.
ELEV0044-002 01/01/2019
Rates Fringes
ELEVATOR MECHANIC................$ 49.72 33.705+a+b
a) PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.
b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service;
6% for less than 5 years' service.
ENGI0150-001 06/01/2018
BUILDING CONSTRUCTION POWER EQUIPMENT OPERATORS:
LAKE, LAPORTE, and PORTER COUNTIES
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 40.75 34.48
GROUP 2.....................$ 39.95 34.48
GROUP 3.....................$ 35.65 34.48
GROUP 4.....................$ 33.45 34.48
GROUP 5.....................$ 28.00 34.48
POWER EQUIPMENT OPERATOR CLASSIFICATIONS:
GROUP 1: Asphalt Plant; Autograde; Batch Plant); Benoto (requires 2 engineers; Boiler & throttle valve; Boring machine (mining machine); Caisson Rigs; Central redi-mix plant; Combination Backhoe Endloader with backhoe bucket over 1/2 cu. yd. or with attachments; Combination tugger hoist & air compressor; Compressor & throttle; Concrete Breaker (truck mounted); Concrete conveyor; Concrete conveyor (truck mounted); Concrete paver over 27E cu.ft.;
Concrete paver 27E cu. ft. & under; Concrete placing boom;
Concrete pump/grout pump with boom (truck mounted);
Concrete pump with boom (truck mounted); concrete tower;
Cranes and Backhoes (All Attachments); Cranes, Hammerhead Tower; Creter Crane; Derricks (all); Derricks (traveling);
Forklift lull type; Forklift, 10 ton & over; Gradall, Hoist 1, 2, and 3 drums; Hoist (2 tugger l floor), Hydraulic Boom truck, Laser Screed, Locomotive (all), Motor patrol, Mucking Machine; Pile Driving and Skid rig, Pit machine, Prestress Machines, Pump cretes (and similar types), Rock Drill (self-propelled), Rock Drill Truck mounted; Slip form paver, Straddle buggies, Tractor with boom and side boom, Trenching Mechine; Winch Tractors, Welding machines (6-9), GROUP 2: Air Comporessor (3) (feeding a common receiver);
Asphalt Spreader; boilers; bulldozers; Combination Backhoe end loader with Backhoe bucket 1/2 cu. yd. and under or with attachments; Corboy drilling machine; Grader, Elevating; Grouting machines; Guard rail post driver;
Highlift Shovel or frontend loader; Hoist (automatic), Hoist (all elevators); Hoist (tugger and single drum); Post hole digger; rollers (all); Scoop (tractor drawn); Stone crushers; Tournapull; Winch trucks
GROUP 3: Air compressor - small 210 and under (1 to 5 not to exceed a total of 300 feet); Air compressor - large over 210; Air compressor (2) feeding a common receiver;
Combination - small equipment operator; Concrete mixer (two bag & over); Conveyor, portable; Forklift-under 10 ton;
Generator; Pumps (1 to 3 not to exceed a total of 300 feet); Pumps, well points; Steam generators; Tractors, farm & similar type; Welding machines (2 thru 5); Winches, 4 electric drillo winches
GROUP 4: Bull gang (crane erection crew); Heaters, mechanical (1 to 5); Oilers; Switchmen
GROUP 5: Fork lifts (Housing and commercial only)
ENGI0150-012 06/01/2018
BUILDING CONSTRUCTION
ST. JOSEPH COUNTY
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 29.45 28.35
GROUP 2.....................$ 28.10 28.35
GROUP 3.....................$ 27.30 28.35
GROUP 4.....................$ 26.50 28.35
GROUP 5.....................$ 23.90 28.35
POWER EQUIPMENT OPERATOR CLASSIFICATIONS:
GROUP 1: Mechanic, Asphalt Plant, Asphalt Spreader, Auto Grader; Batch Plant, Benoto (requires 2 Engineers), Boiler and Throttle Valve, Boring Machine (road), Bulldozers (with engines of 140 net horse power or more) Caisson Rigs, Central Redi-mix Plant, Concrete Conveyor Systems, Concrete Power (over 27E cu. ft.), Concrete Paver (27E cu. ft. and under), Concrete Pumps/Grout cncrete placer (Truck Mounted), Concrete Tower, Cranes and backhoes (all), Cranes, Hammerhead Tower, Creter Crane, Derricks (all), Forklift (capble of hoisting and mechanically moving forks horizontally), Grader, Elevating, Highlift Shovels or Front End Loaders (over 3 yd bucket), Hoists (2 or more drums), Locomotives (all), Laser screed, Motor Patrol, Pile Drivers and Skid Rig, Pre-Stress Machines, Pump Cretes & Similar Types, Rock Drill (Self-Propelled), Rock Drill (self propelled Truck Mounted), Scoops (tractor drawn), Slip-Form Paver, Tournapull, Tractor with Boom & Side Boom, Trenching Machine (12 or more inches in width), Combination Backhoe Front End Loader Machine with backhoe 1/2 yd bucket or attachments.
GROUP 2: Air Compressor (600 cu. ft. and over), Bob Cat (over 3/4 cu. yd.), Boilers, Broom (all powered propelled), Bull Dozers with engines of less than 140 net horsepower, combination backhoe front end loader 1/2 yf bskhhoe or under, Compressor and Throttle Valve, Concrete Breaker (truck mounted), Concrete Mixer (of moore than 21 cu. ft.
capacity), Forklift (with fixed or tilt mast), Greaser Engineer, Highlift shovel or front endloader 3 yd bucket and under, Hoists (1 drum), Hydrulic Boom Truck, Post Hole Digger (vehicle mounted), Pump Cretes (squeze crete type pumps, Gypsum, bulker , Rollers(all), Steam Generators, Stone Crushers, Stradddle Buggies, Tractors, Winch Trucks (with "a" frame.
GROUP 3: Buck Hoist, Combination (small equipment operator), .Conveyor (portable), Grouting Machine, Hoist Elevators (material and personnel), Hydraulic Power Units, Grouting and Pile Driving, Stud Welder, Trenching Machines less than 12 inches in width, Welding Machines (8 through 15).
GROUP 4: Bobcat (up to and including 3/4 cu. yd.).
Compressor (over 210 cu. ft. and less than 600 cu. ft.), Generator (over 50 kw.), Heaters, Mechanical, Hoists (all elevator, permanent installation), Hoist (automatic), Hoist (tugger single drum), Oilers, Pumps, Well Points and electric submersible, Small Rubber Tired End Loaders (1/4
cu. yd. and under), Tractors (farm type) Welding Machines (2 through 8).
GROUP 5: Bobcats and forklifts (commercial or residential).
ENGI0150-014 05/01/2017
POWER EQUIPMENT OPERATOR HEAVY/HIGHWAY
LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 40.50 32.00
GROUP 2.....................$ 40.05 32.00
GROUP 3.....................$ 39.60 32.00
GROUP 4.....................$ 38.40 32.00
GROUP 5.....................$ 37.35 32.00
POWER EQUITMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt plants (construction), Asphalt plant (permanent), Auto Patrol (Maintainer), Automatic Dry Batch Plant, Automated Concrete Placer, Automated Sub-Grader, Automated Slip Form Paver, Automated Finish Machine, Combination Backhoe Front, End Loader Machine
(1/2 cu. yd.), Backhoe bucket or over or with attachments), Combination backhoe 1 cu yd, Backhoe bucket or over or with attachments, Ballast Regulator (RR), Belt Loader (stationary), Boring Machine (road), Bulldozer, Concrete Mixer(27 cu. ft. or over), Concrete Pump (truck mounted), Concrete Breaker (truck mounted and self-propelled), Core Drilling Machine, Cranes and Backhoes (all attachments), Cranes, Hammerhead, Creter Crane, Crushers (concrete, rock, recycling, etc.), Derricks , Derricks (traveling), Dredge Operator, Formless Curb and Gutter Machine (36 inches and over), Formless Curb and Gutter Machine under 36 inches, Gradall and Machines (of a like nature), Guardrail Post Driver (truck mounted), Lead Greaser, Helicopter, Highlift Shovel (3 yd. and over), Hoist (1 drum), Hoist (2, and 3 drums), Hydraulic Power Units (grouting, piledriving and extracting) Hydro or water blaster (self-propelled), Locomotive Operators, Mechanic, Welder, Mucking Machine, Panelboard Concrete Plant (central mix type), Paver (Hetherington), Pile Driver (Skid or Crawler), Road Paving Mixer, Rock Drill Crawler or Skid Rig, Rock Drill (truck Mounted), Ross Carrier, Roto Mill Grinder (36" and over), Roto mill grinder (less than 36"), Throttle Valve and Compressor or Clever Brooks Type Combination, Throttle Valve and Fireman Combination or Horizontal or Upright Boiler, Tournapull or similar type equipment, Tractor (boom), Tractor Drawn Belt Loader with attached Pusher (requires two engineers), Trench Machine, Tug Boat Operator, Wheel Excavator, Winch Tractor with "a" frame, Scoops, Turnapull or similar types machine used in Tandem (add $1.00 to class l hourly rate for each machine attached there to).
GROUP 2: Combination Backhoe Front End Loader Machine with less than 1/2 cu. yd., Backhoe Bucket or with attachments, Bituminous Mixer, Bituminous Paver, Bridge Deck Finisher, Concrete Mixer (less than 27 cu. ft.), Compressor and throttle valve, Compressor (common receiver 3), Greaser, Highlift Shovels (under 3 cu. yds.), Jersey Spreader or Base Paver, Pavement Bump Grinder (self-propelled), Roller (Asphalt, waterbound, Macadam, Bituminous Macadam, Brick Surface, Sheepfoot Roller (self- propelled with blade), Surface Heater and Planer, Tamper (mutiple vibrating, asphalt waterbound macadam, bituminouus macadam, brick surface), Tractor (push), Tractor with scoop, Widener, Apsco or similar type.
GROUP 3: Back Filler, Bituminous Distributor, Broom and Belt Machine, Bull Float, Compressor (common receiver 2), Concrete cutter wheel type (rockwell), Concrete Finishing Machine, Concrete Spreader (power driven), Digger, Post Hole (power driven), Finishing Machine and Bull Float, Forklift, Form Grader, Form Tamper (motor driven), Hydraulic (boom truck) when used for hauling materials, Laser screed, Mutiple Tamping Machine, Paving Breaker, Roller (earth and subbase material), Roller sheepfoot (self-propelled), Sub-grader, Tamper, Mutipile Vibrating (earth and subbase material), Tractaire with Drill, Tractor (with all drawn attachements except backhoe and including Highlift, Endloader of 1 cu. yd. capacity and less.
GROUP 4: Air Compressors, Conveyor (all), Fireman on Boiler, Generator, Grout Machine, Power curing Spraying Machine
(self-propelled), Broom (self-propelled), Seaman Tiller, Skid steer loaders, Spike Machine (RR), Stripping Machine (paint, self-propelled), Throttle Valve, Welding Machine, Well Points System.
GROUP 5: Deck Hand, Hetherington Driver, Mechanical Heater (1 to 5), Outboard or Inboard Motor Boat, Oiler, Power Saw (Concrete Power Driven), Water Pump, Grasscutter.
IRON0292-001 06/01/2018
ST. JOSEPH and LAPORTE (Remainder of County) COUNTIES
Rates Fringes
IRONWORKER.......................$ 29.75 22.01
IRON0395-001 06/01/2018
LAKE, PORTER AND LAPORTE (FROM LAKE MICHIGAN ON NORTH TO 50
MILES S. OF LAKE MICHIGAN ON THE S. AND FROM IN/IL STATE LINE
ON W. TO 3 MILES E. OF IN. COUNTIES
IRONWORKER
SHEETER.....................$ 40.25 31.22
STRUCTURAL & ORNAMENTAL.....$ 40.00 31.22
LABO0041-001 06/01/2018
BUILDING CONSTRUCTION
LAKE COUNTY (Western Half)
Rates Fringes
Laborers:
CAISSON AND TUNNEL WORK
(Compressed & Free Air).....$ 37.33 21.20
GROUP 1.....................$ 35.83 21.20
GROUP 2.....................$ 36.58 21.20
GROUP 3.....................$ 36.83 21.20
LABORER CLASSIFICATIONS:
GROUP 1: Building and Construction Laborers; Scaffold Builders (other than for Mason or Plasterers); Railroad Workers, Masonry Wall Workers, (interior & exterior);
Portable Water, Pumps with discharge up to 3 indches;
Handling of Creosote Lumber or Like Treated Material (excluding railroad material); Asphalt Rakers and Lutemen;
Earth compactors; Jackmen and Sheetmen Working Ditches Deeper than Six (6) Feet in Depth; Laborers Working Ditches Six (6) Feet in Depth or Deeper; Assembly of Unicrete Pump;
Tile Layers (sewer or field) and Sewer Pipe Layers (metallic or non-metallic); Motor Driven Wheelbarrows and Concrete Buggies; Hyster Operators; Pump Crete Assemblers;
Core Drill Operators; Cement, Lime or Silica Clay Handler (bulk or bag); Handling of Toxic Materail Damaging to
Clothing; Pneumatic Spikers; Deck Engine and Winch Operators; Water main and Cable Ducking (metallic and non-metallic); Screed Man or Screw Operator on Asphalt Paver; Chain Saw and Demolition Saw Operators; Concrete Saw; Concrete Conveyor Assemblers; Applying of Curing Compound; Sinking of Wellpoints; Dewatering Header Systems
GROUP 2: Plaster Tenders, Masons Tenders; Mortar Mixers;
Welders (acetylene or electric); Cutting Torch or Burner;
Cement Nozzle Laborers; Cement Gun Operators; Scaffold Builders for Plasterers; Scaffold Builders for Masons;
Water Blast Machine Operators; Air Tool Operators and all Pneumatic Tool Operators, Air and Electric Vibrators and Chpping Hammer Operators; Asbestos Removal; Hazardous Waste Removal; All Boiler Setters Laborers, including expediters, bottom men, bell men, and Mason Tenders
GROUP 3: Dynamite Men; Drillers, Air Track or Wagon Drilling for explosives.
CAISSON AND TUNNEL WORK (Compressed & Free Air)
GROUP 1: Cage Tenders, Dump Men, Flagman, Signalman, Top Laborers, Rod Men, Concrete Repairmen, Motor Men, Muckers, Grout Machine, Track Layers, Air Hoist, Key Board, Agitator Car, Car Pushers, Concrete Laborers, Grout Laborers, Sttl Setters, Tuggers, Switchmen, Mucking Machine, Laser Beam, Liner Plate & Ring Setter, Shield Drivers, Power Knife, Burners, Pipe Jacking Machine, Skinners, Maintenance Technician, Miner, Bricklayer Tenders, Concrete Blowers, Drillers, Erectors, Form Men, Jackhammermen, Mining Machine, Dynamite Men, Drillers-air track or wagon drilling for explosives.
Premium for all employees working in compressed air shall be as follows:
0 - 15 lbs. $1.00 per hour 16 - 20 lbs. 1.50 per hour 21 - 26 lbs. 2.00 per hour 27 - 33 lbs. 3.00 per hour 34 & over 4.00 per hour
LABO0041-004 04/01/2018
UTILITY CONSTRUCTION
LAKE COUNTY
Rates Fringes
LABORERS
Group 1.....................$ 31.32 17.23 Group 2.....................$ 31.62 17.23 Group 3.....................$ 32.32 17.23
LABORERS CLASSIFICATIONS (HEAVY AND HIGHWAY)
GROUP 1: Construction Laborer, Carpenter Tender, Fence Erector, Grade Checker, Guard Rail Erector, Continuous Steel Rod or Mat Installer, Wire Mesh Layer, Joint Man
(Mortar, Mastic, and all other types), Lighting Installer (Permanent or Temporary), Lineman for Automatic Grade Maker on Paving Machines, Mortar Man, Multi-Plant Erector, Rip-rap Installer (all Products and Materials), Road Marking and Delineation Laborer, Setting and Placing of all Precast Concrete Products, Sing Installation including supporting structure, Spraying of all Epoxy, Curing Compound, or Like Material, Flagperson, Air Tool, Power Tool Operator, Asphalt Raker Man, Batch Truck Dumper, Bridge Hand Rail ERector, Handler (bulk or bag cement), Chain Saw Man, Concrete Puddler, Concrete Rubber, Concrete Saw Operator, Core Drill Operator, Eye Level, Hand Blade Operator Hydro Seeder Man, Motor Driven Georgia Buggy Operator, Power Driven Compactor or Taper Operator, Power Saw Operator, Pump Crete Assembly Man, Sreed Man or Screw Man on Asphalt Paver, Regar Installer, Sandblaster Man, Sealer Applicator for Asphalt (toxic), Setting and Placing pre-stressed on Pre-cast Concrete Structural Members, Side Rail Setters (for Sidewalk, Side Ditches, Radii, and Pavement), Spreader Box Tender (manua or power driven), Straw Blower Man, Subsureface Drain and Culvert Pipe Layer, Concrete Conveyor, Horizonal Boring and Jackman and Sheetman, Pipe Greade Man, Winch and Windless Operator Conduit Installer, Sod Layer
GROUP 2: Cutting Torch Burner, Laser Beam Aligner, Manhole Erector, Sewer Pipe Layer, Water Line Installer, Temporary or Permanent Welders (electric or Oxy Acetylene)
GROUP 3: Air Track and Wagon Drillman, Dynamite and Powder Man, Concrete Barrier Rail Form Setter, Concrete Saw Joint Control Cutting
LABO0081-001 04/01/2018
HEAVY and HIGHWAY CONSTRUCTION:
LAKE, LA PORTE, and PORTER COUNTIES
Rates Fringes
Laborers:
GROUP 1.....................$ 30.49 17.23
GROUP 2.....................$ 30.79 17.23
GROUP 3.....................$ 31.49 17.23
LABORERS CLASSIFICATIONS (HEAVY AND HIGHWAY)
GROUP 1: Construction Laborer; Carpenter Tender; Fence Erector; Grade Checker; Guard Rail Erector; Continuous Steel Rod or Mat Installer; Wire Mesh Layer; Joint Man (Mortar, Mastic, and all other types); Lighting Installer (Permanent or Temporary); Lineman for Automatic Grade Maker on Paving Machines; Mortar Man; Multi-Plant Erector;
Rip-rap Installer (all Products and Materials); Road Marking and Delineation Laborer; Setting and Placeing of all Precast Concrete Products; Sing Installation including Supporting Structure; Spraying of all Epoxy, Curing Compound, or Like Material; Flagperson; Air Tool, Power Tool Operator; Asphalt Raker Man; Batch Truck Dumper;
Bridge Hand Rail Erector; Handler (bulk or bag cement);
Chain Saw Man; Concrete Puddler; Concrete Rubber; Concrete Saw Operator; Core Drill Operator, Eye Level; Hand Blade Operator Hydro Seeder Man; Motor Driven Georgia Buggy Operator; Power Driven Compactor or Tamper Operator; Power Saw Operator; Pump Crete Assembly Man; Screed Man or Screw Man on Asphalt Paver; Rebar Installer; Sandblaster Man;
Sealer Applicator for Asphalt (toxic); Setting and Placeing Prestressed on Precast Concrete Structural Members; Side Rail Setters (for Sidewalk, Side Ditches, Radii, and Pavement); Spreader Box Tender (manual or power driven);
Straw Blower Man; Subsurface Drain and Culvert Pipe Layer;
Concrete Conveyor; Horizonial Boring and Jackman and Sheetman; Pipe Grade Man; Winch and Windlass Operator Conduit Installer, Sod Layer.
GROUP 2: Cutting Torch Burner: Laser Beam Aligner; Manhole Erector;…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.