W81G6680961216
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE INVITATION FOR BID NO. W912P618B0008, INDIANA HARBOR AND CANAL CONFINED DISPOSAL FACILITY ENTRANCE ROAD
RESURFACING, EAST CHICAGO, LAKE COUNTY, INDIANA
-- THE DESCRIPTION OF THIS AMENDMENT CONTINUES ON THE FOLLOWING PAGES --
1. CONTRACT ID CODE PAGE OF PAGES
1 37
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Jul-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P618B0008
X 9B. DATED (SEE ITEM 11)
29-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Jul-2018
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P618B0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
A. BID OPENING DATE AND TIME: The Bid Opening Date is hereby EXTENDED by this Amendment, in this regard, BIDs are now due by 2:00 p.m. (Central Time) on August 9, 2018. Detailed information regarding the submission of bids is located at Section 00 22 13 of the Solicitation document.
B. AMENDED SECTION 00 10 00 – SOLICITATION CONTRACT FORM:
Section 00 10 00 has been amended to change the extended description of Contract Line Item Number (CLIN). As a result of this change, a revised Bid Schedule is enclosed hereunder. Therefore, bidders shall replace the previously issued Bid Schedule with the respective Revised Schedule enclosed.
CLIN 0003: The CLIN extended description has changed FROM:
This is a parent Contract Line Item, linking its Sub-Items 0003AA and 0003AB. The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor's pricing to perform the required services shall be provided therein Items 0003AA and 0003AB, wherein the sub-line items themselves identify the quantities required to perform said work.
TO:
This is a parent Contract Line Item, linking its Sub-Items 0003AA through 0003AE. The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor's pricing to perform the required services shall be provided therein Items 0003AA through 0003AE, wherein the sub-line items themselves identify the quantities required to perform said work.
C. AMENDED SPECIFICATION SECTIONS:
(1) 01 11 00 SUMMARY OF WORK. 1.1.1 Project Description – (1) The title for Section 01 57 20.02 03
(ENVIRONMENTAL PROTECTION FOR INDIANA) was added. (2) The words “applying topsoil and seeding” were replaced by “backfilling the removed soil”. (3) The following was added to the end of the same sentence revised in (2): “with CA53 stone and compacting per Section 31 23 00.00 20
EXCAVATION AND FILL”.
(2) 31 23 00.00 20 EXCAVATION AND FILL. 3.3.1 Excavated Materials – (1) The words “of in the designated area” were removed from the second sentence of the second paragraph and that sentence was revised to be “Excavated clay cap material in excess of that required for the permanent work, all material excavated from below the clay cap, and all unsatisfactory material shall be disposed within the West Cell of the CDF in accordance with Subpart 3.9 "Disposition of Surplus Materials.” The third paragraph/sentence was removed. 3.9 DISPOSITION OF SURPLUS MATERIAL – Both original paragraphs were revised and two new paragraphs were added to clarity the disposition of surplus material.
(3) 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS. 1.5.1.1 Site Safety and Health Officer (SSHO) – “The Superintendent can be the SSHO, as long as the Superintendent meets all the requirements/qualifications for a SSHO. However, if the individual proves to be incapable of performing both duties adequately once the project has begun, the Contractor will then be required to staff both roles separately” was added.
D. WAGE DETERMINATION: This Amendment incorporates and encloses the most recently released Wage Determination, General Decision IN1, dated 7/27/2018.
E. PRE-BID MEETING ATTENDANCE SHEET: By this Amendment, the Chicago District is enclosing a copy of the Attendance Sheet from the pre-bid meeting held on July 13, 2018.
F. CONTRACTOR’S INQUIRIES: By this Amendment, the Chicago District, USACE responds to Contractor’s inquiries (SEE THE FOLLOWING PAGE).
G. POINT OF CONTACT: The Point of Contact (POC) for this Amendment is Ericka Hillard at 312-846- 5378; email ericka.d.hillard@usace.army.mil.
USACE’S RESPONSES TO CONTRACTOR’S INQUIRES FOLLOW:
QUESTION 1
What location will the spoils from excavation be placed? A more detailed description of locations, hauling distances, and placement of material would be helpful.
USACE Response 1:
Note 1 on sheets C-102 thru C-106 states “Contract shall excavation the exiting entrance road’s aggregate /slag and subsoil as shown on sheet C-501 and deposit the excavated material either along exposed portions of the upstream dike slopes in the western cell of the confined dispose facility (CDF) or into the western cell of the CDF as directed by the Government.”
The haul distance for the excavated aggregate /slag and subsoil is within the CDF property. Traffic on the dike crest is only allowed in a counter-clockwise direction, thus the path will follow the full CDF perimeter regardless of placement location. A round-trip distance of approximately 1.75 miles should be assumed. See attachment.
Section 01 11 00, paragraph 1.1.1 states “Contractor will dispose of geotextile removed from beneath the existing road at an approved off-site facility in accordance with Section 01 57 20.02 03.” A haul distance for the excavated geotextile (if present) is unknown, since the contractor’s proposed off-site disposal facility is to be approved in conjunction with the Non-Hazardous Solid Waste Diversion Report.
QUESTION 2
If the spoils are to be placed on the slopes of the upstream dike, how is this material to be placed? Does it need to be graded or just dumped and pushed off the edge?
USACE Response 2: A contract amendment for revised Section 31 23 00.00 20 (Subparts 3.3.1 and 3.9) clarifies this. Pushing down the slope is not acceptable but grading cannot be performed as machines cannot be driven on the slope. A crane or a backhoe with a long reach working from the dike crest will need to pile the material in a stable bench as low as possible along the slope.
QUESTION 3
The drawings show the existing road and new road do not align in all locations, will the remaining material from the existing road need to be removed and topsoil placed in these locations? Sheet C-104 shows this pretty good.
USACE Response 3: No. The Contractor is to excavate the existing material along the proposed alignment as shown on Sheet C-501. For the areas where the existing roadway and proposed roadway are not perfectly alignment, the contractor is not to excavate the remaining material from the existing road and replace it with topsoil.
QUESTION 4
Can the safety supervisor play a double role, as in can the site supervisor also be the safety manager?
USACE Response 4: The Superintendent can be the SSHO as long as the Superintendent meets all the requirements/qualifications for a SSHO. This Amendment revises this requirements. Please refer to the enclosed respective Safety Specification Section (paragraph 1.5.1.1)).
QUESTION 5
Will this work be started in 2018? Is there a desired time for this work to be completed?
USACE Response 5: The mandatory performance period for this project is provided at Solicitation Section 00 70 00, FAR Clause 52.211-10. Per the Clause, work shall begin within 10 calendar days following the contractor’s acknowledgement of the Notice to Proceed. The USACE anticipates an award by 31 August 2018. Typically, once the contract is awarded, it can take up to 20 calendar days before the Notice to Proceed is issued.
QUESTION 6
Will USACE perform the survey and establish the control points for the proposed road? If not, please provide the requirement of the surveying for the proposed road.
USACE Response 6: USACE will not perform the survey and establish the control points for the proposed road.
The contractor is responsible for establishing the control points and ensuring the proposed grades and associated “grade to drain” requirements are achieved. Survey control information is provided on Sheet V-001, roadway alignment data is provided on Sheet C-101. Grading plan data is presented on Sheets C-102 thru C-106. Discussion of the provision of survey data associated with CAD drawing submittals is presented in Section 01 78 00, CLOSEOUT SUBMITTALS paragraph 1.2.2, Survey Files and 1.4, CAD Drawing Submittal Format.
QUESTION 7
Project description of the solicitation and specification section 01 11 00 summary of work states “Provide topsoil and seeding along each of its shoulders”. However, we were told during the walkthrough that USACE is intending to place gravel along the shoulder. Please clarify and provide details of the shoulder.
USACE Response 7: Correct. Aggregate is to be placed along the road shoulder as specified in NOTE 2 on Sheet C-501. An amendment is to be issued via the discovery of the need to update the Summary of Work during the Pre- Bid meeting. The following changes are to be made to Section 01 11 00, SUMMARY OF WORK, paragraph 1.1.1 Project Description: (1) The title for Section 01 57 20.02 03 (ENVIRONMENTAL PROTECTION FOR INDIANA) was added. (2) The words “applying topsoil and seeding” were replaced by “backfilling the removed soil”. (3) The following was added to the end of the same sentence revised in (2): “with CA53 stone and compacting per Section
31 23 00.00 20 EXCAVATION AND FILL”.
Per this amendment, the amended paragraph states: “Contractor will resurface 1,128 linear feet (LF) of an existing 24-foot wide gravel pavement of the entrance road located between the south, main entrance and administrative buildings present at the Indiana Harbor and Canal Confined Disposal Facility. Contractor will excavate the existing entrance road's aggregate/slag and subsoil as shown on the drawings and deposit the excavated material along eroded areas of the confined disposal facility's dikes. Final locations of where the spoiled aggregate / slag / subsoil shall be as directed by the Government. Contractor will dispose of geotextile removed from beneath the existing road at an approved off-site facility in accordance with Section 01 57 20.02 03 ENVIRONMENTAL PROTECTION FOR INDIANA. The Contractor will tie-into existing concrete pavements at each end of the new pavement. The work also includes backfilling the removed soil along both sides of the pavement with CA53 stone and compacting per Section 31 23 00.00 20 EXCAVATION AND FILL. The Contractor is authorized to mobilize and execute the Work only after a Notice to Proceed (NTP) has been received from USACE.”
QUESTION 8
The price schedule states that the sum of subline item 0003AA and 0003AB is to be provided in the item number 0003. However, there are actually 5 subline items (0003AA to 0003AE). Please clarify.
USACE Response 8: This was en error that has been corrected via this Amendment. Please refer to the revised Bid Schedule and the above paragraph B. located on page 2 of this Amendment.
QUESTION 9
The price schedule calls for subline item 0003AE “AGGREGATE BACKFILL”. What is this applicable to in this project?
USACE Response 9: Yes. This is for the aggregate to be placed as backfill along the road shoulder as specified in Section 01 22 00.00 10, PRICE AND PAYMENT PROCEDURE, paragraph 1.2.3 and in NOTE 2 on Sheet C-501 and referenced in the amended paragraph 1.1.1 of Section 01 11 00, SUMMARY OF WORK (see response to question #2).
END OF QUESTIONS AND ANSWERS
END OF AMENDMENT
(The aforementioned Revised Bid Schedule and Wage Determination follows)
REVISED VIA AMENDMENT 0001 - Section 00 10 00 – Solicitation Contract Form (Bidders shall complete the below Bidding Schedule and furnish it along with the other items required by this Solicitation)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
MOBILIZATION
FFP
Under this CLIN, the contractor is required to perform mobilization activities. The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.
Payment Provisions:
The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the unit price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
PURCHASE REQUEST NUMBER: W81G6680961216
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job
DEMOBILIZATION
FFP
Under this CLIN, the contractor is required to perform demobilization activities.
The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.
Payment Provisions:
The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the unit price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
PAVEMENT
FFP
This is a parent Contract Line Item, linking its Sub-Items 0003AA through 0003AE. The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor's pricing to perform the required services shall be provided therein Items 0003AA through 0003AE, wherein the sub-line items themselves identify the quantities required to perform said work.
0003AA 1 Job
EXISTING ENTRANCE ROAD
FFP
EXISTING ENTRANCE ROAD AGGREGRATE/SLAG AND SUBSOIL
EXCAVATION AND PLACEMENT INTO CDF
0003AB 1 Job
GEOTEXTILE DISPOSAL
FFP
0003AC 855 Net Ton
(2,000
LB).
SUBBASE AGGREGATE
0003AD 27,072 Square
Foot
NEW ENTRANCE ROAD INSTALLATION
0003AE 123 Net Ton
(2,000
LB).
AGGREGATE BACKFILL
0004 1 Lot
PERFORMANCE AND PAYMENT BOND
FFP
PERFORMANCE AND PAYMENT BOND FOR BID ITEMS 0001 THROUGH
0003AE
THIS IS A COST-REIMBURSABLE LINE ITEM - The government will reimburse the Contractor for the actual cost of acceptable performance and payment bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.
Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.
TOTAL BID PRICE
OVERALL PRICE (LINE ITEMS 0001 THROUGH 0004 (INCLUDES ALL RESPECTIVE SUBITEMS)):
END OF BIDDING SCHEDULE
DEPARTMENT OF LABOR WAGE RATES – APPLICABLE TO THE CONSTURCTION WORK TO BE
PERFORMED UNDER THIS PROJECT
General Decision Number: IN180001 07/27/2018 IN1
Superseded General Decision Number: IN20170001
State: Indiana
Construction Types: Building, Heavy and Highway
Counties: La Porte, Lake, Porter and St Joseph Counties in Indiana.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories, HEAVY AND
HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 02/23/2018 3 03/09/2018 4 04/13/2018 5 04/20/2018 6 05/25/2018 7 06/01/2018 8 06/08/2018 9 06/15/2018 10 06/22/2018 11 06/29/2018 12 07/06/2018 13 07/13/2018 14 07/20/2018 15 07/27/2018
ASBE0017-002 06/01/2017
LAKE AND PORTER COUNTIES
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 50.50 25.80
HAZARDOUS MATERIAL HANDLER
(INCLUDES PREPARATION,
WETTING, STRIPPING REMOVAL
SCRAPPING, VACUUMING, BAGGING
AND DISPOSAL OF ALL
INSULATION MATERIALS, WHETHER
THEY CONTAIN ASBESTOS OR NOT,
FROM MECHANICAL SYSTEMS).........$ 37.80 24.54
ASBE0075-001 06/01/2017
REMAINING COUNTIES
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 31.50 20.79
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal, scrapping, vaccuming, bagging, and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 23.00 14.40
BOIL0001-005 05/01/2017
LAKE COUNTY, City of Hammond; North of 114th Street
Rates Fringes
BOILERMAKER......................$ 46.18 29.58
BOIL0374-003 03/01/2018
Rates Fringes
BOILERMAKER......................$ 37.22 27.65
BRIN0004-011 06/01/2017
LAKE, LAPORTE AND PORTER COUNTIES
Rates Fringes
BRICKLAYER
Bricklayer; Stone Mason;
Pointer, Cleaner, Caulker...$ 37.05 21.64 Marble Finisher; Tile Finisher....................$ 28.29 14.57 Marble Mason; Terrazzo Worker; Tile Layer..........$ 37.05 21.64 Terrazzo Finisher...........$ 29.29 14.57
BRIN0004-018 06/01/2017
SOUTH BEND: ST. JOSEPH COUNTY
Rates Fringes
BRICKLAYER
BRICKLAYER; STONE MASON;
POINTER, CAULKER, CLEANER...$ 28.15 13.21
MARBLE AND TILE FINISHER....$ 28.29 14.57
MARBLE AND TILE LAYER.......$ 30.00 16.91
TERRAZZO FINISHER...........$ 29.29 14.57
TERRAZZO WORKER.............$ 31.00 16.91
CARP0413-002 06/01/2018
St. Joseph County
Rates Fringes
CARPENTER........................$ 26.98 19.81
CARP0765-001 06/01/2018
LAKE, LAPORTE AND PORTER COUNTIES
Rates Fringes
CARPENTER........................$ 37.63 27.05
MILLWRIGHT.......................$ 37.73 26.85
CARP1029-001 06/01/2018
ADAMS, ALLEN, CASS, DEKALB, ELKHART, FULTON, GRANT, HOWARD,
HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, ST.
JOSEPH, STEUBEN, TIPTON, WABASH, WELLS and WHITLEY COUNTIES
MILLWRIGHT.......................$ 26.63 23.76
ELEC0153-001 06/04/2018
ST JOSEPH COUNTY
Communication Technician.........$ 26.15 17.36
ELECTRICIAN......................$ 33.60 21.88
Includes the installation, operation, inspection, modification, maintenance and repair of systems used for the transmission and reception of signals of any nature, for any purpose, including but not limited to, sound and voice transmission/transference systems, communication systems that transmit or receive information and/or control systems, television and video systems, micro-processor controlled fire alarm systems, and security systems and the performance of any task directly related to such installation or service. The scope of work shall exclude the installation of electrical power wiring and the installation of conduit raceways exceeding fifteen (15) feet in length.
ELEC0531-001 05/28/2018
LAPORTE and PORTER COUNTIES
Rates Fringes
ELECTRICIAN......................$ 39.60 25.73
ELEC0697-001 05/28/2018
LAKE COUNTY
Rates Fringes
ELECTRICIAN......................$ 41.00 63.88%+3.18
ELEC0697-004 08/28/2017
LAKE COUNTY
Rates Fringes
Telecommunication Technician.....$ 31.00 24.95
Work covers low voltage installation, maintenance and removal of telecommunication facilities (voice, sound, data and video) including, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V/SAT, bypass, CATV, WAN (WIDE AREA NETWORKS), LAN (local area networks), and ISDN (integrated system digital network).
Does not cover any work which properly comes under the work description of Inside JW (Journeyman Wireman), but shall cover the pulling of wire in raceways, but not the installation of raceways.
ELEC1393-003 01/01/2018
LAKE & PORTER COUNTIES
(Calumet Area, North of U.S. Hwy 30)
Rates Fringes
Line Construction:
EQUIPMENT OPERATOR 1:
(Diggers 5th wheel type trucks, crawler type, D-4 and smaller, bucket trucks and live boom type line trucks).....................$ 30.59 29%+$5.65
EQUIPMENT OPERATOR 3
(Backhoe over 1/2 yard bucket capacity, cranes rated at 15 ton or more capacity) 95% of J.L. Rate..$ 37.88 29%+$5.65
GROUNDMAN...................$ 22.94 29%+$5.65
GROUNDMAN-TRUCK DRIVER......$ 26.55 29%+$5.65
LINEMAN.....................$ 39.95 29%+$5.65
ELEV0002-005 01/01/2018
ELEVATOR CONSTRUCTION
LAKE AND PORTER COUNTIES
Rates Fringes
ELEVATOR MECHANIC................$ 54.85 32.645+a+b
FOOTNOTES:
a) Eight Paid Holidays: New Year's Day; Veterans Day, Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day.
b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service, and 6% of regular hourly rate for less than 5 years of service.
ELEV0044-002 01/01/2018
Rates Fringes
ELEVATOR MECHANIC................$ 48.18 32.645+a+b
a) PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.
b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service;
6% for less than 5 years' service.
ENGI0150-001 06/01/2018
BUILDING CONSTRUCTION POWER EQUIPMENT OPERATORS:
LAKE, LAPORTE, and PORTER COUNTIES
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 40.75 34.48
GROUP 2.....................$ 39.95 34.48
GROUP 3.....................$ 35.65 34.48
GROUP 4.....................$ 33.45 34.48
GROUP 5.....................$ 28.00 34.48
POWER EQUIPMENT OPERATOR CLASSIFICATIONS:
GROUP 1: Asphalt Plant; Autograde; Batch Plant); Benoto (requires 2 engineers; Boiler & throttle valve; Boring machine (mining machine); Caisson Rigs; Central redi-mix plant; Combination Backhoe Endloader with backhoe bucket over 1/2 cu. yd. or with attachments; Combination tugger hoist & air compressor; Compressor & throttle; Concrete Breaker (truck mounted); Concrete conveyor; Concrete conveyor (truck mounted); Concrete paver over 27E cu.ft.;
Concrete paver 27E cu. ft. & under; Concrete placing boom;
Concrete pump/grout pump with boom (truck mounted);
Concrete pump with boom (truck mounted); concrete tower;
Cranes and Backhoes (All Attachments); Cranes, Hammerhead Tower; Creter Crane; Derricks (all); Derricks (traveling);
Forklift lull type; Forklift, 10 ton & over; Gradall, Hoist 1, 2, and 3 drums; Hoist (2 tugger l floor), Hydraulic Boom truck, Laser Screed, Locomotive (all), Motor patrol, Mucking Machine; Pile Driving and Skid rig, Pit machine, Prestress Machines, Pump cretes (and similar types), Rock Drill (self-propelled), Rock Drill Truck mounted; Slip form paver, Straddle buggies, Tractor with boom and side boom, Trenching Mechine; Winch Tractors, Welding machines (6-9), GROUP 2: Air Comporessor (3) (feeding a common receiver);
Asphalt Spreader; boilers; bulldozers; Combination Backhoe end loader with Backhoe bucket 1/2 cu. yd. and under or with attachments; Corboy drilling machine; Grader, Elevating; Grouting machines; Guard rail post driver;
Highlift Shovel or frontend loader; Hoist (automatic), Hoist (all elevators); Hoist (tugger and single drum); Post hole digger; rollers (all); Scoop (tractor drawn); Stone crushers; Tournapull; Winch trucks
GROUP 3: Air compressor - small 210 and under (1 to 5 not to exceed a total of 300 feet); Air compressor - large over 210; Air compressor (2) feeding a common receiver;
Combination - small equipment operator; Concrete mixer (two bag & over); Conveyor, portable; Forklift-under 10 ton;
Generator; Pumps (1 to 3 not to exceed a total of 300 feet); Pumps, well points; Steam generators; Tractors, farm & similar type; Welding machines (2 thru 5); Winches, 4 electric drillo winches
GROUP 4: Bull gang (crane erection crew); Heaters, mechanical (1 to 5); Oilers; Switchmen
GROUP 5: Fork lifts (Housing and commercial only)
ENGI0150-012 06/01/2018
BUILDING CONSTRUCTION
ST. JOSEPH COUNTY
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 29.45 28.35
GROUP 2.....................$ 28.10 28.35
GROUP 3.....................$ 27.30 28.35
GROUP 4.....................$ 26.50 28.35
GROUP 5.....................$ 23.90 28.35
POWER EQUIPMENT OPERATOR CLASSIFICATIONS:
GROUP 1: Mechanic, Asphalt Plant, Asphalt Spreader, Auto Grader; Batch Plant, Benoto (requires 2 Engineers), Boiler and Throttle Valve, Boring Machine (road), Bulldozers (with engines of 140 net horse power or more) Caisson Rigs, Central Redi-mix Plant, Concrete Conveyor Systems, Concrete Power (over 27E cu. ft.), Concrete Paver (27E cu. ft. and under), Concrete Pumps/Grout cncrete placer (Truck Mounted), Concrete Tower, Cranes and backhoes (all), Cranes, Hammerhead Tower, Creter Crane, Derricks (all), Forklift (capble of hoisting and mechanically moving forks horizontally), Grader, Elevating, Highlift Shovels or Front End Loaders (over 3 yd bucket), Hoists (2 or more drums), Locomotives (all), Laser screed, Motor Patrol, Pile Drivers and Skid Rig, Pre-Stress Machines, Pump Cretes & Similar Types, Rock Drill (Self-Propelled), Rock Drill (self propelled Truck Mounted), Scoops (tractor drawn), Slip-Form Paver, Tournapull, Tractor with Boom & Side Boom, Trenching Machine (12 or more inches in width), Combination Backhoe Front End Loader Machine with backhoe 1/2 yd bucket or attachments.
GROUP 2: Air Compressor (600 cu. ft. and over), Bob Cat
(over 3/4 cu. yd.), Boilers, Broom (all powered propelled), Bull Dozers with engines of less than 140 net horsepower, combination backhoe front end loader 1/2 yf bskhhoe or under, Compressor and Throttle Valve, Concrete Breaker (truck mounted), Concrete Mixer (of moore than 21 cu. ft.
capacity), Forklift (with fixed or tilt mast), Greaser Engineer, Highlift shovel or front endloader 3 yd bucket and under, Hoists (1 drum), Hydrulic Boom Truck, Post Hole Digger (vehicle mounted), Pump Cretes (squeze crete type pumps, Gypsum, bulker , Rollers(all), Steam Generators, Stone Crushers, Stradddle Buggies, Tractors, Winch Trucks (with "a" frame.
GROUP 3: Buck Hoist, Combination (small equipment operator), .Conveyor (portable), Grouting Machine, Hoist Elevators (material and personnel), Hydraulic Power Units, Grouting and Pile Driving, Stud Welder, Trenching Machines less than 12 inches in width, Welding Machines (8 through 15).
GROUP 4: Bobcat (up to and including 3/4 cu. yd.).
Compressor (over 210 cu. ft. and less than 600 cu. ft.), Generator (over 50 kw.), Heaters, Mechanical, Hoists (all elevator, permanent installation), Hoist (automatic), Hoist (tugger single drum), Oilers, Pumps, Well Points and electric submersible, Small Rubber Tired End Loaders (1/4
cu. yd. and under), Tractors (farm type) Welding Machines (2 through 8).
GROUP 5: Bobcats and forklifts (commercial or residential).
ENGI0150-014 05/01/2017
POWER EQUIPMENT OPERATOR HEAVY/HIGHWAY
LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 40.50 32.00
GROUP 2.....................$ 40.05 32.00
GROUP 3.....................$ 39.60 32.00
GROUP 4.....................$ 38.40 32.00
GROUP 5.....................$ 37.35 32.00
POWER EQUITMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt plants (construction), Asphalt plant (permanent), Auto Patrol (Maintainer), Automatic Dry Batch Plant, Automated Concrete Placer, Automated Sub-Grader, Automated Slip Form Paver, Automated Finish Machine, Combination Backhoe Front, End Loader Machine (1/2 cu. yd.), Backhoe bucket or over or with attachments), Combination backhoe 1 cu yd, Backhoe bucket or over or with attachments, Ballast Regulator (RR), Belt Loader (stationary), Boring Machine (road), Bulldozer, Concrete Mixer(27 cu. ft. or over), Concrete Pump (truck mounted), Concrete Breaker (truck mounted and self-propelled), Core Drilling Machine, Cranes and Backhoes (all attachments), Cranes, Hammerhead, Creter Crane, Crushers (concrete, rock, recycling, etc.), Derricks , Derricks (traveling), Dredge Operator, Formless Curb and Gutter Machine (36 inches and over), Formless Curb and Gutter Machine under 36 inches, Gradall and Machines (of a like nature), Guardrail Post Driver (truck mounted), Lead Greaser, Helicopter, Highlift Shovel (3 yd. and over), Hoist (1 drum), Hoist (2, and 3 drums), Hydraulic Power Units (grouting, piledriving and extracting) Hydro or water blaster (self-propelled), Locomotive Operators, Mechanic, Welder, Mucking Machine, Panelboard Concrete Plant (central mix type), Paver (Hetherington), Pile Driver (Skid or Crawler), Road Paving Mixer, Rock Drill Crawler or Skid Rig, Rock Drill (truck Mounted), Ross Carrier, Roto Mill Grinder (36" and over), Roto mill grinder (less than 36"), Throttle Valve and Compressor or Clever Brooks Type Combination, Throttle Valve and Fireman Combination or Horizontal or Upright Boiler, Tournapull or similar type equipment, Tractor (boom), Tractor Drawn Belt Loader with attached Pusher (requires two engineers), Trench Machine, Tug Boat Operator, Wheel Excavator, Winch Tractor with "a" frame, Scoops, Turnapull or similar types machine used in Tandem (add $1.00 to class l hourly rate for each machine attached there to).
GROUP 2: Combination Backhoe Front End Loader Machine with less than 1/2 cu. yd., Backhoe Bucket or with attachments, Bituminous Mixer, Bituminous Paver, Bridge Deck Finisher, Concrete Mixer (less than 27 cu. ft.), Compressor and throttle valve, Compressor (common receiver 3), Greaser, Highlift Shovels (under 3 cu. yds.), Jersey Spreader or Base Paver, Pavement Bump Grinder (self-propelled), Roller (Asphalt, waterbound, Macadam, Bituminous Macadam, Brick Surface, Sheepfoot Roller (self- propelled with blade), Surface Heater and Planer, Tamper (mutiple vibrating, asphalt waterbound macadam, bituminouus macadam, brick surface), Tractor (push), Tractor with scoop, Widener, Apsco or similar type.
GROUP 3: Back Filler, Bituminous Distributor, Broom and Belt Machine, Bull Float, Compressor (common receiver 2), Concrete cutter wheel type (rockwell), Concrete Finishing Machine, Concrete Spreader (power driven), Digger, Post Hole (power driven), Finishing Machine and Bull Float, Forklift, Form Grader, Form Tamper (motor driven), Hydraulic (boom truck) when used for hauling materials, Laser screed, Mutiple Tamping Machine, Paving Breaker, Roller (earth and subbase material), Roller sheepfoot (self-propelled), Sub-grader, Tamper, Mutipile Vibrating (earth and subbase material), Tractaire with Drill, Tractor
(with all drawn attachements except backhoe and including Highlift, Endloader of 1 cu. yd. capacity and less.
GROUP 4: Air Compressors, Conveyor (all), Fireman on Boiler, Generator, Grout Machine, Power curing Spraying Machine (self-propelled), Broom (self-propelled), Seaman Tiller, Skid steer loaders, Spike Machine (RR), Stripping Machine (paint, self-propelled), Throttle Valve, Welding Machine, Well Points System.
GROUP 5: Deck Hand, Hetherington Driver, Mechanical Heater (1 to 5), Outboard or Inboard Motor Boat, Oiler, Power Saw (Concrete Power Driven), Water Pump, Grasscutter.
IRON0292-001 06/01/2017
ST. JOSEPH and LAPORTE (Remainder of County) COUNTIES
Rates Fringes
IRONWORKER.......................$ 29.30 21.11
IRON0395-001 06/01/2017
LAKE, PORTER AND LAPORTE (FROM LAKE MICHIGAN ON NORTH TO 50
MILES S. OF LAKE MICHIGAN ON THE S. AND FROM IN/IL STATE LINE
ON W. TO 3 MILES E. OF IN. COUNTIES
IRONWORKER
SHEETER.....................$ 39.80 30.32
STRUCTURAL & ORNAMENTAL.....$ 39.55 30.32
* LABO0041-001 06/01/2018
BUILDING CONSTRUCTION
LAKE COUNTY (Western Half)
Rates Fringes
Laborers:
CAISSON AND TUNNEL WORK
(Compressed & Free Air).....$ 37.33 21.20
GROUP 1.....................$ 35.83 21.20
GROUP 2.....................$ 36.58 21.20
GROUP 3.....................$ 36.83 21.20
LABORER CLASSIFICATIONS:
GROUP 1: Building and Construction Laborers; Scaffold Builders (other than for Mason or Plasterers); Railroad
Workers, Masonry Wall Workers, (interior & exterior);
Portable Water, Pumps with discharge up to 3 indches;
Handling of Creosote Lumber or Like Treated Material (excluding railroad material); Asphalt Rakers and Lutemen;
Earth compactors; Jackmen and Sheetmen Working Ditches Deeper than Six (6) Feet in Depth; Laborers Working Ditches Six (6) Feet in Depth or Deeper; Assembly of Unicrete Pump;
Tile Layers (sewer or field) and Sewer Pipe Layers (metallic or non-metallic); Motor Driven Wheelbarrows and Concrete Buggies; Hyster Operators; Pump Crete Assemblers;
Core Drill Operators; Cement, Lime or Silica Clay Handler (bulk or bag); Handling of Toxic Materail Damaging to Clothing; Pneumatic Spikers; Deck Engine and Winch Operators; Water main and Cable Ducking (metallic and non-metallic); Screed Man or Screw Operator on Asphalt Paver; Chain Saw and Demolition Saw Operators; Concrete Saw; Concrete Conveyor Assemblers; Applying of Curing Compound; Sinking of Wellpoints; Dewatering Header Systems
GROUP 2: Plaster Tenders, Masons Tenders; Mortar Mixers;
Welders (acetylene or electric); Cutting Torch or Burner;
Cement Nozzle Laborers; Cement Gun Operators; Scaffold Builders for Plasterers; Scaffold Builders for Masons;
Water Blast Machine Operators; Air Tool Operators and all Pneumatic Tool Operators, Air and Electric Vibrators and Chpping Hammer Operators; Asbestos Removal; Hazardous Waste Removal; All Boiler Setters Laborers, including expediters, bottom men, bell men, and Mason Tenders
GROUP 3: Dynamite Men; Drillers, Air Track or Wagon Drilling for explosives.
CAISSON AND TUNNEL WORK (Compressed & Free Air)
GROUP 1: Cage Tenders, Dump Men, Flagman, Signalman, Top Laborers, Rod Men, Concrete Repairmen, Motor Men, Muckers, Grout Machine, Track Layers, Air Hoist, Key Board, Agitator Car, Car Pushers, Concrete Laborers, Grout Laborers, Sttl Setters, Tuggers, Switchmen, Mucking Machine, Laser Beam, Liner Plate & Ring Setter, Shield Drivers, Power Knife, Burners, Pipe Jacking Machine, Skinners, Maintenance Technician, Miner, Bricklayer Tenders, Concrete Blowers, Drillers, Erectors, Form Men, Jackhammermen, Mining Machine, Dynamite Men, Drillers-air track or wagon drilling for explosives.
Premium for all employees working in compressed air shall be as follows:
0 - 15 lbs. $1.00 per hour 16 - 20 lbs. 1.50 per hour 21 - 26 lbs. 2.00 per hour 27 - 33 lbs. 3.00 per hour 34 & over 4.00 per hour
LABO0041-004 04/01/2018
UTILITY CONSTRUCTION
LAKE COUNTY
Rates Fringes
LABORERS
Group 1.....................$ 31.32 17.23 Group 2.....................$ 31.62 17.23 Group 3.....................$ 32.32 17.23
LABORERS CLASSIFICATIONS (HEAVY AND HIGHWAY)
GROUP 1: Construction Laborer, Carpenter Tender, Fence Erector, Grade Checker, Guard Rail Erector, Continuous Steel Rod or Mat Installer, Wire Mesh Layer, Joint Man (Mortar, Mastic, and all other types), Lighting Installer (Permanent or Temporary), Lineman for Automatic Grade Maker on Paving Machines, Mortar Man, Multi-Plant Erector, Rip-rap Installer (all Products and Materials), Road Marking and Delineation Laborer, Setting and Placing of all Precast Concrete Products, Sing Installation including supporting structure, Spraying of all Epoxy, Curing Compound, or Like Material, Flagperson, Air Tool, Power Tool Operator, Asphalt Raker Man, Batch Truck Dumper, Bridge Hand Rail ERector, Handler (bulk or bag cement), Chain Saw Man, Concrete Puddler, Concrete Rubber, Concrete Saw Operator, Core Drill Operator, Eye Level, Hand Blade Operator Hydro Seeder Man, Motor Driven Georgia Buggy Operator, Power Driven Compactor or Taper Operator, Power Saw Operator, Pump Crete Assembly Man, Sreed Man or Screw Man on Asphalt Paver, Regar Installer, Sandblaster Man, Sealer Applicator for Asphalt (toxic), Setting and Placing pre-stressed on Pre-cast Concrete Structural Members, Side Rail Setters (for Sidewalk, Side Ditches, Radii, and Pavement), Spreader Box Tender (manua or power driven), Straw Blower Man, Subsureface Drain and Culvert Pipe Layer, Concrete Conveyor, Horizonal Boring and Jackman and Sheetman, Pipe Greade Man, Winch and Windless Operator Conduit Installer, Sod Layer
GROUP 2: Cutting Torch Burner, Laser Beam Aligner, Manhole Erector, Sewer Pipe Layer, Water Line Installer, Temporary or Permanent Welders (electric or Oxy Acetylene)
GROUP 3: Air Track and Wagon Drillman, Dynamite and Powder Man, Concrete Barrier Rail Form Setter, Concrete Saw Joint Control Cutting
LABO0081-001 04/01/2018
HEAVY and HIGHWAY CONSTRUCTION:
LAKE, LA PORTE, and PORTER COUNTIES
Rates Fringes
Laborers:
GROUP 1.....................$ 30.49 17.23
GROUP 2.....................$ 30.79 17.23
GROUP 3.....................$ 31.49 17.23
LABORERS CLASSIFICATIONS (HEAVY AND HIGHWAY)
GROUP 1: Construction Laborer; Carpenter Tender; Fence Erector; Grade Checker; Guard Rail Erector; Continuous Steel Rod or Mat Installer; Wire Mesh Layer; Joint Man (Mortar, Mastic, and all other types); Lighting Installer (Permanent or Temporary); Lineman for Automatic Grade Maker on Paving Machines; Mortar Man; Multi-Plant Erector;
Rip-rap Installer (all Products and Materials); Road Marking and Delineation Laborer; Setting and Placeing of all Precast Concrete Products; Sing Installation including Supporting Structure; Spraying of all Epoxy, Curing Compound, or Like Material; Flagperson; Air Tool, Power Tool Operator; Asphalt Raker Man; Batch Truck Dumper;
Bridge Hand Rail Erector; Handler (bulk or bag cement);
Chain Saw Man; Concrete Puddler; Concrete Rubber; Concrete Saw Operator; Core Drill Operator, Eye Level; Hand Blade Operator Hydro Seeder Man; Motor Driven Georgia Buggy Operator; Power Driven Compactor or Tamper Operator; Power Saw Operator; Pump Crete Assembly Man; Screed Man or Screw Man on Asphalt Paver; Rebar Installer; Sandblaster Man;
Sealer Applicator for Asphalt (toxic); Setting and Placeing Prestressed on Precast Concrete Structural Members; Side Rail Setters (for Sidewalk, Side Ditches, Radii, and Pavement); Spreader Box Tender (manual or power driven);
Straw Blower Man; Subsurface Drain and Culvert Pipe Layer;
Concrete Conveyor; Horizonial Boring and Jackman and Sheetman; Pipe Grade Man; Winch and Windlass Operator Conduit Installer, Sod Layer.
GROUP 2: Cutting Torch Burner: Laser Beam Aligner; Manhole Erector; Sewer Pipe Layer; Water Line Installer, Temporary or Permanent; Welders (electric or Oxy-Acetylene).
GROUP 3: Air Track and Wagon Drillman; Dynamite and Powder Man; Concrete Barrier Rail Form Setter; General Laborer;
concrete saw, joint control cutting
LABO0081-002 04/01/2018
UTILITY CONSTRUCTION
LA PORTE & PORTER COUNTIES
Laborers:
GROUP 1.....................$ 30.97 17.23
GROUP 2.....................$ 31.27 17.23
GROUP 3.....................$ 31.97 17.23
LABORERS CLASSIFICATIONS (UTILITY CONSTRUCTION)
GROUP 1: Construction laborer; Fence erector; Flagger; Grade checker; Guard rail erector; Wire mesh layer; Joint man (mortar, mastic and all other types); Lighting installer (permanent or temporary); Lineman for automatic grade maker on paving machines; Mortar man; Multi-plate erector;
Rip-rap installer (all products and materials); Road marking and delineation laborer; Setting and placing of all precast concrete products; Sign installation including supporting structure; Spraying of all epoxy, curing compound, or like material; sod layer; Air tool, power tool, and power equipment operator; Asphalt lute man;
Asphalt raker man; Batch truck dumper; Bridge handrail erector; Handler (bulk or bag cement); Chain saw man;
concrete puddler; concrete rubber; Concrete saw operator;
Core drill operator, eye level; Hand blade operator; Hydro seeder man; Motor-driven Georgia buggy operator;
Power-driven compactor or tamper operator; Power saw operator; Pumpcrete assembly man; Screed man or screw man on asphalt paver; Rebar installer; Sandblaster man; Sealer applicator for asphalt (toxic); Setting and placing prestressed or precast concrete structural memebers; Side rail setter (for sidewalks, side ditches, radii, and pavements); Spreader box tender (manual or power-driven);
Straw blower man; Subsurface drain and culvert pipe layer;
Transverse and longitudinal hand bull float man; Concrete conveyor assembly man; Horizontal boring and jacking man;
Jackman and sheetman; Pipe grade man; Winch and windlass operator
GROUP 2: Cutting torch burner; Laser beam aligner; Manhole erector; Sewer pipe layer; Water line installer, temporary or permanent; Welder (electric or exy-acetylene) in connection with waterline and sewer work, Hod Carrier (tending bricklayers); TVing and associated grouting of utility lines
GROUP 3: Air track and wagon drillman; Concrete barrier rail form setter; Dynamite and powder man; General leadman;
Concrete Saw Joint Control cutting
* LABO0081-004 06/01/2018
LAKE (Eastern Half), LA PORTE, and PORTER COUNTIES
Laborers
GROUP 1.....................$ 35.83 21.20
GROUP 2.....................$ 36.58 21.20
GROUP 3.....................$ 36.83 21.20
LABORER CLASSIFICATIONS (Building Construction)
GROUP 1: Building and Construction Laborers; Scaffold Builders (other than for Mason or Plasterers); Mechanic Tenders; Rodmen and Chainmen, Railroad Workers, Masonry Wall Workers, (interior & exterior); Roofer Tenders, Cement Finisher Tenders, Carpenter Tenders, Portable Water, Pumps with discharge up to 3 inches; Waterproofing; Hauling of Creosote Lumber or Lutemen; Asphalt Rakers; Kettlem, Earth Compactors; Jackman and Sheetmen in Ditches more than 6 ft.
deep; Laborers in ditches 6' deep or deeper; Assembly of Uncrete Pump; Tile Layers (sewer or field); Sewer Pipe Layers; Motor driven Wheelbarrows and Concrete Buggies;
Hyster Operator; Pump Crete Assemblers; Core Drill Operator; Cement, Line or Silica Clay Handers; Handling of Toxic Materials damaging to clothing; Pneumatic Spikers;
Deck Engine and Winch Operator; Water Main and Cable Ducking; Screed Man or Screw Operator on Asphalt Paver;
Chain Saw and Demolition Saw Operator; Concrete Conveyor Assembler
GROUP 2: Plaster Tenders, Masons Tenders; Mortar Mixers;
Welders (acetylene or electric); Cutting Torch or Burner;
Cement Nozzle; Cement Gun; Scaffold Builders when working for Plasterers, and Mason; Water Blast Machine Operator;
Air Tool Operators and all Pheumatic Tool Operators; Air and Electric Vibrators and Chipping Hammer Operators;
Asbestos Removal; Hazardous Waste Removal
GROUP 3: Dynamite Men; Drillers, Air Track or Wagon Drilling for explosives; Laborer Specialist
LABO0645-002 04/01/2018
UTILITY CONSTRUCTION
ST JOSEPH COUNTY
Rates Fringes
Laborers:
GROUP 1.....................$ 23.92 15.00
GROUP 2.....................$ 24.22 15.00
GROUP 3.....................$ 24.92 15.00
LABORER CLASSIFICATIONS (UTILITY CONSTRUCTION)
GROUP 1: Construction laborer; Fence erector; Flagger; Grade checker; Guard rail erector; Wire mesh layer; Joint man (mortar, mastic and all other types); Lighting installer (permanent or temporary); Lineman for automatic grade maker on paving machines; Mortar man; Multi-plateerector; Rip-rap installer (all products and materials); Road markin and delineation laborer; Setting and placing of all precast concrete products; Sign installation including supporting structure; Spraying of all epoxy, curing compound, or like material; sod layer; Air tool, power tool, and power equipment operator; Asphalt lute man; Asphalt raker man;
Batch truck dumper; Bridge handrail erector; Handler (bulk or bag cement); Chain saw man; concrete puddler; concrete rubber; Concrete saw operator; Core drill operator, eye level; Hand blade operator; Hydro seeder man; Motor-driven Georgia buggy operator; Power-driven cmpactor or tamper operator; Power saw operator; Pumpcrete assembly man;
Screed man or screw man or asphalt paver; Rebar installer;
Sandblaster man; Sealer applicator for asphalt (toxic);
Setting and placing prestressed or precast concrete structural members; Side rail setter (for sidewalks, side ditches, radii, and pavements); Spreader box tender (manual or power-driven); Straw blower man; Subsurface drain and culvert pipe layer; Concrete conveyor assembly man;
Horizontal boring and jacking man; Jackman and sheetman;
Pipe grade man; winch and windlass operator.
GROUP 2: Cutting torch burner; Laser beam aligner; Manhole erector; Sewer pipe layer; Water line installer, temporary or permanent; Welder (electric or exy-acetylene) in connection with waterline and sewer work, Hod Carrier (tending bricklayers); TVing and associated grouting of utility lines.
GROUP 3: Air track and wage drillman; Concrete barrier rail form setter; Dynamite and powder man; General leadman;
Concrete Saw Joint Cutting.
LABO0645-004 04/01/2018
HEAVY AND HIGHWAY
ST. JOSEPH COUNTY
Rates Fringes
LABORERS
GROUP 1.....................$ 23.72 15.00
GROUP 2.....................$ 24.02 15.00
GROUP 3.....................$ 24.72 15.00
LABORER CLASSIFICATIONS (HEAVY AND HIGHWAY CONSTRUCTION)
GROUP 1: Construction laborer; Fence erector; Flagger; Grade checker; Guard rail erector; Wire mesh layer; Joint man (mortar, mastic and all other types); Lighting installer (permanent or temporary); Lineman for automatic grade maker on paving machines; Mortar man; Multi-plateerector; Rip-rap installer (all products and materials); Road markin and delineation laborer; Setting and placing of all precast concrete products; Sign installation including supporting structure; Spraying of all epoxy, curing compound, or like material; sod layer; Air tool, power tool, and power equipment operator; Asphalt lute man; Asphalt raker man;
Batch truck dumper; Bridge handrail erector; Handler (bulk or bag cement); Chain saw man; concrete puddler; concrete rubber; Concrete saw operator; Core drill operator, eye level; Hand blade operator; Hydro seeder man; Motor-driven Georgia buggy operator; Power-driven cmpactor or tamper operator; Power saw operator; Pumpcrete assembly man;
Screed man or screw man or asphalt paver; Rebar installer;
Sandblaster man; Sealer applicator for asphalt (toxic);
Setting and placing prestressed or precast concrete structural members; Side rail setter (for sidewalks, side ditches, radii, and pavements); Spreader box tender (manual or power-driven); Straw blower man; Subsurface drain and culvert pipe layer; Concrete conveyor assembly man;
Horizontal boring and jacking man; Jackman and sheetman;
Pipe grade man; winch and windlass operator
GROUP 2: Cutting torch burner; Laser beam aligner; Manhole erector;…