AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

REVISIONS TO INVITATIONS FOR BIDS NO. W912P618B0006

A. By w ay of this Amendment, the government is hereunder informing interested Bidders of revisions made to the Bid Set issued and published at the Federal Business Opportunities Website on August 15, 2018.

B. The Bid Opening Date is EXTENDED to September 19, 2018; the bid opening time remains unchanged at 4:00pm (Central time). In this respect, Bid packages are due PRIOR to 4:00 p.m. (Central Time) on September 19, 2018. Detailed instructions regarding the submittal of Bids is located at Section 00 22 13 of the Solicitation document – SEE “IMPORTANT BID NOTES.”

THE DESCRIPTION OF THIS AMENDMENT CONTINUES ON THE FOLLOWING PAGE

1. CONTRACT ID CODE PAGE OF PAGES

1 52

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Sep-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P618B0006

X 9B. DATED (SEE ITEM 11)

15-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Sep-2018

CODE

U.S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P618B0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT PARTICULARS

C. REVISIONS to SECTION 00 10 00 – SOLICITATION

By this Amendment No. 0001, the government is issuing a Revised Bid Schedule, which renumbers the Option Items and groups the Earthwork CLINs. Accordingly, the Bidder shall remove and replace the previously issued Schedule with the Revised Bid Schedule Enclosed herein, which shall be used to enter its Bid prices.

D. REVISIONS to SECTION 00 22 13 - SUPPLEMENTARY INSTRUCTIONS TO BIDDERS

The following have been modified:

IMPORTANT BID NOTES

1. BID CONDITIONS – REVISION: Sub paragraph c., wherein the Option Provisions are described, has been revised as follows to correspond with the Revised Bid Schedule issued via this Amendment No. 0001.

c. AWARD OF OPTION ITEMS (Line Items 0022AA through 0031): At the discretion of the government, any, all or none of the Option Items under the Bid Schedule may be exercised within 380 calendar days following the Contractor’s acknowledgement of the Notice to Proceed. If any Option is exercised, the contract will be extended by an additional 180 calendar days. Note: If all options aren’t awarded at the same time, there will only be one time extension regardless of the mutilple option awards;

however, the total of all options must be awarded within the aforementioned time frame. With respect to Option Item for a Payment and Performance Bond, it will be awarded if any option is exercised as bonding is required once the contract price is increased – see provision at Solicitation Section 00 70 00, Federal Acquisition Regulation Clause No. 52.228-15.

2. SUBMISSION OF BIDS –REVISION: A sub paragraph f has been added as follows.

f. PRE-AWARD SURVEY QUESTIONNAIRE FORM: The Bidder is required to fully complete and submit along with the aforementioned items, the enclosed Pre-Award Survey Questionnaire Form.

E. REVISIONS to SECTION 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS:

(1) The following Federal Acquisition Regulation Clause has been added by reference:

52.204-19 Incorporation by Reference of Representations and Certifications

(2) The following Federal Acquisition Regulation Clause has been added in full text:

52.209-13 Violation of Arms Control Treaties or Agreements – (The Bidder shall complete the clause and provide the filled out Clause with its Bid as this Clause is applicable to the Representations and Certifications Section of the Solicitation)

52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS--CERTIFICATION (JUN

2018)

(a) This provision does not apply to acquisitions below the simplified acquisition threshold or to acquisitions of commercial items as defined at FAR 2.101.

(b) Certification. [Offeror shall check either (1) or (2).]

____ (1) The Offeror certifies that--

(i) It does not engage and has not engaged in any activity that contributed to or was a significant factor in the President's or Secretary of State's determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. The determinations are described in the most recent unclassified annual report provided to Congress pursuant to section 403 of the Arms Control and Disarmament Act (22 U.S.C. 2593a). The report is available via the internet at https://www.state.gov/t/avc/rls/rpt/; and

(ii) No entity owned or controlled by the Offeror has engaged in any activity that contributed to or was a significant factor in the President's or Secretary of State's determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. The determinations are described in the most recent unclassified annual report provided to Congress pursuant to section 403 of the Arms Control and Disarmament Act (22 U.S.C. 2593a). The report is available via the internet at https://www.state.gov/t/avc/rls/rpt/; or

____ (2) The Offeror is providing separate information with its offer in accordance with paragraph (d)(2) of this provision.

(c) Procedures for reviewing the annual unclassified report (see paragraph (b)(1) of this provision). For clarity, references to the report in this section refer to the entirety of the annual unclassified report, including any separate reports that are incorporated by reference into the annual unclassified report.

(1) Check the table of contents of the annual unclassified report and the country section headings of the reports incorporated by reference to identify the foreign countries listed there. Determine whether the Offeror or any person owned or controlled by the Offeror may have engaged in any activity related to one or more of such foreign countries.

(2) If there may have been such activity, review all findings in the report associated with those foreign countries to determine whether or not each such foreign country was determined to be in violation of its obligations undertaken in an arms control, nonproliferation, or disarmament agreement to which the United States is a party, or to be not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. For clarity, in the annual report an explicit certification of non-compliance is equivalent to a determination of violation. However, the following statements in the annual report are not equivalent to a determination of violation:

(i) An inability to certify compliance.

(ii) An inability to conclude compliance.

(iii) A statement about compliance concerns.

(3) If so, determine whether the Offeror or any person owned or controlled by the Offeror has engaged in any activity that contributed to or is a significant factor in the determination in the report that one or more of these foreign countries is in violation of its obligations undertaken in an arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. Review the narrative for any such findings reflecting a determination of violation or non-adherence related to those foreign countries in the report, including the finding itself, and to the extent necessary, the conduct giving rise to the compliance or adherence concerns, the analysis of compliance or adherence concerns, and efforts to resolve compliance or adherence concerns.

(4) The Offeror may submit any questions with regard to this report by email to NDAA1290Cert@state.gov. To the extent feasible, the Department of State will respond to such email inquiries within 3 business days.

(d) Do not submit an offer unless--

(1) A certification is provided in paragraph (b)(1) of this provision and submitted with the offer; or

(2) In accordance with paragraph (b)(2) of this provision, the Offeror provides with its offer information that the President of the United States has--

(i) Waived application under U.S.C. 2593e(d) or (e); or

(ii) Determined under 22 U.S.C. 2593e(g)(2) that the entity has ceased all activities for which measures were imposed under 22 U.S.C.2593e(b).

(e) Remedies. The certification in paragraph (b)(1) of this provision is a material representation of fact upon which reliance was placed when making award. If it is later determined that the Offeror knowingly submitted a false certification, in addition to other remedies available to the Government, such as suspension or debarment, the Contracting Officer may terminate any contract resulting from the false certification.

(End of provision)

F. REVISIONS to SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

(1) The following Federal Acquisition Regulation Clause 52.203-19 has been added by full text:

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR

STATEMENTS (JAN 2017)

(a) Definitions. As used in this clause-- Internal confidentiality agreement or statement means a confidentiality agreement or any other written statement that the contractor requires any of its employees or subcontractors to sign regarding nondisclosure of contractor information, except that it does not include confidentiality agreements arising out of civil litigation or confidentiality agreements that contractor employees or subcontractors sign at the behest of a Federal agency.

Subcontract means any contract as defined in subpart 2.1 entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract. It includes but is not limited to purchase orders, and changes and modifications to purchase orders.

Subcontractor means any supplier, distributor, vendor, or firm (including a consultant) that furnishes supplies or services to or for a prime contractor or another subcontractor.

(b) The Contractor shall not require its employees or subcontractors to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting waste, fraud, or abuse related to the performance of a Government contract to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information (e.g., agency Office of the Inspector General).

(c) The Contractor shall notify current employees and subcontractors that prohibitions and restrictions of any preexisting internal confidentiality agreements or statements covered by this clause, to the extent that such prohibitions and restrictions are inconsistent with the prohibitions of this clause, are no longer in effect.

(d) The prohibition in paragraph (b) of this clause does not contravene requirements applicable to Standard Form 312 (Classified Information Nondisclosure Agreement), Form 4414 (Sensitive Compartmented Information Nondisclosure Agreement), or any other form issued by a Federal department or agency governing the nondisclosure of classified information.

(e) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015, (Pub. L. 113-235), and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions) use of funds appropriated (or otherwise made available) is prohibited, if the Government determines that the Contractor is not in compliance with the provisions of this clause.

(f) The Contractor shall include the substance of this clause, including this paragraph (f), in subcontracts under such contracts.

(End of clause)

(2) The following Defense Federal Acquisition Regulation Clauses have been added by reference:

252.215-7013 Supplies and Services Provided By Nontraditional Defense Contractors 252.223-7001 Hazard Warning Labels

(3) The following Federal Acquisition Regulation Clauses have been added by full text:

52.204-23-Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018)

Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities.

As prescribed in 4.2004, insert the following clause:

Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018)

(a) Definitions. As used in this clause--

Covered article means any hardware, software, or service that--

(1) Is developed or provided by a covered entity;

(2) Includes any hardware, software, or service developed or provided in whole or in part by a covered entity;

or

(3) Contains components using any hardware or software developed in whole or in part by a covered entity.

Covered entity means--

(1) Kaspersky Lab;

(2) Any successor entity to Kaspersky Lab;

(3) Any entity that controls, is controlled by, or is under common control with Kaspersky Lab; or

(4) Any entity of which Kaspersky Lab has a majority ownership.

(b) Prohibition. Section 1634 of Division A of the National Defense Authorization Act for Fiscal Year 2018 (Pub. L. 115-91) prohibits Government use of any covered article. The Contractor is prohibited from--

(1) Providing any covered article that the Government will use on or after October 1, 2018; and

(2) Using any covered article on or after October 1, 2018, in the development of data or deliverables first produced in the performance of the contract.

(c) Reporting requirement. (1) In the event the Contractor identifies a covered article provided to the Government during contract performance, or the Contractor is notified of such by a subcontractor at any tier or any other source, the Contractor shall report, in writing, to the Contracting Officer or, in the case of the Department of Defense, to the website at https://dibnet.dod.mil/. For indefinite delivery contracts, the Contractor shall report to the Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil/.

(2) The Contractor shall report the following information pursuant to paragraph (c)(1) of this clause:

(i) Within 1 business day from the date of such identification or notification: The contract number; the order number(s), if applicable; supplier name; brand; model number (Original Equipment Manufacturer (OEM) number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.

(ii) Within 10 business days of submitting the report pursuant to paragraph (c)(1) of this clause: Any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of a covered article, any reasons that led to the use or submission of the covered article, and any additional efforts that will be incorporated to prevent future use or submission of covered articles.

(d) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts, including subcontracts for the acquisition of commercial items.

52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations described throughout the contract, however, the Contractor shall draw particular attention to Specification SECTION 02 01 20.

(b) Weather conditions are described at Specification SECTION 31 32 11.

(4) The following Defense Federal Acquisition Regulation Clause has been deleted:

252.239-7001 Information Assurance Contractor Training and Certification

(5) The following option provisions delineated at the following Federal Acquisition Clause has been modified:

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the options as follows:

AWARD OF OPTION ITEMS (Line Items 0022AA through 0031): At the discretion of the government, any, all or none of the Option Items under the Bid Schedule may be exercised within 380 calendar days following the Contractor’s acknowledgement of the Notice to Proceed. If any Option is exercised, the contract will be extended by an additional 180 calendar days. Note: If all options aren’t awarded at the same time, there will only be one time extension regardless of the mutilple option awards; however, the total of all options must be awarded within the aforementioned time frame. With respect to Option Item for a Payment and Performance Bond, it will be awarded if any option is exercised as bonding is required once the contract price is increased – see provision at Solicitation Section 00 70 00, Federal Acquisition Regulation Clause No. 52.228-15.

Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

G. REVISIONS to PROJECT SPECIFICATIONS – the following Specification Sections have been revised.

Accordingly, the Bidder shall remove and replace the respective Sections with the Revised Sections attached hereto.

a. SECTION 01 10 00, GENERAL PROVISIONS:

i) Para 1.26.1 and para 1.26.2: The security requirement Clause 2 and Clause 13 were removed as requested by OC.

ii) Para 1.16.1, Illinois Department of Transportation (IDOT) Permits: was added to the section describing IDOT permit requirements. The permit forms are included at the end of the section.

b. SECTION 01 22 00.00 10 PRICE AND PAYMENT PROCEDURES:

i) The bid item numbers were revised to be consistent with the bid schedule.

ii) Para. 1.3.12.1 – A statement was added to the payment paragraph specifying that costs for the

Contractor to complete the permit application to complete work within IDOT ROW and lane closures.

c. SECTION 02 01 20, PROTECTING EXISTING UNDERGROUNG UTILITIES

i) Para. 1.1 – paragraph was added to include references for IDOT Standard Specification

ii) Para 2.1.1 – Controlled low strength concrete fill paragraph was revised to reference IDOT

Specification and not MWRD specs.

d. SECTION 31 11 00, CLEARING AND GRUBBING:

i) Para 3.4 – Quantity limitations for the wood chips and vegetated material disposal at MWRD site was added.

e. SECTION 31 32 11, SOIL SURFACE EROSION CONTROL:

i) Para 1.5 – Submittal for Erosion Control Blanket was removed.

ii) Para 2.5 – Material Requirement and Certification for Erosion Control Blanket was revised to show a preferred brand or as approved equal.

f. SECTION 31 23 19, FLOOD WATER CONTROL

i) Para. 3.2 & 3.4 – The maximum length of levee to that can be disturbed at any one time is added.

g. SECTION 31 41 16, METAL SHEET PILING:

i) Para. 1.2 – Submittal for Hydrophilic Waterstop was removed.

ii) Para 2.3 – Material requirement for hydrophilic waterstop was revised to show a preferred brand or as approved equal.

h. SECTION 34 11 00, RAILROAD TRACK AND ACCESSORIES, Para. 1.5.2: As requested by the LS, a paragraph addressing the consequences for the contracting not completing the railroad work within the allotted 8-HR window was added.

Specifications Sections:

i. SECTION 01 10 00, GENERAL PROVISIONS:

i) Para 1.26.1 and para 1.26.2: The security requirement Clause 2 and Clause 13 were removed as requested by OC.

ii) Para 1.16.1, Illinois Department of Transportation (IDOT) Permits: was added to the section describing IDOT permit requirements. The permit forms are included at the end of the section.

j. SECTION 01 22 00.00 10 PRICE AND PAYMENT PROCEDURES:

i) The bid item numbers were revised to be consistent with the bid schedule.

ii) Para. 1.3.12.1 – A statement was added to the payment paragraph specifying that costs for the

Contractor to complete the permit application to complete work within IDOT ROW and lane closures.

k. SECTION 02 01 20, PROTECTING EXISTING UNDERGROUNG UTILITIES

i) Para. 1.1 – paragraph was added to include references for IDOT Standard Specification

ii) Para 2.1.1 – Controlled low strength concrete fill paragraph was revised to reference IDOT

Specification and not MWRD specs.

l. SECTION 31 11 00, CLEARING AND GRUBBING:

i) Para 3.4 – Quantity limitations for the wood chips and vegetated material disposal at MWRD site was added.

m. SECTION 31 32 11, SOIL SURFACE EROSION CONTROL:

i) Para 1.5 – Submittal for Erosion Control Blanket was removed.

ii) Para 2.5 – Material Requirement and Certification for Erosion Control Blanket was revised to show a preferred brand or as approved equal.

n. SECTION 31 23 19, FLOOD WATER CONTROL

i) Para. 3.2 & 3.4 – The maximum length of levee to that can be disturbed at any one time is added.

o. SECTION 31 41 16, METAL SHEET PILING:

i) Para. 1.2 – Submittal for Hydrophilic Waterstop was removed.

ii) Para 2.3 – Material requirement for hydrophilic waterstop was revised to show a preferred brand or as approved equal.

p. SECTION 34 11 00, RAILROAD TRACK AND ACCESSORIES, Para. 1.5.2: As requested by the LS, a paragraph addressing the consequences for the contracting not completing the railroad work within the allotted 8-HR window was added.

H. REVISIONS to PROJECT PLANS/DRAWING SHEETS – the following Drawing Sheets have been revised.

Therefore, the Bidder shall remove and replace the respective Sheets with the Revised Sheets attached hereto.

a. Sheet C-108: The project baseline location coordinates table was added.

b. Sheet C-111: A call-out text missing from the plan view was added.

c. Sheet C-112: An existing gas line omitted from the solicitation set was added.

d. Sheet C-126: A label for one concrete monument missing Detail 1 was added.

I. WAGE RATES: Since the issuance of this Invitations for Bids (Solicitation), the Department of Labor has revised the applicable General Decision Number IL9, wherein the wage rates apply to this project. As such, the revised Decision, dated September 7, 2018 is incorporated hereunder and is enclosed.

J. The Attendance Sheet from the Pre-Bid Meeting held on September 5, 2018 is enclosed hereunder.

K. USACE RESPONSE TO AN INTERESTED BIDDER’S INQUIRY FOLLOWS:

Question:

Per page 38 of the solicitation, questions regarding the project are to be directed to you and to be submitted by Aug. 31, 2018.

Please address the question below:

Section 00 70 00 – Conditions of the Contract (page 48 of 62)

CLAUSES INCORPORATED BY REFERENCE

“DFAR Clause 252.207-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting” OCT 2016

The project does not consist of highly sensitive information regarding national security. The project files were posted on FBO with no sign-in requirement to acquire the files, meaning project documents are available to the general public.

Many small businesses that may want to pursue this project (since it is a set-a-side for Small Business) will have difficulty meeting this DFAR clause. The requirement is very extensive and a large financial burden on small business entities.

Many other projects posted by the USACE (Chicago and other Districts) with much more sensitive information (and require a sign-in to FBO) do not include this clause requirement.

Please consider the removal of this specific DFAR clause via contact amendment.

USACE Response:

No; this is a MANDATORY Defense Federal Acquisition Regulation Clause, which is REQUIRED to be incorporated into ALL solicitations and contracts.

L. The Point of Contact for this Amendment is Regina Blair at regina.g.blair@usace.army.mil.

END OF AMENDMENT NO. 0001

(THE REVISED BID SCHEDULE, UPDATED GENERAL DECISION, REVISED SPECIFICATION

SECTIONS, REVISED PLAN SHEETS, PREAWARD SURVEY QUESTIONAIRRE FORM, AND THE PREBID

MEETING ATTENDANCE SHEET FOLLOWS)

REVISED (VIA AMENDMENT NO. 0001)

Section 00 10 00 – Solicitation

CONTRACT FORM

THE SOLICITATION CONTRACT FORM CONTAINED AT SECTION 00 10 00 OF THIS DOCUMENT SHALL BE USED BY BIDDERS TO SUBMIT THEIR BIDS; SAID FORM IS CONSIDERED THE “BID SCHEDULE” AS TERMED

THROUGHOUT THIS SOLICITATION.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

MOBILIZATION

FFP

Under this CLIN, the contractor is required to perform mobilization activities. The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.

Payment Provisions:

The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.

PURCHASE REQUEST NUMBER: W81G6671598216

NET AMT

0002 1 Job

DEMOBILIZATION

FFP

Under this CLIN, the contractor is required to perform demobilization activities.

The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.

Payment Provisions:

The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to

0003 1 Job

TEMPORARY CONSTRUCTION FACILITIES

FFP

0004 1 Job

DEMOLITION AND REMOVAL

0005 1 Job

CLEARING AND GRUBBING

0006 1 Job

EROSION CONTROL

EARTHWORK

FFP

The Contractor shall provide all labor, materials, and equipment to perform EARTHWORK activities identified at the Sub-Line Item Level, “0007AA through 0007AE.” The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor’s pricing to perform the required services shall be provided therein Items0007AA through 0007AE, wherein the sub-line items themselves identify the quantities required to perform said work.

0007AA 3,220 Cubic

Yard

TOPSOIL STRIPPING & STOCKPILE

0007AB 32,190 Cubic

SUBSOIL STRIPPING & STOCKPILE

0007AC 32,190 Cubic

LEVEE FILL FROM ONSITE

0007AD 13,010 Cubic

IMPORTED LEVEE FILL

0007AE 3,220 Cubic

IMPORTED TOPSOIL

0008 8,700 Square

Foot

STEEL SHEET PILE AT BURIED SPILLWAY

0009 40 Linear

CHAINLINK FENCE

0010 2 Each

SWING GATES

0011 7 Acre

NATIVE SEEDING

0012 1.20 Acre

WETLAND SEEDING

0013 1 Job

PLANTING MAINTENANCE

0014 20 Linear

DRAINAGE CULVERT

0015 1 Job

HEADWALL

0016 1 Each

TIDEFLEX VALVE

0017 5,210 Square

AGGREGATE SERVICE ROAD

0018 3,900 Square

ASPHALT PAVING

0019 3,300 Linear

PARKING STRIPING

0020 14 Each

PARKING BUMPERS

0021 1 Lot

PERFORMANCE & PAYMENT BOND

FFP

PERFORMANCE AND PAYMENT BOND FOR BID ITEMS 0001 THROUGH

0020 (INCLUDES RESPECTIVE SUBITEMS)

THIS IS A COST-REIMBURSABLE LINE ITEM - The government will reimburse the Contractor for the actual cost of acceptable performance and payment bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.

Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.

OPTION IDOT & 47TH STREET SOUTH

FFP

ILLINOIS DEPARTMENT OF TRANSPORTATION (IDOT) & 47TH STREET

SOUTH

The Contractor shall provide all labor, materials, and equipment to perform EARTHWORK activities identified at the Sub-Line Item Level, “0022AA through 0022AT.” The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor’s pricing to perform the required services shall be provided therein Items 0024AA through 0024AE, wherein the sub-line items themselves identify the quantities required to perform said work.

0022AA 620 Cubic

OPTION EARTHWORK-TOPSOIL STRIPPING & STOCKPILE

0022AB 6,140 Cubic

OPTION EARTHWORK-SUBSOIL STRIPPING & STOCKPILE

0022AC 6,140 Cubic

OPTION EARTHWORK-LEVEE FILL FROM ONSITE

0022AD 685 Cubic

OPTION EARTHWORK-IMPORTED LEVEE FILL

0022AE 620 Cubic

OPTION EARTHWORK-IMPORTED TOPSOIL

0022AF 1 Job

OPTION CLEARING AND GRUBBING

0022AG 1 Job

OPTION EROSION CONTROL

0022AH 1,140 Square

OPTION STEEL SHEET PILE AT RAILROADS

0022AJ 560 Linear

OPTION CHAINLINK FENCE

0022AK 1 Each

OPTION SWING GATES

0022AL 1 Acre

OPTION NATIVE SEEDING

0022AM .20 Acre

OPTION WETLAND SEEDING

0022AN 1 Job

OPTION PLANTING MAINTENANCE

0022AP 500 Linear

OPTION PERFORATED DRAINAGE PIPE

0022AQ 34 Net Ton

(2,000

LB).

OPTION OUTLET RIPRAP

0022AR 1,000 Square

OPTION AGGREGATE SERVICE ROAD

0022AS 120 Square

OPTION AGGREGATE FOREST PRESERVE PATH

0022AT 6 Each

OPTION RAILROAD MONUMENTS

0023 1 Lot

OPTION GOVERNMENT PRICE ALLOWANCE

FFP

UNSUITABLE SOIL REMOVAL AND DISPOSAL

THIS IS A GOVERNMENT PRICE ALLOWANCE FOR "UNSUITABLE SOIL

REMOVAL AND DISPOSAL" AT A NOT TO EXCEED CEILING PRICE OF

$70,000.00.

Payments will be reimbursed by the government in an amount for work preapproved by the COR at a NOT TO EXCEED PRICE OF $70,000.00. Only costs determined in writing to be reimbursable in accordance with the Contract set shall be reimbursable.

(1) The Contractor shall NOT incur any additional costs or perform any additional services outside of the ceiling price established hereunder. Should the Contractor determine that the allocated amount is insufficient because additional related services are deemed necessary, the government may negotiate a fair and reasonable price with the contractor to make price adjustments to the Contract

(2) The Contractor shall coordinate all services with the Contracting Officer's Representative (COR) such that compliance with the ceiling price of this item and the tasks performed, the associated level of effort, and scheduling can be verified.

(3) The COR is responsible for processing payments. The contractor shall provide the COR with paid invoices and all other supporting cost information (labor, travel, per diem, subcontractor costs, etc.) for the verification of the Contractor's expenditures for this line item).

ANY UNUSED BALANCE WILL BE DEOBLIGATED AT THE END OF THE

CONTRACT PERIOD

0024 1 Lot

OPTION GOVERNMENT PRICE ALLOWANCE

FFP

CONTAMINATED SOIL REMOVAL AND DISPOSAL

THIS IS A GOVERNMENT PRICE ALLOWANCE FOR "CONTAMINATED

SOIL REMOVAL AND DISPOSAL" AT A NOT TO EXCEED CEILING PRICE

OF $20,000.00.

Payments will be reimbursed by the government in an amount for work preapproved by the COR at a NOT TO EXCEED PRICE OF $20,000.00. Only costs determined in writing to be reimbursable in accordance with the Contract set shall be reimbursable.

(1) The Contractor shall NOT incur any additional costs or perform any additional services outside of the ceiling price established hereunder. Should the Contractor determine that the allocated amount is insufficient because additional related services are deemed necessary, the government may negotiate a fair and reasonable price with the contractor to make price adjustments to the Contract

(2) The Contractor shall coordinate all services with the Contracting Officer's Representative (COR) such that compliance with the ceiling price of this item and the tasks performed, the associated level of effort, and scheduling can be verified.

(3) The COR is responsible for processing payments. The contractor shall provide the COR with paid invoices and all other supporting cost information (labor, travel, per diem, subcontractor costs, etc.) for the verification of the Contractor's expenditures for this line item).

0025 1 Lot

OPTION GOVERNMENT PRICE ALLOWANCE

FFP

FLOOD EVENTS

THIS IS A GOVERNMENT PRICE ALLOWANCE FOR "FLOOD EVENTS"

AT A NOT TO EXCEED CEILING PRICE OF $120,000.00.

Payments will be reimbursed by the government in an amount for work preapproved by the COR at a NOT TO EXCEED PRICE OF $120,000.00. Only costs determined in writing to be reimbursable in accordance with the Contract set shall be reimbursable.

(1) The Contractor shall NOT incur any additional costs or perform any additional services outside of the ceiling price established hereunder. Should the Contractor determine that the allocated amount is insufficient because additional related services are deemed necessary, the government may negotiate a fair and reasonable price with the contractor to make price adjustments to the Contract

(2) The Contractor shall coordinate all services with the Contracting Officer's Representative (COR) such that compliance with the ceiling price of this item and the tasks performed, the associated level of effort, and scheduling can be verified.

(3) The COR is responsible for processing payments. The contractor shall provide the COR with paid invoices and all other supporting cost information (labor, travel, per diem, subcontractor costs, etc.) for the verification of the Contractor's expenditures for this line item).

0026 1 Lot

OPTION GOVERNMENT PRICE ALLOWANCE

FFP

47TH STREET TRAFFIC CONTROL

THIS IS A GOVERNMENT PRICE ALLOWANCE FOR "47TH STREET

TRAFFIC CONTROL" AT A NOT TO EXCEED CEILING PRICE OF

$15,000.00.

Payments will be reimbursed by the government in an amount for work preapproved by the COR at a NOT TO EXCEED PRICE OF $15,000.00. Only costs determined in writing to be reimbursable in accordance with the Contract set shall be reimbursable.

(1) The Contractor shall NOT incur any additional costs or perform any additional services outside of the ceiling price established hereunder. Should the Contractor determine that the allocated amount is insufficient because additional related services are deemed necessary, the government may negotiate a fair and reasonable price with the contractor to make price adjustments to the Contract

(2) The Contractor shall coordinate all services with the Contracting Officer's Representative (COR) such that compliance with the ceiling price of this item and the tasks performed, the associated level of effort, and scheduling can be verified.

(3) The COR is responsible for processing payments. The contractor shall provide the COR with paid invoices and all other supporting cost information (labor, travel, per diem, subcontractor costs, etc.) for the verification of the Contractor's expenditures for this line item).

0027 1 Lot

OPTION GOVERNMENT PRICE ALLOWANCE

FFP

RAILROAD WORK REQUIREMENTS

THIS IS A GOVERNMENT PRICE ALLOWANCE FOR "RAILROAD WORK

REQUIREMENTS" AT A NOT TO EXCEED CEILING PRICE OF $20,000.00.

Payments will be reimbursed by the government in an amount for work preapproved by the COR at a NOT TO EXCEED PRICE OF $20,000.00. Only costs determined in writing to be reimbursable in accordance with the Contract set shall be reimbursable.

(1) The Contractor shall NOT incur any additional costs or perform any additional services outside of the ceiling price established hereunder. Should the Contractor determine that the allocated amount is insufficient because additional related services are deemed necessary, the government may negotiate a fair and reasonable price with the contractor to make price adjustments to the Contract

(2) The Contractor shall coordinate all services with the Contracting Officer's Representative (COR) such that compliance with the ceiling price of this item and the tasks performed, the associated level of effort, and scheduling can be verified.

(3) The COR is responsible for processing payments. The contractor shall provide the COR with paid invoices and all other supporting cost information (labor, travel, per diem, subcontractor costs, etc.) for the verification of the Contractor's expenditures for this line item).

0028 100 Square

OPTION ADDITIONAL STEEL SHEET PILE

0029 1 Lot

OPTION MOBILIZATION (OPTION)

FFP

Under this OPTION CLIN, when or if awarded, the contractor is required to perform mobilization activities. The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.

Payment Provisions:

The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment

0030 1 Lot

OPTION DEMOBILIZATION (OPTION)

FFP

Under this OPTION CLIN, when or if awarded, the contractor is required to perform demobilization activities. The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.

Payment Provisions:

The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment

0031 1 Lot

OPTION PERFORMANCE AND PAYMENT BOND (OPTION)

FFP

PERFORMANCE AND PAYMENT BOND FOR OPTION BID ITEMS 0022AA

THROUGH 0030 (INCLUDES RESPECTIVE SUBITEMS)

THIS IS A COST-REIMBURSABLE LINE ITEM - The government will reimburse the Contractor for the actual cost of acceptable performance and payment bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.

Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.

SUMMATION OF PRICING

CONTRACTOR’S BID AMOUNT FOR CONTRACT LINE ITEMS NUMBERS 0001 through 0021 (inclusive of all Sub Line Items): $__________________

CONTRACTOR’S BID AMOUNT FOR THE OPTION ITEMS 0022AA through 0031 (inclusive of all Sub Line Items):

OVERALL BID AMOUNT (INCLUDES ALL BID AND OPTION ITEMS PLUS ALL PRE-PRICED ITEMS):

END OF REVISED BID SCHEDULE

PREAWARD SURVEY QUESTIONAIRRE

(RE: Subparts 9.104-1 and 9.105-1 of the Federal Acquisition Regulation)

CONTRACTOR: ___________________________________________

SOLICITATION NO. W912P618B0006, FOREST VIEW LYONS LEVEE, IL

Please complete the below form to assist in the completion of a Pre-award Survey:

1. Month and Year started in business:

2. Year and State Incorporated:

3. Key Personnel:

President/Owner :

5. Surety:

Agency:

Agent:

Address, City & State:

Telephone#:

6. Insurance Company:

Agency:

Agent:

Address, City & State:

Telephone#:

7. Financial Institution Information:

Name of Bank:

Contact Person:

Address, City & State:

Telephone#:

8. References: Provide the names and contact information of three references. Information obtained from references will be used to determine if you have been diligent in the following areas: a) Quality of Work; b) Timely Performance; c) Effectiveness of Management; d) Compliance with Safety Standards; and e) Compliance with Labor Standards.

9. Does your company have any ongoing projects that may cause a problem with completing or beginning performance of the subject project?

END OF FORM

Vice President/Partner:

Secretary/Treasurer:

4. Number of Full-Time Employees:

UPDATED WAGE RATES:

General Decision Number: IL180009 09/07/2018 IL9

Superseded General Decision Number: IL20170009

State: Illinois

Construction Types: Building, Heavy, Highway and Residential

County: Cook County in Illinois.

BUILDING, RESIDENTIAL, HEAVY, AND HIGHWAY PROJECTS (does not include landscape projects).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 02/16/2018 3 06/01/2018 4 06/08/2018 5 06/15/2018 6 06/22/2018 7 07/06/2018 8 08/03/2018 9 08/24/2018 10 08/31/2018 11 09/07/2018

ASBE0017-001 06/01/2017

Rates Fringes

ASBESTOS WORKER/INSULATOR

Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems..........$ 50.50 25.80 Fire Stop Technician.............$ 40.40 24.54

HAZARDOUS MATERIAL HANDLER

includes preparation, wetting, stripping removal scrapping, vacuuming, bagging and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems..........$ 37.80 24.54

BOIL0001-001 05/01/2017

Rates Fringes

BOILERMAKER......................$ 46.18 29.58

BRIL0021-001 06/01/2016

Rates Fringes

BRICKLAYER.......................$ 44.88 26.62

BRIL0021-004 06/01/2017

Rates Fringes

Marble Mason.....................$ 44.63 26.83

BRIL0021-006 06/01/2017

Rates Fringes

TERRAZZO WORKER/SETTER...........$ 44.38 25.84

TILE FINISHER....................$ 38.56 22.10

TILE SETTER......................$ 45.49 25.72

BRIL0021-009 06/01/2017

Rates Fringes

MARBLE FINISHER..................$ 33.95 26.03

BRIL0021-012 06/01/2017

Rates Fringes

Pointer, cleaner and caulker.....$ 45.42 24.06

CARP0555-001 06/01/2018

BUILDING, HEAVY, AND HIGHWAY

Rates Fringes

CARPENTER

Carpenter, Lather, Millwright, Piledriver, and Soft Floor Layer Building...................$ 47.35 32.83 Heavy & Highway............$ 47.35 32.83

CARP0555-002 10/01/2017

RESIDENTIAL CONSTRUCTION

Rates Fringes

CARPENTER........................$ 37.11 31.29

ELEC0009-003 06/03/2018

Rates Fringes

Line Construction Groundman...................$ 40.48 61.52% Lineman and Equipment Operator....................$ 51.90 61.52%

ELEC0134-001 06/04/2018

Rates Fringes

ELECTRICIAN......................$ 48.35 33.11

ELEC0134-003 06/04/2018

Rates Fringes

ELECTRICIAN

ELECTRICAL TECHNICIAN.......$ 43.96 24.51

The work shall consist of the installation, operation, inspection, maintenance, repair and service of radio, television, recording, voice sound vision production and reproduction, telephone and telephone interconnect, facsimile, data appatatus, coaxial, fibre optic and wireless equipment, appliances and systems used for the transmission and reception of signals of any nature, business, domestic, commercial, education, entertainment and residential purposes, including but not limited to communication and telephone, electronic and sound equipment, fibre optic and data communication systems, and the performance of any task directly related to such installation or service whether at new or existing sites, such tasks to include the placing of wire and cable and electrical power conduit or other raceway work within the equipment room and pulling wire and/or cable through conduit and the installation of any incidential conduit.

ELEV0002-001 01/01/2018

Rates Fringes

ELEVATOR MECHANIC................$ 54.85 32.645+a+b

FOOTNOTES:

a) PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Day after Thanksgiving Day; Veterans' Day and Christmas Day.

b) Employer contributes 8% of regular hourly rate as vacation pay credit for employee with more than 5 years of service, and 6% for employee with less than 5 years service

* ENGI0150-006 06/01/2017

Building and Residential Construction

Rates Fringes

OPERATOR: Power Equipment

GROUP 1....................$ 50.10 36.45

GROUP 2....................$ 48.80 36.45

GROUP 3....................$ 46.25 36.45

GROUP 4....................$ 44.50 36.45

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Mechanic; Asphalt Plant*; Asphalt Spreader;

Autograde*; Backhoes with Caisson attachment*:Batch Plant*;

Benoto(Requires two Engineers); Boiler and Throttle Valve;

Caisson Rigs*; Central Redi-Mix Plant*; Combination Backhoe Front Endloader Machine; Compressor and Throttle Valve;

Concrete Breaker (Truck Mounted)*; Concrete Conveyor;

Concrete Conveyor, Truck Mounted; Concrete Paver over 27E

cu. ft.*; Concrete Paver 27E cu ft and Under*; Concrete Placer*; Concrete Placing Boom; Concrete Pump (Truck Mounted); Concrete Tower; Cranes*; Cranes, Hammerhead*;

Cranes, (GCI and similar type Requires two operators only);

Creter Crane; Crusher, Stone, etc; Derricks; Derricks, Traveling*; Formless Curb and Gutter Machine*; Grader, Elevating; Grouting Machines; Highlift Shovels or Front Endloader 2 1/4 yd. and over; Hoists, Elevators, Outside Type Rack and pinion and similar Machines; Hoists, One, Two, and Three Drum; Hoists, Two Tugger One Floor;

Hydraulic Backhoes*; Hydraulic Boom Trucks; Hydraulic Vac (and similar equipment);Locomotives; Motor Patrol*; Pile Drivers amd Skid Rig*; Post Hole Digger; Pre- Stress Machine; Pump Cretes Dual Ram(Requiring frequent Lubrication and Water); Pump Cretes; Squeeze Cretes-Screw

Type Pumps Gypsum Bulker and Pump; Raised and Blind Hole Drill*; Roto Mill Grinder (36" and Over)*; Roto Mill Grinder (Less Than 36")*; Scoops-Tractor Drawn; Slip-Form Paver*; Straddle Buggies; Tournapull; Tractor with Boom, and Side Boom; and Trenching Machines*.

GROUP 2: Bobcat…