W81G6670947646
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
CLERICAL CORRECTIONS - IFB W912P6-147-B-0004, "WAUKEGAN HARBOR DREDGING"
THE BID OPENING DATE IS NOT EXTENDED BY THIS AMENDMENT; THEREFORE, BIDS ARE DUE BY 1PM ON 28 AUGUST (CENTRAL TIME) AS
SPECIFIED AT SECTION 00100 OF THE SOLICITATION DOCUMENT.
SEE THE FOLLOWING PAGES
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Aug-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-17-B-0004
X 9B. DATED (SEE ITEM 11)
28-Jul-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Aug-2017
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P6-17-B-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT PARTICULARS
A. THIS AMENDMENT CORRECTS THE UNIT OF MEASURE AT CLIN 0014 OF SECTION 00010.
The government hereby corrects an error in Section 00010 of the Solicitation (Bid Schedule), wherein, the unit of measure should have read "cubic yards," which corresponds with the unit of measure at the Measurement and Payment Section of the Specifications (Re: . SPECIFICATION SECTION 01 22 00.00 10 Page 8, paragraph 1.2.4.3 Unit of Measurement). BIDDERS SHALL PROVIDE A PEN AND INK
CHANGE ON THEIR SUBMITTED BID SCHEDULES TO DENOTE THIS AMENDED AREA.
B. In addition to the above, the Measurement and Payment Section of the Specifications contained a clerical mistake relating to the same CLIN 0014 with regard to the quantity stated therein. The quantity should have read as 50,000, which corresponds with the Bid Schedule QUANTITY. Accordingly, the following applies and will be provided via the conformed copy of the resultant contract.
1.2.4 Outer Channel Material Disposal at Optional Placement Area (Option Bid Item 0014) This is a cost reimbursable line item for transportation of dredge material to the alternative Disposal Site at a NOT TO EXCEED 50,000 cubic yards. The contractor shall price this line item based upon disposal costs from Approach Channel to the OPTIONAL PLACEMENT AREA. The contractor will be reimbursed at its unit price per cubic yard. The exercising of this option item is contingent upon funds. Therefore, when exercised, the government at its discretion may award less than 50,000 cubic yards.
The difference in disposal quantity MAY BE executed via one of the bid items contained under "Outer Harbor Maintenance Dredging and Disposal," which may also be adjusted if the full quantity of this item is awarded.
In either case, CONTRACTOR's are hereby informed that quantity adjustments may result without any increase to the contract price (since the government is not eliminating work, but using a different location that would be pre-priced by Contract). Contractor's would be paid at their unit price based upon actual cubic yards disposed. (Reference FAR Subpart, 16.202-2 Application).
1.2.4.1 Payment
Full compensation for all labor, equipment, and materials for the transportation of Approach Channel dredged material to Optional Placement Area, as shown in the contract drawings and in accordance with 35 25 00 TRANSPORTATION AND DISPOSAL OF DREDGED MATERIAL, shall be paid at the contract unit price.
1.2.4.2 Measurement
The total amount of materials to be disposed of at the Optional Placement Area will be measured by identifying volume of material in the scow used to transport and dispose of in this area. Contractor will provide either barge displacement tables or dimensions of each scow to be used in the work. These will be used to calculate the volume each scow can accommodate. The contractor will also provide data from scow monitoring profile 35 21 23.13 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM SCOW MONITORING PROFILE relating to barge displacement for each load to the optional displacement area or the positioning data for each disposal.
1.2.4.3 Unit of Measurement
W912P6-17-B-0004
Unit of measure: cubic yard.
C. Bidders may acknowledge this amendment via an email to Regina Blair at regina.g.blair@usace.army.mil and Ericka Hillard at Ericka.d.hillard@usace.army.mil.