Amendment_0002_W912P6-16-B-0013_Calumet_Harbor_Rock_Removal.pdf
PDF 4 MB Posted
- Attached to
- CALUMET HARBOR ROCK REMOVAL
- Solicitation number
- W912P6-16-B-0013
About this file
This file contains Amendment 0002 which includes updated wage rates an updated bid schedule and revised plans and specifications
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6662034906
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE INVITATION FOR BID NO. W912P6-16-B-0013, CALUMET HARBOR ROCK REMOVAL, CALUMET HARBOR, IN
- SEE THE FOLLOWING PAGES FOR THE AMENDMENT PARTICULARS
1. CONTRACT ID CODE PAGE OF PAGES
J 1 52
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Sep-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-16-B-0013
X 9B. DATED (SEE ITEM 11)
18-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Sep-2016
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P6-16-B-0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT PARTICULARS:
A. The BID Opening Date and Time remains unchanged by this Amendment; therefore, BIDS shall be provided to the USACE‐Chicago District by 1:00 p.m. (CDT) on September 19, 2016. However, as set forth by the Solicitation, the BELOW contingency still applies:
CONTINGENCY STATEMENT: The receipt of BIDS is contingent upon the USACE’s receipt of the 401 Water Quality Certification Permit, a Finding of No Significant Impact (FONSI), and a Consistency Determination under the Coastal Zone Management Act. In this respect, the USACE is under no obligation to receive bids for this project until such permits have been received. Therefore, the due date for bids is subject to being extended until said Permits have been provided to the USACE, which is anticipated mid‐ September 2016. When acquired, offerors will be notified via an Amendment.
B. By this Amendment, revisions have been made to the Bidding Schedule (Section 00010 – Solicitation Contract Form) AND SECTION 00100 of the Solicitation; therefore, Bidders shall remove and replace the previously issued respective Sections with the Revised Sections 00010 and 00100 enclosed hereunder.
Bidders shall provide their prices on the Revised Bidding Schedule. The resultant change is the addition of a Bid Item for “TOP OF ROCK/HARD MATERIAL CONTOUR SURVEY.” In the revised Bidding Schedule, Contract Line Item 0006 is now designated as this Bid Item. Due to the Bid Item change, the Option items were renumbered as shown in the Revised Bidding Schedule and at the Revised Section
00100 (SEE PARAGRAPH 2).
C. As a result of the aforementioned change described at Paragraph B, the numbering of the Option Items included under FAR Clause 52.217‐7 (at Section 00700 of the IFB document) have been modified to coincide with the Line Item Numbering therein the Bidding Schedule– see below:
52.217‐7 OPTION FOR INCREASED QUANTITY‐‐SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor in accordance with the below option provisions. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
OPTION PROVISIONS : BIDDABLE OPTION LINE ITEMS 0008AA‐0008AB (Priority 1); 0009AA‐0009AB (Priority 2), 0010AA‐0010AB (Priority 3), and 0011AA‐0011AB (Priority 4):
EXERCISE OF OPTION ITEMS: At the government's discretion, any, all or none of the Options Items under the Bid Schedule may be awarded NO LATER THAN 180 calendar days from the date the Contractor acknowledges the Notice to Proceed. Options, if awarded, will be exercised within the order of priority, beginning with Priority 1 Option Items (0008AA and 0008AB), then Priority 2 Option Items (0009AA and 0009AB), Priority 3 Option Items (0010AA and 0010AB), ending with Priority 4 Option Items (0011AA and 0011AB). If any of the Options are awarded, no additional time will be added to the Contract’s performance time.
(End of clause)
D. This Amendment includes Revised Specifications Sections, which are as follows and attached hereto:
SECTION 01 11 00, SUMMARY OF WORK, was added.
SECTION 01 22 00.00 10, PRICE AND PAYMENT PROCEDURES, para 1.1.5 and 1.1.6, and 1.2.1.
SUBMITTAL REGISTER, “TOP OF ROCK/HARD MATERIAL CONTOUR SURVEY” was added.
SECTION 35 20 23.00 03, MECHANICAL DREDGING, the following sections have changed 1.5 and 1.6.
E. By this Amendment, the following Drawing Sheets were modified and are attached hereto:
Drawing Sheet C‐101 was updated.
F. Included hereunder is the most current Wage Determination for the non‐marine work– see attached General Decision IN1, dated September 9, 2016.
G. The Point of Contact (POC) for this Amendment is Ericka Hillard, who may be reached by phone at 312‐846‐5378.
H. ANY AND ALL TECHNICAL OR CONTRACTING INQUIRIES SHALL BE PROVIDED IN WRITING AND EMAILED TO ERICKA D. HILLARD at ericka.d.hillard@usace.army.mil.
REVISED VIA AMENDMENT 0002 - Section 00010 - SOLICITATION CONTRACT FORM (Bidders shall complete the below Bidding Schedule and furnish it along with the other items required by this Solicitation)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
DEMONSTRATION WORK
FFP
For the work involved for this Contract Line Item, the Contractor shall refer to the Project Specifications, Section 35 30 00, para 1.5.2.
PURCHASE REQUEST NUMBER: W81G6662034906
NET AMT
0002 1 Job
MOBILIZATION
FFP
Under this CLIN, the contractor is required to perform mobilization activities. The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.
Payment Provisions:
The Government will pay all costs for the mobilization of all of the
Contractor's plant and equipment at the unit price for this item. The
Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting
Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the
Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
0003 1 Job
DEMOBILIZATION
FFP
Under this CLIN, the contractor is required to perform demobilization activities. The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.
Payment Provisions:
The Government will pay all costs for the demobilization of all of the
Contractor's plant and equipment at the unit price for this item. The
Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting
Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the
Contracting Officer will result in payment determined by the Contracting
Officer of the actual costs, which is not subject to appeal.
0004 10,000 Cubic
Yard
ROCK EXCAVATION &DISPOSAL CALUMET HARBOR
0005 1 Job
SCOW SILENT INSPECTOR
0006 1 Job
TOP OF ROCK/HARD MATERIAL CONTOUR SURVEY
0007 1 Lot
PERFORMANCE AND PAYMENT BOND
FFP
PERFORMANCE AND PAYMENT BONDS ASSOCIATED WITH LINE ITEMS
0001 THROUGH 0006
THIS IS A COST‐REIMBURSABLE LINE ITEM ‐ The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.
OPTION PRIORITY 1 OPTIONS
This is a Parent Line Item identifying the option work that relates directly to its Sub‐Items 0008AA and the required bond coverage, via 0008AB.
Therefore, the Contractor shall provide its pricing separately at Sub‐Items
0008AA and 0008AB.
0008AA 2,500 Cubic
OPTION ROCK EXCAVATION &DISPOSAL CALUMET HARBOR
(PRIORTIY 1)
0008AB 1 Lot
OPTION PERFORMANCE & PAYMENT BOND (PRIORITY 1)
PERFORMANCE AND PAYMENT BONDS ASSOCIATED WITH OPTION LINE
ITEM 0007AA
and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.
OPTION PRIORITY 2 OPTIONS
This is a Parent Line Item identifying the option work that relates directly to its Sub‐Items 0009AA and the required bond coverage, via 0009AB.
0009AA and 0009AB.
0009AA 2,500 Cubic
(PRIORITY 2)
0009AB 1 Lot
OPTION PERFORMANCE & PAYMENT BOND (PRIORITY 2)
ITEM 0009AA
and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly. Adjustment(s) to the line
OPTION PRIORITY 3 OPTIONS
FFP
This is a Parent Line Item identifying the option work that relates directly to its Sub‐Items 0010AA and the required bond coverage, via 0010AB.
0010AA and 0010AB.
0010AA 2,500 Cubic
(PRIORITY 3)
0010AB 1 Lot
OPTION PERFORMANCE & PAYMENT BOND (PRIORITY 3)
ITEM 0010AA
and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly. Adjustment(s) to the line
OPTION PRIORITY 4 OPTIONS
FFP
This is a Parent Line Item identifying the option work that relates directly to its Sub‐Items 0011AA and the required bond coverage, via 0011AB.
0011AA and 0011AB.
0011AA 2,500 Cubic
(PRIORITY 4)
0011AB 1 Lot
OPTION PERFORMANCE & PAYMENT BOND (PRIORITY 4)
FFP
PERFORMANCE AND PAYMENT BONDS ASSOCIATED WITH OPTION
LINE ITEM 0011AA
and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.
BID PRICING:
TOTAL AMOUNT FOR BASE BID WORK
(ITEMS 0001 THROUGH 0007): $_____________________________
TOTAL AMOUNT FOR BIDDABLE LINE ITEMS FOR PRIORITY 1 OPTIONS
(LINE ITEMS 0008AA‐0008AB): $ ________________________________________
TOTAL AMOUNT FOR BIDDABLE LINE ITEMS FOR PRIORITY 2 OPTIONS
(LINE ITEMS 0009AA ‐0009AB): $__________________________________________
TOTAL AMOUNT FOR BIDDABLE LINE ITEMS FOR PRIORITY 3 OPTIONS
(LINE ITEMS 0010AA ‐0010AB): $__________________________________________
TOTAL AMOUNT FOR BIDDABLE LINE ITEMS FOR PRIORITY 3 OPTIONS
(LINE ITEMS 0011AA ‐0011AB): $__________________________________________
OVERALL TOTAL BID AMOUNT (ITEMS 0001 THROUGH 0011AB):
END OF BIDDING SCHEDULE
REVISED Section 00100 ‐ Bidding Schedule/Instructions to Bidders (VIA AMENDMENT 0002)
IMPORTANT NOTES TO BIDDERS:
1. BID CONDITIONS:
a. The receipt of BIDS is contingent upon the USACE’s receipt of the 401 Water Quality
Certification Permit, a Finding of No Significant Impact (FONSI), and a Consistency Determination under the Coastal Zone Management Act. In this respect, the USACE is under no obligation to receive bids for this project until such permits have been received. Therefore, the due date for bids is subject to being extended until said Permits have been provided to the USACE, which is anticipated by early
September 2016. When acquired, offerors will be notified via an Amendment.
b. The Contractor shall bid ALL items including the option items contained in the Bid Schedule, with no exceptions. Should a Contractor fail to fully complete the bid schedule, its bid may be considered non‐responsive to the solicitation and In‐eligible for the resultant contract award. Therefore, the bidder’s total price for the work shall be based on the TOTAL of all BID items included in the Bid
Schedule. The Contractor shall enter both its unit prices and extended prices for each Bid Item and the
Option Items.
c. The Government intends to award all Base Bid Items to the responsive, responsible bidder.
Award will be based upon the bidder submitting the lowest aggregate fair and reasonable price for all items in the bid schedule, including the option items.
d. Split or multiple awards will not result from this solicitation.
2. OPTION PROVISIONS : BIDDABLE OPTION LINE ITEMS 0008AA‐0008AB (Priority 1); 0009AA‐0009AB
(Priority 2), 0010AA‐0010AB (Priority 3), and 0011AA‐0011AB (Priority 4):
EXERCISE OF OPTION ITEMS: At the government's discretion, any, all or none of the Options Items under the Bid Schedule may be awarded NO LATER THAN 180 calendar days from the date the
Contractor acknowledges the Notice to Proceed. Options, if awarded, will be exercised within the order of priority, beginning with Priority 1 Option Items (0008AA and 0008AB) , then Priority 2 Option Items
(0009AA and 0009AB), Priority 3 Option Items (0010AA and 0010AB), ending with Priority 4 Option
Items (0011AA and 0011AB). If any of the Options are awarded, no additional time will be added to the
Contract’s performance time.
3. SUBMISSION OF BIDS:
a. BIDS OR MODIFICATIONS TO BIDS THAT ARE RECEIVED BY FACSIMILE OR
TELETYPE WILL NOT BE CONSIDERED. All Sealed Bids must be submitted in accordance with the procedures set forth in Block No. 13 of Page 1 of this Solicitation Document.
b. Bidders are required to acknowledge the receipt of all amendments to the Solicitation on the
Standard Form 1442 in the space provided, by completing Blocks 8 and 15 of the Amendment (Standard
Form 30), by separate letter, or by telegram prior to opening of bids.
c. SF 1442 BACK (Page 2 of the Solicitation): Bidders shall fully complete all the required areas located under the section designated as “OFFER” (refer to Items 14 through 20C)
d. Section 00600 (Representations and Certifications): The bidder must fully complete Section
00600 of this Solicitation and submit it along with all other documents required by this Solicitation. Bids received without this Section fully completed may be rejected, considered non‐responsive and ineligible for award.
e. BID GUARANTEE: The bidder is required to submit a Bid Guarantee for this procurement. Any bidder failing to submit an authentic Bid Guarantee will be considered non‐responsive to the Solicitation and ineligible for award. The Bid Guarantee shall be in the amount of 20% of the bidder’s price or
$3,000,000.00, whichever is less.
DELIVERY OF BIDS:
(1) Sealed Bids: Regardless of the method of delivery (mailed or hand‐carried), bids and all other documents called out in the Solicitation shall be enclosed and sealed in an envelope that is clearly marked “Bid” and shall include the assigned Solicitation Number, and the Bid Opening Date and Time.
(2) Mailed Bids: It is the responsibility of each bidder to ensure that its Sealed Bid is received by the Chicago District’s – USACE Contracting Branch, located at 231 South LaSalle Street, Suite 1500, Chicago, IL 60604 prior to the date and time set for the opening of the bids – See Block 13A of Page 1 of the Solicitation.
(3) Hand‐carried Bids Delivered on the Day of the Bid Opening PRIOR TO NOON: For bids being hand‐carried prior to 12: NOON on the date of the bid opening, the bidder shall CONTACT Ericka D.
Hillard at 312‐846‐5378, or Mike Jones at 312‐846‐5373 to retrieve its Bid from the Lobby Area of the
USACE’s office location, which is located at 231 South LaSalle Street, Chicago, Illinois 60604
(4) Hand‐carried Bids Delivered on the Day of the Bid Opening AFTER 12:00 NOON: For bids being hand‐carried after 12:noon on the date of the bid opening, the bidder shall be prepared to check in at the Security desk (see detailed instructions provided below at Paragraph 4) and from there, sign in at Suite 1500 wherein afterwards it will be directed to the designated Bid Opening Room to furnish its sealed bid.
4. BID OPENING ROOM:
a. The designated Bid Opening Room is located on the 16th floor at 231 South LaSalle Street, Suite 1500, Chicago, Illinois 60604.
b. In order to gain access, all interested participants must check in at the Security Desk in the lobby (Clark Street entrance) with a valid photo ID. The Security desk will issue an access card for gaining access to the USACE Main Office, Suite 1500.
c. Each visitor is required to check‐in at the USACE Main Office, Suite 1500, where they will be asked to sign‐in and will then be directed to the Bid Opening Room. All individuals intending to attend the Bid Opening must allow enough time to go through security and check in at the USACE office before being escorted to the Bid opening room.
5. QUESTIONS: PLEASE NOTE: INTERESTED BIDDERS ARE HIGHLY ENCOURAGED TO SUBMIT THEIR
CONTRACTING AND TECHNICAL INQUIRIES IN WRITING ON OR ABOUT SEPTEMBER 1, 2016 to Ms. Ericka
Hillard at ericka.d.hillard@usace.army.mil. – BE SURE TO INCLUDE THE SOLICIATION NUMBER
W912P6‐16‐B‐0013 AND PROJECT TITLE ON THE SUBJECT LINE OF YOUR EMAIL.
END OF SECTION 00100
DEPARTMENT OF LABOR WAGE RATES – APPLICABLE TO THE NON MARINE
WORK TO BE PERFORMED UNDER THIS PROJECT
General Decision Number: IN160001 09/09/2016 IN1
Superseded General Decision Number: IN20150001
State: Indiana
Construction Types: Building, Heavy and Highway
Counties: La Porte, Lake, Porter and St Joseph Counties in Indiana.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories, HEAVY AND
HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 01/22/2016 2 01/29/2016 3 02/26/2016 4 03/04/2016 5 04/01/2016 6 04/08/2016 7 04/15/2016 8 04/29/2016 9 05/20/2016 10 06/10/2016 11 06/24/2016 12 07/01/2016 13 07/22/2016 14 08/19/2016 15 08/26/2016 16 09/09/2016
ASBE0017-002 06/01/2015
LAKE AND PORTER COUNTIES
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 48.45 24.35
HAZARDOUS MATERIAL HANDLER
(INCLUDES PREPARATION,
WETTING, STRIPPING REMOVAL
SCRAPPING, VACUUMING, BAGGING
AND DISPOSAL OF ALL
INSULATION MATERIALS, WHETHER
THEY CONTAIN ASBESTOS OR NOT,
FROM MECHANICAL SYSTEMS).........$ 36.34 23.15
ASBE0075-001 06/01/2016
REMAINING COUNTIES
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 31.50 20.79
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal, scrapping, vaccuming, bagging, and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 19.49 10.95
BOIL0001-005 01/01/2014
LAKE COUNTY, City of Hammond; North of 114th Street
Rates Fringes
BOILERMAKER......................$ 42.13 25.45
BOIL0374-003 01/01/2013
Rates Fringes
BOILERMAKER......................$ 33.78 25.19
BRIN0004-011 06/01/2015
MERRILLVILLE
LAKE, LAPORTE AND PORTER COUNTIES
Rates Fringes
BRICKLAYER
Bricklayer; Stone Mason;
Pointer, Cleaner, Caulker...$ 36.12 20.20 Marble Finisher; Tile Finisher....................$ 28.29 10.68 Marble Mason; Terrazzo Worker; Tile Layer..........$ 36.80 20.37 Terrazzo Finisher...........$ 29.29 10.68
BRIN0004-018 06/01/2015
SOUTH BEND: ST. JOSEPH COUNTY
Rates Fringes
BRICKLAYER
BRICKLAYER; STONE MASON;
POINTER, CAULKER, CLEANER...$ 28.15 13.21
MARBLE AND TILE FINISHER....$ 28.29 12.04
MARBLE AND TILE LAYER.......$ 29.30 14.59
TERRAZZO FINISHER...........$ 29.29 12.04
TERRAZZO WORKER.............$ 30.30 14.59
CARP0413-002 04/01/2016
St. Joseph County
Rates Fringes
CARPENTER........................$ 26.44 18.84
CARP0765-001 01/01/2016
HEAVY, HIGHWAY AND BUILDING CONSTRUCTION
LAKE, LAPORTE AND PORTER COUNTIES
Rates Fringes
CARPENTER........................$ 37.42 25.78
MILLWRIGHT.......................$ 37.52 25.96
CARP1029-001 06/01/2016
ADAMS, ALLEN, CASS, DEKALB, ELKHART, FULTON, GRANT, HOWARD,
HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, ST.
JOSEPH, STEUBEN, TIPTON, WABASH, WELLS and WHITLEY COUNTIES
MILLWRIGHT.......................$ 25.46 21.83
ELEC0153-001 06/06/2016
ST JOSEPH COUNTY
Communication Technician.........$ 25.00 14.17
ELECTRICIAN......................$ 32.75 20.87
Includes the installation, operation, inspection, modification, maintenance and repair of systems used for the transmission and reception of signals of any nature, for any purpose, including but not limited to, sound and voice transmission/transference systems, communication systems that transmit or receive information and/or control systems, television and video systems, micro-processor controlled fire alarm systems, and security systems and the performance of any task directly related to such installation or service. The scope of work shall exclude the installation of electrical power wiring and the installation of conduit raceways exceeding fifteen (15) feet in length.
ELEC0531-001 02/28/2016
LAPORTE and PORTER COUNTIES
Rates Fringes
ELECTRICIAN......................$ 39.00 24.95
ELEC0697-001 05/30/2016
LAKE COUNTY
Rates Fringes
ELECTRICIAN......................$ 40.34 28.72
* ELEC0697-004 08/29/2016
LAKE COUNTY
Rates Fringes
Telecommunication Technician.....$ 30.50 24.42
Work covers low voltage installation, maintenance and removal of telecommunication facilities (voice, sound, data and video) including, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V/SAT, bypass, CATV, WAN (WIDE AREA NETWORKS), LAN (local area networks), and ISDN (integrated system digital network).
Does not cover any work which properly comes under the work description of Inside JW (Journeyman Wireman), but shall cover the pulling of wire in raceways, but not the installation of raceways.
ELEC1393-003 12/01/2014
LAKE & PORTER COUNTIES
(Calumet Area, North of U.S. Hwy 30)
Rates Fringes
Line Construction:
EQUIPMENT OPERATOR 1:
(Diggers 5th wheel type trucks, crawler type, D-4 and smaller, bucket trucks and live boom type line trucks).....................$ 29.98 13.84
EQUIPMENT OPERATOR 3
(Backhoe over 1/2 yard bucket capacity, cranes rated at 15 ton or more capacity) 95% of J.L. Rate..$ 36.79 15.82
GROUNDMAN...................$ 17.88 10.34
GROUNDMAN-TRUCK DRIVER......$ 20.87 11.21
LINEMAN.....................$ 39.01 16.46
ELEV0002-005 01/01/2015
ELEVATOR CONSTRUCTION
LAKE AND PORTER COUNTIES
Rates Fringes
ELEVATOR MECHANIC................$ 50.80 28.39+a+b
FOOTNOTES:
a) Eight Paid Holidays: New Year's Day; Veterans Day, Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day.
b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service, and 6% of regular hourly rate for less than 5 years of service.
ELEV0044-005 01/01/2015
LAPORTE AND ST. JOSEPH COUNTIES
Rates Fringes
ELEVATOR MECHANIC................$ 44.77 28.39+a+b
a) Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.
b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years service; 6% for less than 5 years' service.
ENGI0150-001 06/01/2016
BUILDING CONSTRUCTION POWER EQUIPMENT OPERATORS:
LAKE, LAPORTE, and PORTER COUNTIES
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 40.00 31.53
GROUP 2.....................$ 39.20 31.53
GROUP 3.....................$ 34.90 31.53
GROUP 4.....................$ 32.70 31.53
GROUP 5.....................$ 27.25 31.53
POWER EQUIPMENT OPERATOR CLASSIFICATIONS:
GROUP 1: Asphalt Plant; Autograde; Batch Plant); Benoto (requires 2 engineers; Boiler & throttle valve; Boring machine (mining machine); Caisson Rigs; Central redi-mix plant; Combination Backhoe Endloader with backhoe bucket over 1/2 cu. yd. or with attachments; Combination tugger hoist & air compressor; Compressor & throttle; Concrete Breaker (truck mounted); Concrete conveyor; Concrete conveyor (truck mounted); Concrete paver over 27E cu.ft.;
Concrete paver 27E cu. ft. & under; Concrete placing boom;
Concrete pump/grout pump with boom (truck mounted);
Concrete pump with boom (truck mounted); concrete tower;
Cranes and Backhoes (All Attachments); Cranes, Hammerhead Tower; Creter Crane; Derricks (all); Derricks (traveling);
Forklift lull type; Forklift, 10 ton & over; Gradall, Hoist 1, 2, and 3 drums; Hoist (2 tugger l floor), Hydraulic Boom truck, Laser Screed, Locomotive (all), Motor patrol, Mucking Machine; Pile Driving and Skid rig, Pit machine, Prestress Machines, Pump cretes (and similar types), Rock Drill (self-propelled), Rock Drill Truck mounted; Slip form paver, Straddle buggies, Tractor with boom and side boom, Trenching Mechine; Winch Tractors, Welding machines (6-9), GROUP 2: Air Comporessor (3) (feeding a common receiver);
Asphalt Spreader; boilers; bulldozers; Combination Backhoe end loader with Backhoe bucket 1/2 cu. yd. and under or with attachments; Corboy drilling machine; Grader, Elevating; Grouting machines; Guard rail post driver;
Highlift Shovel or frontend loader; Hoist (automatic), Hoist (all elevators); Hoist (tugger and single drum); Post hole digger; rollers (all); Scoop (tractor drawn); Stone crushers; Tournapull; Winch trucks
GROUP 3: Air compressor - small 210 and under (1 to 5 not to exceed a total of 300 feet); Air compressor - large over
210; Air compressor (2) feeding a common receiver;
Combination - small equipment operator; Concrete mixer (two bag & over); Conveyor, portable; Forklift-under 10 ton;
Generator; Pumps (1 to 3 not to exceed a total of 300 feet); Pumps, well points; Steam generators; Tractors, farm & similar type; Welding machines (2 thru 5); Winches, 4 electric drillo winches
GROUP 4: Bull gang (crane erection crew); Heaters, mechanical (1 to 5); Oilers; Switchmen
GROUP 5: Fork lifts (Housing and commercial only)
ENGI0150-012 06/01/2016
BUILDING CONSTRUCTION
ST. JOSEPH COUNTY
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 28.65 25.95
GROUP 2.....................$ 27.30 25.95
GROUP 3.....................$ 26.50 25.95
GROUP 4.....................$ 25.70 25.95
GROUP 5.....................$ 23.10 25.95
POWER EQUIPMENT OPERATOR CLASSIFICATIONS:
GROUP 1: Mechanic, Asphalt Plant, Asphalt Spreader, Auto Grader; Batch Plant, Benoto (requires 2 Engineers), Boiler and Throttle Valve, Boring Machine (road), Bulldozers (with engines of 140 net horse power or more) Caisson Rigs, Central Redi-mix Plant, Concrete Conveyor Systems, Concrete Power (over 27E cu. ft.), Concrete Paver (27E cu. ft. and under), Concrete Pumps/Grout cncrete placer (Truck Mounted), Concrete Tower, Cranes and backhoes (all), Cranes, Hammerhead Tower, Creter Crane, Derricks (all), Forklift (capble of hoisting and mechanically moving forks horizontally), Grader, Elevating, Highlift Shovels or Front End Loaders (over 3 yd bucket), Hoists (2 or more drums), Locomotives (all), Laser screed, Motor Patrol, Pile Drivers and Skid Rig, Pre-Stress Machines, Pump Cretes & Similar Types, Rock Drill (Self-Propelled), Rock Drill (self propelled Truck Mounted), Scoops (tractor drawn), Slip-Form Paver, Tournapull, Tractor with Boom & Side Boom, Trenching Machine (12 or more inches in width), Combination Backhoe Front End Loader Machine with backhoe 1/2 yd bucket or attachments.
GROUP 2: Air Compressor (600 cu. ft. and over), Bob Cat (over 3/4 cu. yd.), Boilers, Broom (all powered propelled), Bull Dozers with engines of less than 140 net horsepower, combination backhoe front end loader 1/2 yf bskhhoe or under, Compressor and Throttle Valve, Concrete Breaker (truck mounted), Concrete Mixer (of moore than 21 cu. ft.
capacity), Forklift (with fixed or tilt mast), Greaser Engineer, Highlift shovel or front endloader 3 yd bucket and under, Hoists (1 drum), Hydrulic Boom Truck, Post Hole Digger (vehicle mounted), Pump Cretes (squeze crete type pumps, Gypsum, bulker , Rollers(all), Steam Generators, Stone Crushers, Stradddle Buggies, Tractors, Winch Trucks (with "a" frame.
GROUP 3: Buck Hoist, Combination (small equipment operator), .Conveyor (portable), Grouting Machine, Hoist Elevators (material and personnel), Hydraulic Power Units, Grouting and Pile Driving, Stud Welder, Trenching Machines less than 12 inches in width, Welding Machines (8 through 15).
GROUP 4: Bobcat (up to and including 3/4 cu. yd.).
Compressor (over 210 cu. ft. and less than 600 cu. ft.), Generator (over 50 kw.), Heaters, Mechanical, Hoists (all elevator, permanent installation), Hoist (automatic), Hoist (tugger single drum), Oilers, Pumps, Well Points and electric submersible, Small Rubber Tired End Loaders (1/4
cu. yd. and under), Tractors (farm type) Welding Machines (2 through 8).
GROUP 5: Bobcats and forklifts (commercial or residential).
ENGI0150-014 05/01/2016
POWER EQUIPMENT OPERATOR HEAVY/HIGHWAY
LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 40.00 30.80
GROUP 2.....................$ 39.55 30.80
GROUP 3.....................$ 39.10 30.80
GROUP 4.....................$ 37.90 30.80
GROUP 5.....................$ 36.85 30.80
POWER EQUITMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt plants (construction), Asphalt plant (permanent), Auto Patrol (Maintainer), Automatic Dry Batch Plant, Automated Concrete Placer, Automated Sub-Grader, Automated Slip Form Paver, Automated Finish Machine, Combination Backhoe Front, End Loader Machine (1/2 cu. yd.), Backhoe bucket or over or with attachments), Combination backhoe 1 cu yd, Backhoe bucket or over or with attachments, Ballast Regulator (RR), Belt Loader (stationary), Boring Machine (road), Bulldozer, Concrete Mixer(27 cu. ft. or over), Concrete Pump (truck mounted), Concrete Breaker (truck mounted and self-propelled), Core
Drilling Machine, Cranes and Backhoes (all attachments), Cranes, Hammerhead, Creter Crane, Crushers (concrete, rock, recycling, etc.), Derricks , Derricks (traveling), Dredge Operator, Formless Curb and Gutter Machine (36 inches and over), Formless Curb and Gutter Machine under 36 inches, Gradall and Machines (of a like nature), Guardrail Post Driver (truck mounted), Lead Greaser, Helicopter, Highlift Shovel (3 yd. and over), Hoist (1 drum), Hoist (2, and 3 drums), Hydraulic Power Units (grouting, piledriving and extracting) Hydro or water blaster (self-propelled), Locomotive Operators, Mechanic, Welder, Mucking Machine, Panelboard Concrete Plant (central mix type), Paver (Hetherington), Pile Driver (Skid or Crawler), Road Paving Mixer, Rock Drill Crawler or Skid Rig, Rock Drill (truck Mounted), Ross Carrier, Roto Mill Grinder (36" and over), Roto mill grinder (less than 36"), Throttle Valve and Compressor or Clever Brooks Type Combination, Throttle Valve and Fireman Combination or Horizontal or Upright Boiler, Tournapull or similar type equipment, Tractor (boom), Tractor Drawn Belt Loader with attached Pusher (requires two engineers), Trench Machine, Tug Boat Operator, Wheel Excavator, Winch Tractor with "a" frame, Scoops, Turnapull or similar types machine used in Tandem (add $1.00 to class l hourly rate for each machine attached there to).
GROUP 2: Combination Backhoe Front End Loader Machine with less than 1/2 cu. yd., Backhoe Bucket or with attachments, Bituminous Mixer, Bituminous Paver, Bridge Deck Finisher, Concrete Mixer (less than 27 cu. ft.), Compressor and throttle valve, Compressor (common receiver 3), Greaser, Highlift Shovels (under 3 cu. yds.), Jersey Spreader or Base Paver, Pavement Bump Grinder (self-propelled), Roller (Asphalt, waterbound, Macadam, Bituminous Macadam, Brick Surface, Sheepfoot Roller (self- propelled with blade), Surface Heater and Planer, Tamper (mutiple vibrating, asphalt waterbound macadam, bituminouus macadam, brick surface), Tractor (push), Tractor with scoop, Widener, Apsco or similar type.
GROUP 3: Back Filler, Bituminous Distributor, Broom and Belt Machine, Bull Float, Compressor (common receiver 2), Concrete cutter wheel type (rockwell), Concrete Finishing Machine, Concrete Spreader (power driven), Digger, Post Hole (power driven), Finishing Machine and Bull Float, Forklift, Form Grader, Form Tamper (motor driven), Hydraulic (boom truck) when used for hauling materials, Laser screed, Mutiple Tamping Machine, Paving Breaker, Roller (earth and subbase material), Roller sheepfoot (self-propelled), Sub-grader, Tamper, Mutipile Vibrating (earth and subbase material), Tractaire with Drill, Tractor (with all drawn attachements except backhoe and including Highlift, Endloader of 1 cu. yd. capacity and less.
GROUP 4: Air Compressors, Conveyor (all), Fireman on Boiler, Generator, Grout Machine, Power curing Spraying Machine
(self-propelled), Broom (self-propelled), Seaman Tiller, Skid steer loaders, Spike Machine (RR), Stripping Machine (paint, self-propelled), Throttle Valve, Welding Machine, Well Points System.
GROUP 5: Deck Hand, Hetherington Driver, Mechanical Heater (1 to 5), Outboard or Inboard Motor Boat, Oiler, Power Saw (Concrete Power Driven), Water Pump, Grasscutter.
IRON0292-001 06/01/2016
ST. JOSEPH and LAPORTE (Remainder of County) COUNTIES
Rates Fringes
IRONWORKER.......................$ 28.81 20.16
IRON0395-001 06/01/2015
LAKE, PORTER AND LAPORTE (FROM LAKE MICHIGAN ON NORTH TO 50
MILES S. OF LAKE MICHIGAN ON THE S. AND FROM IN/IL STATE LINE
ON W. TO 3 MILES E. OF IN. COUNTIES
IRONWORKER
SHEETER.....................$ 39.75 27.77
STRUCTURAL & ORNAMENTAL.....$ 39.50 27.77
LABO0041-001 06/01/2015
BUILDING CONSTRUCTION
LAKE COUNTY (Western Half)
Rates Fringes
Laborers:
CAISSON AND TUNNEL WORK
(Compressed & Free Air).....$ 37.33 18.10
GROUP 1.....................$ 35.83 18.10
GROUP 2.....................$ 36.58 18.10
GROUP 3.....................$ 36.83 18.10
LABORER CLASSIFICATIONS:
GROUP 1: Building and Construction Laborers; Scaffold Builders (other than for Mason or Plasterers); Railroad Workers, Masonry Wall Workers, (interior & exterior);
Portable Water, Pumps with discharge up to 3 indches;
Handling of Creosote Lumber or Like Treated Material (excluding railroad material); Asphalt Rakers and Lutemen;
Earth compactors; Jackmen and Sheetmen Working Ditches Deeper than Six (6) Feet in Depth; Laborers Working Ditches
Six (6) Feet in Depth or Deeper; Assembly of Unicrete Pump;
Tile Layers (sewer or field) and Sewer Pipe Layers (metallic or non-metallic); Motor Driven Wheelbarrows and Concrete Buggies; Hyster Operators; Pump Crete Assemblers;
Core Drill Operators; Cement, Lime or Silica Clay Handler (bulk or bag); Handling of Toxic Materail Damaging to Clothing; Pneumatic Spikers; Deck Engine and Winch Operators; Water main and Cable Ducking (metallic and non-metallic); Screed Man or Screw Operator on Asphalt Paver; Chain Saw and Demolition Saw Operators; Concrete Saw; Concrete Conveyor Assemblers; Applying of Curing Compound; Sinking of Wellpoints; Dewatering Header Systems
GROUP 2: Plaster Tenders, Masons Tenders; Mortar Mixers;
Welders (acetylene or electric); Cutting Torch or Burner;
Cement Nozzle Laborers; Cement Gun Operators; Scaffold Builders for Plasterers; Scaffold Builders for Masons;
Water Blast Machine Operators; Air Tool Operators and all Pneumatic Tool Operators, Air and Electric Vibrators and Chpping Hammer Operators; Asbestos Removal; Hazardous Waste Removal; All Boiler Setters Laborers, including expediters, bottom men, bell men, and Mason Tenders
GROUP 3: Dynamite Men; Drillers, Air Track or Wagon Drilling for explosives.
CAISSON AND TUNNEL WORK (Compressed & Free Air)
GROUP 1: Cage Tenders, Dump Men, Flagman, Signalman, Top Laborers, Rod Men, Concrete Repairmen, Motor Men, Muckers, Grout Machine, Track Layers, Air Hoist, Key Board, Agitator Car, Car Pushers, Concrete Laborers, Grout Laborers, Sttl Setters, Tuggers, Switchmen, Mucking Machine, Laser Beam, Liner Plate & Ring Setter, Shield Drivers, Power Knife, Burners, Pipe Jacking Machine, Skinners, Maintenance Technician, Miner, Bricklayer Tenders, Concrete Blowers, Drillers, Erectors, Form Men, Jackhammermen, Mining Machine, Dynamite Men, Drillers-air track or wagon drilling for explosives.
Premium for all employees working in compressed air shall be as follows:
0 - 15 lbs. $1.00 per hour 16 - 20 lbs. 1.50 per hour 21 - 26 lbs. 2.00 per hour 27 - 33 lbs. 3.00 per hour 34 & over 4.00 per hour
LABO0041-004 04/01/2016
LAKE COUNTY (WESTERN HALF)
LABORERS
Group 1.....................$ 30.24 13.55 Group 2.....................$ 30.54 13.55 Group 3.....................$ 31.24 13.55
LABORERS CLASSIFICATIONS (HEAVY AND HIGHWAY)
GROUP 1: Construction Laborer, Carpenter Tender, Fence Erector, Grade Checker, Guard Rail Erector, Continuous Steel Rod or Mat Installer, Wire Mesh Layer, Joint Man (Mortar, Mastic, and all other types), Lighting Installer (Permanent or Temporary), Lineman for Automatic Grade Maker on Paving Machines, Mortar Man, Multi-Plant Erector, Rip-rap Installer (all Products and Materials), Road Marking and Delineation Laborer, Setting and Placing of all Precast Concrete Products, Sing Installation including supporting structure, Spraying of all Epoxy, Curing Compound, or Like Material, Flagperson, Air Tool, Power Tool Operator, Asphalt Raker Man, Batch Truck Dumper, Bridge Hand Rail ERector, Handler (bulk or bag cement), Chain Saw Man, Concrete Puddler, Concrete Rubber, Concrete Saw Operator, Core Drill Operator, Eye Level, Hand Blade Operator Hydro Seeder Man, Motor Driven Georgia Buggy Operator, Power Driven Compactor or Taper Operator, Power Saw Operator, Pump Crete Assembly Man, Sreed Man or Screw Man on Asphalt Paver, Regar Installer, Sandblaster Man, Sealer Applicator for Asphalt (toxic), Setting and Placing pre-stressed on Pre-cast Concrete Structural Members, Side Rail Setters (for Sidewalk, Side Ditches, Radii, and Pavement), Spreader Box Tender (manua or power driven), Straw Blower Man, Subsureface Drain and Culvert Pipe Layer, Concrete Conveyor, Horizonal Boring and Jackman and Sheetman, Pipe Greade Man, Winch and Windless Operator Conduit Installer, Sod Layer
GROUP 2: Cutting Torch Burner, Laser Beam Aligner, Manhole Erector, Sewer Pipe Layer, Water Line Installer, Temporary or Permanent Welders (electric or Oxy Acetylene)
GROUP 3: Air Track and Wagon Drillman, Dynamite and Powder Man, Concrete Barrier Rail Form Setter, Concrete Saw Joint Control Cutting
LABO0081-001 04/01/2016
HEAVY and HIGHWAY CONSTRUCTION:
LAKE (Eastern Half), LA PORTE, and PORTER COUNTIES
Rates Fringes
Laborers:
GROUP 1.....................$ 30.24 13.80
GROUP 2.....................$ 30.54 13.80
GROUP 3.....................$ 31.24 13.80
LABORERS CLASSIFICATIONS (HEAVY AND HIGHWAY)
GROUP 1: Construction Laborer; Carpenter Tender; Fence Erector; Grade Checker; Guard Rail Erector; Continuous Steel Rod or Mat Installer; Wire Mesh Layer; Joint Man (Mortar, Mastic, and all other types); Lighting Installer (Permanent or Temporary); Lineman for Automatic Grade Maker on Paving Machines; Mortar Man; Multi-Plant Erector;
Rip-rap Installer (all Products and Materials); Road Marking and Delineation Laborer; Setting and Placeing of all Precast Concrete Products; Sing Installation including Supporting Structure; Spraying of all Epoxy, Curing Compound, or Like Material; Flagperson; Air Tool, Power Tool Operator; Asphalt Raker Man; Batch Truck Dumper;
Bridge Hand Rail Erector; Handler (bulk or bag cement);
Chain Saw Man; Concrete Puddler; Concrete Rubber; Concrete Saw Operator; Core Drill Operator, Eye Level; Hand Blade Operator Hydro Seeder Man; Motor Driven Georgia Buggy Operator; Power Driven Compactor or Tamper Operator; Power Saw Operator; Pump Crete Assembly Man; Screed Man or Screw Man on Asphalt Paver; Rebar Installer; Sandblaster Man;
Sealer Applicator for Asphalt (toxic); Setting and Placeing Prestressed on Precast Concrete Structural Members; Side Rail Setters (for Sidewalk, Side Ditches, Radii, and Pavement); Spreader Box Tender (manual or power driven);
Straw Blower Man; Subsurface Drain and Culvert Pipe Layer;
Concrete Conveyor; Horizonial Boring and Jackman and Sheetman; Pipe Grade Man; Winch and Windlass Operator Conduit Installer, Sod Layer.
GROUP 2: Cutting Torch Burner: Laser Beam Aligner; Manhole Erector; Sewer Pipe Layer; Water Line Installer, Temporary or Permanent; Welders (electric or Oxy-Acetylene).
GROUP 3: Air Track and Wagon Drillman; Dynamite and Powder Man; Concrete Barrier Rail Form Setter; General Laborer;
concrete saw, joint control cutting
LABO0081-004 06/01/2015
LAKE (Eastern Half), LA PORTE, and PORTER COUNTIES
Rates Fringes
Laborers
GROUP 1.....................$ 35.83 18.10
GROUP 2.....................$ 36.58 18.10
GROUP 3.....................$ 36.83 18.10
LABORER CLASSIFICATIONS (Building Construction)
GROUP 1: Building and Construction Laborers; Scaffold Builders (other than for Mason or Plasterers); Mechanic Tenders; Rodmen and Chainmen, Railroad Workers, Masonry
Wall Workers, (interior & exterior); Roofer Tenders, Cement Finisher Tenders, Carpenter Tenders, Portable Water, Pumps with discharge up to 3 inches; Waterproofing; Hauling of Creosote Lumber or Lutemen; Asphalt Rakers; Kettlem, Earth Compactors; Jackman and Sheetmen in Ditches more than 6 ft.
deep; Laborers in ditches 6' deep or deeper; Assembly of Uncrete Pump; Tile Layers (sewer or field); Sewer Pipe Layers; Motor driven Wheelbarrows and Concrete Buggies;
Hyster Operator; Pump Crete Assemblers; Core Drill Operator; Cement, Line or Silica Clay Handers; Handling of Toxic Materials damaging to clothing; Pneumatic Spikers;
Deck Engine and Winch Operator; Water Main and Cable Ducking; Screed Man or Screw Operator on Asphalt Paver;
Chain Saw and Demolition Saw Operator; Concrete Conveyor Assembler
GROUP 2: Plaster Tenders, Masons Tenders; Mortar Mixers;
Welders (acetylene or electric); Cutting Torch or Burner;
Cement Nozzle; Cement Gun; Scaffold Builders when working for Plasterers, and Mason; Water Blast Machine Operator;
Air Tool Operators and all Pheumatic Tool Operators; Air and Electric Vibrators and Chipping Hammer Operators;
Asbestos Removal; Hazardous Waste Removal
GROUP 3: Dynamite Men; Drillers, Air Track or Wagon Drilling for explosives; Laborer Specialist
LABO0645-001 06/01/2016
BUILDING CONSTRUCTION
ST JOSEPH COUNTY
Rates Fringes
Laborers:
GROUP 1.....................$ 21.08 13.80
GROUP 2.....................$ 21.58 13.80
GROUP 3.....................$ 22.08 13.80
BUILDING CONSTRUCTION
GROUP 1: Building and Construction Laborers; Scaffold Builders (other than for Plasterers); Mechanic Tenders;
Window Washers and cleaners; Waterboys and Toolhousemen;
Roofers Tenders; Railroad Workers; Masonry Wall Washers (interior and exterior); Cement Finisher Tenders; Carpenter Tenders; All Portable Water pumps with discharge up to (3) inches; Plaster Tenders; Mason Tenders; Flag & Signal Person.
GROUP 2: Waterproofing; Handling of Creosot Lumber or like treated material (excluding railroad material); Asphalt Rakers and Lutemen; Kettlemen; Air Tool Operators and all Pneumatic Tool Operators; Air and Electric Vibrators and
Chipping Hammer Operators; Earth Compactors Jackmen and Sheetmen working Ditches deeper than (6) ft.in depth;
Laborers working in ditches (6) ft.in depth or deeper;
Assembly of Unicrete Pump; Tile Layers (sewer or field) and Sewer Pipe Layer (metallic or non-metallic); Motor driven Wheelbarrows and Concrete Buggies; Hyster Operators; Pump Crete Assemblers; Core Drill Operators; Cement, Lime or Silica Clay Handlers (bulk or bag); Handling of Toxic Materials damaging to clothing; Pneumatic Spikers; Deck Engine and Winch Operators; Water Main and Cable Ducking (metallic and non-metallic); Screed Man or Screw Operator on Asphalt Paver; Chain and Demolition Saw Operators;
Concrete Conveyor Assemblers.
GROUP 3: Water Blast Machine Operator; Mortar Mixers; Welders (Acetylene or electric); Cutting Torch or Burner; Cement Nozzle. Laborers; Cement Gun Operator; Scaffold Builders when Working for Plasterers. Dynamite Men; Drillers - Air Track or Wagon Drilling for explosives Hazardous and Toxic material handler, asbestos removal or handler.
LABO0645-002 04/01/2015
(UTILITY CONSTRUCTION)
ST JOSEPH COUNTY
Rates Fringes
Laborers:
GROUP 1.....................$ 22.82 13.30
GROUP 2.....................$ 23.12 13.30
GROUP 3.....................$ 23.82 13.30
LABORER CLASSIFICATIONS (UTILITY CONSTRUCTION)
GROUP 1: Construction laborer; Fence erector; Flagger; Grade checker; Guard rail erector; Wire mesh layer; Joint man (mortar, mastic and all other types); Lighting installer (permanent or temporary); Lineman for automatic grade maker on paving machines; Mortar man; Multi-plateerector; Rip-rap installer (all products and materials); Road markin and delineation laborer; Setting and placing of all precast concrete products; Sign installation including supporting structure; Spraying of all epoxy, curing compound, or like material; sod layer; Air tool, power tool, and power equipment operator; Asphalt lute man; Asphalt raker man;
Batch truck dumper; Bridge handrail erector; Handler (bulk or bag cement); Chain saw man; concrete puddler; concrete rubber; Concrete saw operator; Core drill operator, eye level; Hand blade operator; Hydro seeder man; Motor-driven Georgia buggy operator; Power-driven cmpactor or tamper operator; Power saw operator; Pumpcrete assembly man;
Screed man or screw man or asphalt paver; Rebar installer;
Sandblaster man; Sealer applicator for asphalt (toxic);
Setting and placing prestressed or precast concrete structural members; Side rail setter (for sidewalks, side ditches, radii, and pavements); Spreader box tender (manual or power-driven); Straw blower man; Subsurface drain and culvert pipe layer; Concrete conveyor assembly man;
Horizontal boring and jacking man; Jackman and sheetman;
Pipe grade man; winch and windlass operator.
GROUP 2: Cutting torch burner; Laser beam aligner; Manhole erector; Sewer pipe layer; Water line…