THIS FILE CONTAINS THE ABSTRACT OF BIDS FOR THE SUBJECT PROJECT.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF BIDS

SOLICITATION NO. (IFB) W912P6-16-B-0008

PROJECT TITLE: ELKHART AVE SECTION 219

FORCE MAIN REPLACEMENT, LAKE STATION

INDIANA

BID OPENING DATE & TIME: SEPTEMBER 13, 2016

AT 2PM CDT

BIDDER #1:

ATLAS

EXCAVATING,

INC

BIDDER #2: D.W.

MERTZKE

EXCAVATING &

TRUCKING

BIDDER #3:

FOUNDATION

MECHANICS

LLC

BIDDER #4:

DSI

ASSOCIATES

INC

BIDDER #5:

ECO-IES JV

AMENDMENTS: 4 ISSUED 4740 SWISHER ROAD 7401 BUNKUM ROAD 2860 S. RIVER ROAD, STE 100 7420 COUNTY LINE ROAD 3011 W. GRAND BLVD, STE 420 WEST LAFAYETTE, IN 47906 EAST ST LOUIS, IL 62294 DES PLAINES, IL 60018 BURR RIDGE, IL 60527 DETROIT, MICHIGAN 48202-3011

ITEM DESCRIPTION Quantity U/M Unit Price Amount (ELIGIBLE WOSB) (ELIGIBLE WOSB) (ELIGIBLE WOSB) (ELIGIBLE WOSB) (ELIGIBLE JV WOSB)

00 01 MOBILIZATION 1 JOB $48,800.00 48,800.00$ $900,000.00 $900,000.00 $145,000.00 $145,000.00 $142,000.00 $142,000.00 $114,484.86 $114,484.86 $45,000.00 $45,000.00 00 02 DEMOBILIZATION 1 JOB $20,200.00 20,200.00$ $30,000.00 $30,000.00 $35,000.00 $35,000.00 $45,000.00 $45,000.00 $45,127.54 $45,127.54 $30,000.00 $30,000.00 00 03 TEMPORARY FORCE MAIN INSTALLATION 1 JOB $116,600.00 116,600.00$ $310,000.00 $310,000.00 $155,000.00 $155,000.00 $325,000.00 $325,000.00 $167,119.09 $167,119.09 $270,000.00 $270,000.00 00 04 EXISTING FORCE MAIN ABANDONMENT 1 JOB $28,800.00 28,800.00$ $85,000.00 $85,000.00 $33,000.00 $33,000.00 $50,000.00 $50,000.00 $40,417.54 $40,417.54 $10,000.00 $10,000.00 00 05 STRUCTURE 1 w/ 12" TAP & BYPASS 1 JOB $30,375.00 30,375.00$ $75,000.00 $75,000.00 $77,000.00 $77,000.00 $100,000.00 $100,000.00 $88,740.32 $88,740.32 $55,000.00 $55,000.00 00 06 STRUCTURE 2 w/ 10" TAP & BYPASS 1 JOB $30,375.00 30,375.00$ $70,000.00 $70,000.00 $76,000.00 $76,000.00 $100,000.00 $100,000.00 $87,637.82 $87,637.82 $52,500.00 $52,500.00 00 07 10-INCH CHECK VALVE IN VAULT 1 JOB $12,500.00 12,500.00$ $18,250.00 $18,250.00 $22,000.00 $22,000.00 $50,044.00 $50,044.00 $39,734.34 $39,734.34 $12,000.00 $12,000.00 00 08 12-INCH CHECK VALVE IN VAULT 1 JOB $15,000.00 15,000.00$ $20,000.00 $20,000.00 $25,000.00 $25,000.00 $50,044.00 $50,044.00 $42,490.59 $42,490.59 $14,500.00 $14,500.00 00 09 SITE RESTORATION 1 JOB $44,800.00 44,800.00$ $65,000.00 $65,000.00 $52,000.00 $52,000.00 $100,000.00 $100,000.00 $74,965.66 $74,965.66 $30,000.00 $30,000.00

00 10 10" Forcemain 71 LF $226.00 16,046.00$ $425.00 $30,175.00 $232.00 $16,472.00 $275.00 $19,525.00 $484.03 $34,366.31 $385.00 $27,335.00

00 11 12" Forcemain 67 LF $245.00 16,415.00$ $450.00 $30,150.00 $275.00 $18,425.00 $300.00 $20,100.00 $552.41 $37,011.55 $450.00 $30,150.00

00 12 A A 18" FORCEMAIN (CONSTRUCTION METHOD A) 2,485 LF $300.00 745,500.00$ $490.00 $1,217,650.00 $240.00 $596,400.00 $325.00 $807,625.00 $243.74 $605,686.73 $266.00 $661,010.00

00 12 A B 18" FORCEMAIN W/ GRTANULAR BACKFILL 175 LF $319.00 55,825.00$ $500.00 $87,500.00 $245.00 $42,875.00 $350.00 $61,250.00 $336.60 $58,904.15 $325.00 $56,875.00

00 13 24" FORCEMAIN (CONSTRUCTION METHOD B) 2,660 LF -$ $0.00 $0.00 $0.00 $0.00 $0.00 00 14 PLUG VALVE, 10 IN. W/ 5' DIA BOX 1 EA $2,660.00 2,660.00$ $15,000.00 $15,000.00 $10,000.00 $10,000.00 $25,000.00 $25,000.00 $14,015.44 $14,015.44 $4,000.00 $4,000.00 00 15 PLUG VLAVE, 12 IN. 1 EA $15,500.00 15,500.00$ $12,500.00 $12,500.00 $12,000.00 $12,000.00 $25,000.00 $25,000.00 $15,117.94 $15,117.94 $5,000.00 $5,000.00 00 16 PERFORMANCE & PAYMENT BONDS 1 LOT $15,400.00 15,400.00$ $75,000.00 $75,000.00 $21,000.00 $21,000.00 $35,000.00 $35,000.00 $37,472.42 $37,472.42 $16,500.00 $16,500.00

TOTAL AMOUNT FOR BASE BIDS 1,214,796.00$ $3,041,225.00 $1,337,172.00 $1,955,588.00 $1,503,292.30 $1,319,870.00

OPTIONS

00 17 A A AIR RELEASE VALVE & VAULT 1 EA $12,000.00 11,400.00$ $26,000.00 $26,000.00 $12,000.00 $12,000.00 $10,000.00 $10,000.00 $11,374.66 $11,374.66 $8,000.00 $8,000.00 00 17 A B 18-INCH BYPASS VALVE STATION 3 EA $28,100.00 79,500.00$ $22,000.00 $66,000.00 $105,000.00 $315,000.00 $100,000.00 $300,000.00 $100,477.13 $301,431.39 $85,000.00 $255,000.00 00 17 A C STRUCTURE REMOVAL, SOUTH END 1 JOB $36,200.00 34,200.00$ $7,000.00 $7,000.00 $18,000.00 $18,000.00 $15,000.00 $15,000.00 $19,112.68 $19,112.68 $14,500.00 $14,500.00 00 17 A D REMOVAL OF ABANDONED FORCE MAIN 1 JOB $63,500.00 60,000.00$ $88,000.00 $88,000.00 $40,000.00 $40,000.00 $82,800.00 $82,800.00 $42,706.18 $42,706.18 $39,000.00 $39,000.00 00 17 A E PERFORMANCE & PAYMENT BONDS 1 JOB $5,400.00 5,100.00$ $5,000.00 $5,000.00 $6,000.00 $6,000.00 $8,000.00 $8,000.00 $9,576.96 $9,576.96 $3,100.00 $3,100.00

TOTAL AMOUNT FOR OPTION ITEMS 190,200.00$ $192,000.00 $391,000.00 $415,800.00 $384,201.87 $319,600.00

OVERALL TOTAL AMOUNT 1,404,996.00$ 3,233,225.00$ 1,728,172.00$ 2,371,388.00$ 1,887,494.17$ 1,639,470.00$

CERTIFICATION:

I CERTIFY that all the bids recorded on this abstract were received, opened and read in response to above named IFB

NAME AND TITLE OF CERTIFYING OFFICER

REGINA G. BLAIR,

DISTRICT CHIEF OF CONTRACTING, CHICAGO DISTRICT

Bid Schedule

2016-09-13T22:44:58-0500
BLAIR.REGINA.GAIL.1120858889