CUP McCook Reservoir - 5235.PO Patrick Engineering
00 31 32 Appendix B
COE/GRNDWTR/IL
Golder Associates
73STR. TARP TUNNEL RELOCATION
De Leuw, Cather & Company
McCook Haul Tunnels
URS (2000)
McCook Reservoir Main Tunnel
AECOM
BOX OR
SAMPLE
NO.
Spoon 1 13, 8, 6 N = 14
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
Asphalt Used auger to advance through asphalt and gravel base
Spoon 8 N = 50/6" No Recovery. Switch to rock bit at 17.5' and advance to 20'.
~1/4" sand and bone shells
Qp = 2.0 tsf
Spoon 7 2, 2, 2 N = 4 Qp = 0.25 tsf
Spoon 6 8, 8, 7 N = 15 Qp = 3.5 tsf
Spoon 5 3, 3, 5, 7 N = 8 Qp = 1.5 tsf
Spoon 4 4, 4, 5 N = 9 Qp = 2.75 tsf
Spoon 3 5, 7, 8, 7 N = 15 Qp > 4.5 tsf
Spoon 2 6, 6, 10 N = 16 Qp = 2.75 tsf
Qp > 4.5 tsf
+2.0
17.5 17.8
15.0 16.5
12.5 14.0
10.0 12.0
7.5 9.5
5.0 7.0
2.5 4.0
1.0 2.5
Coarse sand and fine to coarse gravel (dolomite chips), trace clay - gray - very dense to extremely dense - wet (GP)
Silty clay, some fine to medium sand, trace shells - gray - soft (CL)
Silty clay, some fine to coarse sand -brown/gray, mottled - very stiff (CL)
Silty clay, with organics - black - soft (CL-PT)
Silty clay, little fine to coarse sand, trace fine gravel - gray and brown - stiff to very stiff (CL)
FILL: Silty clay, some fine to coarse sand, trace fine gravel - gray with brown mottling -very stiff to hard (CL)
Crushed limestone base course
+4.8
+5.5
+6.0
+11.5
+20.0
+20.6
6. DIRECTION OF HOLE
5. NAME OF DRILLER
3. DRILLING AGENCY
17DRILLING LOG SHEETS
4. HOLE NO. (As shown on drawing title and file number) LB-121-08
OF
12. MANUFACTURER'S DESIGNATION OF DRILL
--- 11/18/2008
Chicago District
Hole No. LB-121-08
STARTED
LEGEND
ENG FORM
MAR 71 1836 PREVIOUS EDITIONS ARE OBSOLETE. LB-121-08McCook Reservoir Main Tunnel
HOLE NO.PROJECT
DEG. FROM VERT.
DISTURBED
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
Chicago IL N 1,864,689.6 E 1,122,363.7
19. SIGNATURE OF INSPECTOR
COMPLETED
Mark Baker
10. SIZE AND TYPE OF BIT
INSTALLATION
16. DATE HOLE
Great Lakes and Ohio River Div.
DIVISION
14. TOTAL NUMBER CORE BOXES
e
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)ELEVATION DEPTH a
SHEET
cb gd
PA / 2 7/8" RB
f
18. TOTAL CORE RECOVERY FOR BORING
11/26/2008
McCook Reservoir Main Tunnel
0.0
INCLINED
2. LOCATION (Coordinates or Station)
15. ELEVATION GROUND WATER
VERTICAL
13. TOTAL NO. OF
OVERBURDEN SAMPLES
TAKEN
UNDISTURBEDSubsurface Exploration, Inc.
+21.0
Chicago City Datum (vertical) NAD 83 (horizontal)
1. PROJECT
17. ELEVATION TOP OF HOLE
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
35.0 350.2 385.2
B-61
-21.0
-14.0
-11.0
-9.0
-3.5
Spoon 13 37, 70 N = 70+ Water in gravel thinned out drilling mud considerably.
Spoon 11 40, 47, 51 N = 98
Silt - gray - extremely dense to very dense -wet (ML)
Spoon 9 N = 70/3" Difficult drilling in occasional layer of gravel/cobbles.
30.0 31.0
27.5 29.0
25.0 26.5
22.5 23.0
20.0 20.3
RUN 1
BOX 1
35.0 44.5 high angle fracture
Dolomite (Racine Formation)
Moderately hard to hard, slightly weathered, fine-grained, light gray to gray, Dolomite;
occasional blue mottling, vuggy/porous, scattered styolites, clay partings and chert nodules.
Sandy clay and thinly bedded dolomite chips -gray - wet (SC)
Sandy gravel, little clay - very dense - wet
(GP)
32.5 34.0
34.0 70.0
Spoon 12 30, 30, 47 N = 77
PROJECT
21.0
ELEVATION TOP OF HOLEDRILLING LOG (Cont Sheet)
Chicago District
Gravel with abundant water: thinned out drilling mud considerably.
Hole No. LB-121-08
SHEETS17
Spoon 10 N = 100/6" Difficult drilling in occasional layer of gravel/cobbles.
INSTALLATION
44ENG FORM
JUN 67 1836-A LB-121-08McCook Reservoir Main Tunnel
HOLE NO.
OF
SHEET
McCook Reservoir Main Tunnel
PROJECT
BOX OR
SAMPLE
NO.
LEGEND
RQD=92%
RQD = 8.73/9.5 = 92%
Casing deflected around hard zone at approximately 17' deep. Corebarrel became stuck during extraction. A new hole was drilled 5' away from original boring due to casing deflection. Offset hole was blind drilled to bedrock, casing was set and coring began at 35 ft. Large boulders encountered from 20.5'-22.5' and 25'-26.25'.
Drilling rate: 1.75 min/ft
Run rock bit from 34'-36', or 2' into rock;
set casing for coring.
Spoon 14 27, 32, 41 N = 73 ed gb
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant) c fa
DEPTHELEVATION CLASSIFICATION OF MATERIALS
(Description)
% CORE
RECOV-
ERY
RQD = 9.6/10.1 = 95%
-26.5
-30.0
-32.5
-35.0
-38.0
-43.0
-45.0
-47.0 bedding plane fracture
RQD = 10.4/10.4 = 97%
Drilling rate: 1.75 min/ft Water loss at 50' while drilling bedding plane fracture high angle fracture high angle fracture high angle fractures open styolite joints open styolite joints open styolite joints
RQD = 0.9/1.5 =60%
Dolomite pieces with some gravel plugged core barrel.
RUN 2
BOX 1
44.5 46.0
RUN 3
BOX 1
BOX 2
46.0 56.4
RUN 4
BOX 2
BOX 3
56.4 66.5
RUN 5
BOX 3
66.5 76.5
RQD = 9.7/10 = 97%
21.0
ELEVATION TOP OF HOLE
McCook Reservoir Main Tunnel
SHEET
Chicago District
INSTALLATION 3PROJECT
SHEETS
DRILLING LOG (Cont Sheet)
PROJECTENG FORM
JUN 67 1836-A LB-121-08
Hole No. LB-121-08
HOLE NO.
OF
McCook Reservoir Main Tunnel
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant) fa
DEPTHELEVATION CLASSIFICATION OF MATERIALS
(Description)
% CORE
RECOV-
ERY
e
BOX OR
SAMPLE
NO.
RQD=95%
RQD=97%
RQD=60%
LEGEND
b gdc
DEPTH
g
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
LEGEND
% CORE
RECOV-
ERY
RQD=92%
ELEVATION
RQD=97%
a fc e joint partially filled with chalk
CLASSIFICATION OF MATERIALS
(Description)
RUN 6
BOX 3
BOX 4
76.5 86.8
RUN 7
BOX 4
BOX 5
86.8 97.2
-58.0 d
RQD = 9.5/10.3 = 92%
Drilling rate: 1 ft/min
RQD = 10.2/10.2 = 100%
PROJECT
b
McCook Reservoir Main Tunnel
SHEET
OF
HOLE NO.
McCook Reservoir Main Tunnel LB-121-081836-AJUN 67
ENG FORM
PROJECT
Hole No. LB-121-08
SHEETS
4INSTALLATION
Chicago District
DRILLING LOG (Cont Sheet) ELEVATION TOP OF HOLE 21.0
LEGEND
-90.0
-93.0
-95.0
-88.0
-86.0
RQD = 8.5/10 = 85%
RQD = 8.1/10.2 = 79%
RQD=100%
RQD=85%
RQD=79%
chert content increases
BOX OR
SAMPLE
NO.
100 RUN 8
BOX 5
97.2
107.2 fractures fracture at chert fracture at chert fracture at chert fracture at chert fracture at chert
-89.0
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
RUN 9
BOX 5
BOX 6
107.2 117.4
DRILLING LOG (Cont Sheet) ELEVATION TOP OF HOLE
21.0 Hole No. LB-121-08
McCook Reservoir Main Tunnel
SHEET
% CORE
RECOV-
ERY
116 PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-121-081836-AJUN 67
ENG FORM
OF
CLASSIFICATION OF MATERIALS
(Description)ELEVATION DEPTH a fc eb gd
SHEETSChicago District
INSTALLATION 5PROJECT
NO.
e
RQD = 7.1/8.3 = 85%
RQD=95%
RQD=59%
RQD=85%
RQD = 9.3/9.8 = 95%
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)ELEVATION DEPTH a f
Dolomite (Sugar Run Formation)
Hard, fresh, fine-grained, thickly-bedded, light gray Dolomite; styolites, clay partings few vugs, little chert, less fracturing relative to overlying formation.
RUN 10
BOX 7
117.4 127.2
RUN 11
BOX 7
127.2 129.4
RUN 12
BOX 7
BOX 8
129.4 137.7
RUN 13
BOX 8
137.7 147.7
RQD = 1.3/2.2 = 59%
-100.8 c
Hole No. LB-121-08
McCook Reservoir Main Tunnel
SHEET
OF
21.0
ELEVATION TOP OF HOLE
PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-121-081836-AJUN 67
ENG FORM
b gd
17 SHEETS
PROJECT 6INSTALLATION
Chicago District
DRILLING LOG (Cont Sheet)
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
LEGEND
% CORE
RECOV-
ERY
RQD=98%
ELEVATION
RQD = 9.8/10 = 98%
a fc e
Dolomite (Joliet-Romeo Formation)
Medium hard, fresh, fine-grained, thickly bedded, gray to dark gray Dolomite; vuggy, occasional styolites and chert darker color, more vugs relative to overlying formation b
CLASSIFICATION OF MATERIALS
(Description)
-143.0
RUN 14
BOX 9
147.7 158.0
RUN 15
BOX 10
158.0 168.0
RQD=98%
-120.0 g
RQD = 10.1/10.3 = 98%
PROJECT
Hole No. LB-121-08
SHEET
OF
d
HOLE NO.
McCook Reservoir Main Tunnel LB-121-081836-AJUN 67
ENG FORM
PROJECT
17McCook Reservoir Main Tunnel SHEETS
7INSTALLATION
Chicago District
DRILLING LOG (Cont Sheet) ELEVATION TOP OF HOLE 21.0
RQD = 10.4/10.4 = 100%
-163.0
ELEVATION
RQD = 9.8/10.2 = 96%
White discharge water
-150.4
RQD=96%
RQD=100%
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
Dolomite (Joliet - Markgraf Formation)
Medium hard to hard, fine-grained, dense, light-gray to gray DOLOMITE; occasional vugs and styolites lighter color and little structure relative to overlying formation
% CORE
RECOV-
ERY
RUN 17
BOX 11
BOX 12
178.2 188.6 vertical fracture with pyrite fracture filled with white clay/chalk (+/- 0.4ft thick) wispy bedding
Dolomite (Joliet - Brandon Bridge Formation)
Hard, fresh, fine-grained, dense, gray to dark gray Dolomite; argillaceous, clay partings, occasional vugs thinly bedded and colorful with dark-light bands relative to overlying formation bedding plane fracture
-161.5
RUN 16
BOX 10
BOX 11
168.0 178.2
-159.0
-144.0
CLASSIFICATION OF MATERIALS
(Description)DEPTH
21.0
LEGEND
Hole No. LB-121-08
McCook Reservoir Main Tunnel
SHEET
DRILLING LOG (Cont Sheet) ELEVATION TOP OF HOLE
188 PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-121-081836-AJUN 67
ENG FORM
OF
a fc eb gd
17 SHEETS
PROJECT 8INSTALLATION
Chicago District
NO.
RQD = 10/10 = 100%
RQD = 9.5/10 = 95%
RQD = 7.3/7.6 = 96%
RQD=100%
RQD=95%
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)ELEVATION DEPTH a large cavity filled with chert c clay-filled joint
RUN 18
BOX 12
188.6 198.6
RUN 19
BOX 12
BOX 13
198.6 208.6
RUN 20
BOX 13
208.6 216.2 e
-188.0
-189.0 f
Hole No. LB-121-08
McCook Reservoir Main Tunnel
SHEET
OF
21.0
PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-121-081836-AJUN 67
ENG FORM
b gd
ELEVATION TOP OF HOLE
SHEETS
PROJECT 9INSTALLATION
Chicago District
RQD=97%
-192.0
-192.5
-194.0
-201.0
-203.0
-204.0
-213.0
-214.0 clay-filled joint
RQD = 9.7/10 = 97%
RQD=99%
Dolomite (Kankakee - Plaines Formation)
Hard, fresh, fine-grained, light gray Dolomite, vuggy
Dolomite (Kankakee - Troutman Formation)
Hard, fresh, fine-grained light gray Dolomite thinly bedded, less vugs, lighter color and more chert relative to overlying formation clay-filled joint clay-filled joint large cavity partially filled with chert cavity/joint filled with white clay and possibly broken rock joint filled with clay
RQD=96%
RUN 21
BOX 14
216.2 226.3
RUN 22
BOX 15
226.3 236.3
21.0
JUN 67
RQD = 10/10.1 = 99%
Chicago District
1836-A LB-121-08
DRILLING LOG (Cont Sheet)
McCook Reservoir Main Tunnel
PROJECT HOLE NO.ENG FORM
Hole No. LB-121-08
McCook Reservoir Main Tunnel
SHEET
OF
ELEVATION TOP OF HOLE
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
LEGEND
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)ELEVATION DEPTH a fc
PROJECT
b gd
17 SHEETS
INSTALLATION
e
CLASSIFICATION OF MATERIALS
(Description)
RQD=90%
RQD=97%
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
% CORE
RECOV-
ERY
RQD = 9.2/10.2 = 90%
ELEVATION DEPTH
a fc e
Dolomite (Kankakee - Offerman Formation)
Hard, fresh to slightly weathered, light gray Dolomite; vuggy, chert nodules, fossils more chert zones, vugs and cavities relative to overlying formation
LEGEND
-227.5
RUN 23
BOX 15
BOX 16
236.3 246.5
RUN 24
BOX 16
BOX 17
246.5 256.7
RUN 25
BOX 17
256.7 267.0
RQD = 10/10.3 = 97%
RQD = 9.9/10.2 = 97%
b
Hole No. LB-121-08
McCook Reservoir Main Tunnel
SHEET
OF
21.0
PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-121-081836-AJUN 67
ENG FORM
SHEETS
gd
PROJECT 11INSTALLATION
Chicago District
DRILLING LOG (Cont Sheet) ELEVATION TOP OF HOLE
-241.2
-243.4
-244.2
-253.5
-262.0
BOX OR
SAMPLE
NO.
100 RQD = 10/10.1 = 99%
RQD = 9.6/10.2 = 94%
RQD=97%
RQD=99%
larger joints and cavities
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant) larger joints and cavities larger joints and cavities larger joints and cavities possibly encounter Kankakee Drummond formation at about 272' (more chert, thicker chert bands)
Chert band (+/- 0.5 ft thick) becomes more finely laminated, darker, with less chert broken rock, bedding plae fractures, and more weathering between about 282 feet and geologic contact
Dolomite (Elwood Formation)
Fine-grained, gray to brownish gray Dolomite;
fossils, occasional chert nodules
-239.7
RUN 26
BOX 17
BOX 18
267.0 277.1
RUN 27
BOX 18
BOX 19
277.1 287.3
RQD=94%
DRILLING LOG (Cont Sheet) ELEVATION TOP OF HOLE
21.0 Hole No. LB-121-08
McCook Reservoir Main Tunnel
SHEET
LEGEND
OF
284 PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-121-081836-AJUN 67
ENG FORM
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)ELEVATION DEPTH a fc eb gd
SHEETSChicago District
INSTALLATION
12PROJECT
a more weathered, less chert, thin laminations, dark-light banding relative to overlying formation
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
LEGEND
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)DEPTH fc eb g
ELEVATION
becomes harder, less weathered, more competent
RUN 28
BOX 19
287.3 297.5
RUN 29
BOX 20
297.5 307.8
100 RQD = 9.7/10.2 = 95%
RQD = 10.2/10.3 = 99%
RQD=95%
RQD=99%
PROJECT
McCook Reservoir Main Tunnel
SHEET
OF
d
HOLE NO.
McCook Reservoir Main Tunnel LB-121-081836-AJUN 67
ENG FORM
INSTALLATION
17 SHEETS
Hole No. LB-121-08
Chicago District
DRILLING LOG (Cont Sheet) ELEVATION TOP OF HOLE 21.0
PROJECT
RQD=100%
LB-121-081836-AJUN 67
ENG FORM HOLE NO.PROJECT
RQD = 10.3/10.3 = 100%
RQD = 10.3/10.3 = 100%
possibly encountered the Wilhlemi formation as indicated by wider dark-light bands
-299.2
McCook Reservoir Main Tunnel dark bands get broader with fewer vugs
RUN 30
BOX 20
BOX 21
307.8 318.1
RUN 31
BOX 21
318.1 328.4
RUN 32
BOX 22
328.4 337.6
McCook Reservoir Main Tunnel
RQD=100%
SHEET
OF
Chicago District
RQD = 9.2/9.2 = 100%
17 SHEETS
PROJECT INSTALLATION
DRILLING LOG (Cont Sheet) ELEVATION TOP OF HOLE 21.0 a
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
LEGEND
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)ELEVATION DEPTH
Hole No. LB-121-08 fc eb gd fc eb g
ELEVATION
-322.2
-325.0 rip-up clasts d
Dolomite (Brainard Formation)
BEGIN ORDOVICIAN SYSTEM
Moderately hard, fresh, greenish gray Dolomitic mudstone; laminated greater disturbed/chaotic bedding, more rip-up clasts and fossils than overlying formation fossils rip up clasts
RUN 33
BOX 22
337.6 347.9
RUN 34
BOX 23
347.9 357.7 a
DEPTH
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
LEGEND
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)
Hole No. LB-121-08
McCook Reservoir Main Tunnel
SHEET
OF
21.0
PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-121-081836-AJUN 67
ENG FORM
SHEETS
RQD = 9.8/9.8 = 100%
RQD=100%
RQD=99%
RQD=100%
RQD = 10.2/10.3 = 99%
PROJECT 15INSTALLATION
Chicago District
RQD = 10/10.1 = 99%
RQD = 10.1/10.1 = 100%
RQD=99%
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
LEGEND
% CORE
RECOV-
ERY
rip up clasts
ELEVATION
RQD = 7.3/7.3= 100%
fossils rip up clasts fossils fossils
RUN 35
BOX 23
357.7 367.8
RUN 36
BOX 23
BOX 24
367.8 377.9
-336.0
-342.2
-346.2
DEPTH
RUN 37
BOX 24
BOX 25
377.9 385.2
ELEVATION TOP OF HOLE
CLASSIFICATION OF MATERIALS
(Description)
Hole No. LB-121-08
McCook Reservoir Main Tunnel
SHEET
OF
a
DRILLING LOG (Cont Sheet)
PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-121-081836-AJUN 67
ENG FORM
fc eb gd
21.0
17 SHEETS
PROJECT 16INSTALLATION
ELEVATION
d gb ec f
-364.2 a
RQD=100%
DEPTH
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
LEGEND
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)
END OF BORING @ 385.2 FT. BORING
TREMIE GROUTED TO SURFACE
WITH PORTLAND CEMENT GROUT.
Water level depth (below ground surface) recorded as follows:
11/21/08: 66.6 ft 11/24/08: 22.5 ft 11/25/08: 32.4 ft 11/26/08: 36.1 ft
SHEET
ENG FORM
JUN 67 1836-A LB-121-08McCook Reservoir Main Tunnel
HOLE NO.PROJECT
DRILLING LOG (Cont Sheet)
SHEETS
PROJECT 17INSTALLATION
Chicago District OF
ELEVATION TOP OF HOLE
21.0 Hole No. LB-121-08
% CORE
RECOV-
ERY
Spoon 1 11,7,10 N = 17
Spoon 2 6, 13, 13 N = 26
LEGEND
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
Asphalt
Auger Sample
Spoon 8 2, 2, 4, 5 N = 6
Spoon 7 3, 3, 5, 7 N = 8 Qp = 1.5 tsf
Spoon 6 7, 18, 11 N = 29
Spoon 5 3, 5, 3, 5 N = 8
Spoon 4 3, 3, 6, 10 N = 9
Spoon 3 10, 10, 12 N = 22
0.5 0.9
17.5 19.5
15.0 17.0
12.5 14.0
10.0 12.0
7.5 9.5
5.0 6.5
1.0 2.5
Fine to coarse sand, little silt, trace clay, trace fine gravel - dark gray - medium dense to
Organic clay, trace sand with fibrous material grades quickly to organic silt - dark gray/black
- stiff (OL)
Silty clay, some fine to coarse sand, trace fine gravel, trace organics, wth silt beds - dark gray with occasional gray/brown mottling (CL)
Silty clay, some fine to coarse gravel, little fine to coarse sand, trace organics - dark brown and gray, slightly mottled (CL)
FILL: Silty clay, trace coarse sand, trace fine gravel, trace organics - dark brown (CL)
Crushed limestone base course
2.5 4.0
BOX OR
SAMPLE
NO.
+2.6
+7.1
+12.1
+19.6
+20.7
+21.7
6. DIRECTION OF HOLE
5. NAME OF DRILLER
3. DRILLING AGENCY
DEG. FROM VERT.
4. HOLE NO. (As shown on drawing title and file number) LB-122-08
OF
12. MANUFACTURER'S DESIGNATION OF DRILL
--- 12/29/2008
Chicago District
Hole No. LB-122-08
STARTED
CLASSIFICATION OF MATERIALS
(Description)
DRILLING LOG
ENG FORM
MAR 71 1836 PREVIOUS EDITIONS ARE OBSOLETE. LB-122-08McCook Reservoir Main Tunnel
HOLE NO.PROJECT
DISTURBED
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
Chicago IL N 1,865,131.3 E 1,122,611.7
19. SIGNATURE OF INSPECTOR
INSTALLATION
2. LOCATION (Coordinates or Station)
DIVISION
16. DATE HOLE
14. TOTAL NUMBER CORE BOXES
10. SIZE AND TYPE OF BIT
Mark Baker
COMPLETED
ELEVATION DEPTH
a fc
SHEET
b gd
PA / 2 7/8" RB
Great Lakes and Ohio River Div.
31.0 350.0 381.0 e
18. TOTAL CORE RECOVERY FOR BORING
12/31/2008
McCook Reservoir Main Tunnel
0.0
INCLINED
15. ELEVATION GROUND WATER
VERTICAL
13. TOTAL NO. OF
OVERBURDEN SAMPLES
TAKEN
UNDISTURBEDSubsurface Exploration, Inc.
+22.1
Chicago City Datum (vertical) NAD 83 (horizontal)
1. PROJECT
17. ELEVATION TOP OF HOLE
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
SHEETS
B-61
-12.9
-11.9
-8.9
-2.4
Spoon 12 50/0" N = Refusal (Casing set 1-foot into rock at 31 ft)
Spoon 11 17, 22, 22 N = 44 dense - wet (SM) Spoon 9 10, 10, 12 N = 21
27.5 28.5
25.0 26.5
22.5 24.0
20.0 21.5
RUN 1
BOX 1
31.0 41.1
RUN 2
41.1 51.1 bedding plane fractures fewer vugs vertical fracture bedding plane fractures
Dolomite (Racine Formation)
Light gray, fine to medium grained Dolomite;
abundant small vugs, some greenish mottling
Silt, some clay, trace to little fine to coarse sand and fine gravel, trace fine sand seams, finely laminated - dark olive gray - dense to very dense (ML)
30.0 30.0
Spoon 12 52, 38 N = 38+
22.1
ELEVATION TOP OF HOLEDRILLING LOG (Cont Sheet)
RQD = 8.7/10.1 = 86%
INSTALLATION
McCook Reservoir Main Tunnel
PROJECT
SHEETS17
Spoon 10 10, 15, 17 N = 32
Chicago District
ENG FORM
JUN 67 1836-A LB-122-08McCook Reservoir Main Tunnel
PROJECT
Hole No. LB-122-08
OF
SHEET
HOLE NO.
BOX OR
SAMPLE
NO.
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)
RQD=86%
RQD = 8.9/10 = 89%
d g
LEGEND
ec fa
DEPTHELEVATION
b
-30.9
-28.9
-26.9
-24.9
-22.9
-36.9
-32.4
-33.4
-44.9
-41.9
-39.9
-38.4 open joints and fractures open joints and fractures fracture fracture fracture vertical fracture open joints and fractures open joints and fractures open joints and fractures open joints and fractures open joints and fractures increase vugs between 46 and 55 feet fracture
RUN 4
61.1 71.2
RUN 3
51.1 61.1
PROJECT
22.1
ELEVATION TOP OF HOLEDRILLING LOG (Cont Sheet)
Chicago District
Hole No. LB-122-08
SHEETS17
INSTALLATION
68ENG FORM
JUN 67 1836-A LB-122-08McCook Reservoir Main Tunnel
HOLE NO.
OF
SHEET
McCook Reservoir Main Tunnel
PROJECT
RQD=94%
ELEVATION CLASSIFICATION OF MATERIALS
(Description)
% CORE
RECOV-
ERY
LEGEND
BOX OR
SAMPLE
NO.
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant) a
RQD=100%
f
RQD=89%
RQD = 10.1/10.1 = 100%
RQD = 9.5/10 = 95%
b c ed g
-66.9
LEGEND
-51.9
RQD =9.6/10.1 = 95%
RQD = 9.0/10 = 90%
RQD = 8.8/9.8 = 90%
RQD=95%
RQD=90%
fracture
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant) fracture fracture open bedding plane joints open joints
RUN 5
71.2 81.3
-57.4
RUN 7
91.3
101.1
-52.9
-49.4
BOX OR
SAMPLE
NO.
RUN 6
81.3 91.3
DRILLING LOG (Cont Sheet) ELEVATION TOP OF HOLE
22.1 Hole No. LB-122-08
McCook Reservoir Main Tunnel
SHEET
% CORE
RECOV-
ERY
92 PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-122-081836-AJUN 67
ENG FORM
OF
CLASSIFICATION OF MATERIALS
(Description)ELEVATION DEPTH a fc eb gd
17Chicago District
INSTALLATION 4PROJECT
SHEETS
RQD = 7.2/10.3 = 70%
RQD=90%
RQD=92%
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
% CORE
RECOV-
ERY
ELEVATION DEPTH
a fc e chert increases
LEGEND
open joints fractures
RUN 8
101.1 111.0
RUN 9
111.0 121.3
RQD = 9.1/9.9 = 92%
-80.9
-92.9 b
McCook Reservoir Main Tunnel
SHEET
OF
116 PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-122-081836-AJUN 67
ENG FORM
SHEETS
gd
Hole No. LB-122-08
22.1
PROJECT 5INSTALLATION
Chicago District
NO.
RQD = 10.1/10.4 = 97%
Drilling rate: 1.6 min/ft
RQD = 9.75/9.8 = 99%
Drilling rate: 1.1 min/ft
RQD=70%
RQD=97%
RQD=99%
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)ELEVATION DEPTH a
Dolomite (Sugar Run Formation)
Light gray, fine grained Dolomite ; few vugs, little chert c fracture fracture
RUN 10
121.3 131.7
RUN 11
131.7 141.5 e
-99.2
-103.4
-105.4 f
Hole No. LB-122-08
McCook Reservoir Main Tunnel
SHEET
OF
22.1
PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-122-081836-AJUN 67
ENG FORM
b gd
ELEVATION TOP OF HOLE
SHEETS
PROJECT 6INSTALLATION
Chicago District
RQD = 10/10.1 =99%
Driller reports 100% water loss between 168 and 171 feet.
RQD = 9.7/10.1 = 96%
-126.9
RQD=100%
RQD=96%
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
increased vugs
% CORE
RECOV-
ERY
RQD = 10.2/10.2 = 100%
fracture fracture fracture fracture
RUN 12
141.5 151.7
RUN 14
BOX 10
161.8 171.9
-127.4
-121.9
-125.9
CLASSIFICATION OF MATERIALS
(Description)
RUN 13
BOX 9
151.7 161.8
ELEVATION
ELEVATION TOP OF HOLE
LEGEND
Hole No. LB-122-08
McCook Reservoir Main Tunnel
SHEET
DRILLING LOG (Cont Sheet)
164 PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-122-081836-AJUN 67
ENG FORM
OF
DEPTH
a fc eb gd
22.1
17 SHEETS
PROJECT 7INSTALLATION
% CORE
RECOV-
ERY
RQD=99%
RQD=100%
RQD=100%
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
RQD = 121+/121 = 100%
100% water loss at 172 feet
LEGEND CLASSIFICATION OF MATERIALS
(Description)ELEVATION DEPTH a fc
Dolomite (Joliet Formation - Romeo Member)
Light gray Dolomite, fresh, medium hard, thickly bedded, massive - little structure, occasional styolite (only trace vugs)
BOX OR
SAMPLE
NO.
rubble zone
Dolomite (Joliet Formation - Markgraf Member)
Dolomite, gray with occasional dark gray clay partings, moderately hard, argillaceous, medium bedded
RUN 15
BOX 10
BOX 11
171.9 182.0
RUN 16
BOX 11
182.0 192.0
RQD = 10.2/10 = 102%
Initially recovered 6.8 ft, 3.2 ft of core slipped out of barrel, 3.4 ft recovered from top of RUN 17.
-145.4
-163.4 e
McCook Reservoir Main Tunnel
SHEET
OF
b
188 PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-122-081836-AJUN 67
ENG FORM
SHEETS
gd
Hole No. LB-122-08
22.1
PROJECT 8INSTALLATION
Chicago District
RQD=100%
RQD=95%
RQD = 10/10 = 100%
BOX OR
SAMPLE
NO.
RQD = 3.0/3.0 = 100%
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)ELEVATION DEPTH a fc
Possible Brandon Bridge Formation
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
Dolomite (Kankakee Formation - Plaines Member)
RUN 17
BOX 11
192.0 195.0
RUN 18
BOX 12
195.0 205.0
RUN 19
BOX 13
205.0 215.0
RQD = 9.5'/10' = 95%
-187.8 e
Hole No. LB-122-08
McCook Reservoir Main Tunnel
SHEET
OF
22.1
PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-122-081836-AJUN 67
ENG FORM
b gd
SHEETS
PROJECT 9INSTALLATION
Chicago District
RQD=100%
RQD=100%
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
% CORE
RECOV-
ERY
RQD = 10.1/10 = 100%
ELEVATION DEPTH
a fc e
Dolomite (Kankakee Formation - Troutman Member)
Dolomite, gray, medium bedded with frequent gray to dark gray clay partins, fresh, moderately hard.
LEGEND
-194.9
RUN 20
BOX 13
BOX 14
215.0 225.0
RUN 21
BOX 14
225.0 235.0
RUN 22
BOX 15
235.0 245.0
RQD = 9.5/10 = 95%
RQD = 10/10 = 100%
b
Hole No. LB-122-08
McCook Reservoir Main Tunnel
SHEET
OF
22.1
PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-122-081836-AJUN 67
ENG FORM
SHEETS
gd
PROJECT 10INSTALLATION
Chicago District a d
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
LEGEND
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)DEPTH
RQD=100%
fc eb
Dolomite (Kankakee Formation - Offerman Member)
Dark brownish-gray Dolomite with frequent chert bands, fresh, medium bedded
ELEVATION
RUN 23
BOX 16
245.0 255.0
RUN 24
BOX 16
255.0 265.0
-225.9
RQD = 10/10 = 100%
RQD = 9.8/10 = 98%
2" of core recovered from catcher, so recovery likely 100%
RQD=95%
PROJECT
g
SHEET
OF
Hole No. LB-122-08
HOLE NO.
McCook Reservoir Main Tunnel LB-122-081836-AJUN 67
ENG FORM
17McCook Reservoir Main Tunnel
PROJECT INSTALLATION
Chicago District
DRILLING LOG (Cont Sheet) ELEVATION TOP OF HOLE 22.1
RQD=98%
RQD=98%
RQD=97%
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
% CORE
RECOV-
ERY
ELEVATION DEPTH
a fc e
Dolomite (Kankakee Formation - Drummond Member)
Brownish gray Dolomite, thinly to medium bedded with frequent chert
LEGEND
fractures
RUN 25
BOX 17
265.0 275.0
RUN 26
BOX 17
BOX 18
275.0 285.0
RQD = 9.7/10 = 97%
Driller reports no water return during
RUN 26
RQD = 9.8/10 = 98%
Driller notes 10% of return water (from no return during last few runs) at 5 ft and up to 70% deeper in run.
-248.4
-255.9 b
McCook Reservoir Main Tunnel
SHEET
OF
284 PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-122-081836-AJUN 67
ENG FORM
SHEETS
gd
Hole No. LB-122-08
22.1
PROJECT 12INSTALLATION
Chicago District
RQD=99%
RQD=100%
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
% CORE
RECOV-
ERY
RQD = 9.9/10 = 99%
ELEVATION DEPTH
a fc e
Dolomite (Elwood Formation)
Olive gray Dolomite, moderately hard, fresh, thinly bedded (banded) with black fine clay partings (occasional pits and cherty zones)
LEGEND
-273.4
RUN 27
BOX 18
285.0 295.0
RUN 28
BOX 19
295.0 305.0
RUN 29
BOX 19
BOX 20
305.0 315.0
RQD = 9.8/10 = 98%
RQD = 10/10 = 100%
b
Hole No. LB-122-08
McCook Reservoir Main Tunnel
SHEET
OF
22.1
PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-122-081836-AJUN 67
ENG FORM
SHEETS
gd
PROJECT 13INSTALLATION
Chicago District
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
LEGEND
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description) d
DEPTH
RQD=97%
fc eb
Dolomite (Wilhelm Formation - Birds Member)
ELEVATION
100 RUN 30
BOX 21
BOX 22
315.0 325.0
RUN 31
BOX 22
325.0 335.0
RQD=100%
RQD = 9.7/10 = 97%
RQD = 10/10 = 100%
RQD=98%
-293.9
PROJECT
g
SHEET
OF
Hole No. LB-122-08
HOLE NO.
McCook Reservoir Main Tunnel LB-122-081836-AJUN 67
ENG FORM
17McCook Reservoir Main Tunnel
PROJECT INSTALLATION
Chicago District
DRILLING LOG (Cont Sheet) ELEVATION TOP OF HOLE 22.1
RQD=95%
RQD = 10/10 = 100%
RQD = 8.6/9 = 95%
RQD=100%
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
LEGEND
% CORE
RECOV-
ERY
Dolomite (Wilhelm Formation - Schwietzer Member)
ELEVATION
RQD = 9.8/10 = 98%
fresh, no vugs
Brainard Shale disturbed bedding rip up clasts
Dolomite (Fort Atkinson formation)
RUN 32
BOX 22
BOX 23
335.0 345.0
RUN 34
BOX 24
354.0 364.0
DEPTH
-310.9
-325.9
-328.9
RUN 33
BOX 23
345.0 354.0
ELEVATION TOP OF HOLE
CLASSIFICATION OF MATERIALS
(Description)
Hole No. LB-122-08
McCook Reservoir Main Tunnel
SHEET
OF
a
DRILLING LOG (Cont Sheet)
PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-122-081836-AJUN 67
ENG FORM
fc eb gd
22.1
17 SHEETS
PROJECT 15INSTALLATION
RQD=94%
RQD = 9.4/10 = 94%
-345.9
RQD=98%
-343.9
RQD=85%
b disturbed bedding d
RQD = 6/7 = 86%RUN 36
BOX 25
374.0 381.0 large clasts fractures fractures fractures fractures large clasts
RUN 35
BOX 24
BOX 25
364.0 374.0
-338.9
-340.9 f g
PROJECT
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
LEGEND
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)ELEVATION a c e
HOLE NO.
McCook Reservoir Main Tunnel LB-122-081836-AJUN 67
ENG FORM
DEPTH
22.1
17 SHEETS
PROJECT 16INSTALLATION
Chicago District
ELEVATION TOP OF HOLE
Hole No. LB-122-08
McCook Reservoir Main Tunnel
SHEET
OF
d gb eca
ELEVATION CLASSIFICATION OF MATERIALS
(Description)
% CORE
RECOV-
ERY
LEGEND
BOX OR
SAMPLE
NO.
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
END OF BORING @ 381 FT. BORING
TREMIE GROUTED TO SURFACE
WITH PORTLAND CEMENT GROUT.
Water level depth (below ground surface) recorded as follows:
12/22/08: 19.5 ft 12/30/08: 26.7 ft 12/31/08: 62 ft
-358.9 f
SHEET
ENG FORM
JUN 67 1836-A LB-122-08McCook Reservoir Main Tunnel
HOLE NO.PROJECT
DRILLING LOG (Cont Sheet)
SHEETS
PROJECT 17INSTALLATION
Chicago District OF
ELEVATION TOP OF HOLE
22.1 Hole No. LB-122-08
Spoon 2 4, 4, 5 N = 9
Spoon 1 20, 10, 7 N = 17
Spoon 4 3, 3, 3 N = 6
Spoon 5 2, 2, 2 N = 4
DEPTH CLASSIFICATION OF MATERIALS
(Description)
Asphalt
LEGEND
BOX OR
SAMPLE
NO.
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
Spoon 3 9, 12, 12 N = 24
Spoon 8 7, 6, 4, 4 N = 10
Spoon 7 30, 21, 15 N = 36
Spoon 6 2, 2, 3 N = 5
17.5 19.5
15.0 16.5
12.5 14.5
10.0 12.0
7.5 9.0
5.0 6.5
80 1 1.0 2.5
Silty CLAY,trace gravel, trace shell fagments
(CL)
FILL: Silty SAND, trace organics, trace clay, trace organics - gray, brown, and black - loose to dense - moist (SM)
FILL: Sandy clayey silt - brown- medium dense - moist (ML)
FILL: Silty CLAY, little fine to coarse sand -gray (CL)
FILL: Silty sand - gray - medium dense - dry to moist (SM)
Crushed limetone base course
2.5 4.0
ELEVATION
+3.8
+14.3
+16.8
+18.8
+20.3
+20.9
STARTED
6. DIRECTION OF HOLE
5. NAME OF DRILLER
3. DRILLING AGENCY
4. HOLE NO. (As shown on drawing title and file number)
DRILLING LOG
19. SIGNATURE OF INSPECTOR
26LB-123-08
OF
12. MANUFACTURER'S DESIGNATION OF DRILL
--- 1/8/2009
% CORE
RECOV-
ERY
Hole No. LB-123-08 f
ENG FORM
MAR 71 1836 PREVIOUS EDITIONS ARE OBSOLETE. LB-123-08McCook Reservoir Main Tunnel
HOLE NO.PROJECT
DEG. FROM VERT.
COMPLETED
DISTURBED
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
Chicago IL N 1,865,416.3 E 1,122,942.5
Mark Baker
42.5 349.5 392.0
2. LOCATION (Coordinates or Station)
DIVISION
16. DATE HOLE
Chicago District
10. SIZE AND TYPE OF BIT1. PROJECT
SHEETINSTALLATION
Great Lakes and Ohio River Div.
PA / 2 7/8" RB
d gb ec
14. TOTAL NUMBER CORE BOXES
INCLINED
SHEETS
15. ELEVATION GROUND WATER 0.0
2/2/2009
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
McCook Reservoir Main Tunnel
18. TOTAL CORE RECOVERY FOR BORING
Chicago City Datum (vertical) NAD 83 (horizontal)
+21.3
Subsurface Exploration, Inc. UNDISTURBED13. TOTAL NO. OF
OVERBURDEN SAMPLES
TAKEN
17. ELEVATION TOP OF HOLE
B-61
VERTICAL
-0.7
-20.7
-15.7
-10.7
-8.7
-1.7
+1.0
-6.7
Gravel (GP)
30.0 32.0
12A, 12B 27.5 29.0
25.0 26.5
10A, 10B 22.5 24.0
20.0 20.3
16A, 16B 37.5 39.0
Dolomite (Racine formation - Silurimis system)
Dolomite, moderately hard, medium to thickly bedded, light gray to dark gray, occasional blue mottling, scattered vugs and chert nodules
Gravel (fractured rock) - extremely dense
(GP)
Silty fine sand, trace clay - gray - dense - wet
(SM)
Gravel/Boulders (GP)
Silty fine to medium sand, trace clay -gray -very dense - wet (SM)
Silty CLAY, little fine to coarse sand - gray -hard (CL)
Sandy silt, gray (ML)
32.5 33.5
35.0 36.5
RUN 1
BOX 1
42.5 49.5
40.0 41.5
DEPTH
INSTALLATION 2PROJECT
SHEETS17
d gb ec fa
ENG FORM
JUN 67 1836-A LB-123-08McCook Reservoir Main Tunnel
HOLE NO.PROJECT
Chicago District
ELEVATION
OF
SHEET
McCook Reservoir Main Tunnel
Hole No. LB-123-0821.3 ELEVATION TOP OF HOLEDRILLING LOG (Cont Sheet)
Spoon 13.
No sample, drilled through gravel/boulders from 30' to 32'.
RQD = 6.8/7 = 97%
100% water loss at 48'
Spoon 17 27, 34, 60 N = 94
Spoon 16 22, 34, 48 N = 82
Spoon 14 37, 38 N = 38+
Spoon 12 13, 20, 26 N = 46 Qp = 4.5 tsf
Spoon 11 10, 14, 19 N = 34 Qp > 5.0 tsf
Spoon 10 15, 26, 27 N = 53 Qp > 5.0 tsf
Spoon 9 50/3" N = Refusal
Spoon 15 20, 37, 34 N = 70
CLASSIFICATION OF MATERIALS
(Description)
% CORE
RECOV-
ERY
LEGEND
BOX OR
SAMPLE
NO.
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
RUN 2
BOX 1
BOX 2
49.5 58.0
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)ELEVATION DEPTH a
BOX OR
SAMPLE
NO.
c
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant) b gd f
RQD = 7.2/8.5 = 85%
RUN 3
BOX 2
58.0 68.5
LEGEND
RQD = 10/10.5 = 95%
RQD=97%
RQD=85%
RQD=95%
HOLE NO.
SHEET
OF
68 PROJECT
McCook Reservoir Main Tunnel LB-123-081836-AJUN 67
ENG FORM
Chicago District 17 SHEETS
PROJECT
McCook Reservoir Main Tunnel
INSTALLATION
Hole No. LB-123-08DRILLING LOG (Cont Sheet) ELEVATION TOP OF HOLE 21.3
RQD = 9.8/10 = 98%
RQD = 9.0/10 = 90%
RQD = 8.8/10.5 = 84%
DEPTH
RQD=90%
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
LEGEND
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description) harder/more competent rock
RQD=98%
softer vug vugs and/or pits vugs and/or pits
Much more chert, tan color, not as white.
Chert in layers and nodules.
vugs
RUN 4
BOX 2
BOX 3
68.5 78.5
RUN 5
BOX 3
BOX 4
78.5 88.5
-62.7
-70.7 a
RUN 6
BOX 4
88.0 99.0
ELEVATION TOP OF HOLE
ELEVATION
Hole No. LB-123-08
McCook Reservoir Main Tunnel
SHEET
OF
DRILLING LOG (Cont Sheet)
PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-123-081836-AJUN 67
ENG FORM
fc eb gd
21.3
17 SHEETS
PROJECT 4INSTALLATION
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
LEGEND
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description) d
DEPTH
RQD=88%
fc eb vugs and/or pits
ELEVATION
fracture fracture fracture fracture
RUN 7
BOX 5
99.0
109.0
RUN 8
BOX 6
109.0 119.0
RQD=94%
RQD = 8.8/10 = 88%
RQD = 9.4/10 = 94%
RQD=84%
PROJECT
McCook Reservoir Main Tunnel
SHEET
OF
g
HOLE NO.
McCook Reservoir Main Tunnel LB-123-081836-AJUN 67
ENG FORM
INSTALLATION
17 SHEETS
Hole No. LB-123-08
Chicago District
DRILLING LOG (Cont Sheet) ELEVATION TOP OF HOLE 21.3
(Drilling time, water loss, depth weathering, etc., if significant) c
RQD = 9.6/10 = 96%
RQD = 10/10 = 100%
RQD = 9.5/10 = 95%
RQD=96%
RQD=100%
BOX OR
SAMPLE
NO.
LEGEND
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)ELEVATION DEPTH a
Dolomite (Sugar Run Formation)
Gray Dolomite, fine grained, less chert, fewer styolites vugs and/or pits vugs and/or pits vugs and/or pits fracture fracture fracture (at chalk zone)
RUN 9
BOX 6
BOX 7
119.0 129.0
RUN 11
BOX 8
139.0 149.0 e
-100.7
100 RUN 10
BOX 7
BOX 8
129.0 139.0 f
Hole No. LB-123-08
McCook Reservoir Main Tunnel
SHEET
OF
21.3
ELEVATION TOP OF HOLE
PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-123-081836-AJUN 67
ENG FORM
b gd
SHEETS
PROJECT 6INSTALLATION
Chicago District
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
LEGEND
% CORE
RECOV-
ERY
g
ELEVATION
RQD = 10/10 = 100%
a fc e vugs and/or pits
CLASSIFICATION OF MATERIALS
(Description)
-141.7 vugs and/or pits vugs and/or pits
RUN 12
BOX 8
BOX 9
149.0 159.0
RUN 13
BOX 9
BOX 10
159.0 169.0
RQD=96%
RQD=95%
RQD = 9.6/10 = 96%
d
PROJECT
b
McCook Reservoir Main Tunnel
SHEET
OF
HOLE NO.
McCook Reservoir Main Tunnel LB-123-081836-AJUN 67
ENG FORM
PROJECT
Hole No. LB-123-08
SHEETS
7INSTALLATION
Chicago District
DRILLING LOG (Cont Sheet) ELEVATION TOP OF HOLE 21.3
RQD = 9.8/10 = 98%
RQD=100%
RQD=92%
RQD=98%
BOX OR
SAMPLE
NO.
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)ELEVATION DEPTH a fc
Dolomite (Joliet Formation - Romeo Member)
Light gray, moderately hard, thickly bedded, Dolomite; fresh, massive, little structure vugs and pits decrease below 166'
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant) fracture (chalk/clay filled) fracture (chalk/clay filled)
Dolomite (Joliet Formation - Markgraf Member)
Gray Dolomite, dark gray clay partings, moderately hard, medium bedded
RUN 14
BOX 10
169.0 179.0
RUN 15
BOX 11
179.0 189.0
RQD = 9.2/10 = 92%
-144.7
-158.7 e
Hole No. LB-123-08
McCook Reservoir Main Tunnel
SHEET
OF
21.3
PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-123-081836-AJUN 67
ENG FORM
SHEETS
b gd
PROJECT 8INSTALLATION
Chicago District weathering, etc., if significant) c
RQD = 10/10 = 100%
RQD = 9.7/10 = 97%
RQD = 9.8/10 = 98%
RQD=100%
RQD=97%
BOX OR
SAMPLE
NO.
LEGEND
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)ELEVATION DEPTH a darker minerals and fine laminations at 191'
Dolomite (Joliet Formation - Brandon Bridge Member) fracture fracture
RUN 16
BOX 11
BOX 12
189.0 199.0
RUN 17
BOX 12
BOX 13
199.0 209.0
RUN 18
BOX 13
209.0 219.0 e
-178.7
-190.7 f
Hole No. LB-123-08
McCook Reservoir Main Tunnel
SHEET
OF
21.3
ELEVATION TOP OF HOLE
PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-123-081836-AJUN 67
ENG FORM
b gd
SHEETS
PROJECT 9INSTALLATION
Chicago District
RQD=95%
RQD=100%
RQD=95%
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
% CORE
RECOV-
ERY
ELEVATION DEPTH
a fc e Dolomite (Kankakee Formation - Plaines Member)
LEGEND
vugs increase
Dolomite (Kankakee Formation - Troutman Member) Gray, medium bedded, Dolomite, frequent clay partings and bedding planes vugs and/or pits and facture fracture vugs and/or pits
RUN 19
BOX 14
219.0 229.0
RQD = 9.5/10 = 95%
RQD =10/10 = 100%
-198.7 b
RUN 20
BOX 14
BOX 15
229.0 239.0
Hole No. LB-123-08
McCook Reservoir Main Tunnel
SHEET
OF
21.3
PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-123-081836-AJUN 67
ENG FORM
PROJECT
gd
SHEETS
10INSTALLATION
Chicago District
DRILLING LOG (Cont Sheet) ELEVATION TOP OF HOLE weathering, etc., if significant)
RQD = 9.7/10 = 97%
RQD = 9.2/10 = 92%
RQD = 10/10 = 100%
RQD=97%
RQD=92%
BOX OR
SAMPLE
NO.
LEGEND
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)ELEVATION DEPTH fracture f vugs and/or pits
Dolomite (Kankakee Formation - Offerman Member)
Dark brown-gray Dolomite; frequent chert bands, fresh, medium bedded frequent chert nodules/banding from 250' to 259'
RUN 21
BOX 15
BOX 16
239.0 249.0
RUN 22
BOX 16
249.0 259.0
RUN 23
BOX 16
BOX 17
259.0
-228.7
-237.7 ca
Hole No. LB-123-08
McCook Reservoir Main Tunnel
SHEET
OF
21.3
ELEVATION TOP OF HOLE
PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-123-081836-AJUN 67
ENG FORM
b gd e
SHEETS
PROJECT 11INSTALLATION
Chicago District
NO.
RQD = 9.4/10 = 94%
RQD = 9.4/10 = 94%
RQD=100%
RQD=94%
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)ELEVATION DEPTH a vugs and/or pits c
RUN 25
BOX 18
279.0 289.0 fracture fracture vugs and/or pits fracture fracture
Dolomite (Kankakee Formation - Drummond Member)
RUN 24
BOX 17
BOX 18
269.0 279.0 e
-242.7
-260.7
269.0 f
Hole No. LB-123-08
McCook Reservoir Main Tunnel
SHEET
OF
21.3
PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-123-081836-AJUN 67
ENG FORM
SHEETS
b gd
ELEVATION TOP OF HOLE
PROJECT 12INSTALLATION
Chicago District
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
LEGEND
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description) d
DEPTH
RQD=100%
fc eb
Dolomite (Elwood Formation)
ELEVATION
100 RUN 26
BOX 19
289.0 299.0
RUN 27
BOX 19
BOX 20
299.0 309.0
RQD=100%
RQD = 10/10 = 100%
RQD = 10/10 = 100%
RQD=94%
-280.7
PROJECT
g
SHEET
OF
Hole No. LB-123-08
HOLE NO.
McCook Reservoir Main Tunnel LB-123-081836-AJUN 67
ENG FORM
17McCook Reservoir Main Tunnel
PROJECT INSTALLATION
Chicago District
DRILLING LOG (Cont Sheet) ELEVATION TOP OF HOLE 21.3
NO.
RQD = 9.7/10 = 97%
RQD = 10/10 = 100%
RQD = 10/10 = 100%
RQD=97%
RQD=100%
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)ELEVATION DEPTH a
Argillaceous Dolomite ( Wilhelmi Formation - Birds Member)
Dark gray/black, argillaceous Dolomite, very fine grained, fresh, moderately hard, finely bedded c
Dolomite (Wilhelmi Formation - Schweitzer Member)
Black argillaceous dolomite, finely laminated, fissile
RUN 28
BOX 20
BOX 21
309.0 319.0
RUN 29
BOX 21
319.0 329.0
RUN 30
BOX 22
329.0 339.0 e
-297.7
-307.7 f
Hole No. LB-123-08
McCook Reservoir Main Tunnel
SHEET
OF
21.3
PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-123-081836-AJUN 67
ENG FORM
b gd
ELEVATION TOP OF HOLE
SHEETS
PROJECT 14INSTALLATION
Chicago District
RQD=100%
RQD=99%
RQD=100%
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
% CORE
RECOV-
ERY
ELEVATION DEPTH
a fc e
Ordovician System/Maquoketa Group Green Mudstone (Brainard formation)
Green Mudstone, soft with fissile unconformity above and rip-up clasts below forming gradual contact with Fort Atkinson formation.
LEGEND
Dolomite (Fort Atkinson Formation)
Interbedded Dolomite and argillaceous Dolomite, rip up clasts common
RUN 31
BOX 22
BOX 23
339.0 349.0
RUN 32
BOX 23
BOX 24
349.0 359.0
RQD = 10/10 = 100%
RQD = 9.9/10 = 99%
-323.7
-329.7 b
McCook Reservoir Main Tunnel
SHEET
OF
356 PROJECT HOLE NO.
McCook Reservoir Main Tunnel LB-123-081836-AJUN 67
ENG FORM
SHEETS
Hole No. LB-123-08 d
21.3
PROJECT 15INSTALLATION
Chicago District
DRILLING LOG (Cont Sheet) ELEVATION TOP OF HOLE g
(Drilling time, water loss, depth weathering, etc., if significant)
BOX OR
SAMPLE
NO.
LEGEND
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description) d
DEPTH
RQD=100%
fc eb
RUN 33
BOX 23
359.0 369.0
ELEVATION
RUN 34
BOX 24
369.0 379.0
RUN 35
BOX 25
BOX 26
379.0
RQD = 8.6/9 = 95%
RQD = 10/10 = 100%
Coring rate = 0.5 ft/min
RQD = 10/10 = 100%
Coring Rate = 0.6 ft/min
RQD=95%
PROJECT
McCook Reservoir Main Tunnel
SHEET
OF
g
HOLE NO.
McCook Reservoir Main Tunnel LB-123-081836-AJUN 67
ENG FORM
INSTALLATION
17 SHEETS
Hole No. LB-123-08
Chicago District
DRILLING LOG (Cont Sheet) ELEVATION TOP OF HOLE 21.3
% CORE
RECOV-
ERY
CLASSIFICATION OF MATERIALS
(Description)ELEVATION DEPTH a cb gd f 389.0
RUN 36
BOX 26
389.0 392.0
-370.7
BOX OR
SAMPLE
NO.
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
RQD = 10/10 = 100%
Coring Rate = 0.5 ft/min
END OF BORING @ 392 FT. BORING
TREMIE GROUTED TO SURFACE
WITH PORTLAND CEMENT GROUT.
Water level depth (below ground surface) recorded as follows:
1/9/09: 8.5 ft 1/12/09: 7.5 ft 2/2/09: 41 ft
RQD=100%
RQD=100%
HOLE NO.
OF
McCook Reservoir Main Tunnel
PROJECT
Hole No. LB-123-08
McCook Reservoir Main Tunnel LB-123-081836-AJUN 67
ENG FORM
Chicago District 17 SHEETS
PROJECT SHEETINSTALLATION
DRILLING LOG (Cont Sheet) ELEVATION TOP OF HOLE 21.3
APPENDIX C
Historical Laboratory Data Summary
Test Count: 70
Date Tested Report/Investigation Geological Formation
Borehole Identifier
Test Depth / Interval (ft)
Strength (psi)
AECOM Racine LB-121-08 106.5/8 4,191 AECOM Racine LB-121-08 108.5/9 4,706 AECOM Racine LB-121-08 116.8/9 7,810 AECOM Sugar Run LB-121-08 128.0/11 9,846 AECOM Sugar Run LB-121-08 139.0/13 8,132 AECOM Joliet LB-121-08 159.0/15 18,246 AECOM Joliet LB-121-08 166.5/15 16,043 AECOM Joliet LB-121-08 177.5/16 13,777 AECOM Joliet LB-121-08 187.5/17 12,508 AECOM Joliet LB-121-08 198.0/18 16,459 AECOM Joliet LB-121-08 198.0/18 17,312 AECOM Joliet LB-121-08 207.5/19 13,920 AECOM Kankakee LB-121-08 216.0/20 20,774 AECOM Kankakee LB-121-08 226.0/21 23,313 AECOM Kankakee LB-121-08 236.0/22 15,814 AECOM Kankakee LB-121-08 244.5/23 15,620 AECOM Kankakee LB-121-08 256.5/24 12,397 AECOM Kankakee LB-121-08 266.0/25 14,174 AECOM Elwood LB-121-08 286.5/27 20,256 AECOM Elwood LB-121-08 295.5/28 15,697 AECOM Elwood LB-121-08 306.0/29 12,023 AECOM Wilhelmi LB-121-08 316.5/30 8,867 AECOM Wilhelmi LB-121-08 328.0/31 13,032 AECOM Wilhelmi LB-121-08 337.0/32 7,501 AECOM Wilhelmi LB-121-08 340.0/33 2,553 AECOM Maquoketa LB-121-08 358.5/35 10,119 AECOM Maquoketa LB-121-08 366.0/35 8,024 AECOM Racine LB-121-08 37.0/1 21,028 AECOM Maquoketa LB-121-08 376.0/36 3,971 AECOM Maquoketa LB-121-08 384.0/37 1,595 AECOM Racine LB-121-08 41.8/1 3,727 AECOM Racine LB-121-08 58.0/4 19,427 AECOM Racine LB-121-08 60.0/4 18,202 AECOM Racine LB-121-08 74.5/5 12,023 AECOM Racine LB-121-08 79.6/6 5,195 AECOM Racine LB-121-08 91.2/7 11,315
02/25/09 AECOM Kankakee LB-122-08 40.5 14,428 11/21/00 URS Racine B-1/B-2 12,108 11/21/00 URS Sugar Run B-1/B-2 16,297 11/21/00 URS Joliet B-1/B-3 18,213 11/21/00 URS Kankakee B-1/B-4 16,750 11/21/00 URS Elwood B-1/B-5 15,822 11/21/00 URS Wilhelmi B-1/B-6 13,832 11/21/00 URS Maquoketa B-1/B-7 8,720 05/01/99 USACE Racine DH-91-15 70.5 14,633 05/01/99 USACE Racine DH-91-15 78.5 19,023 05/01/99 USACE Racine DH-91-15 80.1 29,266 05/01/99 USACE Racine DH-91-15 93.7 27,803
Appendix C - Historical Laboratory Data Summary Point Load Index (PLI) - Axial
Test Count: 70
Geological Formation
Borehole Identifier
Test Depth / Interval (ft)
Strength (psi)
Appendix C - Historical Laboratory Data Summary Point Load Index (PLI) - Axial
05/01/99 USACE Racine DH-91-15 100 11,898 05/01/99 USACE Kankakee DH-91-15 116 18,145 05/01/99 USACE Sugar Run DH-91-15 117 56,582 05/01/99 USACE Joliet DH-91-15 138.7 31,887 05/01/99 USACE Joliet DH-91-15 145.1 26,340 05/01/99 USACE Joliet DH-91-15 160 41,705 05/01/99 USACE Joliet DH-91-15 172 16,846 05/01/99 USACE Joliet DH-91-15 181.1 54,143 05/01/99 USACE Joliet DH-91-15 192.3 5,200 05/01/99 USACE Joliet DH-91-15 200.5 71,703 05/01/99 USACE Kankakee DH-91-15 226.9 10,967 05/01/99 USACE Kankakee DH-91-15 237.5 1,487 05/01/99 USACE Elwood DH-91-15 261.1 16,098 05/01/99 USACE Elwood DH-91-15 273.1 29,266 05/01/99 USACE Wilhelmi DH-91-15 282.1 23,797 05/01/99 USACE Wilhelmi DH-91-15 300 39,510 05/01/99 USACE Wilhelmi DH-91-15 304.8 19,755 05/01/99 USACE Wilhelmi DH-91-15 317.6 8,048 05/01/99 USACE Wilhelmi DH-91-15 331.3 8,552 05/01/99 USACE Maquoketa DH-91-15 335.3 1,080 05/01/99 USACE Wilhelmi DH-91-15 337.5 1,745 05/01/99 USACE Maquoketa DH-91-15 352.4 10,411
Test Count: 337
Geological Formation
Borehole Identifier
Test Depth / Interval (ft)
Strength (psi)
05/01/99 USACE Racine DH-91-10 34.1 21,747 05/01/99 USACE Racine DH-91-10 45 153 05/01/99 USACE Racine DH-91-10 53.3 8,276 05/01/99 USACE Racine DH-91-10 71.9 1,783 05/01/99 USACE Racine DH-91-10 80 17,265 05/01/99 USACE Racine DH-91-10 90.2 51,490 05/01/99 USACE Racine DH-91-10 95 22,409 05/01/99 USACE Sugar Run DH-91-10 111.1 31,067 05/01/99 USACE Joliet DH-91-10 118 3,056 05/01/99 USACE Joliet DH-91-10 129.9 16,807 05/01/99 USACE Joliet DH-91-10 138.5 24,192 05/01/99 USACE Joliet DH-91-10 148.2 9,677 05/01/99 USACE Joliet DH-91-10 158.7 11,841 05/01/99 USACE Joliet DH-91-10 166.7 9,167 05/01/99 USACE Kankakee DH-91-10 177.1 4,060 05/01/99 USACE Kankakee DH-91-10 189.9 10,695 05/01/99 USACE Kankakee DH-91-10 196.7 5,093 05/01/99 USACE Kankakee DH-91-10 210 14,515 05/01/99 USACE Kankakee DH-91-10 216.2 37,051 05/01/99 USACE Elwood DH-91-10 233.4 33,232 05/01/99 USACE Elwood DH-91-10 237.1 382 05/01/99 USACE Wilhelmi DH-91-10 258.8 25,210 05/01/99 USACE Wilhelmi DH-91-10 262.1 7,639 05/01/99 USACE Wilhelmi DH-91-10 266.9 13,751 05/01/99 USACE Wilhelmi DH-91-10 267.8 23,428 05/01/99 USACE Wilhelmi DH-91-10 276.7 10,699 05/01/99 USACE Wilhelmi DH-91-10 294.2 7,639 05/01/99 USACE Maquoketa DH-91-10 311.1 764 05/01/99 USACE Maquoketa DH-91-10 318.2 40,489 05/01/99 USACE Racine DH-91-11 11.1 14,439 05/01/99 USACE Racine DH-91-11 17.5 12,033 05/01/99 USACE Racine DH-91-11 21.4 24,066 05/01/99 USACE Racine DH-91-11 36 20,055 05/01/99 USACE Racine DH-91-11 39.9 12,033 05/01/99 USACE Sugar Run DH-91-11 60 11,431 05/01/99 USACE Sugar Run DH-91-11 66.9 9,626 05/01/99 USACE Joliet DH-91-11 88.8 16,846 05/01/99 USACE Joliet DH-91-11 103.4 24,056 05/01/99 USACE Joliet DH-91-11 104.9 32,890 05/01/99 USACE Joliet DH-91-11 115 40,912 05/01/99 USACE Joliet DH-91-11 140 14,439 05/01/99 USACE Kankakee DH-91-11 149.7 30,505 05/01/99 USACE Kankakee DH-91-11 158.8 22,261 05/01/99 USACE Kankakee DH-91-11 164.9 24,066 05/01/99 USACE Kankakee DH-91-11 180 19,854 05/01/99 USACE Kankakee DH-91-11 181.5 8,423 05/01/99 USACE Kankakee DH-91-11 192.3 12,033 05/01/99 USACE Elwood DH-91-11 209.7 29,481
Appendix C - Historical Laboratory Data Summary Point Load Index (PLI) - Diametrical
Geological Formation
Borehole Identifier
Test Depth / Interval (ft)
Strength (psi)
Appendix C - Historical Laboratory Data Summary Point Load Index (PLI) - Diametrical
05/01/99 USACE Elwood DH-91-11 212 2,407 05/01/99 USACE Wilhelmi DH-91-11 231.5 9,626 05/01/99 USACE Wilhelmi DH-91-11 240 6,618 05/01/99 USACE Wilhelmi DH-91-11 241.9 20,857 05/01/99 USACE Wilhelmi DH-91-11 252.5 11,632 05/01/99 USACE Wilhelmi DH-91-11 271.3 35,296 05/01/99 USACE Wilhelmi DH-91-11 277 602 05/01/99 USACE Elwood DH-91-12 217.5 10,695 05/01/99 USACE Elwood DH-91-12 220 11,714 05/01/99 USACE Wilhelmi DH-91-12 234.9 23,428 05/01/99 USACE Wilhelmi DH-91-12 239.9 21,390 05/01/99 USACE Wilhelmi DH-91-12 250 509 05/01/99 USACE Wilhelmi DH-91-12 257.5 1,528 05/01/99 USACE Kankakee DH-91-13 198.5 13,751 05/01/99 USACE Elwood DH-91-13 215 637 05/01/99 USACE Elwood DH-91-13 218.7 458 05/01/99 USACE Wilhelmi DH-91-13 245.1 255 05/01/99 USACE Wilhelmi DH-91-13 249.7 15,279 05/01/99 USACE Wilhelmi DH-91-13 254.9 11,459 05/01/99 USACE Wilhelmi DH-91-13 272.5 127 05/01/99 USACE Wilhelmi DH-91-13 286 14,362 05/01/99 USACE Racine DH-91-14 45.1 1,805 05/01/99 USACE Racine DH-91-14 58.5 602 05/01/99 USACE Racine DH-91-14 75.4 602 05/01/99 USACE Racine DH-91-14 82 1,203 05/01/99 USACE Racine DH-91-14 82.9 602 05/01/99 USACE Racine DH-91-14 96.7 8,022 05/01/99 USACE Racine DH-91-14 111.1 401 05/01/99 USACE Sugar Run DH-91-14 123 24,066 05/01/99 USACE Sugar Run DH-91-14 125 11,431 05/01/99 USACE Joliet DH-91-14 138.5 17,448 05/01/99 USACE Joliet DH-91-14 143.9 33,692 05/01/99 USACE Joliet DH-91-14 156.7 36,099 05/01/99 USACE Joliet DH-91-14 168.2 34,895 05/01/99 USACE Joliet DH-91-14 180 16,846 05/01/99 USACE Joliet DH-91-14 181.9 18,049 05/01/99 USACE Joliet DH-91-14 198.9 15,041 05/01/99 USACE Kankakee DH-91-14 211.3 4,579 05/01/99 USACE Kankakee DH-91-14 236.1 27,074 05/01/99 USACE Kankakee DH-91-14 239.9 39,708 05/01/99 USACE Kankakee DH-91-14 242.5 30,684 05/01/99 USACE Elwood DH-91-14 261.1 9,626 05/01/99 USACE Elwood DH-91-14 267.7 19,253 05/01/99 USACE Elwood DH-91-14 279.5 26,472 05/01/99 USACE Elwood DH-91-14 292.2 14,439 05/01/99 USACE Racine DH-91-15 38.7 4,813 05/01/99 USACE Racine DH-91-15 47.7 18,049 05/01/99 USACE Racine DH-91-15 49.8 15,643
Geological Formation
Borehole Identifier
Test Depth / Interval (ft)
Strength (psi)
Appendix C - Historical Laboratory Data Summary Point Load Index (PLI) - Diametrical
05/01/99 USACE Racine DH-91-15 70.4 36,099 05/01/99 USACE Racine DH-91-15 79 1,983 05/01/99 USACE Racine DH-91-15 85.5 32,489 05/01/99 USACE Racine DH-91-15 96.5 21,659 05/01/99 USACE Racine DH-91-15 101.3 14,439 05/01/99 USACE Kankakee DH-91-15 115 21,659 05/01/99 USACE Sugar Run DH-91-15 116.9 33,692 05/01/99 USACE Sugar Run DH-91-15 135.5 31,887 05/01/99 USACE Joliet DH-91-15 145.1 36,099 05/01/99 USACE Joliet DH-91-15 153 41,513 05/01/99 USACE Joliet DH-91-15 160 42,717 05/01/99 USACE Joliet DH-91-15 172 27,074 05/01/99 USACE Joliet DH-91-15 181.1 26,472 05/01/99 USACE Joliet DH-91-15 192.3 26,472 05/01/99 USACE Joliet DH-91-15 201.9 21,659 05/01/99 USACE Kankakee DH-91-15 225.3 38,505 05/01/99 USACE Kankakee DH-91-15 234.9 14,439 05/01/99 USACE Elwood DH-91-15 259 21,650 05/01/99 USACE…