Amendment_No._0003_for_W912P6-14-R-0023.pdf
PDF 85 KB Posted
- Solicitation number
- W912P6-14-R-0023
About this file
This file contains Amendment No. 0003 for the subject project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6631514154
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE: SOLICITATION NO. W912P6-14-R-0023; PORTAGE PARK SECTION 125 ECOSYSTEM RESTORATION PROJECT IN PORTAGE, IN.
Continued on next page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Sep-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-14-R-0023
X 9B. DATED (SEE ITEM 11)
16-Aug-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Sep-2014
CODE
U. S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P6-14-R-0023
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
AMENDMENT PARTICULARS
A. PROPOSAL DUE DATE: The response due date for this Solicitation remains unchanged; therefore, proposals shall be furnished in accordance with Section 00100 of the Solicitation, not later than 4:30 p.m. (CST) on September 18, 2014 to be considered timely.
B. ADDITIONAL BID SCHEDULE NOTES: The following paragrah has been added to Section 00010 of the subject Solicitation:
The contractor will be issued two separate Notice to Proceed letters. Although the government is using this particular method to issue the notice to proceed, it does not in any way change the time allowed for completing the contract; thus, the performance period of the contract will remain 1,825 calendar days
Notice to Proceed Provisions:
(1) Notice to Proceed Letter #1 will be issued following the government’s approval of the Contractor’s Payment and Performance Bonds and Insurance. By way of Letter #1, the Contractor will be authorized to perform the work of the contract, except physical construction of features and demolition of existing features 75 feet from the crest of the bank in sites 1 and 5.
(2) Notice to Proceed Letter #2 will be issued once the easement from the Porter County Drainage Board is issued to the USACE Chicago District, which is expected to occur by March 31 of 2015. Under this particular Notice, the contractor will be authorized to initiate physical construction of proposed features and demolition of existing features 75 feet from the crest of the bank in sites 1 and 5. The Contractor will be required to complete the entire work ready for use not later than 1,825 calendar days after the acknowledgment of Notice to Proceed #1. The time stated for completion shall include final cleanup of the premises.
C. AMENDED SOLICITATION SECTION 00100, INSTRUCTIONS, CONDITIONS, AND NOTICES TO
OFFERORS: This Amendment has been made to revise PART I, para 1.0, ACQUISITION METHOD.
Accordingly, PART I, para 1.0, ACQUISITION METHOD of SECTION 00100 is hereby corrected to read:
1.0 ACQUISITION METHOD
Through use of the best value method of contracting, using the source selection low price, technically acceptable process, the USACE Chicago District seeks to acquire the services described in this RFP and its accompanying documents. This particular acquisition method considers award to the lowest price, technically acceptable offer.
D. AMENDED SOLICITATION SECTION 00700, CONTRACT CLAUSE: Under this contract, the contractor will be issued two separate Notice to Proceed letters. Although the government is using this particular method to issue the notice to proceed, it does not in any way change the time allowed for completing the contract; thus, the performance period of the contract will remain 1,825 calendar days. Accordingly, this Amendment implements the aforementioned Notice to Proceed provisions to FAR Clause 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) and now reads as follows:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
W912P6-14-R-0023
| The | Contractor | shall | be | required | to | (a) | commence | work | under | this | contract | within | 10 | calendar | |
| days | following | its | acknowledgement | of | Notice | to | Proceed | Letter | #1, | and | (b) | prosecute | the | work | |
| diligently | that’s | authorized | by | Notice | to | Proceed | Letter | #1. | ‐NOTE: | Notice | to | Proceed | Letter | #1 | |
| will | be | issued | following | the | government’s | approval | of | the | Contractor’s | Payment | and | ||||
| Performance | Bonds | and | Insurance. | By | way | of | Letter | #1, | the | Contractor | will | be | authorized | to | |
| perform | the | work | of | the | contract, | except | physical | construction | of | features | and | demolition | of | ||
| existing | features | 75 | feet | from | the | crest | of | the | bank | in | sites | 1 | and | 5. |
| Upon | the | USACE‐Chicago | District’s | receipt | of | the | easement | from | the | Porter | County | Drainage | Board, | ||||||
| the | contracting | officer | will | issue | Notice | to | Proceed | Letter | #2 | (final | notice) | to | the | Contractor, | which | ||||
| is | expected | to | occur | by | mid | April | 2015. | Under | this | particular | Notice | #2, | the | contractor | will | be | |||
| authorized | to | initiate | physical | construction | of | proposed | features | and | demolition | of | existing | features | |||||||
| 75 | feet | from | the | crest | of | the | bank | in | sites | 1 | and | 5. | Following | the | Contractor’s | acknowledgement | of | ||
| Notice | to | Proceed | Letter | #2, | it | will | be | required | to | complete | the | entire | work | of | the | Contract | ready | ||
| for | use | not | later | than | 1,825 | calendar | days | from | the | date | it | acknowledged | Notice | to | Proceed | #1. | The | ||
| time | stated | for | completion | shall | include | final | cleanup | of | the | premises. | |||||||||
| (End of clause) |
E. POINT OF CONTACT: Greg M. Hermsen at (312) 846-5376 or gregory.m.hermsen@usace.army.mil.