AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SUBJECT: INVITATION FOR BIDS NO. W912P6-12-B-0002, SEWER IMPROVEMENTS; SCHERERVILLE INDIANA, SECTION 219 PROJECT

A. The government is issuing this Amendment Number 0002 to its previously issued Solicitation W912P6-12-B-0002 to amend the IFB as discussed on the follow ing page and to provide responses to Contractor's inquiries.

B. The point of contact for this Amendment is Sean McNab at (312) 846-5368.

---See Next Page---

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Feb-2012

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-12-B-0002

X 9B. DATED (SEE ITEM 11)

24-Jan-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Feb-2012

CODE

U. S. ARMY ENGINEER DISTRICT, CHICAGO

111 NORTH CANAL STREET SUITE 600

CHICAGO IL 60606-7206

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P6-12-B-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

C. BID OPENING DATE: The bid opening date is NOT EXTENDED by this Amendment;

therefore, BIDs are due by 2:00 p.m. CDT on 24 February 2012. Detailed information regarding the submission of bids is located in SECTION 00010 of the Solicitation Document. Please submit any inquiries in writing to Sean McNab at sean.e.mcnab@usace.army.mil with a copy furnished to Regina Blair at regina.g.blair@usace.army.mil. – BE SURE TO INCLUDE THE

SOLICITATION NUMBER W912P6-12-B-0002 AND PROJECT TITLE ON THE SUBJECT

LINE OF YOUR EMAIL.

D. AMENDED SOLICITATION SECTION:

STANDARD FORM 1442: BIDDERS SHALL DISREGARD THE CONTIGENCY STATEMENT

PROVIDED AT BLOCK #10 OF THE IFB WITH RESPECT TO THE 401 PERMIT. In this regard, the Bid Opening will be held on 24 FEBRUARY 2012. Therefore, ALL BIDS MUST

BE FURNISHED AS SPECFICIED IN THE SOLICITATION, AND RECEIVED BY 2:00PM CDT

ON 24 FEBRUARY 2012.

E. USACE’S RESPONSES TO CONTRACTOR’S INQUIRIES

Q1. What is your expectation for dewatering during this project both at the ditch work and the box structure installation? The borings for HA3 and PA2 show that we will be in the water when placing the stone under the box structure.

A1. It is anticipated that the construction work and regrading of the ditch will lower the static water in this area during the drier summer months of July, August and September. Refer to Specification Section 01 57 20.02 03 for dewatering procedures as part of the Environmental Protection Plan. Also, a Dewatering Work Plan shall be submitted as described in Specification Section 31 00 00. Finally, dewatering is included in the cost for certain bid items described in Specification Section 01 22 00.00 03.

Q2. I understand 36" RCP in lieu of 33" RCP is not acceptable. Would you consider pouring a 33" restrictor into the 36" concrete pipe. 33" pipe would most likely have to come from Minnesota or Ohio or a form rental would be required, either will add considerable cost to the 33" pipe.

A2. Reference the USACE’s response to Question #39 of Amendment 0001, dated 17 Feb 2012, the response should have read as: Contractor’s shall bid on the 3’x 4’ box culvert, as specified in the Bid Set. Subsequent to the contract award, the winning Contractor may propose material savings via the Value Engineering Contruction Clause, 52.248-3.

Q3. Between Stations 71+50-72+50 on Sheet C-13 shows a fill on the contour lines and shows a cut on the profile. Also, cross sections on Sheets C-51 and C-52 show fills.

Please clarify.

A3. There was a software error when producing the existing contours shown in the plan view on Sheet C-13 and existing profile shown on Sheets C-51 & C-52. The profile view on Sheet C-13 best represents the existing conditions of a plateau or “land bridge” between Sta. 71+50 to 72+50. This area must be excavated to install the new 33” RCP and shall be regraded to the elevations shown in the plan/profile view on Sheet C-13.

Q4. Just spoke with pipe supplier and he cannot find any type 2 pipe 33" in diameter. Please advise.

A4. Reference the USACE’s response to Question #39 of Amendment 0001, dated 17 Feb 2012, the response should have read as: Contractor’s shall bid on the 3’x4’ box culvert, as specified in the Bid Set. Subsequent to the contract award, the winning Contractor may propose material savings via the Value Engineering Contruction Clause, 52.248-3.

Q5. [Question] #39 in Addendum #1 appears to ask if a 38” x 60” elliptical pipe could be substituted for the 3’ x 4’ box culvert. The governments answer is that the pipe could be substituted if the cross sectional area is greater or equal. Rausch Construction believes this answer is improper. The project is designed and the CLIN call out for 36” x 48” Precast Box Culvert. The low base bid should be evaluated on that basis. If a contractor want to submit a VE proposal after award to substitute a elliptical pipe for the box culvert, then that is the proper time for that substitution. If the government wants to issue a alternate bid documents indicating the use of a 38’ x 60” elliptical pipe then all the contractors and material suppliers can submit bids on that. The answer to this question, the way it was issued, could result in the government comparing apples to oranges if some contractors pricing is based on the IFB design and others are on some alternate pipe section not shown on the IFB. With all due respect this is not the way lowest, responsive, responsible bidding is supposed to work. We formally request the government issue another addendum stating the lowest bid will be based on the IFB which has a 36” x 48” precast concrete box culvert and elliptical pipe could be considered in a VE proposal.

A5. Reference the USACE’s response to Question #39 of Amendment 0001, dated 17 Feb 2012, the response should have read as: Contractor’s shall bid on the 3’x4’ box culvert, as specified in the Bid Set. Subsequent to the contract award, the winning Contractor may propose material savings via the Value Engineering Contruction Clause, 52.248-3.

Q6. Plans/specs clearly indicate that there is to be 4" of topsoil re-spread along the box culvert section. However, it is not as clear on what to do for the ditch and fill areas (along

Rohrman Rd.) Is 4" topsoil to be re-spread along those sections (prior to the erosion blanket)?

It appears as if there is very little existing true topsoil. So if we are to place topsoil along the ditch/fill areas, then will the contractor be required to import topsoil as part of this contract? Or will that be handled as a change order later?

A6. Per Specification Section 31 00 00 and the “RCP Trench Detail” on Sheet C-16, a minimum of 4” of topsoil shall be placed to ensure grass growth. Topsoil excavation and placement is part of the unit cost for CLIN 0010 so the contractor shall identify areas of topsoil strip before excavation. Soil testing in the ditch after excavation is highly recommended to ensure material suitable for plant growth.

Additionally, attention to the material from the wetland excavation (Sheets C-03 & C- 04, Sta. 20+00 to 28+50) should be given for use as topsoil respread. It is anticipated all excavated topsoil can be reused onsite as respread.

(End of Summary of Changes)