W81G6613228376

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SUBJECT: INVITATION FOR BIDS NO. W912P6-12-B-0002, SEWER IMPROVEMENTS, SCHERERVILLE, INDIANA, SECTION 219 PROJECT

A. The government is issuing this Amendment Number 0001 to its previously issued Solicitation W912P6-12-B-0002 for the purpose of implementing various changes throughout the Bid Set (Solicitation, Plans & Specifications) as called out w ithin this Amendment.

B. In this Amendment, the USACE is also providing: 1) responses to Contractor's inquires; 2) the most current Davis Bacon (DOL) w age rates; and, 3) the “Attendance” Sheet from the Pre-Bid Meeting held on Friday, 10 February 2012.

C. The point of contact for this Amendment is Regina G. Blair at 312-846-5371& regina.g.blair@usace.army.mil.

See NEXT PAGE

1. CONTRACT ID CODE PAGE OF PAGES

J 1 28

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Feb-2012

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-12-B-0002

X 9B. DATED (SEE ITEM 11)

24-Jan-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Feb-2012

CODE

U. S. ARMY ENGINEER DISTRICT, CHICAGO

111 NORTH CANAL STREET SUITE 600

CHICAGO IL 60606-7206

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P6-12-B-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

D. BID OPENING DATE: The bid opening date is NOT EXTENDED by this Amendment; therefore, BIDs are due by 2:00 p.m. CDT on 24 February 2012. Detailed information regarding the submission of bids is located in SECTION 00010 of the Solicitation Document. Please submit any inquiries in writing to Sean McNab at sean.e.mcnab@usace.army.mil WITH A COPY FURNISHED TO REGINA BLAIR AT regina.g.blair@usace.army.mil. – BE SURE TO INCLUDE THE SOLICITATION NUMBER W912P6‐12‐B‐

0002 AND PROJECT TITLE ON THE SUBJECT LINE OF YOUR EMAIL.

E. AMENDED SOLICITATION SECTIONS:

1. AMENDED BID SCHEDULE: THIS AMENDMENT IMPLEMENTS THE FOLLOWING CHANGES TO

SECTION 00010 (BID SCHEDULE) OF THE SOLICITATION DOCUMENT. PROVIDED HEREUNDER IS A REVISED BID SCHEDULE THAT CONTRACTORS SHALL USE TO INPUT THEIR PRICES; THEREFORE, THE PREVIOUSLY ISSUED BID SCHEDULE of 24 Jan 2012 IS HEREBY REPLACED WITH THE REVISED BID

SCHEDULE CONTAINED HEREIN.

CLIN 0007

The unit of issue has changed from Square Yard to Linear Foot.

CLIN 0013

The pricing detail quantity has increased by 105.00 from 603.00 to 708.00.

CLIN 0018

The pricing detail quantity has increased by 29.00 from 246.00 to 275.00.

CLIN 0020

The pricing detail quantity has increased by 16.00 from 946.00 to 962.00.

CLIN 0031

The CLIN description has changed from POND OUTFILL RECONSTRUCTION to POND OUTFALL

RECONSTRUCTION.

The CLIN extended description has changed from This Line Item identifies the work description that relates directly to Sub‐line Items 0031AA THROUGH 0031AF. The Sub‐line Items themselves identify the quantities required to execute the work associated with this LINE ITEM 0031. Therefore, the Contractor shall provide its pricing separately at Sub‐line Items 0031AA THROUGH 0031AF. to This Line Item identifies the work description that relates directly to Sub‐line Items 0031AA THROUGH 0031AG. The Sub‐line Items themselves identify the quantities required to execute the work associated with this LINE ITEM 0031. Therefore, the Contractor shall provide its pricing separately at Sub‐line Items 0031AA THROUGH 0031AG..

SUBCLIN 0031AF

This SUBCLIN has been renumbered to SUBCLIN 0031AG.

The unit of issue Lump Sum has been added.

SUBCLIN 0031AF is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0031AF 1 Each

OPTION RISER, TYPE 4 CASTING

FFP

NET AMT

2. DAVIS BACON ACT WAGE DETERMINATION (Re: Block #10, Page 1 of the IFB): This

Amendment incorporates the most current wage rates IN120001 02/10/2012 IN1 and is attached hereto.

F. AMENDED PROJECT SPECIFICATION SECTIONS

1. SECTION 01 22 00.00 03 MEASUREMENT & PAYMENT

Paragraph 1.2.5.1 Payment – Revised language to clarify “offsite disposal” of material is incidental to the work for ditch construction.

Paragraph 1.1.6 – Revised Option Bid Item to 0031AG

Paragraph 1.2.20 – Added Option Bid Item 0031AF.

2. SECTION 01 33 00 SUBMITTAL PROCEDURES, SUBMITTAL REGISTER – Updated Submittal Register to accommodate SD‐01 Preconstruction Submittals for Specification Sections 32 11 23, 32 11 26, 32 12 11, and 32 16 13.

3. SECTION 31 00 00 EARTHWORK, Paragraph 1.1.1 Excavation – Revised language to clarify measurement for ditch construction.

4. SECTION 32 11 23 AGGREGATE BASE COURSE (ABC), Paragraph 1.4 SUBMITTALS – Added SD‐01

Preconstruction Submittals.

5. SECTION 32 11 26 BITUMINOUS BASE COURSE, Paragraph 1.3 SUBMITTALS – Added SD‐01 Preconstruction

Submittals.

6. SECTION 32 12 11 BITUMINOUS SURFACE TREATMENT, Paragraph 1.4 SUBMITTALS – Added SD‐01

Preconstruction Submittals.

7. SECTION 32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTER, Paragraph 1.4 SUBMITTALS – Added

SD‐01 Preconstruction Submittals.

8. SECTION 33 40 00 STORM DRAINAGE UTILITIES, Paragraph 3.1 EXCAVATION FOR PIPE CULVERTS, STORM

DRAINS, AND DRAINAGE STRUCTURES – Corrected spelling error.

G. AMENDED PROJECT DRAWING SHEETS

1. G‐04 – Revised the bold project lines to better represent the limits of construction.

2. C‐01 – Added a callout in plan‐view near Sta. 10+65 to reference a 120° pre‐cast bend detail shown on C‐

16.

3. C‐01 – Added Note #2 regarding re‐installation of fence in Lot 89 during construction.

4. C‐01 – Added Note #3 regarding protection of pool in Lots 89 and 90 after construction.

5. C‐01 – Added Note #4 regarding tree protection in Lot 76 during construction.

6. C‐02 – Added a callout in plan‐view regarding utility coordination.

7. C‐03 – Revised Note #1 to clarify material disposal responsibility.

8. C‐04 – Revised Note #1 to clarify material disposal responsibility.

9. C‐04 – Revised Note #2 to reference Sheet (20) C‐16 for typical ditch detail.

10. C‐04 – Located existing 24” RCP outfall near Sta. 76+50 on Line ‘C’.

11. C‐13 – Revised callout for quantity of aggregate used for land bridge at Sta. 72+50.

12. C‐15 – Located existing 24” RCP outfall near Sta. 76+50 on Line ‘C’. Added callout to provide riprap.

13. C‐16 – Revised RCP TRENCH DETAIL topsoil thickness from 6” to 4”.

14. C‐16 – Added 120 DEGREE BEND SECTION detail.

15. C‐19 – Added note to EROSION CONTROL BLANKET STAPLE PATTERN detail for acceptable type of erosion control blanket.

16. C‐55 – Added Type 4 beehive grate to manhole DETAIL STR. NO. 101.

H. USACE’s RESPONSES TO CONTRACTOR’S INQUIRIES:

Q1. The unit for Item 0007 Curb and Gutter, Remove is Square Yard, should this be Linear Feet?

A1. Yes; the unit for Curb and Gutter Remove should be Linear Feet (LF). The Bid Schedule has been amended to show this change for CLIN 0007, revising the unit of measure to LF.

Q2. Sheet 6 of 58 C‐02 aprox. Sta 19&3' Structure #9 drawn as existing appears to be called out as new. Is this a new structure or existing structure to be removed?

A2. Existing STR. NO. 9 shown on Sheet C‐02 is to be removed. Please note Proposed STR. 9A and STR. 9B will intercept the existing pipes entering STR 9 and then be connected perpendicular to the proposed box culvert.

Q3. Bid Line Item 0007 is 136 Sq. Yds gutter remove. 0017 is 136 Lin. Ft. curb & gutter. Is Lin Ft or Sq Yds correct?

A3. The Bid Schedule has been amended to show this change for CLIN 0007, revising the unit of measure to LF.

Q4. Bid Line Item #13‐Is this aggregate base course for asphalt? Per specs 32 11 23 Page #2 aggregate called out as size no 53. Line Item calls out #8. Which is correct?

A4. CLIN 0013 refers to the aggregate #8 placed at Sta. 72+00 for the construction/maintenance roadway shown on Sheet C‐13. Specification Section 32 11 23 refers to aggregate #53 required under the roadway section when installing storm sewer. Refer to the Bituminous Roadway Repair detail on Sheet C‐17. Please note aggregate

#53 is paid as part of the roadway patching under CLIN 0014.

Q5. Will 36" RCP be accepted in lieu of 33" RCP?

A5. No, 36” RCP shall not be accepted. The 33” pipe must be used. It has been designed to act as the control structure for detention upstream.

Q6. Does bid item 0011 & 0012 (grass seed) take care of seeding in ditch construction?

A6. Yes. On Sheets C‐03 and C‐04, refer to callouts 12 and 15 in the legend requiring erosion control blankets and wetland seed mixture (Sta. 20+00 to 29+63). On Sheets C‐04 through C‐13 from Sta. 29+00 to 76+50 (Line B) and from Sta. 75+00 to 76+95 on Line C, refer to callouts 12 and 14 requiring erosion control blankets and prairie seed mixture to be placed. On Sheet C‐01 and C‐02 along Line A, Sta 10+00 to Sta 20+00, callout 13 in the legend refers to CLIN 0019 Mulched Seeding D.

Q7. Ditch construction cuts and fills do not balance. Can excess cut material be placed in fill area and raise the proposed grade to accommodate the excess material?

A7. The fill areas shall not exceed the proposed elevations shown on the plans. There will be excess cut material to be removed and the cost of off‐site disposal is incidental as described for Bid Item 0010 in the Specification

Section 01 22 00.00 03 Measurement & Payment.

Q8. Can excess trenched soils from box culvert be added to ditch fill area?

A8. The fill areas shall not exceed the proposed elevations shown on the plans. There will be excess cut material to be removed and the cost of off‐site disposal is incidental as described for Bid Item 0010 in the Specification

Section 01 22 00.00 03 Measurement & Payment.

Q9. Bid Line item #11 ‐ 316 Lbs. Prairie Seed #12 ‐ 61 Lbs. Wet Land Seed #19 ‐ 2783 Sq. Yds. Mulched Seeding Please explain where these different seeding items go?

A9. On Sheets C‐03 and C‐04, refer to callouts 12 and 15 in the legend requiring erosion control blankets and wetland seed mixture (Sta. 20+00 to 29+63). On Sheets C‐04 through C‐13 from Sta. 29+00 to 76+50 (Line B) and from Sta. 75+00 to 76+95 on Line C, refer to callouts 12 and 14 requiring erosion control blankets and prairie seed mixture to be placed. On Sheet C‐01 and C‐02 along Line A, Sta 10+00 to Sta 20+00, callout 13 in the legend refers to CLIN 0019 Mulched Seeding D.

Q10. G‐04: We noticed that the maintenance of traffic map is off. The dark bold lines, representing project work, are not centered over the actual areas of work.

A10. The dark bold project lines of the traffic control map have been revised on Sheet G‐04 to better depict the limits of construction.

Q11. Sheet C‐01:There is an existing concrete channel with handrailing (please see photos 004‐007). This is not clearly addressed on the plans, there is no call for demo that we could see. Apparently there is to be a new grated concrete end section to be installed (C‐16), but it isn’t clear how this work will be done, or if the existing concrete slab is to remain, be re‐installed, etc. Also where exactly does the 4'x3' rcp box culvert end at this location? We feel there should be a new drawing for this work specifically, or additional notes to direct the contractor on how to proceed with this work?

A11. Refer to Sheet C‐16 for a new detail showing an extension of the culvert with a pre‐cast bend. Rather than trying to join the new culvert to the existing headwalls, the proposed box will be extended. Per Sheet C‐01, a new handrail will be installed into the top of the box. CLIN 0020 has been revised to 962 LFT.

Q12. Sheet C‐01: There are a line of pine trees on the north side of 85th avenue that we noticed with the AE on a site visit. These trees were never addressed on the backcheck set. They should provide direction on what to do with these trees; to either remove, or protect them.

A12. These trees are not shown on C‐01 however, they are over existing sanitary sewer and have a small drip line. Note #4 has been placed on Sheet C‐01 for contractor to protect the trees. In addition, the County has agreed to replace these trees if they do not survive the construction activities.

Q13. C‐02: There are a few Ameritech phone line boxes throughout the area the pipe is to be installed. There are no notes addressing the phone lines here and they definitely look like they will be in conflict.

A13. During utility coordination conversations between DLZ and AT&T, AT&T stated they wanted to be notified by the contractor to coordinate temporary relocation. A callout has been added near Sta. 15+20 on Sheet C‐02.

Q14. C‐04, C‐15: We found an 18" or 21" RCP from the NW that goes under Rohrman and extends, and empties out, into the ditch from the lake across the street. This pipe wasn’t shown in the plans. It looks to be about station

76+50 on Line C?

A14. The existing 24” RCP is now shown on Sheet C‐04 & C‐15. The pipe has been approximated on the plans and a note for the contractor to field verify its location and elevation has been added to Sheet C‐15. This pipe outfall will receive riprap and CLIN 0018 has been revised to 275 tons.

Q15. C‐16: The GBES detail drawings all should be in one box so it is clear all the details pertaining to that structure are isolated. The set we had some of the text was overlapping other details.

A15. The Grated Box End Section Type II detail has been revised and boxed.

Q16. C‐55: There appear to be access problems. The easement access path has a large dropoff in elevation (there is a retaining wall see pic 013), so it will be difficult to bring equipment back there without going into the other residents yard (also a steep slope). I am not exactly sure what should be done about that, but it will be an issue for the contractor.

A16. The easement is the only access. Objects in the easement can be removed. The County will be contacting the affected homeowners and discussing the details of accessing the area. Also on Sheet C‐55, a note calls for the contractor’s responsibility of property restoration from any damage occurred during construction activities.

Q17. C‐55: There was no mention of removing and replacing the existing pipes and open grate structure (see 007‐009). Currently there are 2 ~12" plastic (corrugated pvc?) pipes extending from a manhole into the pond. On the land side there is another ~18"‐24" corrugated pvc pipe.

Also, what type of cover is needed for the new manhole? Is it just a concrete box.

A17. The existing pipes and structures are to be removed and replaced by the storm sewer and structure shown on Sheet C‐55. Per the Detail of STR. No. 101, the top of the manhole is a concrete slab set on 4” blocks to allow weir flow into the structure. A beehive inlet (Type casting) on top of the slab has been added for access inside the manhole. CLIN 0031AF has been added to the bid schedule for this casting.

Q18. Is the area shown on drawing C‐13(J/903) where the 603 tons of #8 aggregate, item 0013, to be placed? The aggregate required under the walks, paving and at the precast box section is to be included with those bid items. Also, the square yards quantity of 903 is incorrect if the ramp down to the bottom of the ditch is included.

A18.C LIN 0013 refers to aggregate #8 placed at Sta. 72+00 for the construction/maintenance roadway shown on Sheet C‐13. The quantity for aggregate at this location shown on C‐13 has been revised to 1060 sq. yds. CLIN 0013 has been revised to 708 tons

Q19. Drawing C‐13 shows a "spoils disposal area". Can we dispose spoils from the ditch reconstruction there?

A19. The fill areas shall not exceed the proposed elevations shown on the plans. There will be excess cut material to be removed and the cost of off‐site disposal is incidental as described for Bid Item 0010 in the Specification Section 01 22 00.00 03 Measurement & Payment. The disposal areas shown on Sheets C‐13 & C‐14 may receive spoils to meet the proposed grades shown on the plans. This area will be an emergency overflow for the pond and the “channel” formed by the proposed contours must be maintained.

Q20. Is Microsoft Project an acceptable software program?

A20. Microsoft Project is an acceptable software for the project schedule.

Q21. In the back yard at approximately 11+00 there is a swimming pool and deck which may be within the easement?

A21. The contractor will need to delineate the easement on the ground and coordinate with the homeowner shown on Sheet C‐01. The deck shall be removed and the material placed outside the easement at a location specified by the owner. The contractor shall not re‐install the deck.

The pool shall be protected and worked around if possible. Refer to added Note #3 on C‐01. In addition, the County GIS photos (not provided) indicate the pool may only minimally encroach on the easement—contractor to field verify.

Q22. The Pond Outfall Reconstruction Item 0031AD, Excavation, Common, has a quantity of 10 cubic yards, is this correct? Also, per your drawing the grade is to be raised, can we use soils from the ditch for this?

A22. CLIN 0031AD is correct in the quantity of 10 cubic yards of excavation. Excess spoils from the ditch excavation may be used for fill in this area. Per Specification Section 31 00 00, a 4” layer of topsoil shall be respread to meet final grade shown on Sheet C‐55.

Q23. Your Bid Schedule for the Stormwater Diversion Schererville Heights project does not contain an item for the demolition of the existing paving at 85th Ave. and Edison St. Where does that quantity go?

A23. The cost of pavement demolition is included in the cost of the box culvert as described for Bid Item 0020 in the Specification Section 01 22 00.00 03 Measurement & Payment.

Q24. The unit for Item 0007 Curb and Gutter, Remove is Square Yard, should this be Linear Feet?

A24. Yes, the unit for Curb and Gutter Remove should be Linear Feet, LFT. CLIN 0007 in the Bid Schedule has been revised to LFT.

Q25. There is a concrete sluice way at the beginning of the box structure, approximately 10+75, that is not shown on the drawings. Is this structure to be demolished? Where do the costs for this demolition go on the bid form.

A25. The existing sluice is to be demolished and the cost is included in CLIN 0020. Refer to Sheet C‐16 for a new detail showing an extension of the culvert with a pre‐cast bend. Rather than trying to join the new culvert to the existing headwalls, the proposed box will be extended. Per Sheet C‐01, a new handrail will be installed into the top of the box. CLIN 0020 has been revised to 962 LFT.

Q26. It appears that property owners adjacent to the utility easement west of Edison St. have encroached on to the easement. There are wood and chain link fences and timber retaining walls, please advise.

A26. The easement is the only access. Objects in the easement can be removed. The County will be contacting the affected homeowners and discussing the details of accessing the area. Also on Sheet C‐55, a note calls for the contractor’s responsibility of property restoration from any damage occurred during construction activities.

Q27. Drawings C‐01 and C‐02 have a legend note 7, "Utility, Protect". This note is coupled with note 10, "Utility

Relocation By Others". Are we to protect these utilities or are they to be relocated.

A27. These utilities will be moved “by others” prior to this project. However, they may only be deflected below the proposed culvert so note 7 to protect them was added to keep the contractor aware of their presence.

Q28.Drawing C‐02 shows a proposed grade at the center line of the easement over the box structure. What are the proposed grades at the edge of the easement.

A28. In the profile view on Sheet C‐02, a note for the contractor to “grade to drain” is given. The contractor is to match high point and rim elevations of inlets provided. The contractor shall meet the existing grade at the easement lines and slope to the drains.

Q29.Drawing C‐01 does not show a proposed grade and very few existing grades, please provide.

A29. On Sheet C‐01, no proposed grades are shown because the contractor shall restore the grades back to existing elevations after installation of the box culvert. According to the existing contours, the high point elevation is at approximately Sta. 11+40 and the existing overflow channel shall be re‐graded uniformly to the north and south. Existing ground elevations over the box culvert are also shown in the profile view.

Q30. REF: Specification 01 52 02.00 03‐Temporary Construction Facilities ‐ Item: 3.2.1‐Administrative Field Office

a. Is a field office required, considering the limited construction work zone? i.e. restricted space for trailers/parking/material lay down area.

b. If "YES" to (a) above, will there be a designated area outside of the construction work zone

A30. Per Specification Section 01 52 02.00 03, a USACE field office is not required. If the contractor chooses to use a field office for his use, requirements are specified in paragraph 3.2. Two areas designated as construction staging areas are shown on Sheet C‐03 may be used for materials staging or office trailers. The contractor shall stay out of the wetland area and provide erosion control measures to protect the wetland and surrounding properties.

Q31. REF: Specification 01 52 02.00 03‐Temporary Construction Facilities ‐Item: 3.2.2‐Storage Area

a. Will a storage area be allowed?

b. If "YES" to (a) above, will there be a designated area outside of the construction zone?

A31. Two areas designated as construction staging areas are shown on Sheet C‐03 may be used for materials staging or office trailers. The contractor shall stay out of the wetland area and provide erosion control measures to protect the wetland and surrounding properties.

Q32. REF: Bid Form Item # 0009‐Shed, Remove and Reinstall

a. The shed will be temporarily relocated in their yard along 85th Ave. Will this be acceptable?

b. Can the shed be emptied to facilitate ease of relocation and minimize damage?

A32. The temporary relocation of the shed must be coordinated with the homeowner by the contractor. If they agree to relocation in their yard, than that is acceptable. Prior to construction, the Lake County Surveyor’s

Office will notify the homeowner that they should remove the contents of the shed before its relocation. The contractor shall confirm with the homeowner prior to beginning work in this section.

Q33. REF: Sheet C‐01 Station 12+50 to 13+50

a. T here is no mention of the beautiful mature spruce trees located on the east side of the easement. It may not be possible to save these trees during the installation of the culvert. Please advise.

A33. These trees are not shown on C‐01 however, they are over existing sanitary sewer and have a small drip line. Note #4 has been placed on Sheet C‐01 for contractor to protect the trees. In addition, the County has agreed to replace these trees if they do not survive the construction activities.

Q34. REF: Sheet C‐01, Station 14+00 to 14+50

a. There is no mention of the shed located on the east side of the easement. It is along the fence to be removed and will be in jeopardy during the installation of the culvert. Please advise.

A34. Per Sheet C‐01, only one corner of the shed in Lot 76 encroaches upon the easement and construction activities are primarily on the west side of the easement. The shed should not interfere with nor be impacted by any construction activities.

Q35. REF: Sheet C‐01, Station 12+680.4

There is no mention of the large tree outside the west side of the easement. The branches, thus the dip line and roots, extend well past the culvert installation to the east. The tree and root system will be compromised during the culvert installation. Please advise.

A35. This tree will be removed by others during water line relocation activities prior to this project.

Q36. REF: Sheet C‐01, Station 11+00 There is no mention of the pool and deck on the west easement. The pool and deck will be in jeopardy during the installation of the culvert. Please advise.

A36. The contractor will need to delineate the easement on the ground and coordinate with the homeowner shown on Sheet C‐01. The deck shall be removed and the material placed outside the easement at a location specified by the owner. The contractor shall not re‐install the deck. The pool shall be protected and worked around if possible. Refer to added Note #3 on C‐01. In addition, the County GIS photos (not provided) indicate the pool may only minimally encroach on the easement—contractor to field verify.

Q37. Do you want the 4' x 3' Box culvert ASTM C‐1577 Spec?

A37. Yes, per INDOT Section 714. Specification Section 33 40 00 paragraph 3.1.A, references work to be performed under INDOT Section 714 and 715.

Q38. Are mastic joints (INDOT spec) adequate?

A38. Yes, mastic joint are adequate under INDOT Section 715.

Q39. Eliptical pipe 38" x 60" HE3 would have gasketed joints for significant savings? The material savings would be about half!

A39. As long as the elliptical pipe meets INDOT specs and it has equal or greater cross‐sectional area, it could be substituted. HOWEVER, structures would have to be added at inlets and pipe connections to ensure stable and level structures. Currently, the plans call for inlets and side connections into the top and sides of the box, which will provide a stable surface for these structures.

Q40. What design earth cover is required? (i.e. 0‐2', 2'‐3', 3'‐5').

A40. INDOT specifications require a minimum of 1‐2 feet of cover. Contractor shall meet proposed grade over the storm sewer.

Q41. Can we install 36" RCP in lieu of 33" RCP?

A41. No, 36” RCP shall not be accepted. The 33” pipe must be used. It has been designed to act as the control structure for detention upstream.

Q42. The specifications call for the registered surveyor to be independent. Is it absolutely necessary to use an independent firm as it will affect how smoothly the project is controlled from our stand point?

A42. This is a standard USACE requirement per Specification Section 31 00 00.

Q43.Does the Corps have a pre‐approved dump site for the muck from Station 20+00 to 29+00?

A43. The plans and specifications do not specify pre‐approved dump sites. The cost of off‐site disposal is incidental as described for Bid Item 0010 in the Specification Section 01 22 00.00 03 Measurement & Payment.

Refer to Note #1 on Sheets C‐03 & C‐04 for contractor responsibility of material disposal.

Q44. Are there station by station cross sections available for the proposed box culvert area so that the amount of fill needed can be calculated accurately?

A44. No cross‐sections for the box culvert stations are available. Excess spoils from the ditch excavation may be used for fill in this area. Per Specification Section 31 00 00, a 4” layer of topsoil shall be respread to meet final grade over the culvert.

Q45. Please provide a specification or standard spec number for the erosion control blanket. No properties are available in the documents.

A45. The erosion control blanket is North American Green 125BN or equivalent. A note has been added to Sheet

C‐19 above the staple pattern.

Q46. In the general area of Station 30+00 to Station 70+00, is it acceptable for the contractor to cut a bench if needed in areas that aren't necessarily in the proposed cut section if the material is replaced and compacted upon not needing the access any longer?

A46. No earthwork shall occur outside of the construction limits shown on the plans. Minimizing the disturbed area in the ditch was a requirement of IDEM. Within the construction limits, benching could be done with complete restoration and stabilization afterward.

- End of Inquiries and Responses -

Section 00010 Solicitation Contract Form

REVISED BID SCHEDULE

(AMENDMENT 0001)

THE BELOW BID SCHEDULE CONTAINS A COMBINATION OF FIRM FIXED PRICE AND COST REIMBURSABLE

LINE ITEMS

0001 1 Lump Sum Mobilization and Demobilization

FIRM-FIXED-PRICE (FFP)

PURCHASE REQUEST NUMBER: W81G6613228376

0002 1 Lump Sum Maintaining Traffic

0003 1 Lump Sum Erosion Control

0004 1 Lump Sum Clearing and Grubbing

0005 1 Lump Sum Fence, Remove and Reinstall

0006 2 Each Project Sign and Safety Sign

0007 136 Linear

Foot

Curb and Gutter, Remove

0008 54 Square

Yard

Sidewalk, Concrete, Remove

0009 1 Each Shed, Remove and Reinstall

0010 5,800 Linear

Ditch Construction

0011 316 Pound Seed Mixture, Prairie

0012 61 Pound Seed Mixture, Wetland

0013 708 Net Ton

(2,000 LB)

Coarse Aggregate, 8

0014 243 Square

HMA Patching, Type A

0015 246 Square

Geotextiles

0016 54 Square

Sidewalk, Concrete, 4 Inch

0017 136 Linear

Curb and Gutter, Concrete

0018 275 Net Ton

(2,000 LB)

Riprap, Revetment, Grouted

0019 2,783 Square

Mulched Seeding, D

0020 962 Linear

Structure, Precast, RC, Box Section 4FT X 3FT

0021 2 Each Safety Metal End Section, 2:1, 33 Inch

0022 439 Linear

Pipe, Type 2, Circular, 33 Inch

0023 2 Each Grated Box End Section 1, 4:1, 48" X 36"

0024 4 Each Riser, Type 2 Casting

0025 3 Each Riser, Type 4 Casting

0026 3 Each Riser, Type 7 Casting

0027 2 Each Manhole, C4

0028 13 Linear

Pipe, Type 2, Circular, 15 Inch

0029 8 Linear

Pipe, Type 2, Circular, 18 Inch

0030 1 Lump Sum Performance & Payment Bond for LINE ITEMS 0001 THROUGH 0029

THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.

Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.

NOT TO EXCEED

AMT

ITEM NO SUPPLIES/SERVICES

OPTION POND OUTFALL RECONSTRUCTION

This Line Item identifies the work description that relates directly to Sub-line Items 0031AA THROUGH 0031AG. The Sub-line Items themselves identify the quantities required to execute the work associated with this LINE ITEM 0031.

Therefore, the Contractor shall provide its pricing separately at Sub-line Items

0031AA THROUGH 0031AG.

0031AA 1 Each OPTION Manhole, K

0031AB 34 Linear

OPTION Pipe, Type 2, Circular, 12 Inch

0031AC 31 Linear

OPTION Pipe, Type 2, Circular, 36 Inch

0031AD 10 Cubic

OPTION Excavation, Common

0031AE 400 Square

OPTION Mulched Seeding, D

0031AF 1 Each

OPTION RISER, TYPE 4 CASTING

0031AG Lump Sum OPTION Performance & Payment Bond FOR OPTION ITEMS 0031AA THROUGH

0031AF

THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.

Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.

NOT TO EXCEED

AMT

TOTAL BID PRICE (Line Items 0001 through 0031AG): $____________________________

IMPORTANT NOTES REGARDING THIS ACQUISITION:

1. BID CONDITIONS:

a. Contractor’s shall bid ALL items ( INCLUDING THE OPTION ITEMS) that are contained in the Bid Schedule, with no exceptions. Should a contractor fail to fully complete the bid schedule, its bid will not be considered responsive to the solicitation and eligible for the resultant contract award. Therefore, the bidder’s total price for the work shall be based on the TOTAL of all BID and OPTION ITEMS included in the Bid Schedule; the Contractor shall enter both its unit price and extended price for EACH BID & OPTION ITEM.

b. The Government intends to award all BASE BID ITEMS to the successful bidder at the bid prices provided under its winning bid schedule.

c. The Option Items in the Bid Schedule are numbered 0031AA through 0031AG.

d. Split awards or multiple award contracts will not result from this Solicitation.

2. COMPETITION: Competition for this acquisition is RESTRICTED TO SMALL BUSINESSES.

3. EVALUATION OF OPTION ITEMS:

The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

4. EXERCISE OF OPTION ITEMS:

At the government's discretion, Any, All or None of the Option Items (0031AA through 0031AG) may be exercised within 60 calendar days following the contractor’s acknowledgement of the Notice to Proceed. If any option item is exercised, it will be awarded by way of a formal modification to the Contract and in accordance with the provisions of FAR Clause 52.217‐7. The modification will not grant any additional performance period to the contactor; hence, no additional calendar days will be added to the contract.

Note: The Government is under no obligation to award any of the option items.

5. SUBMISSION OF BIDS:

a. BIDS OR MODIFICATIONS TO BIDS THAT ARE RECEIVED BY FACSIMILE OR TELETYPE WILL NOT BE CONSIDERED. All sealed Bids must be submitted in accordance with the procedures set forth in BLOCK NO. 13 of PAGE 1 of this Solicitation Document.

b. Bidders are required to acknowledge the receipt of all amendments to the Solicitation on the Standard Form 1442 in the space provided, by completing Blocks 8 and 15 of the Amendment (Standard Form 30), by separate letter, or by telegram prior to opening of bids. Failure to acknowledge all amendments may cause rejection of the bid.

c. SF 1442 BACK (Page 2 of the Solicitation): Bidders shall fully complete all the required areas located under the section designated as “OFFER” (refer to Items 14. through 20C.)

d. SECTION 00600 (REPRESENTATIONS AND CERTIFICATIONS): The bidder must fully complete Section 00600 of this Solicitation and submit it along with all other documents required by this Solicitation. Bids received without this Section fully completed may be rejected, considered non‐responsive and ineligible for award.

e. BID GUARANTEE: The bidder is required to submit a Bid Guarantee for this procurement. Any bidder failing to submit an authentic Bid Guarantee will be considered non‐responsive to the Solicitation and ineligible for award. The Bid Guarantee shall be in the amount of 20% percent of the bidder’s bid price or $3,000,000.00, whichever is less.

f. DELIVERY OF BIDS:

Sealed Bids: Regardless of the method of delivery (mailed or hand‐carried), bids and all other documents called out in the Solicitation shall be enclosed and sealed in an envelope that is clearly marked “Bid” and shall include the assigned Solicitation Number, and the Bid Opening Date and Time.

Mailed Bids: It is the responsibility of each bidder to ensure that its Sealed Bid is received by the Chicago District’s – USACE Contracting Branch, located at 111 North Canal Street, Suite 600, Chicago, Illinois 60606 prior to the date and time set of the opening of bids – See Block 13A of Page 1 of the Solicitation.

Hand – carried Bids Delivered on the Day of the Bid Opening: For bids being hand‐carried after 12:

NOON on the date of the bid opening, the bidder shall deliver its sealed bid directly to the Bid Opening Room, which is located at 111 North Canal Street, the 1st Floor Lobby Conference Room, Chicago, Illinois

60606. Prior to12: NOON on the date of the bid opening, it is the responsibility of each bidder to ensure that its Bid is received by the Chicago District’ – USACE Contracting Branch, located at 111 North Canal Street, Suite 600, Chicago, Illinois 60606 prior to the date and time set of the opening of bids.

6. BID OPENING ROOM: The designated Bid Opening is the Lobby Conference Room which is located on the first floor at 111 North Canal Street, Chicago, Illinois 60606.

7. CONTRACTOR PERFORMANCE EVALUATIONS. In accordance with the provisions of Subpart 36.201 (Evaluation of Contractor Performance) of the Federal Acquisition Regulation (FAR), construction contractor’s performance shall be evaluated throughout the performance of the contract. The United States Army Corps of Engineers (USACE) follows the procedures outlined in Engineering Regulation 415‐1‐17 to fulfill this FAR requirement. For construction contracts awarded at or above $100,000.00, the USACE will evaluate contractor’s performance and prepare a performance report using the Construction Contractor Appraisal Support System (CCASS), which is now a web‐based system. After an evaluation (interim or final) is written up by the USACE, the contractor will have the ability to access, review and comment on the evaluation for a period of 30 days. Accessing and using CCASS requires specific software, called PKI certification, which is installed on the user’s computer. The certification is a Department of Defense requirement and was implemented to provide security in electronic transactions. The certification software could cost approximately $110 ‐ $125 per certificate per year and is purchased from an external Certificate Authorities (ECA) vendor. Current information about the PKI certification process and for contacting vendors can be found on the web site: www.cpars.navy.mil/. If the Contractor wishes to participate in the performance evaluation process, access to CCASS and PKI certification is the sole responsibility of the Contractor.

8. QUESTIONS: PLEASE NOTE: INTERESTED BIDDERS MUST SUBMIT THEIR CONTRACTING AND TECHNICAL

INQUIRIES IN WRITING to Sean McNab at sean.e.mcnab@usace.army.mil WITH A COPY FURNISHED TO REGINA BLAIR AT regina.g.blair@usace.army.mil. – BE SURE TO INCLUDE THE SOLICITATION NUMBER

W912P6‐12‐B‐0002 AND PROJECT TITLE ON THE SUBJECT LINE OF YOUR EMAIL.

END OF AMENDMENT NUMBER 0001

http://www.wdol.gov/wdol/scafiles/davisbacon/IN1.dvb[2/17/2012 2:04:17 PM]

General Decision Number: IN120001 02/10/2012 IN1

Superseded General Decision Number: IN20100001

State: Indiana

Construction Types: Building, Heavy and Highway

Counties: La Porte, Lake, Porter and St Joseph Counties in Indiana.

LAKE AND PORTER COUNTIES

BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories, HEAVY AND

HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 01/06/2012 1 01/27/2012 2 02/10/2012

ASBE0017-002 01/01/2011

LAKE AND PORTER COUNTIES

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 43.05 23.30

HAZARDOUS MATERIAL HANDLER

(INCLUDES PREPARATION,

WETTING, STRIPPING REMOVAL

SCRAPPING, VACUUMING, BAGGING

AND DISPOSAL OF ALL

INSULATION MATERIALS, WHETHER

THEY CONTAIN ASBESTOS OR NOT,

FROM MECHANICAL SYSTEMS).........$ 32.29 22.10

ASBE0075-001 06/01/2011

REMAINING COUNTIES

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 31.40 15.29

HAZARDOUS MATERIAL HANDLER

(includes preparation, wetting, stripping, removal, scrapping, vaccuming, bagging, and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 19.35 10.35

BOIL0001-005 07/01/2009

LAKE COUNTY, City of Hammond; North of 114th Street

Rates Fringes

BOILERMAKER......................$ 40.97 18.97

BOIL0374-003 01/01/2011

Rates Fringes

BOILERMAKER......................$ 33.43 22.14

BRIN0004-011 06/01/2011

MERRILLVILLE

LAKE, LAPORTE AND PORTER COUNTIES

Rates Fringes

Bricklayer, Stone Mason, Marble Mason, Terrazzo

Worker, Tile Layer, Pointer, Cle..............................$ 35.35 18.80 Marble and terrazzo finisher.....$ 22.32 7.35 Marble Setter, Terrazzo Worker & Tile Setter.............$ 29.10 12.72

TILE FINISHER....................$ 21.32 7.35

BRIN0004-018 06/01/2011

SOUTH BEND: ST. JOSEPH COUNTY

Rates Fringes

BRICKLAYER

BRICKLAYER; STONE MASON;

POINTER, CAULKER, CLEANER...$ 27.61 11.94

MARBLE AND TILE FINISHER....$ 26.06 9.97

MARBLE AND TILE LAYER.......$ 27.58 9.97

TERRAZZO FINISHER...........$ 27.06 9.97

TERRAZZO WORKER.............$ 28.58 11.64

CARP0413-002 06/01/2011

St. Joseph County

Rates Fringes

CARPENTER........................$ 25.67 14.21

CARP0765-001 06/01/2010

HEAVY, HIGHWAY AND BUILDING CONSTRUCTION

LAKE, LAPORTE AND PORTER COUNTIES

Rates Fringes

CARPENTER........................$ 33.43 2249

MILLWRIGHT.......................$ 33.53 22.54

CARP1029-001 06/01/2011

ADAMS, ALLEN, CASS, DEKALB, ELKHART, FULTON, GRANT, HOWARD,

HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, ST.

JOSEPH, STEUBEN, TIPTON, WABASH, WELLS and WHITLEY COUNTIES

Rates Fringes

MILLWRIGHT.......................$ 24.02 17.51

ELEC0153-001 09/05/2011

ST JOSEPH COUNTY

Rates Fringes

Communication Technician.........$ 26.16 10.64

ELECTRICIAN......................$ 30.00 17.12

Includes the installation, operation, inspection, modification, maintenance and repair of systems used for the transmission and reception of signals of any nature, for any purpose, including but not limited to, sound and voice transmission/transference systems, communication systems that transmit or receive information and/or control systems, television and video systems, micro-processor controlled fire alarm systems, and security systems and the performance of any task directly related to such installation or service. The scope of work shall exclude the installation of electrical power wiring and the installation of conduit raceways exceeding fifteen (15) feet in length.

ELEC0531-001 02/28/2011

LAPORTE and PORTER COUNTIES

Rates Fringes

ELECTRICIAN......................$ 37.00 21.00

ELEC0697-001 05/30/2011

LAKE COUNTY

Rates Fringes

ELECTRICIAN......................$ 37.70 22.39

ELEC0697-004 08/29/2011

LAKE COUNTY

Rates Fringes

Telecommunication Technician.....$ 29.75 19.03

Work covers low voltage installation, maintenance and removal of telecommunication facilities (voice, sound, data and video) including, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V/SAT, bypass, CATV, WAN (WIDE AREA NETWORKS), LAN (local area networks), and ISDN (integrated system digital network).

Does not cover any work which properly comes under the work description of Inside JW (Journeyman Wireman), but shall cover the pulling of wire in raceways, but not the installation of raceways.

ELEC1393-003 12/06/2010

LAKE & PORTER COUNTIES

(Calumet Area, North of U.S. Hwy 30)

Rates Fringes

Line Construction:

EQUIPMENT OPERATOR

(Backhoe over 1/2 yard bucket capacity, cranes rated at 15 ton or more capacity) 95% of J.L. Rate..$ 34.65 4.75+27.75%

GROUNDMAN, EQUIPMENT

OPERATOR: (Diggers 5th wheel type trucks, crawler type, D-4 and smaller, bucket trucks and live boom type line trucks)......$ 27.78 4.75+27.75%

GROUNDMAN...................$ 20.26 4.75+27.75%

GROUNDMAN-TRUCK DRIVER......$ 24.31 4.75+27.75%

LINEMAN.....................$ 34.65 4.75+27.75%

ELEV0002-005 01/01/2012

ELEVATOR CONSTRUCTION

LAKE AND PORTER COUNTIES

Rates Fringes

ELEVATOR MECHANIC................$ 48.56 23.535+a+b

FOOTNOTES:

a. Eight Paid Holidays: New Year's Day; Veterans Day, Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day.

b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years. Employer contributes 6% of regular hourly rate to vacation pay credit for employee who has worked in business less than 5 years.

ELEV0057-001 01/01/2005

LAPORTE AND ST. JOSEPH COUNTIES

ELEVATOR MECHANIC................$ 31.77 12.015+a

FOOTNOTES:

a. Employer contributes 8% basic hourly rate for 5 years or more of service or 6% basic hourly rate for 6 months to 5 years of service as vacation pay credit.

b. Eight Paid Holidays: New Year's Day; Memorial Day;

Independence Day; Labor Day; Veteran's Day; Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.

ENGI0150-001 01/01/2012

BUILDING CONSTRUCTION POWER EQUIPMENT OPERATORS:

LAKE, LAPORTE, and PORTER COUNTIES

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 38.70 23.78

GROUP 2.....................$ 37.90 23.78

GROUP 3.....................$ 33.60 23.78

GROUP 4.....................$ 31.40 23.78

GROUP 5.....................$ 25.95 23.78

POWER EQUIPMENT OPERATOR CLASSIFICATIONS:

GROUP 1: Asphalt Plant; Autograde; Batch Plant); Benoto (requires 2 engineers; Boiler & throttle valve; Boring machine (mining machine); Caisson Rigs; Central redi-mix plant; Combination Backhoe Endloader with backhoe bucket over 1/2 cu. yd. or with attachments; Combination tugger hoist & air compressor; Compressor & throttle; Concrete Breaker (truck mounted); Concrete conveyor; Concrete conveyor (truck mounted); Concrete paver over 27E cu.ft.;

Concrete paver 27E cu. ft. & under; Concrete placing boom;

Concrete pump/grout pump with boom (truck mounted);

Concrete pump with boom (truck mounted); concrete tower;

Cranes and Backhoes (All Attachments); Cranes, Hammerhead Tower; Creter Crane; Derricks (all); Derricks (traveling);

Forklift lull type; Forklift, 10 ton & over; Gradall, Hoist 1, 2, and 3 drums; Hoist (2 tugger l floor), Hydraulic Boom truck, Laser Screed, Locomotive (all), Motor patrol, Mucking Machine; Pile Driving and Skid rig, Pit machine, Prestress Machines, Pump cretes (and similar types), Rock Drill (self-propelled), Rock Drill Truck mounted; Slip form paver, Straddle buggies, Tractor with boom and side boom, Trenching Mechine; Winch Tractors, Welding machines (6-9), GROUP 2: Air Comporessor (3) (feeding a common receiver);

Asphalt Spreader; boilers; bulldozers; Combination Backhoe end loader with Backhoe bucket 1/2 cu. yd. and under or with attachments; Corboy drilling machine; Grader, Elevating; Grouting machines; Guard rail post driver;

Highlift Shovel or frontend loader; Hoist (automatic), Hoist (all elevators); Hoist (tugger and single drum); Post hole digger; rollers (all); Scoop (tractor drawn); Stone crushers; Tournapull; Winch trucks

GROUP 3: Air compressor - small 210 and under (1 to 5 not to exceed a total of 300 feet); Air compressor - large over 210; Air compressor (2) feeding a common receiver;

Combination - small equipment operator; Concrete mixer (two bag & over); Conveyor, portable; Forklift-under 10 ton;

Generator; Pumps (1 to 3 not to exceed a total of 300 feet); Pumps, well points; Steam generators; Tractors, farm & similar type; Welding machines (2 thru 5); Winches, 4 electric drillo winches

GROUP 4: Bull gang (crane erection crew); Heaters, mechanical (1 to 5); Oilers; Switchmen

GROUP 5: Fork lifts (Housing and commercial only)

ENGI0150-012 10/01/2011

BUILDING CONSTRUCTION

ST. JOSEPH COUNTY

Power equipment operators:

GROUP 1.....................$ 27.60 20.05+a GROUP 2.....................$ 26.25 20.05+a GROUP 3.....................$ 25.45 20.05+a GROUP 4.....................$ 24.65 20.05+a GROUP 5.....................$ 22.05 20.05+a

FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Memorial Day, Fourth of July, Labor Day, Thanksgivng Day, Day After Thanksgiving, and Christmas Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS:

GROUP 1: Mechanic, Asphalt Plant, Asphalt Spreader, Auto Grader; Batch Plant, Benoto (requires 2 Engineers), Boiler and Throttle Valve, Boring Machine (road), Bulldozers (with engines of 140 net horse power or more) Caisson Rigs, Central Redi-mix Plant, Concrete Conveyor Systems, Concrete Power (over 27E cu. ft.), Concrete Paver (27E cu. ft.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .