IHC CDF Facility Operations & Dredging W912P6-11-R-0008
PROJECT TABLE OF CONTENTS
DIVISION 00 PROCUREMENT & CONTRACTING REQUIREMENTS
SECTION A SOLICITATION/CONTRACT FORM
SECTION B SUPPLIES OR SERVICE AND PRICES
SECTION C DESCRIPTION AND SPECIFICATIONS
SECTION E INSPECTION AND ACCEPTANCE
SECTION F DELIVERIES OR PERFORMANCE
SECTION H SPECIAL CONTRACT REQUIREMENTS
SECTION I CONTRACT CLAUSES
SECTION J LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION K REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF
OFFERORS
SECTION L INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
SECTION M EVALUATION FACTORS FOR AWARD
UDIVISION 01 GENERAL REQUIREMENTS
01 10 00.00 00 GENERAL PROVISIONS
01 11 00 SUMMARY OF WORK
01 22 00.00 03 MEASUREMENT AND PAYMENT
01 31 23 PROJECT WEB SITE
01 32 01.02 03 PROJECT SCHEDULE FOR CALUMET AREA OFFICE
01 33 00 SUBMITTAL PROCEDURES
01 35 26.00 00 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 29.13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR
CONTAMINATED SITES
01 35 45.00 03 CHEMICAL DATA QUALITY CONTROL
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 01.00 03 USACE QUALITY CONTROL
01 45 01.10 03 USACE QUALITY CONTROL SYSTEM (QCS)
01 57 20.02 03 ENVIRONMENTAL PROTECTION FOR INDIANA
01 58 00.00 03 PROJECT SIGN AND SAFETY SIGN
01 93 10.00 03 CDF FACILITY MAINTENANCE PROCEDURES
DIVISION 27 COMMUNICATIONS
27 26 26 DATA COMMUNICATIONS INTEGRATION REQUIREMENTS
DIVISION 31 - EARTHWORK
31 37 16.00 03 RIP-RAP FOR EROSION CONTROL
DIVISION 33 UTILITIES
33 24 13.02 03 GROUNDWATER GRADIENT CONTROL SYSTEM OPERATION AND
MAINTENANCE
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 23.00 03 MECHANICAL DREDGING, TRANSPORTATION, AND DISPOSAL
35 20 23.50 03 TSCA DREDGING, PLACEMENT AND CAPPING
35 21 00.03 IN-STREAM WATER QUALITY MONITORING
35 21 10 OIL BOOM INSTALLATION AND MAINTENANCE
35 21 23.00 03 NATIONAL DREDGING QUALITY MANAGEMENT (DQM) PROGRAM SCOW
Tracking Profile
DIVISION 44 - POLLUTION AND WASTE CONTROL EQUIPMENT
44 10 00 AIR MONITORING
44 41 13.10 03 WASTEWATER TREATMENT PLANT
-- End of Project Table of Contents –-
AMD-0001
W81G6610424231
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REQUEST FOR PROPOSAL NUMBER W912P6-11-R-0008, Operations and Support Services Project, Indiana Harbor & Canal Confined Disposal Facility in East Chicago, Indiana
THIS AMENDMENT DOES NOT RESULT IN AN EXTENSION TO THE PROPOSAL DUE DATE.
DESCRIPTION CONTINUES ON THE NEXT PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 93
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Aug-2011
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-11-R-0008
X 9B. DATED (SEE ITEM 11)
22-Jul-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Aug-2011
CODE
U. S. ARMY ENGINEER DISTRICT, CHICAGO
111 NORTH CANAL STREET SUITE 600
CHICAGO IL 60606-7206
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P6-11-R-0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
A. PROPOSAL DUE DATE: The Proposal Due Date is NOT EXTENDED by this Amendment;
therefore, Contractor’s proposals must be furnished to the USACE by 4:30 pm CDT on 24 August 2011 to be considered timely submitted. Detailed information regarding the submission of proposals is located in SECTION 00100 of the Solicitation document.
B. PREBID MEETING Invitation is hereby extended to all prospective bidders to attend a Pre- Bid Meeting and Site Visit for this project. The Pre-Bid Meeting will be held on August 10, 2010 beginning promptly at 10 a.m. Central daylight time. The location of the meeting will be held at 4444 RAILROAD AVE. EAST CHICAGO, INIDIANA 46312. The Site Visit will immediately follow the Meeting. During the Pre-Bid Meeting, government representatives will highlight specific contract requirements. The objective is to provide an information exchange between potential bidders and the government to avoid the possibility of misinterpretation of the contract requirements. In the interest of making the meeting more meaningful, prospective bidders are urged to present any written questions concerning the project bid documents, bidding, and construction requirements or other related matters prior to the pre-bid meeting.
Send written questions, by facsimile to: Gregg Gulledge at 312-886-5475. Ensure that your correspondence contains the project title. Written questions may be submitted at the beginning of the meeting and oral questions may be submitted from the floor, will only be addressed if they are clarifications of information provided in the solicitation and in subsequent amendments issued before the scheduled pre-bid meeting and site visit. Answers, interpretations, and decisions made at the meeting will not become official unless and until verified by an amendment to the solicitation issued prior to the receipt of proposals. Following the meeting, prospective bidders will be permitted to inspect the site where services are to be performed and to satisfy themselves as to all general and local conditions that may affect the cost of performance of the contract to the extent such information is reasonably obtained.
The USACE strongly encourages attendance at its Pre-Bid Meetings and Site Visits and looks forward to a large turnout of contractors
C. AMENDED BID SCHEDULE: THIS AMENDMENT IMPLEMENTS THE FOLLOWING
CHANGES TO SECTION 00010 (BID SCHEDULE) OF THE RFP DOCUMENT. PROVIDED
HEREUNDER IS A REVISED BID SCHEDULE THAT CONTRACTORS SHALL USE TO
INPUT THEIR PRICES; THEREFORE, THE PREVIOUSLY ISSUED BID SCHEDULE IS
HEREBY REPLACED WITH THE REVISED BID SCHEDULE CONTAINED HEREIN.
SUBCLIN 0001AB
The CLIN extended description has changed to designate this CLIN as a COST-REIMBURSABLE LINE ITEM with a budget allowance of $50,000.00 reserved therein.
SUBCLIN 0001AH
The pricing detail quantity has decreased by 6.00 from 12.00 to 6.00.
SUBCLIN 0001AU
The CLIN description has changed from REMOVE & REINSTALL EXTRACTION WELL PUMP to REPLACE
EXTRACTION WELL PUMP.
The pricing detail quantity has increased by 30.00 from 10.00 to 40.00.
SUBCLIN 0001AW
The CLIN description has changed from REMOVE & REINSTALL EXTRACTION WELL LEVEL to REPLACE
EXTRACTION AND MONITORING WELL.
The CLIN extended description has changed from TRANSDUCER to LEVEL TRANSDUCER.
The pricing detail quantity has increased by 25.00 from 5.00 to 30.00.
SUBCLIN 0001BH
The CLIN extended description has changed from CANAL to CANAL +G100.
The pricing detail quantity has increased by 39,000.00 from 61,000.00 to 100,000.00.
SUBCLIN 0001BL
The pricing detail quantity has increased by 60.00 from 120.00 to 180.00.
SUBCLIN 0001BM
The CLIN description has changed from PERFORMANCE & PAYMENT BONDS to CDF FACILITY
MAINTENANCE.
The CLIN extended description THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes. has been deleted.
SUBCLIN 0002AA
The CLIN extended description has changed to designate this CLIN as a COST-REIMBURSABLE LINE ITEM with a budget allowance of $50,000.00 reserved therein.
SUBCLIN 0002AK
SUBCLIN 0002AW
The CLIN description has changed from REMOVE & REINSTALL EXTRACTION WELL to REPLACE
EXTRACTION WELL.
The pricing detail quantity has increased by 30.00 from 10.00 to 40.00.
SUBCLIN 0002AY
The CLIN description has changed from REMOVE & REINSTALL EXTRACTION WELL to REPLACE
EXTRACTION WELL AND MONITORING.
The CLIN extended description has changed from LEVEL TRANSDUCER to WELL LEVEL TRANSDUCER.
The pricing detail quantity has increased by 25.00 from 5.00 to 30.00.
SUBCLIN 0002BK
The pricing detail quantity has increased by 39,000.00 from 61,000.00 to 100,000.00.
SUBCLIN 0002BN
SUBCLIN 0002BP
MAINTENANCE.
The CLIN extended description THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes. has been deleted.
SUBCLIN 0003AA
SUBCLIN 0003AK
SUBCLIN 0003AW
The CLIN description has changed from REMOVE & INSTALL EXTRACTION WELL PUMP to REPLACE
EXTRACTION WELL PUMP.
The pricing detail quantity has increased by 30.00 from 10.00 to 40.00.
SUBCLIN 0003AY
EXTRACTION AND MOINTORING WELL.
The pricing detail quantity has increased by 25.00 from 5.00 to 30.00.
SUBCLIN 0003BK
The pricing detail quantity has increased by 39,000.00 from 61,000.00 to 100,000.00.
SUBCLIN 0003BN
SUBCLIN 0003BP
MAINTENANCE.
The CLIN extended description THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions to the actual bond costs
SUBCLIN 0004AA
with a budget allowance of $50,000.00 reserved therein.
SUBCLIN 0004AK
SUBCLIN 0004AW
EXTRACTION WELL PUMP.
The pricing detail quantity has increased by 30.00 from 10.00 to 40.00.
SUBCLIN 0004AY
SUBCLIN 0004BK
SUBCLIN 0004BN
SUBCLIN 0004BP
MAINTENANCE.
The CLIN extended description THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions to the actual bond costs
SUBCLIN 0005AA
SUBCLIN 0005AK
SUBCLIN 0005AW
EXTRACTION WELL PUMP.
The pricing detail quantity has increased by 30.00 from 10.00 to 40.00.
SUBCLIN 0005AY
SUBCLIN 0005BK
SUBCLIN 0005BS
MAINTENANCE.
The CLIN extended description THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions to the actual bond costs
The following CLINs were added to the Bid Schedule:
SUBCLIN 0001BN
SUBCLIN 0001BP
SUBCLIN 0002BR
SUBCLIN 0002BQ
SUBCLIN 0003BQ
SUBCLIN 0003BR
SUBCLIN 0004BQ
SUBCLIN 0004BR
SUBCLIN 0005BT
SUBCLIN 0005BU
D. AMENDED PROJECT SPECIFICATION SECTIONS: The following Specification Sections have been amended. Offerors shall replace the affected pages delineated below with the corresponding revised pages that are attached hereto.
1) Specification Section 01 10 00.00 03 GENERAL PROVISIONS is replaced in its entirety.
2) Specification Section 01 22 00.00 03 MEASUREMENT AND PAYMENT Replace pages 4, and 12‐23
3) Submittal Register, located at the end of Section 01 33 00 SUBMITTAL PROCEDURES, replace in its entirety
4) Specification Section 01 22 00.00 03 MEASUREMENT AND PAYMENT Replace pages 4, and 12‐23
5) Specification Section 01 35 29.13 HEALTH, SAFETY, AND MERGENCY RESPONSE PROCEDURES FOR CONTAMINATED SITES Replace page 6
6) SECTION 01 57 20.02 03 ENVIRONMENTAL PROTECTION FOR INDIANA Replace the NPDES permit attached to the end of Section 01 57 20.02 03
7) Specification Section 35 21 00.03 IN‐STREAM WATER QUALITY MONITORING Replace
8) Specification Section 33 24 13.02 03 GROUNDWATER GRADIENT CONTROL SYSTEM OPERATION AND MAINTENANCE replace in its entirety
9) Specification Section 35 20 23.00 03 MECHANICAL DREDGING, TRANSPORTATION, AND DISPOSAL replace in its entirety
10) Specification Section 44 10 00 AIR MONITORING replace the PID Monitoring Sample Log attached at the end of the specification section with the attached.
The data is unchanged, only the formatting was changed so all columns fit on one sheet
E. AMENDED PROJECT DRAWING SHEETS: The below drawing sheets have been amended; therefore, offerors shall replace the affected sheets with the corresponding revised sheets attached hereto.
1) G‐04 ‐ Added survey control sheet
2) C‐01 to C‐10 ‐ Added additional coordinates to the federal channel limits and proposed features
F. DAVIS BACON WAGE RATES: The most current Davis Bacon Wage Determination dated 06/13/2011, Wage Determination N. 2005-2191 is enclosed herein.
G. USACE RESPONSE’S TO CONTRACTOR’S INQUIRIES: Provided below are the USACE’s responses to Contractor inquiries. The block of inquiries represent the questions that have been received from the issuance of the Bid Package through August 3, 2011.
QUESTION: Dredging Projects of this scope can consume a very significant amount of fuel a year and are one of the largest cost factors on a dredging project. How does the government anticipate the contractor to present fair and reasonable pricing and not have to make inflated assumptions for the cost of fuel five years from now?
Has the government considered some sort of fuel escalation clause?
USACE’S RESPONSE: This being a multiple year contract, contractors shall escalate their fuel costs for the out-years when bidding on this contract. Thus, no escalation clause will be incorporated into the contract.
QUESTION: Are contractor questions and government responses going to be posted on FBO?
USACE’S RESPONSE: Yes; responses will be posted via an Amendment on FBO.
QUESTION: References:
1) Section A (page 2 of 194), “Important Notes Regarding this Acquisition”, Paragraph 2;
2) Section L (page 175 of 194) Subsection 1.1 “Who may Submit,” Paragraph 2;
AND
3) Section L (181 of 194) Subsection 2.1 “Proposal Requirements” Subfactor 5A: Prime Contractor Experience
Reference 3 requires information to be included under TAB 5A (Prime Contractor Experience) in the submitted proposal for the prime contractor to present descriptions of projects completed that include a minimum cumulative of 5 years experience in mechanical dredging, hydraulic sediment transport and placement, disposal facility operation, and water management services. Similarly, requirements are identified for listing of at least three projects each that present experience in water treatment using mobile equipment , and ambient and real-time air monitoring.
References 1 and 2 indicate that “firms organized as construction contractors that have associated specifically for this project, or other interested parties may submit proposals. In the latter case the association may be a joint venture or a subcontractor.”
In many cases, the prime contractor or “offeror” will be comprised of an integrated team of contractors established to collectively perform the primary elements of the Statement of Work while retaining a small number of “niche” subcontractors to provide specialty products and services. In this case the association may be based on a formalized teaming agreement that establishes the relationships of the teaming partners but not based on the formation of an LLC or other similar entity to identify the “offeror” as being comprised of two or more contractors. In reading the requirements addressed in the discussion we have interpreted the term “Prime Contractor” as presented to mean the “offeror” , which may be comprised of a team of two or more contractors not necessarily comprised of a formalized LLC but who are bound by a formalized teaming agreement.. Given that the interpretation is appropriate in this case, would the 5 year requirement and other experience requirements be met using a combination of the experience from the contractors comprising the “offeror’s” team? Please provide clarification on this requirement.
USACE’S RESPONSE: The solicitation requires that the offeror, being the "prime," provide its experience where requested and that the subs experience be addressed where requested. As the prime, it cannot comingle its subs experience with its PRIME experience to meet the necessary technical experience called out in the respective EVALUATION FACTOR.
QUESTION: Section L – Instruction, Conditions and Notices to Bidders (Sub-factor 5A) Prime Contractor Experience: --If the Prime Contractor can demonstrate experience for mechanical dredging, hydraulic sediment transport and placement and disposal facility operation for similar projects performed with the USACE can it use a subcontractor to meet the experience requirements for the wastewater treatment and air monitoring?
USACE’S RESPONSE: Per the provisions stipulated by Subfactor 5A, the "Prime Contractor" experience must be demonstrated in the areas of "wastewater treatment and air monitoring," meaning, the experience cannot be satisfied by your proposed sub.
QUESTION: We have reviewed the announcement, plans and specifications for this important project. Upon review of the documents we cannot locate information concerning; Has a date / timeline been set for an on-site prebid / site meeting??
Do you anticipate this type of a meeting to take place?? If a meeting date has been scheduled, is there a specific registration process to attend?
USACE’S RESPONSE: A pre-proposal meeting has not been scheduled as of yet; once the specifics have been determined, contractors will be advised via the Notice (announcement) for this procurement, which is published on the Federal Business Opportunities Website.
Contractors will not have to register for the pre-proposal meeting.
Section B - Supplies or Services and Prices
REVISED BID SCHEDULE
(AMENDMENT 0001)
- THIS BID SCHEDULE CONTAINS A COMBINATION OF FIRM-FIXED PRICE
AND COST REIMBURSABLE CONTRACT LINE ITEMS -
ITEM NO SUPPLIES/SERVICES
BASE YEAR
INDIANA HARBOR & CANAL CONFINED DISPOSAL
FACILITY OPERATIONS AND SUPPORT SERVICES
(INCLUDES DREDGING ACTIVITIES)
The Contractor shall furnish all personnel, equipment, materials, supplies and services necessary to perform the contract services. Services will be ordered pursuant to the provisions of the “Ordering” and “Ordering Limitations” Clauses of the Contract.
The government’s requirements will be stated and ordered by way of the issuance of individual task orders to the Contractor.
Under the Base Period of the Contract, the Government must satisfy a minimum ordering obligation in the amount of $300,000.00. The effective ordering period under this Base Year is for a period of 12 months, commencing from the Date of Award.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AA 1 Lump Sum
PROJECT START-UP
FIRM-FIXED-PRICE (FFP)
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE NTE AMOUNT
0001AB 1 Lump
Sum $50,000.00 $50,000.00
SITE UTILITY SERVICES
THIS IS A COST-REIMBURSABLE LINE ITEM- An allowance of $50,000.00 has been reserved for this Line Item. The Government will reimburse the Contractor for actual costs associated with this item, not to exceed the line item price. Therefore, the government will not pay more than the total line item amount for this item. Should the contractor exhaust its budget for this line item because additional services are deemed necessary, the government may negotiate a fair and reasonable price with the contractor to make adjustments to the contract price.
However, the contractor shall NOT incur any additional costs or perform any additional services outside of the item price until the government has authorized the contractor to proceed with additional services.
The Contractor shall coordinate the services of this line item with the Contracting Officer's Representative (COR) such that compliance with the ceiling price of this item and the tasks performed, the associated level of effort, and scheduling can be verified. Therefore, any work performed in association with this line item must be verified by the COR prior to the contractor's submission of its invoice for this item.
The COR is responsible for processing payments. The contractor shall provide the COR with paid invoices and all other supporting cost information for the verification of the Contractor's expenditures for this line item
NOT TO
EXCEED
$50,000.00
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001AC 1 Lump Sum
MECHANICAL DREDGING MOBILIZATION
FFP
MAX
UNIT UNIT PRICE MAX AMOUNT
0001AD 1 Lump
MECHANICAL DREDGING DEMOBILIZATION
UNIT UNIT PRICE MAX AMOUNT
0001AE 1 Lump
DREDGING QUALITY MANAGEMENT PROGRAM
ITEM NO SUPPLIES/SERVICES EST
UNIT UNIT PRICE AMOUNT
0001AF 400,000 Cubic Yard
MECHANICAL DREDGING & TRANSPORTATION
TO CDF HYDRAULICALLYOFF-LOAD/DISTRIBUTE SEDIMENT
UNIT UNIT PRICE AMOUNT
0001AG 1 Lump
INSTALL & MAINTAIN OIL BOOMS AT CDF SITE
UNIT UNIT PRICE AMOUNT
0001AH 6 Months
INSTALL & MAINTAIN OIL BOOMS DURING DREDGING
UNIT UNIT PRICE AMOUNT
0001AJ 8 Days
SUSPEND SEDIMENT PLACEMENT
UNIT UNIT PRICE AMOUNT
0001AK 8 Days
SUSPEND MECHANICAL DREDGING OPERATIONS
UNIT UNIT PRICE MAX AMOUNT
0001AL 1 Lump
DEBRIS MANAGEMENT MOBILIZATION
UNIT UNIT PRICE MAX AMOUNT
0001AM 1 Lump
DEBRIS MANAGEMENT DEMOBILIZATION
UNIT UNIT PRICE AMOUNT
0001AN 100 Net Ton (2,000
LB)
DEBRIS DISPOSAL IN CDF
UNIT UNIT PRICE MAX AMOUNT
0001AP 1 Lump
MOBILIZE HYDRAULIC OFF-LOADING SYSTEM
EQUIPMENT
UNIT UNIT PRICE MAX AMOUNT
0001AQ 1 Lump
DEMOBILIZE HYDRAULIC OFF-LOADING SYSTEM
UNIT UNIT PRICE AMOUNT
0001AR 20 Net Ton
RIP-RAP
UNIT UNIT PRICE MAX AMOUNT
0001AS 1 Lump
WATER MANAGEMENT
UNIT UNIT PRICE MAX AMOUNT
0001AT 1 Lump
OPERATE & MAINTAIN GROUNDWATER GRADIENT
SYSTEM
UNIT UNIT PRICE AMOUNT
0001AU 40 Each
REPLACE EXTRACTION WELL PUMP
UNIT UNIT PRICE AMOUNT
0001AV 4 Each
REPLACE LIFT STATION PUMP
UNIT UNIT PRICE AMOUNT
0001AW 30 Each
REPLACE EXTRACTION AND MONITORING WELL LEVEL
TRANSDUCER
UNIT UNIT PRICE MAX AMOUNT
0001AX 1 Lump
INSTALL REAL TIME AIR MONITORING STATION
(NAPHTHALENE)
UNIT UNIT PRICE MAX AMOUNT
0001AY 1 Lump
INSTALL REAL TIME AIR MONITORING STATION
(PARTICULATE)
UNIT UNIT PRICE AMOUNT
0001AZ 12 Months
OPERATE & MAINTAIN REAL TIME AIR
MONITORING STATION
UNIT UNIT PRICE MAX AMOUNT
0001BA 1 Lump
CDF POND WATER TREATMENT PLANT
MOBILIZATION
UNIT UNIT PRICE MAX AMOUNT
0001BB 1 Lump
CDF POND WATER TREATMENT PLANT
DEMOBILIZATION
UNIT UNIT PRICE MAX AMOUNT
0001BC 1 Lump
GROUNDWATER TREATMENT PLANT MOBILIZATION
UNIT UNIT PRICE MAX AMOUNT
0001BD 1 Lump
GROUNDWATER TREATMENT PLANT
UNIT UNIT PRICE AMOUNT
0001BE 12 Months
MONTHLY RENTAL OF CDF POND WATER
TREATMENT PLANT
UNIT UNIT PRICE AMOUNT
0001BF 12 Months
MONTHLY RENTAL OF GROUNDWATER TREATMENT
PLANT
UNIT UNIT PRICE AMOUNT
0001BG 61,000 Gallons per
Thousand
CDF POND WATER TREATMENT & DISCHARGE
TO CANAL
UNIT UNIT PRICE AMOUNT
0001BH 100,000 Gallons
GROUNDWATER TREATMENT & DISCHARGE TO
CANAL
UNIT UNIT PRICE MAX AMOUNT
0001BJ 1 Lump
CREATE, OPERATE & MAINTAIN CDF DATA
& INFORMATION WEBSITE
UNIT UNIT PRICE MAX AMOUNT
0001BK 1 Lump
DOCK FACE AREA PID MONITORING
UNIT UNIT PRICE AMOUNT
0001BL 180 Days
IN-STREAM WATER QUALITY MONITORING
UNIT UNIT PRICE MAX AMOUNT
0001BM 1 Lump
CDF FACILITY MAINTENANCE
UNIT UNIT PRICE MAX AMOUNT
0001BN 1 Each
REPLACE CANAL ULTRASONIC SENSOR
UNIT UNIT PRICE NTE AMOUNT
0001BP 1 Lump
PERFORMANCE & PAYMENT BONDS
THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.
Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.
TOTAL PROPOSED PRICE FOR THE BASE YEAR: $______________________
OPTION OPTION YEAR 1
(INCLUDES DREDGING ACTIVITIES)
At the discretion of the government, the line items associated with Option Year 1 may be exercised in accordance with the relevant Clause Number 52.217-9 (Refer to Section I).
If this Option is exercised, the effective ordering period will be for a period of 12 months and the Government must satisfy a minimum ordering obligation in the amount of $150,000.00.
The government’s requirements will be stated and ordered by way of the issuance of individual task orders to the Contractor. For any task order issued during this Option Year, the Contractor shall furnish all personnel, equipment, materials, supplies and services necessary to perform the contract services. Services will be ordered pursuant to the provisions of the “Ordering” and “Ordering Limitations” Clauses of the Contract.
UNIT UNIT PRICE NTE AMOUNT
0002AA 1 Lump Sum
$50,000.00 $50,000.00
OPTION SITE UTILITY SERVICES
THIS IS A COST-REIMBURSABLE LINE ITEM- An allowance of $50,000.00 has been reserved for this Line Item. The Government will reimburse the Contractor for actual costs associated with this item, not to exceed the line item price. Therefore, the government will not pay more than the total line item amount for this item. Should the contractor exhaust its budget for this line item because additional services are deemed necessary, the government may negotiate a fair and reasonable price with the contractor to make adjustments to the contract price.
However, the contractor shall NOT incur any additional costs or perform any additional services outside of the item price until the government has authorized the contractor to proceed with additional services.
The Contractor shall coordinate the services of this line item with the Contracting Officer's Representative (COR) such that compliance with the ceiling price of this item and the tasks performed, the associated level of effort, and scheduling can be verified. Therefore, any work performed in association with this line item must be verified by the COR prior to the contractor's submission of its invoice for this item.
The COR is responsible for processing payments. The contractor shall provide the
UNIT UNIT PRICE MAX AMOUNT
0002AB 1 Lump
OPTION MECHANICAL DREDGING MOBILIZATION
UNIT UNIT PRICE MAX AMOUNT
0002AC 1 Lump
OPTION MECHANICAL DREDGING DEMOBILIZATION
UNIT UNIT PRICE MAX AMOUNT
0002AD 1 Lump
OPTION DREDGING QUALITY MANAGEMENT PROGRAM
UNIT UNIT PRICE AMOUNT
0002AE 400,000 Cubic
OPTION MECHANICAL DREDGING & TRANSPORTATION
TO CDF HYDRAULICALLY OFF-LOAD & DISTRIBUTE SEDIMENT
UNIT UNIT PRICE AMOUNT
0002AF 60,000 Cubic
OF TSCA MATERIAL TO CDF HYDRAULICALLY OFF LOAD &
DISTRIBUTE SEDIMENT
UNIT UNIT PRICE AMOUNT
0002AG 3,455 Square
OPTION PLACE GEOTEXTILE BLANKET
UNIT UNIT PRICE AMOUNT
0002AH 2,760 Net Ton
OPTION PLACE ARMOR STONE
UNIT UNIT PRICE MAX AMOUNT
0002AJ 1 Lump
OPTION INSTALL & MAINTAIN OIL BOOMS AT CDF SITE
UNIT UNIT PRICE AMOUNT
0002AK 6 Months
OPTION INSTALL & MAINTAIN OIL BOOMS DURING
DREDGING
UNIT UNIT PRICE AMOUNT
0002AL 8 Days
OPTION SUSPEND SEDIMENT PLACEMENT
UNIT UNIT PRICE AMOUNT
0002AM 8 Days
OPTION SUSPEND MECHANICAL DREDGING OPERATIONS
UNIT UNIT PRICE MAX AMOUNT
0002AN 1 Lump
OPTION DEBRIS MANAGEMENT MOBILIZATION
UNIT UNIT PRICE MAX AMOUNT
0002AP 1 Lump
OPTION DEBRIS MANAGEMENT DEMOBILIZATION
UNIT UNIT PRICE AMOUNT
0002AQ 100 Net Ton
OPTION DEBRIS DISPOSAL IN CDF
UNIT UNIT PRICE MAX AMOUNT
0002AR 1 Lump
OPTION MOBILIZE HYDRAULIC OFF-LOADING SYSTEM
UNIT UNIT PRICE MAX AMOUNT
0002AS 1 Lump
OPTION DEMOBILIZE HYDRAULIC OFF-LOADING SYSTEM
UNIT UNIT PRICE AMOUNT
0002AT 20 Net Ton
OPTION RIP-RAP
UNIT UNIT PRICE MAX AMOUNT
0002AU 1 Lump
OPTION WATER MANAGEMENT
UNIT UNIT PRICE MAX AMOUNT
0002AV 1 Lump
OPTION OPERATE & MAINTAIN GROUNDWATER GRADIENT
UNIT UNIT PRICE AMOUNT
0002AW 40 Each
OPTION REPLACE EXTRACTION WELL
PUMP
UNIT UNIT PRICE AMOUNT
0002AX 4 Each
OPTION REPLACE LIFT STATION PUMP
UNIT UNIT PRICE AMOUNT
0002AY 30 Each
OPTION REPLACE EXTRACTION AND MONITORING WELL
LEVEL TRANSDUCER
UNIT UNIT PRICE AMOUNT
0002AZ 12 Months
OPTION OPERATE & MAINTAIN REAL TIME AIR
UNIT UNIT PRICE MAX AMOUNT
0002BA 1 Lump
OPTION REPLACE REAL TIME AIR MONITORING STATION
(NAPHTHALENE)
UNIT UNIT PRICE MAX AMOUNT
0002BB 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0002BC 1 Lump
OPTION CDF POND WATER TREATMENT PLANT
UNIT UNIT PRICE MAX AMOUNT
0002BD 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0002BE 1 Lump
OPTION GROUNDWATER TREATMENT PLANT
UNIT UNIT PRICE MAX AMOUNT
0002BF 1 Lump
UNIT UNIT PRICE AMOUNT
0002BG 12 Months
OPTION MONTHLY RENTAL OF CDF POND WATER
UNIT UNIT PRICE AMOUNT
0002BH 12 Months
OPTION MONTHLY RENTAL OF GROUNDWATER TREATMENT
UNIT UNIT PRICE AMOUNT
0002BJ 61,000 Gallons
OPTION CDF POND WATER TREATMENT & DISCHARGE
UNIT UNIT PRICE AMOUNT
0002BK 100,000 Gallons
OPTION GROUNDWATER TREATMENT & DISCHARGE TO
UNIT UNIT PRICE MAX AMOUNT
0002BL 1 Lump
OPTION OPERATE & MAINTAIN CDF DATA &
INFORMATION WEBSITE
UNIT UNIT PRICE MAX AMOUNT
0002BM 1 Lump
OPTION DOCK FACE AREA PID MONITORING
UNIT UNIT PRICE AMOUNT
0002BN 180 Days
IN-STREAM WATER QUALITY MONITORING
UNIT UNIT PRICE MAX AMOUNT
0002BP 1 Lump
OPTION CDF FACILITY MAINTENANCE
UNIT UNIT PRICE MAX AMOUNT
0002BQ 1 Each
OPTION REPLACE CANAL ULTRASONIC SENSOR
UNIT UNIT PRICE NTE AMOUNT
0002BR 1 Lump
OPTION PERFORMANCE & PAYMENT BONDS
reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.
TOTAL PROPOSED PRICE FOR OPTION YEAR 1: $_________________________
OPTION OPTION YEAR 2
(INCLUDES DREDGING ACTIVITIES)
At the discretion of the government, the line items associated with Option Year 2 may be exercised in accordance with the relevant Clause Number 52.217-9 (Refer to Section I).
If this Option is exercised, the effective ordering period will be for a period of 12 months and the Government must satisfy a minimum ordering obligation in the amount of $150,000.00.
The government’s requirements will be stated and ordered by way of the issuance of individual task orders to the Contractor. For any task order issued during this Option Year, the Contractor shall furnish all personnel, equipment, materials, supplies and services necessary to perform the contract services. Services will be
UNIT UNIT PRICE NTE AMOUNT
0003AA 1 Lump Sum
$50,000.00 $50,000.00
OPTION SITE UTILITY SERVICES
THIS IS A COST-REIMBURSABLE LINE ITEM- An allowance of $50,000.00 has been reserved for this Line Item. The Government will reimburse the Contractor for actual costs associated with this item, not to exceed the line item price. Therefore, the government will not pay more than the total line item amount for this item. Should the contractor exhaust its budget for this line item because additional services are deemed necessary, the government may negotiate a fair and reasonable price with the contractor to make adjustments to the contract price.
However, the contractor shall NOT incur any additional costs or perform any additional services outside of the item price until the government has authorized the contractor to proceed with additional services.
The Contractor shall coordinate the services of this line item with the Contracting Officer's Representative (COR) such that compliance with the ceiling price of this item and the tasks performed, the associated level of effort, and scheduling can be verified. Therefore, any work performed in association with this line item must be verified by the COR prior to the contractor's submission of its invoice for this item.
The COR is responsible for processing payments. The contractor shall provide the
UNIT UNIT PRICE MAX AMOUNT
0003AB 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0003AC 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0003AD 1 Lump
UNIT UNIT PRICE AMOUNT
0003AE 400,000 Cubic
OPTION MECHANCIAL DREDGING & TRANSPORTATION
UNIT UNIT PRICE AMOUNT
0003AF 60,000 Cubic
OF TSCA MATERIAL TO CDF HYDRAULICALLY OFF-LOAD &
UNIT UNIT PRICE AMOUNT
0003AG 3,455 Square
UNIT UNIT PRICE AMOUNT
0003AH 2,760 Net Ton
UNIT UNIT PRICE MAX AMOUNT
0003AJ 1 Lump
OPTION INSTALL & MAINTAIN OIL BOOMS AT CDF
SITE
UNIT UNIT PRICE AMOUNT
0003AK 6 Months
OPTION INSTALL & MAINTAIN OIL BOOMS DURING
UNIT UNIT PRICE AMOUNT
0003AL 8 Days
UNIT UNIT PRICE AMOUNT
0003AM 8 Days
UNIT UNIT PRICE MAX AMOUNT
0003AN 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0003AP 1 Lump
UNIT UNIT PRICE AMOUNT
0003AQ 100 Net Ton
UNIT UNIT PRICE MAX AMOUNT
0003AR 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0003AS 1 Lump
UNIT UNIT PRICE AMOUNT
0003AT 20 Net Ton
UNIT UNIT PRICE MAX AMOUNT
0003AU 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0003AV 1 Lump
UNIT UNIT PRICE AMOUNT
0003AW 40 Each
OPTION REPLACE EXTRACTION WELL PUMP
UNIT UNIT PRICE AMOUNT
0003AX 4 Each
UNIT UNIT PRICE AMOUNT
0003AY 30 Each
OPTION REPLACE EXTRACTION AND MONITORING WELL
UNIT UNIT PRICE AMOUNT
0003AZ 12 Months
OPTION OPERATE & MAINTAIN REAL TIME AIR
UNIT UNIT PRICE MAX AMOUNT
0003BA 1 Lump
OPTION REPLACE REAL TIME AIR MONITORING
STATION (NAPHTHALENE)
UNIT UNIT PRICE MAX AMOUNT
0003BB 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0003BC 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0003BD 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0003BE 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0003BF 1 Lump
UNIT UNIT PRICE AMOUNT
0003BG 12 Months
OPTION MONTHLY RENTAL OF CDF POND WATER
UNIT UNIT PRICE AMOUNT
0003BH 12 Months
OPTION MONTHLY RENTAL OF GROUNDWATER TREATMENT
UNIT UNIT PRICE AMOUNT
0003BJ 61,000 Gallons
UNIT UNIT PRICE AMOUNT
0003BK 100,000 Gallons
OPTION GROUNDWATER TREATMENT & DISCHARGE
UNIT UNIT PRICE MAX AMOUNT
0003BL 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0003BM 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0003BN 180 Days
OPTION IN-STREAM WATER QUALITY MONITORING
UNIT UNIT PRICE MAX AMOUNT
0003BP 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0003BQ 1 Each
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE NTE AMOUNT
0003BR 1 Lump Sum
OPTION PERFORMANCE & PAYMENT BONDS FOR OPTION YEAR 2
reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.
bond costs associated with contract changes
NOT TO EXCEED
TOTAL PROPOSED PRICE FOR OPTION YEAR 2: $___________________________
UNIT UNIT PRICE MAX AMOUNT
0004 UNDEFINED
OPTION OPTION YEAR 3
(INCLUDES DREDGING ACTIVITIES)
At the discretion of the government, the line items associated with Option Year 4 may be exercised in accordance with the relevant Clause Number 52.217-9 (Refer to Section I).
If this Option is exercised, the effective ordering period will be for a period of 12 months and the Government must satisfy a minimum ordering obligation in the amount of $150,000.00.
The government’s requirements will be stated and ordered by way of the issuance of individual task orders to the Contractor. For any task order issued during this Option Year, the Contractor shall furnish all personnel, equipment, materials, supplies and services necessary to perform the contract services. Services will be
UNIT UNIT PRICE NTE AMOUNT
0004AA 1 Lump Sum
$50,000.00 $50,000.00
OPTION SITE UTILITY SERVICES
THIS IS A COST-REIMBURSABLE LINE ITEM- An allowance of $50,000.00 has been reserved for this Line Item. The Government will reimburse the Contractor for actual costs associated with this item, not to exceed the line item price. Therefore, the government will not pay more than the total line item amount for this item. Should the contractor exhaust its budget for this line item because additional services are deemed necessary, the government may negotiate a fair and reasonable price with the contractor to make adjustments to the contract price.
However, the contractor shall NOT incur any additional costs or perform any additional services outside of the item price until the government has authorized the contractor to proceed with additional services.
The Contractor shall coordinate the services of this line item with the Contracting Officer's Representative (COR) such that compliance with the ceiling price of this item and the tasks performed, the associated level of effort, and scheduling can be verified. Therefore, any work performed in association with this line item must be verified by the COR prior to the contractor's submission of its invoice for this item.
The COR is responsible for processing payments. The contractor shall provide the
UNIT UNIT PRICE MAX AMOUNT
0004AB 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0004AC 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0004AD 1 Lump
UNIT UNIT PRICE AMOUNT
0004AE 400,000 Cubic
TO CDF HYDRAULICALLY OFF-LOAD/DISTRIBUTE SEDIMENT
UNIT UNIT PRICE AMOUNT
0004AF 60,000 Cubic
UNIT UNIT PRICE AMOUNT
0004AG 3,455 Square
UNIT UNIT PRICE AMOUNT
0004AH 2,760 Net Ton
UNIT UNIT PRICE MAX AMOUNT
0004AJ 1 Lump
UNIT UNIT PRICE AMOUNT
0004AK 6 Months
OPTION INSTALL & MAINTAIN OIL BOOMS DURING
UNIT UNIT PRICE AMOUNT
0004AL 8 Days
UNIT UNIT PRICE AMOUNT
0004AM 8 Days
UNIT UNIT PRICE MAX AMOUNT
0004AN 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0004AP 1 Lump
UNIT UNIT PRICE AMOUNT
0004AQ 100 Net Ton
UNIT UNIT PRICE MAX AMOUNT
0004AR 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0004AS 1 Lump
UNIT UNIT PRICE AMOUNT
0004AT 20 Net Ton
UNIT UNIT PRICE MAX AMOUNT
0004AU 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0004AV 1 Lump
UNIT UNIT PRICE AMOUNT
0004AW 40 Each
UNIT UNIT PRICE AMOUNT
0004AX 4 Each
UNIT UNIT PRICE AMOUNT
0004AY 30 Each
OPTION REPLACE EXTRACTION AND MONITORING WELL
UNIT UNIT PRICE AMOUNT
0004AZ 12 Months
OPTION OPERATE & MAINTAIN REAL TIME AIR
UNIT UNIT PRICE MAX AMOUNT
0004BA 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0004BB 1 Lump
STATION (PARTICULATE)
UNIT UNIT PRICE MAX AMOUNT
0004BC 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0004BD 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0004BE 1 Lump
OPTION GROUNDWATER TREATMENT PLANT MOBILIZATION
UNIT UNIT PRICE MAX AMOUNT
0004BF 1 Lump
UNIT UNIT PRICE AMOUNT
0004BG 12 Months
OPTION MONTHLY RENTAL OF CDF POND WATER
UNIT UNIT PRICE AMOUNT
0004BH 12 Months
OPTION MONTHLY RENTAL OF GROUNDWATER TREATMENT
UNIT UNIT PRICE AMOUNT
0004BJ 61,000 Gallons
OPTION CDF POND WATER TREATMENT & DISCHARGE TO
UNIT UNIT PRICE AMOUNT
0004BK 100,000 Gallons
UNIT UNIT PRICE MAX AMOUNT
0004BL 1 Lump
OPTION OPERATE & MAINTAIN CDF DATA
& INFORMATION WEBSITE
UNIT UNIT PRICE MAX AMOUNT
0004BM 1 Lump
UNIT UNIT PRICE AMOUNT
0004BN 180 Days
UNIT UNIT PRICE MAX AMOUNT
0004BP 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0004BQ 1 Each
UNIT UNIT PRICE NTE AMOUNT
0004BR 1 Lump
OPTION PERFORMANCE & PAYMENT BONDS FOR OPTION YEAR 3
reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.
N OT TO
TOTAL PROPOSED PRICE FOR OPTION YEAR 3: $__________________________
OPTION OPTION YEAR 4
(INCLUDES DREDGING ACTIVITIES)
At the discretion of the government, the line items associated with Option Year 4 may be exercised in accordance with the relevant Clause Number 52.217-9 (Refer to Section I).
If this Option is exercised, the effective ordering period will be for a period of 12 months and the Government must satisfy a minimum ordering obligation in the amount of $150,000.00.
The government’s requirements will be stated and ordered by way of the issuance of individual task orders to the Contractor. For any task order issued during this Option Year, the Contractor shall furnish all personnel, equipment, materials, supplies and services necessary to perform the contract services. Services will be
UNIT UNIT PRICE NTE AMOUNT
0005AA 1 Lump Sum
$50,000.00 $50,000.00
OPTION SITE UTILITY SERVICES
THIS IS A COST-REIMBURSABLE LINE ITEM- An allowance of $50,000.00 has been reserved for this Line Item. The Government will reimburse the Contractor for actual costs associated with this item, not to exceed the line item price. Therefore, the government will not pay more than the total line item amount for this item. Should the contractor exhaust its budget for this line item because additional services are deemed necessary, the government may negotiate a fair and reasonable price with the contractor to make adjustments to the contract price.
However, the contractor shall NOT incur any additional costs or perform any additional services outside of the item price until the government has authorized the contractor to proceed with additional services.
The Contractor shall coordinate the services of this line item with the Contracting Officer's Representative (COR) such that compliance with the ceiling price of this item and the tasks performed, the associated level of effort, and scheduling can be verified. Therefore, any work performed in association with this line item must be verified by the COR prior to the contractor's submission of its invoice for this item.
The COR is responsible for processing payments. The contractor shall provide the
UNIT UNIT PRICE MAX AMOUNT
0005AB 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0005AC 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0005AD 1 Lump
UNIT UNIT PRICE AMOUNT
0005AE 400,000 Cubic
UNIT UNIT PRICE AMOUNT
0005AF 60,000 Cubic
UNIT UNIT PRICE AMOUNT
0005AG 3,455 Square
UNIT UNIT PRICE AMOUNT
0005AH 2,760 Net Ton
UNIT UNIT PRICE MAX AMOUNT
0005AJ 1 Lump
UNIT UNIT PRICE AMOUNT
0005AK 6 Months
OPTION INSTALL & MAINTAIN OIL BOOMS DURING
UNIT UNIT PRICE AMOUNT
0005AL 8 Days
UNIT UNIT PRICE AMOUNT
0005AM 8 Days
OPTION SUSPEND MECHANICAL DREDGE OPERATIONS
NET
AMOUNT
UNIT UNIT PRICE MAX AMOUNT
0005AN 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0005AP 1 Lump
UNIT UNIT PRICE AMOUNT
0005AQ 100 Net Ton
UNIT UNIT PRICE MAX AMOUNT
0005AR 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0005AS 1 Lump
UNIT UNIT PRICE AMOUNT
0005AT 20 Net Ton
NET
AMOUNT
UNIT UNIT PRICE MAX AMOUNT
0005AU 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0005AV 1 Lump
UNIT UNIT PRICE AMOUNT
0005AW 40 Each
UNIT UNIT PRICE AMOUNT
0005AX 4 Each
UNIT UNIT PRICE AMOUNT
0005AY 30 Each
OPTION REPLACE EXTRACTION AND MONITORING WELL
UNIT UNIT PRICE AMOUNT
0005AZ 12 Months
OPTION OPERATE & MAINTAIN REAL TIME AIR
UNIT UNIT PRICE MAX AMOUNT
0005BA 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0005BB 1 Lump
STATION (PARTICULATE)
UNIT UNIT PRICE MAX AMOUNT
0005BC 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0005BD 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0005BE 1 Lump
OPTION GROUNDWATER TREATMENT PLANT MOBILIZATION
UNIT UNIT PRICE MAX AMOUNT
0005BF 1 Lump
UNIT UNIT PRICE AMOUNT
0005BG 12 Months
OPTION MONTHLY RENTAL OF CDF POND WATER
UNIT UNIT PRICE AMOUNT
0005BH 12 Months
OPTION MONTHLY RENTAL OF GROUNDWATER TREATMENT
UNIT UNIT PRICE AMOUNT
0005BJ 61,000 Gallons
UNIT UNIT PRICE AMOUNT
0005BK 100,000 Gallons
UNIT UNIT PRICE MAX AMOUNT
0005BL 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0005BM 1 Lump
UNIT UNIT PRICE AMOUNT
0005BN 180 Days
UNIT UNIT PRICE MAX AMOUNT
0005BP 1 Lump
OPTION POSTPLACEMENT SEDIMENT SURVEY
UNIT UNIT PRICE MAX AMOUNT
0005BQ 1 Lump
OPTION TRAINING ON EXISTING SITE SYSTEMS
UNIT UNIT PRICE MAX AMOUNT
0005BR 1 Lump
OPTION PROJECT CLOSE-OUT
UNIT UNIT PRICE MAX AMOUNT
0005BS 1 Lump
UNIT UNIT PRICE MAX AMOUNT
0005BT 1 Each
UNIT UNIT PRICE NTE AMOUNT
0005BU 1 Lump
OPTION PERFORMANCE & PAYMENT BONDS FOR OPTION YEAR 4
reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.
TOTAL PROPOSED PRICE FOR OPTION YEAR 4: $______________________
OVERALL PROPOSED AMOUNT (BASE YEAR + 4 OPTION
YEARS):$_________________________________
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 10 00.00 03
GENERAL PROVISIONS
PART 1 GENERAL
1.1 REFERENCES
1.2 CERTIFICATES OF COMPLIANCE
1.3 RESPONSIBILITY OF THE CONTRACTOR
1.4 SUBMITTALS
1.5 REAL ESTATE
1.6 INSPECTION
1.7 CONDITION OF EXISTING STRUCTURES
1.8 PRESERVATION OF HISTORICAL, ARCHAEOLOGICAL AND CULTURAL RESOURCES
1.9 GOVERNMENT FURNISHED PROPERTY
1.10 RESPONSIBILITY FOR GOVERNMENT FURNISHED PROPERTY
1.10.1 Facility Occupancy Closure
1.11 SECURITY
1.12 MINIMUM AMOUNT OF INSURANCE REQUIRED
1.13 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
1.14 PERMITS AND RESPONSIBILITIES
1.15 COORDINATION WITH OTHERS
1.16 SPECIAL SAFETY REQUIREMENTS
1.17 ONE CALL SYSTEMS FOR EXCAVATORS
1.18 ELECTRICAL POWER LINES
1.19 BORROW/DISPOSAL SITES AND QUARRIES
1.20 SIGNAL LIGHTS
1.21 TEMPORARY LIGHTS AND SIGNALS REQUIRED BY THE COAST GUARD
1.22 TAX EXEMPTION
1.23 BARRICADES AND WARNING SIGNS
1.24 TRAFFIC CONTROL
1.24.1 Bridge Contact Information
1.24.2 Rush Hour Restrictions for Indianapolis Boulevard Bridge
Opening
1.24.3 Bridge Opening Permits
1.25 PROGRESS MEETINGS
1.26 CONTRACTOR PERFORMANCE EVALUATIONS
1.27 CONSTRUCTION/IMPLEMENTATION PROJECT SCHEDULE
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 10 00.00 03 - Page 1
SECTION 01 10 00.00 03
GENERAL PROVISIONS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2008; Change 1-2010; Change 3-2010;
Errata 1-2010) Safety and Health Requirements Manual
1.2 CERTIFICATES OF COMPLIANCE
Any certificates required for demonstrating proof of compliance of materials with specification requirements shall be executed in two copies.
Each certificate shall be signed by an official authorized to certify on behalf of the manufacturing company and shall contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the tests to which the report applies.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .