INDIANA HARBOR & CANAL CONFINED DISPOSAL FACILITY OPERATIONS AND SUPPORT SERVICES (INCLUDES DREDGING ACTIVITIES), EAST CHICAGO, INDIANA
Solicitation number
W912P6-11-R-0008
Issued by

About this file

THIS FILE CONTAINS THE SOLICITATION DOCUMENT AND TECHNICAL SPECIFICATIONS

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO: W912P6-11-R-0008

CHICAGO DISTRICT

LEADERS IN CUSTOMER CARE

SPECIFICATIONS FOR

INDIANA HARBOR AND CANAL,

CONFINED DISPOSAL FACILITY

FACILITY OPERATIONS & DREDGING

CONSTRUCTION SOLICITATION

AND SPECIFICATIONS

SOLICITATION SET

July 22, 2011

IHC CDF Facility Operations & Dredging W912P6-11-R-0008

PROJECT TABLE OF CONTENTS

DIVISION 00 PROCUREMENT & CONTRACTING REQUIREMENTS

SECTION A SOLICITATION/CONTRACT FORM

SECTION B SUPPLIES OR SERVICE AND PRICES

SECTION C DESCRIPTION AND SPECIFICATIONS

SECTION E INSPECTION AND ACCEPTANCE

SECTION F DELIVERIES OR PERFORMANCE

SECTION H SPECIAL CONTRACT REQUIREMENTS

SECTION I CONTRACT CLAUSES

SECTION J LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

SECTION K REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF

OFFERORS

SECTION L INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

SECTION M EVALUATION FACTORS FOR AWARD

UDIVISION 01 GENERAL REQUIREMENTS

01 10 00.00 00 GENERAL PROVISIONS

01 11 00 SUMMARY OF WORK

01 22 00.00 03 MEASUREMENT AND PAYMENT

01 31 23 PROJECT WEB SITE

01 32 01.02 03 PROJECT SCHEDULE FOR CALUMET AREA OFFICE

01 33 00 SUBMITTAL PROCEDURES

01 35 26.00 00 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 29.13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR

CONTAMINATED SITES

01 35 45.00 03 CHEMICAL DATA QUALITY CONTROL

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 01.00 03 USACE QUALITY CONTROL

01 45 01.10 03 USACE QUALITY CONTROL SYSTEM (QCS)

01 57 20.02 03 ENVIRONMENTAL PROTECTION FOR INDIANA

01 58 00.00 03 PROJECT SIGN AND SAFETY SIGN

01 93 10.00 03 CDF FACILITY MAINTENANCE PROCEDURES

DIVISION 27 COMMUNICATIONS

27 26 26 DATA COMMUNICATIONS INTEGRATION REQUIREMENTS

DIVISION 31 - EARTHWORK

31 37 16.00 03 RIP-RAP FOR EROSION CONTROL

DIVISION 33 UTILITIES

33 24 13.02 03 GROUNDWATER GRADIENT CONTROL SYSTEM OPERATION AND

MAINTENANCE

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 20 23.00 03 MECHANICAL DREDGING, TRANSPORTATION, AND DISPOSAL

35 20 23.50 03 TSCA DREDGING, PLACEMENT AND CAPPING

35 21 00.03 IN-STREAM WATER QUALITY MONITORING

35 21 10 OIL BOOM INSTALLATION AND MAINTENANCE

35 21 23.00 03 NATIONAL DREDGING QUALITY MANAGEMENT (DQM) PROGRAM SCOW

Tracking Profile

DIVISION 44 - POLLUTION AND WASTE CONTROL EQUIPMENT

44 10 00 AIR MONITORING

44 41 13.10 03 WASTEWATER TREATMENT PLANT

-- End of Project Table of Contents –-

CODE

(Hour)

PAGE(S)

until 04:30 PM local time 24 Aug 2011

A X B X C

D

EX

X G F 164 - 176

177 - 187 X H 188 - 194 gregory.c.gulledge@lrc02.usace.army.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 194

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912P6 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

GREGORY C GULLEDGE 312.846.5374

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 3 4 - 87

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

88 - 105 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

106 - 112

113 - 114 X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 115 - 135 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

136 - 150

PART II - CONTRACT CLAUSES

U. S. ARMY ENGINEER DISTRICT, CHICAGO

111 NORTH CANAL STREET SUITE 600

CHICAGO IL 60606-7206

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

151 - 163

6. REQUISITION/PURCHASE NO.

W81G6610424231

5. DATE ISSUED

22 Jul 2011

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912P6-11-R-0008

SEE SECTION L OF THIS RFP

W912P6-11-R-0008

Section A - Solicitation/Contract Form

IMPORTANT NOTES REGARDING THIS ACQUISITION:

PROJECT TITLE: INDEFINITE DELIVERY, INDEFINITE QUANITITY CONTRACT FOR

INDIANA HARBOR & CANAL CONFINED DISPOSAL FACILITY OPERATIONS AND

SUPPORT SERVICES (INCLUDES DREDGING ACTIVITIES)

UNDER THE CONTRACT SET, the Contractor will provide facility operations support services, which includes providing dredging, dredged material disposal and dredged material containment related services at the Indiana Harbor & Canal Confined Disposal Facility (CDF) and in the Indiana Harbor and Canal federal navigational channel that are located in East Chicago, Indiana. The work consists of, but may not be limited to: The operations support services will require the contractor to be responsible for facility operations that include water system management such as operating/maintaining a groundwater gradient system, monitoring cell water levels and furnishing/operating/maintaining a package water treatment plant. The contractor furnished package wastewater treatment plant will treat water to discharge concentrations specified in the National Pollutant Discharge Elimination System (NPDES) permit issued by the Indiana Department of Environmental Management (IDEM). The treated water will be discharged to the canal south of the CDF site. Air monitoring management includes purchasing, installing, operating/maintaining the real-time air monitoring equipment and reporting the data via a contractor created website. Extensive regulatory reporting for various project activities will also be required. Dredging operations will include mechanical dredging, hydraulic off-loading of sediment, debris management, monitoring and environmental controls for the dredging operation, and extensive reporting.

This acquisition will be competed unrestricted to business size, and classified under the applicable North American Industry System Code of 561210, with a small business size in dollars of $35.5M. The intent of the Solicitation is to select one contractor, who will be required to perform the facility support services with dredging activities as mentioned above. Firms organized as construction contractors that have associated specifically for this project, or other interested parties, will be invited to submit proposals as well.

This acquisition implements the statutes which prescribe labor standards requirements for services and construction contracts; the applicable Labor Acts are the Service Contract Act of 1965, as Amended, Davis-Bacon Act, Copeland Act, and Contract Work Hours and Safety Standards Act. In this respect, the USACE intends to award a services contract, with a substantial amount of construction (e.g. dredging work), from this SOLICITATION. Note that a mixture of services and construction provisions and clauses are incorporated hereunder.

The applicable Wage Rates for the BASE PERIOD of the Contract are included at Section J of this Solicitation Document (Note: As Options are exercised, the most current wage determination will be incorporated into the Contract):

- For the Service Work, the Contractor shall comply with Wage Determination No.:

2005-2191, Revision No.: 11, Date Of Revision: 06/13/2011;

- For the dredging work, the Contractor shall comply with General Decision Number: IL100018 07/01/2011 IL18

The magnitude of cost for the dredging portion of the Contract is between $5M and $10M for the Base Period, and between $5M and $10M for each Option Period.

COMPETITION FOR THIS ACQUISITION IS UNRESTRICTED TO BUSINESS SIZE

ELECTRONIC OR FAXED BIDS WILL NOT BE ACCEPTED

SUBMITTAL PROCEDURES FOR THIS ACQUISITION ARE LOCATED IN SECTION L OF

THIS SOLICITATION DOCUMENT.

Section B - Supplies or Services and Prices

- THIS BID SCHEDULE CONTAINS A COMBINATION OF FIRM-FIXED PRICE AND COST

REIMBURSABLE CONTRACT LINE ITEMS -

ITEM NO SUPPLIES/SERVICES

BASE YEAR

INDIANA HARBOR & CANAL CONFINED DISPOSAL

FACILITY OPERATIONS AND SUPPORT SERVICES

(INCLUDES DREDGING ACTIVITIES)

The Contractor shall furnish all personnel, equipment, materials, supplies and services necessary to perform the contract services. Services will be ordered pursuant to the provisions of the “Ordering” and “Ordering Limitations” Clauses of the Contract.

The government’s requirements will be stated and ordered by way of the issuance of individual task orders to the Contractor.

Under the Base Period of the Contract, the Government must satisfy a minimum ordering obligation in the amount of $300,000.00. The effective ordering period under this Base Year is for a period of 12 months, commencing from the Date of Award.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001AA 1 Lump Sum

PROJECT START-UP

FIRM-FIXED-PRICE (FFP)

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001AB 1 Lump Sum

SITE UTILITY SERVICES

THIS IS A COST-REIMBURSABLE LINE ITEM

The Government will reimburse the Contractor for actual costs associated with this item, NOT TO EXCEED the line item price. Therefore, the Contractor shall NOT incur any additional costs or perform any additional services outside of the item price.

The Contracting Officer’s Representative (COR) is responsible for processing payments. The Contractor shall provide the COR with invoices and all other supporting cost information for the verification of the Contractor’s expenditures for this line item.

NOT TO

EXCEED

UNIT UNIT PRICE MAX AMOUNT

0001AC 1 Lump

MECHANICAL DREDGING MOBILIZATION

FFP

MAX

UNIT UNIT PRICE MAX AMOUNT

0001AD 1 Lump

MECHANICAL DREDGING DEMOBILIZATION

UNIT UNIT PRICE MAX AMOUNT

0001AE 1 Lump

DREDGING QUALITY MANAGEMENT PROGRAM

ITEM NO SUPPLIES/SERVICES EST

UNIT UNIT PRICE AMOUNT

0001AF 400,000 Cubic Yard

MECHANICAL DREDGING & TRANSPORTATION

TO CDF HYDRAULICALLYOFF-LOAD/DISTRIBUTE SEDIMENT

UNIT UNIT PRICE AMOUNT

0001AG 1 Lump

INSTALL & MAINTAIN OIL BOOMS AT CDF SITE

UNIT UNIT PRICE AMOUNT

0001AH 12 Months

INSTALL & MAINTAIN OIL BOOMS DURING DREDGING

UNIT UNIT PRICE AMOUNT

0001AJ 8 Days

SUSPEND SEDIMENT PLACEMENT

UNIT UNIT PRICE AMOUNT

0001AK 8 Days

SUSPEND MECHANICAL DREDGING OPERATIONS

UNIT UNIT PRICE MAX AMOUNT

0001AL 1 Lump

DEBRIS MANAGEMENT MOBILIZATION

UNIT UNIT PRICE MAX AMOUNT

0001AM 1 Lump

DEBRIS MANAGEMENT DEMOBILIZATION

UNIT UNIT PRICE AMOUNT

0001AN 100 Net Ton (2,000

LB)

DEBRIS DISPOSAL IN CDF

UNIT UNIT PRICE MAX AMOUNT

0001AP 1 Lump

MOBILIZE HYDRAULIC OFF-LOADING SYSTEM

EQUIPMENT

UNIT UNIT PRICE MAX AMOUNT

0001AQ 1 Lump

DEMOBILIZE HYDRAULIC OFF-LOADING SYSTEM

UNIT UNIT PRICE AMOUNT

0001AR 20 Net Ton

RIP-RAP

UNIT UNIT PRICE MAX AMOUNT

0001AS 1 Lump

WATER MANAGEMENT

UNIT UNIT PRICE MAX AMOUNT

0001AT 1 Lump

OPERATE & MAINTAIN GROUNDWATER GRADIENT

SYSTEM

UNIT UNIT PRICE AMOUNT

0001AU 10 Each

REMOVE & REINSTALL EXTRACTION WELL PUMP

UNIT UNIT PRICE AMOUNT

0001AV 4 Each

REPLACE LIFT STATION PUMP

UNIT UNIT PRICE AMOUNT

0001AW 5 Each

REMOVE & REINSTALL EXTRACTION WELL LEVEL

TRANSDUCER

UNIT UNIT PRICE MAX AMOUNT

0001AX 1 Lump

INSTALL REAL TIME AIR MONITORING STATION

(NAPHTHALENE)

UNIT UNIT PRICE MAX AMOUNT

0001AY 1 Lump

INSTALL REAL TIME AIR MOINTORING STATION

(PARTICULATE)

UNIT UNIT PRICE AMOUNT

0001AZ 12 Months

OPERATE & MAINTAIN REAL TIME AIR

MONITORING STATION

UNIT UNIT PRICE MAX AMOUNT

0001BA 1 Lump

CDF POND WATER TREATMENT PLANT

MOBILIZATION

UNIT UNIT PRICE MAX AMOUNT

0001BB 1 Lump

CDF POND WATER TREATMENT PLANT

DEMOBILIZATION

UNIT UNIT PRICE MAX AMOUNT

0001BC 1 Lump

GROUNDWATER TREATMENT PLANT MOBILIZATION

UNIT UNIT PRICE MAX AMOUNT

0001BD 1 Lump

GROUNDWATER TREATMENT PLANT

UNIT UNIT PRICE AMOUNT

0001BE 12 Months

MONTHLY RENTAL OF CDF POND WATER

TREATMENT PLANT

UNIT UNIT PRICE AMOUNT

0001BF 12 Months

MONTHLY RENTAL OF GROUNDWATER TREATMENT

PLANT

UNIT UNIT PRICE AMOUNT

0001BG 61,000 Gallons per

Thousand

CDF POND WATER TREATMENT & DISCHARGE

TO CANAL

UNIT UNIT PRICE AMOUNT

0001BH 61,000 Gallons

GROUNDWATER TREATMENT & DISCHARGE TO

CANAL

UNIT UNIT PRICE MAX AMOUNT

0001BJ 1 Lump

CREATE, OPERATE & MAINTAIN CDF DATA

& INFORMATION WEBSITE

UNIT UNIT PRICE MAX AMOUNT

0001BK 1 Lump

DOCK FACE AREA PID MONITORING

UNIT UNIT PRICE AMOUNT

0001BL 120 Days

IN-STREAM WATER QUALITY MONITORING

UNIT UNIT PRICE MAX AMOUNT

0001BM 1 Lump

PERFORMANCE & PAYMENT BONDS FOR THE BASE YEAR

THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.

Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.

TOTAL PROPOSED PRICE FOR THE BASE YEAR: $______________________

OPTION OPTION YEAR 1

(INCLUDES DREDGING ACTIVITIES)

At the discretion of the government, the line items associated with Option Year 1 may be exercised in accordance with the relevant Clause Number 52.217-9 (Refer to Section I).

If this Option is exercised, the effective ordering period will be for a period of 12 months and the Government must satisfy a minimum ordering obligation in the amount of $150,000.00.

The government’s requirements will be stated and ordered by way of the issuance of individual task orders to the Contractor. For any task order issued during this Option Year, the Contractor shall furnish all personnel, equipment, materials, supplies and services necessary to perform the contract services. Services will be ordered pursuant to the provisions of the “Ordering” and “Ordering Limitations” Clauses of the Contract.

UNIT UNIT PRICE MAX AMOUNT

0002AA 1 Lump

OPTION SITE UTILITY SERVICES

The Government will reimburse the Contractor for actual costs associated with this item, NOT TO EXCEED the line item price. Therefore, the Contractor shall NOT incur any additional costs or perform any additional services outside of the item price.

The Contracting Officer’s Representative (COR) is responsible for processing payments. The Contractor shall provide the COR with invoices and all other

UNIT UNIT PRICE MAX AMOUNT

0002AB 1 Lump

OPTION MECHANICAL DREDGING MOBILIZATION

UNIT UNIT PRICE MAX AMOUNT

0002AC 1 Lump

OPTION MECHANICAL DREDGING DEMOBILIZATION

UNIT UNIT PRICE MAX AMOUNT

0002AD 1 Lump

OPTION DREDGING QUALITY MANAGEMENT PROGRAM

UNIT UNIT PRICE AMOUNT

0002AE 400,000 Cubic

OPTION MECHANICAL DREDGING & TRANSPORTATION

TO CDF HYDRAULICALLY OFF-LOAD & DISTRIBUTE SEDIMENT

UNIT UNIT PRICE AMOUNT

0002AF 60,000 Cubic

OF TSCA MATERIAL TO CDF HYDRAULICALLY OFF LOAD &

DISTRIBUTE SEDIMENT

UNIT UNIT PRICE AMOUNT

0002AG 3,455 Square

OPTION PLACE GEOTEXTILE BLANKET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002AH 2,760 Net Ton

OPTION PLACE ARMOR STONE

UNIT UNIT PRICE MAX AMOUNT

0002AJ 1 Lump

OPTION INSTALL & MAINTAIN OIL BOOMS AT CDF SITE

UNIT UNIT PRICE AMOUNT

0002AK 12 Months

OPTION INSTALL & MAINTAIN OIL BOOMS DURING

DREDGING

UNIT UNIT PRICE AMOUNT

0002AL 8 Days

OPTION SUSPEND SEDIMENT PLACEMENT

UNIT UNIT PRICE AMOUNT

0002AM 8 Days

OPTION SUSPEND MECHANICAL DREDGING OPERATIONS

UNIT UNIT PRICE MAX AMOUNT

0002AN 1 Lump

OPTION DEBRIS MANAGEMENT MOBILIZATION

UNIT UNIT PRICE MAX AMOUNT

0002AP 1 Lump

OPTION DEBRIS MANAGEMENT DEMOBILIZATION

UNIT UNIT PRICE AMOUNT

0002AQ 100 Net Ton

OPTION DEBRIS DISPOSAL IN CDF

UNIT UNIT PRICE MAX AMOUNT

0002AR 1 Lump

OPTION MOBILIZE HYDRAULIC OFF-LOADING SYSTEM

UNIT UNIT PRICE MAX AMOUNT

0002AS 1 Lump

OPTION DEMOBILIZE HYDRAULIC OFF-LOADING SYSTEM

UNIT UNIT PRICE AMOUNT

0002AT 20 Net Ton

OPTION RIP-RAP

UNIT UNIT PRICE MAX AMOUNT

0002AU 1 Lump

OPTION WATER MANAGEMENT

UNIT UNIT PRICE MAX AMOUNT

0002AV 1 Lump

OPTION OPERATE & MAINTAIN GROUNDWATER GRADIENT

UNIT UNIT PRICE AMOUNT

0002AW 10 Each

OPTION REMOVE & REINSTALL EXTRACTION WELL

PUMP

UNIT UNIT PRICE AMOUNT

0002AX 4 Each

OPTION REPLACE LIFT STATION PUMP

UNIT UNIT PRICE AMOUNT

0002AY 5 Each

OPTION REMOVE & REINSTALL EXTRACTION WELL

LEVEL TRANSDUCER

UNIT UNIT PRICE AMOUNT

0002AZ 12 Months

OPTION OPERATE & MAINTAIN REAL TIME AIR

UNIT UNIT PRICE MAX AMOUNT

0002BA 1 Lump

OPTION REPLACE REAL TIME AIR MONITORING STATION

(NAPHTHALENE)

UNIT UNIT PRICE MAX AMOUNT

0002BB 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0002BC 1 Lump

OPTION CDF POND WATER TREATMENT PLANT

UNIT UNIT PRICE MAX AMOUNT

0002BD 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0002BE 1 Lump

OPTION GROUNDWATER TREATMENT PLANT

UNIT UNIT PRICE MAX AMOUNT

0002BF 1 Lump

UNIT UNIT PRICE AMOUNT

0002BG 12 Months

OPTION MONTHLY RENTAL OF CDF POND WATER

UNIT UNIT PRICE AMOUNT

0002BH 12 Months

OPTION MONTHLY RENTAL OF GROUNDWATER TREATMENT

UNIT UNIT PRICE AMOUNT

0002BJ 61,000 Gallons

OPTION CDF POND WATER TREATMENT & DISCHARGE

UNIT UNIT PRICE AMOUNT

0002BK 61,000 Gallons

OPTION GROUNDWATER TREATMENT & DISCHARGE TO

UNIT UNIT PRICE MAX AMOUNT

0002BL 1 Lump

OPTION OPERATE & MAINTAIN CDF DATA &

INFORMATION WEBSITE

UNIT UNIT PRICE MAX AMOUNT

0002BM 1 Lump

OPTION DOCK FACE AREA PID MONITORING

UNIT UNIT PRICE AMOUNT

0002BN 120 Days

IN-STREAM WATER QUALITY MONITORING

UNIT UNIT PRICE MAX AMOUNT

0002BP 1 Lump

OPTION PERFORMANCE & PAYMENT BONDS FOR OPTION YEAR 1

reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.

TOTAL PROPOSED PRICE FOR OPTION YEAR 1: $_________________________

OPTION OPTION YEAR 2

(INCLUDES DREDGING ACTIVITIES)

At the discretion of the government, the line items associated with Option Year 2 may be exercised in accordance with the relevant Clause Number 52.217-9 (Refer to Section I).

If this Option is exercised, the effective ordering period will be for a period of 12 months and the Government must satisfy a minimum ordering obligation in the amount of $150,000.00.

The government’s requirements will be stated and ordered by way of the issuance of individual task orders to the Contractor. For any task order issued during this Option Year, the Contractor shall furnish all personnel, equipment, materials, supplies and services necessary to perform the contract services. Services will be

UNIT UNIT PRICE MAX AMOUNT

0003AA 1 Lump

The Government will reimburse the Contractor for actual costs associated with this item, NOT TO EXCEED the line item price. Therefore, the Contractor shall NOT incur any additional costs or perform any additional services outside of the item price.

The Contracting Officer’s Representative (COR) is responsible for processing payments. The Contractor shall provide the COR with invoices and all other

UNIT UNIT PRICE MAX AMOUNT

0003AB 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0003AC 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0003AD 1 Lump

UNIT UNIT PRICE AMOUNT

0003AE 400,000 Cubic

OPTION MECHANCIAL DREDGING & TRANSPORTATION

UNIT UNIT PRICE AMOUNT

0003AF 60,000 Cubic

OF TSCA MATERIAL TO CDF HYDRAULICALLY OFF-LOAD &

UNIT UNIT PRICE AMOUNT

0003AG 3,455 Square

UNIT UNIT PRICE AMOUNT

0003AH 2,760 Net Ton

UNIT UNIT PRICE MAX AMOUNT

0003AJ 1 Lump

OPTION INSTALL & MAINTAIN OIL BOOMS AT CDF

SITE

UNIT UNIT PRICE AMOUNT

0003AK 12 Months

OPTION INSTALL & MAINTAIN OIL BOOMS DURING

UNIT UNIT PRICE AMOUNT

0003AL 8 Days

UNIT UNIT PRICE AMOUNT

0003AM 8 Days

UNIT UNIT PRICE MAX AMOUNT

0003AN 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0003AP 1 Lump

UNIT UNIT PRICE AMOUNT

0003AQ 100 Net Ton

UNIT UNIT PRICE MAX AMOUNT

0003AR 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0003AS 1 Lump

UNIT UNIT PRICE AMOUNT

0003AT 20 Net Ton

UNIT UNIT PRICE MAX AMOUNT

0003AU 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0003AV 1 Lump

UNIT UNIT PRICE AMOUNT

0003AW 10 Each

OPTION REMOVE & INSTALL EXTRACTION WELL PUMP

UNIT UNIT PRICE AMOUNT

0003AX 4 Each

UNIT UNIT PRICE AMOUNT

0003AY 5 Each

OPTION REMOVE & REINSTALL EXTRACTION WELL

UNIT UNIT PRICE AMOUNT

0003AZ 12 Months

OPTION OPERATE & MAINTAIN REAL TIME AIR

UNIT UNIT PRICE MAX AMOUNT

0003BA 1 Lump

OPTION REPLACE REAL TIME AIR MONITORING

STATION (NAPHTHALENE)

UNIT UNIT PRICE MAX AMOUNT

0003BB 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0003BC 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0003BD 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0003BE 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0003BF 1 Lump

UNIT UNIT PRICE AMOUNT

0003BG 12 Months

OPTION MONTHLY RENTAL OF CDF POND WATER

UNIT UNIT PRICE AMOUNT

0003BH 12 Months

OPTION MONTHLY RENTAL OF GROUNDWATER TREATMENT

UNIT UNIT PRICE AMOUNT

0003BJ 61,000 Gallons

UNIT UNIT PRICE AMOUNT

0003BK 61,000 Gallons

OPTION GROUNDWATER TREATMENT & DISCHARGE

UNIT UNIT PRICE MAX AMOUNT

0003BL 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0003BM 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0003BN 120 Days

OPTION IN-STREAM WATER QUALITY MONITORING

UNIT UNIT PRICE MAX AMOUNT

0003BP 1 Lump

OPTION PERFORMANCE & PAYMENT BONDS FOR OPTION YEAR 2

reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.

TOTAL PROPOSED PRICE FOR OPTION YEAR 2: $___________________________

UNIT UNIT PRICE MAX AMOUNT

0004 UNDEFINED

OPTION OPTION YEAR 3

(INCLUDES DREDGING ACTIVITIES)

At the discretion of the government, the line items associated with Option Year 4 may be exercised in accordance with the relevant Clause Number 52.217-9 (Refer to Section I).

If this Option is exercised, the effective ordering period will be for a period of 12 months and the Government must satisfy a minimum ordering obligation in the amount of $150,000.00.

The government’s requirements will be stated and ordered by way of the issuance of individual task orders to the Contractor. For any task order issued during this Option Year, the Contractor shall furnish all personnel, equipment, materials, supplies and services necessary to perform the contract services. Services will be

UNIT UNIT PRICE MAX AMOUNT

0004AA 1 Lump

The Government will reimburse the Contractor for actual costs associated with this item, NOT TO EXCEED the line item price. Therefore, the Contractor shall NOT incur any additional costs or perform any additional services outside of the item price.

The Contracting Officer’s Representative (COR) is responsible for processing payments. The Contractor shall provide the COR with invoices and all other

UNIT UNIT PRICE MAX AMOUNT

0004AB 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0004AC 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0004AD 1 Lump

UNIT UNIT PRICE AMOUNT

0004AE 400,000 Cubic

TO CDF HYDRAULICALLY OFF-LOAD/DISTRIBUTE SEDIMENT

UNIT UNIT PRICE AMOUNT

0004AF 60,000 Cubic

UNIT UNIT PRICE AMOUNT

0004AG 3,455 Square

UNIT UNIT PRICE AMOUNT

0004AH 2,760 Net Ton

UNIT UNIT PRICE MAX AMOUNT

0004AJ 1 Lump

UNIT UNIT PRICE AMOUNT

0004AK 12 Months

OPTION INSTALL & MAINTAIN OIL BOOMS DURING

UNIT UNIT PRICE AMOUNT

0004AL 8 Days

UNIT UNIT PRICE AMOUNT

0004AM 8 Days

UNIT UNIT PRICE MAX AMOUNT

0004AN 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0004AP 1 Lump

UNIT UNIT PRICE AMOUNT

0004AQ 100 Net Ton

UNIT UNIT PRICE MAX AMOUNT

0004AR 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0004AS 1 Lump

UNIT UNIT PRICE AMOUNT

0004AT 20 Net Ton

UNIT UNIT PRICE MAX AMOUNT

0004AU 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0004AV 1 Lump

UNIT UNIT PRICE AMOUNT

0004AW 10 Each

OPTION REMOVE & REINSTALL EXTRACTION WELL PUMP

UNIT UNIT PRICE AMOUNT

0004AX 4 Each

UNIT UNIT PRICE AMOUNT

0004AY 5 Each

OPTION REMOVE & REINSTALL EXTRACTION WELL

UNIT UNIT PRICE AMOUNT

0004AZ 12 Months

OPTION OPERATE & MAINTAIN REAL TIME AIR

UNIT UNIT PRICE MAX AMOUNT

0004BA 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0004BB 1 Lump

STATION (PARTICULATE)

UNIT UNIT PRICE MAX AMOUNT

0004BC 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0004BD 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0004BE 1 Lump

OPTION GROUNDWATER TREATMENT PLANT MOBILIZATION

UNIT UNIT PRICE MAX AMOUNT

0004BF 1 Lump

UNIT UNIT PRICE AMOUNT

0004BG 12 Months

OPTION MONTHLY RENTAL OF CDF POND WATER

UNIT UNIT PRICE AMOUNT

0004BH 12 Months

OPTION MONTHLY RENTAL OF GROUNDWATER TREATMENT

UNIT UNIT PRICE AMOUNT

0004BJ 61,000 Gallons

OPTION CDF POND WATER TREATMENT & DISCHARGE TO

UNIT UNIT PRICE AMOUNT

0004BK 61,000 Gallons

UNIT UNIT PRICE MAX AMOUNT

0004BL 1 Lump

OPTION OPERATE & MAINTAIN CDF DATA

& INFORMATION WEBSITE

UNIT UNIT PRICE MAX AMOUNT

0004BM 1 Lump

UNIT UNIT PRICE AMOUNT

0004BN 120 Days

UNIT UNIT PRICE MAX AMOUNT

0004BP 1 Lump

OPTION PERFORMANCE & PAYMENT BONDS FOR OPTION YEAR 3

reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.

TOTAL PROPOSED PRICE FOR OPTION YEAR 3: $__________________________

OPTION OPTION YEAR 4

(INCLUDES DREDGING ACTIVITIES)

At the discretion of the government, the line items associated with Option Year 4 may be exercised in accordance with the relevant Clause Number 52.217-9 (Refer to Section I).

If this Option is exercised, the effective ordering period will be for a period of 12 months and the Government must satisfy a minimum ordering obligation in the amount of $150,000.00.

The government’s requirements will be stated and ordered by way of the issuance of individual task orders to the Contractor. For any task order issued during this Option Year, the Contractor shall furnish all personnel, equipment, materials, supplies and services necessary to perform the contract services. Services will be

UNIT UNIT PRICE MAX AMOUNT

0005AA 1 Lump

The Government will reimburse the Contractor for actual costs associated with this item, NOT TO EXCEED the line item price. Therefore, the Contractor shall NOT incur any additional costs or perform any additional services outside of the item price.

The Contracting Officer’s Representative (COR) is responsible for processing payments. The Contractor shall provide the COR with invoices and all other

UNIT UNIT PRICE MAX AMOUNT

0005AB 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0005AC 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0005AD 1 Lump

UNIT UNIT PRICE AMOUNT

0005AE 400,000 Cubic

UNIT UNIT PRICE AMOUNT

0005AF 60,000 Cubic

UNIT UNIT PRICE AMOUNT

0005AG 3,455 Square

UNIT UNIT PRICE AMOUNT

0005AH 2,760 Net Ton

UNIT UNIT PRICE MAX AMOUNT

0005AJ 1 Lump

UNIT UNIT PRICE AMOUNT

0005AK 12 Months

OPTION INSTALL & MAINTAIN OIL BOOMS DURING

UNIT UNIT PRICE AMOUNT

0005AL 8 Days

UNIT UNIT PRICE AMOUNT

0005AM 8 Days

OPTION SUSPEND MECHANICAL DREDGE OPERATIONS

NET

AMOUNT

UNIT UNIT PRICE MAX AMOUNT

0005AN 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0005AP 1 Lump

UNIT UNIT PRICE AMOUNT

0005AQ 100 Net Ton

UNIT UNIT PRICE MAX AMOUNT

0005AR 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0005AS 1 Lump

UNIT UNIT PRICE AMOUNT

0005AT 20 Net Ton

NET

AMOUNT

UNIT UNIT PRICE MAX AMOUNT

0005AU 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0005AV 1 Lump

UNIT UNIT PRICE AMOUNT

0005AW 10 Each

OPTION REMOVE & REINSTALL EXTRACTION WELL PUMP

UNIT UNIT PRICE AMOUNT

0005AX 4 Each

UNIT UNIT PRICE AMOUNT

0005AY 5 Each

OPTION REMOVE & REINSTALL EXTRACTION WELL

UNIT UNIT PRICE AMOUNT

0005AZ 12 Months

OPTION OPERATE & MAINTAIN REAL TIME AIR

UNIT UNIT PRICE MAX AMOUNT

0005BA 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0005BB 1 Lump

STATION (PARTICULATE)

UNIT UNIT PRICE MAX AMOUNT

0005BC 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0005BD 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0005BE 1 Lump

OPTION GROUNDWATER TREATMENT PLANT MOBILIZATION

UNIT UNIT PRICE MAX AMOUNT

0005BF 1 Lump

UNIT UNIT PRICE AMOUNT

0005BG 12 Months

OPTION MONTHLY RENTAL OF CDF POND WATER

UNIT UNIT PRICE AMOUNT

0005BH 12 Months

OPTION MONTHLY RENTAL OF GROUNDWATER TREATMENT

UNIT UNIT PRICE AMOUNT

0005BJ 61,000 Gallons

UNIT UNIT PRICE AMOUNT

0005BK 61,000 Gallons

UNIT UNIT PRICE MAX AMOUNT

0005BL 1 Lump

UNIT UNIT PRICE MAX AMOUNT

0005BM 1 Lump

UNIT UNIT PRICE AMOUNT

0005BN 120 Days

UNIT UNIT PRICE MAX AMOUNT

0005BP 1 Lump

OPTION POSTPLACEMENT SEDIMENT SURVEY

UNIT UNIT PRICE MAX AMOUNT

0005BQ 1 Lump

OPTION TRAINING ON EXISTING SITE SYSTEMS

UNIT UNIT PRICE MAX AMOUNT

0005BR 1 Lump

OPTION PROJECT CLOSE-OUT

UNIT UNIT PRICE MAX AMOUNT

0005BS 1 Lump

OPTION PERFORMANCE & PAYMENT BONDS FOR OPTION YEAR 4

reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.

TOTAL PROPOSED PRICE FOR OPTION YEAR 4: $______________________

OVERALL PROPOSED AMOUNT (BASE YEAR + 4 OPTION

YEARS):$_________________________________

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

FOR

INDIANA HARBOR & CANAL CONFINED DISPOSAL FACILITY

(INCLUDES DREDGING ACTIVITIES)

CONTENTS

1.0 GENERAL INFORMATION

2.0 GOVERNMENT DEFINITIONS

3.0 GOVERNMENT FURNISHED FACILITIES, PROPERTY, EQUIPMENT, MATERIAL AND

SERVICES

4.0 CONTRACTOR ACQUIRIED PROPERTY

5.0 MANAGEMENT RESPONSIBILITIES

6.0 PERFORMANCE REQUIREMENTS

ATTACHMENTS

Attachment A: Quality Assurance Surveillance Plan Attachment B: Plans (CDF Site Characteristics & Maps) Attachment C: Technical Specifications

1.0 GENERAL INFORMATION

1.1 SCOPE

The intention of this requirement is to obtain facility operations support services, which includes providing dredging, dredged material disposal and dredged material containment related services at the Indiana Harbor & Canal Confined Disposal Facility (CDF) and in the Indiana Harbor and Canal federal navigational channel that are located in East Chicago, Indiana. The operations support services will require supervision on a 24-hour, 7-day-a-week basis as described in Section 01 11 00 of the Technical Specifications. More specifically, the contractor will be responsible for facility operations that include water system management such as operating/maintaining the groundwater dewatering pumps, monitoring cell water levels and furnishing/operating/maintaining the package water treatment plant. Air monitoring management includes purchasing, installing, operating/maintaining the real-time air monitoring equipment and reporting the data via a website. The contractor furnished package wastewater treatment plant will treat CDF water to discharge concentrations specified in the National Pollutant Discharge

Elimination System (NPDES) permit to be issued by the Indiana Department of Environmental Management (IDEM). The treated water will be discharged to the canal south of the CDF site.

Regulatory reporting for various project activities will also be required.

1.2 BACKGROUND

The Indiana Harbor and Canal CDF is located in East Chicago, Indiana. The CDF was constructed on a former petroleum refinery site that has open status under the Resource Conservation and Recovery Act (RCRA); the site required corrective action. Elements of the corrective action requirements are built into the CDF operation. The site contains buried waste and debris, a free phase oil layer on top of the contaminated groundwater, and contaminated soil. The CDF consists of the following major features:

1) Clay exterior dikes, with a height of approximately 22’;

2) An interior dike that divides the CDF into two cells of approximately 45 acres each; the interior dike is approximately 18’ high and each cell includes a decant structure;

3) A groundwater gradient system which consists of 88 groundwater extraction wells, plus monitoring wells, collection piping, level sensors, and lift stations;

4) A bentonite slurry cutoff wall that isolates the site on the west, north, and east sides, plus a sealed steel sheetpile wall along the canal;

5) An administration building and parking lot for site management operations; and

6) Support facilities including a gravel pad for a package wastewater treatment plant, a crane pad for debris off-loading, a storage pad, a decontamination station for rinsing vehicles or large objects, roads, air monitoring pads, and utilities.

This performance work statement includes activities required to dredge and dispose of material in the CDF, as well as to operate the CDF.

1.3 CONTRACTOR PERSONNEL

1.3.1 Project Manager. The Contractor shall provide an onsite Project Manager who shall be responsible for all Contractor work performed under the resulting contract.

1.3.1.1 The Project Manager shall be a single point of contact for the Contracting Officer and the Contracting Officer’s Representative (COR). It is anticipated that the Project Manager shall be one of the senior level employees provided by the Contractor for this work effort. The name of the Project Manager, and the name(s) of any alternate(s) who shall act for the Contractor in the absence of the Project Manager, shall be provided to the Government as part of the Contractor's proposal. During any absence of the Project Manager, only one alternate shall have full authority to act for the Contractor on all matters relating to work performed under the resulting contract.

1.3.1.2 The Project Manager shall be available to the COR via telephone at all times, 24/7. If the Project Manager will not be available by telephone, he/she will notify the COR of the unavailability and identify an alternate. The Project Manager or designated alternate shall be available to meet with Government personnel at the designated CDF within (30) minutes during normal working hours (Monday through Friday between 7:30 and 4:30) and within (2) hours of request outside normal working hours.

1.3.2 Qualified Personnel. The Contractor shall provide qualified personnel to perform all requirements specified in this PWS. Prior to assignment to the contract, the contractor shall submit a current résumé for all management and other key personnel if different from those personnel identified in the proposal. Any replacement of key personnel shall be subject to the Contracting Officer's approval in accordance with the clause HSAR 3052.215-70, Key Personnel or Facilities.

1.3.3 Contractor Licensing, Certification, and Specific Experience Requirements. Licenses required of the Contractor to conduct business (i.e., local or state business licenses) shall be obtained prior to beginning work on this contract. Personnel licensing and certification shall be complete before that individual performs any work under this contract. The Contractor shall provide personnel that have the appropriate skill for their position. The degree of skill of individuals shall be commensurate with that required for the work.

1.3.4 Employee Identification. Contractor employees or visitors to the CDF site will be required to check in at the administration building. All Contractor employees will have some type of government issued photo identification in their possession. Visitors to the site must show a government issued photo identification at the time of their check-in to the site. The Contractor must maintain a secure site with controlled access.

1.3.5 Employee Conduct. Contractor’s employees shall comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, emergency response, sanitation, environmental protection, security, “off limits” areas, possession of drugs or alcohol and possession of weapons) when visiting or working at Government facilities. The contractor personnel shall conform to conduct regulations contained in Subpart C, Part 265, Title 15 of the Code of Federal Regulations.

1.3.6 Removing Employees for Misconduct or Security Reasons. The Government may, at its sole discretion, direct the Contractor to remove any Contractor employee from CDF facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

1.4 Security, Privacy, Safety and Proprietary Data

1.4.1 Security Clearance. Unclassified.

1.4.2 Privacy Act. This agreement may require the Contractor employees to safeguard data in accordance with the Privacy Act (5 USC 522a).

1.4.3 Contractor User Security Agreement. The Contractor acknowledges that during the term of this requirement, all contractor employees may be required to sign some form of Contractor User Security Agreement. The Contractor agrees to have all Contractor employees sign the agreement. The Contractor further agrees that they will comply with this requirement (if required) at no cost to the Government.

1.4.4 Safety Requirements. The contractor shall conduct operations in strict conformance with all state, federal and local safety regulations, local ordinances and applicable provisions of Part 29 of the Code of Federal Regulations to include but not limited to 1904, 1910, 1925 and 1926 of the Occupational Safety and Health Act, and USACE EM 385-1-1. The contractor agrees to take all reasonable steps and precautions to prevent accidents and preserve the life and health of contractor and Government personnel performing in any way under this contract. The contractor shall comply with all elements of OSHA safety and health standards and U.S. Army Corps of Engineers safety and health directives. All accidents/incidents shall be reported in accordance with EM 385-1-1. If the contractor fails or refuses to promptly comply with safety requirements, the Contracting Officer or designated representative may stop all or part of the work until corrective action has been taken. Additional safety requirements are discussed in the Technical Specifications.

1.4.4.1 Upon commencement of work under this contract, the contractor shall implement a suitable safety program for employees performing work under this contract. This safety program shall be in writing and a copy shall be furnished to the COR for approval within forty-five (45) calendar days after contract award. This detailed plan shall describe the contractor's safety program and identify how it complies with federal and state Occupational Safety and Health Acts, EM 385-1-1, and any other safety provisions within this contract.

1.4.4.2 The contractor shall develop and implement standard operating procedures to ensure that all operations under this contract are completed safely, with no adverse impact on the environment and meet all applicable Federal, state and local regulations and standards.

1.4.4.3 The contractor shall properly placard, label and/or mark all items to include but not limited to: vehicles, storage areas, containers, materials, devices and structures as required by regulatory agencies to include: Occupational Safety and Health Administration (OSHA), Department of Transportation (DOT), Indiana Department of Environmental Management (IDEM), and Environmental Protection Agency (EPA).

1.4.4.4 The contractor shall notify the COR ten days prior to bringing any hazardous material/substance as defined by 29 CFR 1910, 29 CFR 1926 or 49 CFR 172.101 onto the project site. The contractor will ensure that all contracted personnel, USACE employees, and/or visitors exposed or potentially exposed to any material/substance meeting the definitions of the above referenced regulations will be properly trained in accordance with 29 CFR 1910.1200 – Hazard Communication and shall maintain a materials safety data sheet (MSDS) for all materials/substances. Additional safety and environmental requirements are given in the Technical Specifications.

1.4.4.5 Safety Enforcement. If the contractor fails or refuses to promptly comply with safety requirements, the Contracting Officer or their designated representative may stop all or part of the work until corrective action has been taken. No part of the time lost due to any such order will be made the subject of a claim by the contractor for extension of time or for reimbursement of excess costs or damages.

1.4.5 Safety Representative. The contractor shall designate an on-site safety representative(s) assigned to the project, who shall be available (on-call) twenty-four hours a day, seven days per week. The safety representative(s) shall have the authority to speak for and act for the contractor in all safety related matters and shall be available within 2 hours of notification.

1.4.6 Proprietary Data. In the performance of services under this agreement, the Contractor employees may perform operations on data containing sensitive proprietary information. All inquiries regarding operation systems, data base controls and contents, passwords or other matters shall be referred to the COR.

1.5 PERIOD of Performance

The total performance period inclusive of options is 5 years, delineated as follows:

Base Period: 12 Months, commencing from the Date of Award Option Year 1: 12 Months, commencing from the ending date of the Base Period Option Year 2: 12 Months, commencing from the ending date of Option Year 1 Option Year 3: 12 Months, commencing from the ending date of Option Year 2 Option Year 4: 12 Months, commencing from the ending date of Option Year 3

1.6 PLACE OF PERFORMANCE

The primary place of performance will be the IHC CDF located at 3500 Indianapolis Boulevard, East Chicago, Indiana.

1.7 KICK-OFF MEETING

The Contractor shall attend a Kick-Off Meeting with the Contracting Officer and the COR at a date to be determined. The purpose of the Kick-Off Meeting, which will be chaired by the Contracting Officer, is to discuss technical and contracting objectives of this contract and review the Contractor's draft project management plan. The Kick-Off Meeting will be held at the IHC CDF or other local mutually agreeable site.

1.8 RECORDS AND REPORTS

The Contractor shall prepare and submit complete and accurate records, reports and logs in accordance with Federal Acquisition Regulations (FAR) Part 45, other Federal requirements, and USACE policies or procedures. These daily, weekly, monthly, other recurring operating records, reports, logs, and other documents are specified as contract requirement submissions in the Technical Specifications.

1.9 PROGRESS MEETINGS

The Project Manager shall be available to meet with the COR upon request to present deliverables, discuss progress, exchange information and resolve emergent technical problems and issues. These meetings shall take place at the IHC CDF or at other mutually agreeable facilities.

1.9.1 Regular periodic status meetings shall be held between the Government and the contractor. The status meetings shall alternate in subject and may be attended by the Project Manager, Contracting Officer, the COR, and quality management personnel. The meeting agenda shall include: 1) CDF operations, 2) Service Requests, 3) Funding issues 4) Project Work or any other subject desired by the contractor or Government. The purpose of these meetings shall be to discuss and record status of projects and to make decisions on priority for projects. The Project Manager and the COR shall invite any USACE personnel or contractor employees they deem necessary for the meetings. Written minutes of these meetings, prepared by the contractor, shall be prepared as required in Attachment C, Technical Specifications.

1.10 GENERAL REPORT REQUIREMENTS

The Contractor shall provide all reports and submittals as specified in the Technical Specifications.

1.11 QUALITY ASSURANCE SURVEILLANCE PLAN

A Quality Assurance Surveillance Plan (QASP) is provided as Attachment A to the PWS. In general, the QASP sets forth the expected outcomes (objectives) of the contract, the service(s) required of the Contractor to achieve the objectives and a performance standard per outcome.

Positive/negative incentives will be applied based on performance. The QASP is not an exclusive remedy and inclusion of the QASP does not preclude the Government from using any other remedy available by law or contract terms, including reductions in payment in accordance with any clause for inspection of services.

1.12 GENERAL INFORMATION

1.12.1 Workmanship. All workmanship shall meet or exceed the standards specified herein and shall be accomplished in conformance with approved and accepted standards of the industry; equipment manufactures; Federal, State and local standards; and all applicable building and safety codes.

1.12.2 Working Hours. For the purposes of this contract, the Government’s regular (normal) working hours range from 7:30 a.m. to 4:30 p.m. CST Mondays through Fridays, except Federal holidays and facility closures due to inclement weather. The contractor shall be required to perform certain critical or continuous services as defined in the PWS, 24 hours per day, 7 days per week, 365 days per year.

1.12.3 Federal Holidays: The contractor may be required to provide normal operating service on the following holidays if performance of work is required: New Year’s Day, Martin Luther King Jr. Day, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, and Christmas Day.

The working hours may be extended beyond the regular hours due to unforeseen weekend/holiday maintenance support, emergency on-call services, student services support, and any other program support related to CDF’s mission and goals.

1.12.4 Emergency Action Plan. The Government has prepared an Emergency Action Plan for this facility. Contractor participation in emergency response planning and exercises shall be mandatory regardless of scheduled contractor work. Contractor will be responsible for providing and managing surge workforce if needed to protect Government property and personnel in the event of an emergency situation. Such work will be requested and authorized as an emergency work order as defined within the PWS and Technical Specifications. The constraints set forth in Section H, Limitation of Contractor Obligations, will apply. Costs will be reimbursed on a cost plus fixed fee basis pursuant to FAR 52.216-17, Allowable Cost and Payment.

2.0 GOVERNMENT DEFINITIONS

2.1 DEFINITIONS

Acceptable Level of Maintenance. The level of maintenance which will preserve equipment and buildings in unimpaired operating condition-that is, above the point where deterioration begins.

Alteration. The work required to adjust interior arrangement, or other physical characteristics of an existing facility or relocation within an installation, so that it may be more effectively adapted to, or utilized for its presently designated purpose. This includes equipment installed in and made a part of an existing facility.

Breakdown. The stoppage or failure of equipment or a facility, or a component thereof, which requires immediate corrective action to restore it to an operating condition.

Building Codes. A set of written documents, periodically amended, containing methods and standards used to regulate the erection, construction, enlargement, alteration, repair, moving, removal, demolition, conversion, occupancy, equipment, use, height, area, and maintenance of all buildings or structures in a given jurisdiction.

Call-Back. A request for additional service, such as maintenance or repair, when the initial service did not accomplish the desired end result; or a return visit to a site by the workman when, on the original visit, the necessary parties were not available.

Cannibalization. The removal of serviceable parts, components, or assemblies from one piece of equipment to be used as a replacement in other equipment or to fabricate another item.

CDF. Confined Disposal Facility.

Check. To examine, test or compare with a standard to verify that the item under surveillance is operating within design specifications. Also referred to as inspect.

Clean. As used, generally means removal of dirt or impurities. As used for acceptance of work, means gleaming, bright, free from dirt, contamination, or impurities, unsoiled, unstained, recently…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .