This Statement of Work (SOW) details the replacement of two water source heat pumps (WSHPs) at the Old Hickory Powerhouse in Hendersonville, Tennessee. The project requires removing existing AHU-1 and AHU-2 units and installing new packaged WSHPs with specific technical requirements, including 15-ton cooling capacity, minimum 20.1 EER, 180,400 BTUH heating capacity, and 460V/60hz/3-phase electrical specifications. The new units must use low-GWP, A2L-class refrigerant and be UL 60335-2-40 compliant, with installation including flexible ductwork and piping connections.

The work is to be performed at 10 Power Plant Road, with site visits coordinated through POC Chris Campbell (615-265-2113). Working hours are Monday-Thursday, 0600-1630, excluding federal holidays. Contractors must comply with strict security requirements, including background checks, suspicious activity reporting training, and E-Verify program verification. The contractor is responsible for proper equipment removal, refrigerant evacuation, and disposal in accordance with federal, state, and local laws, with careful attention to preventing damage to existing infrastructure during the replacement process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Old Hickory – Powerhouse HVAC Replacement

Statement of Work

Description:

This is for the purchase and installaƟon of two packaged water source heat pumps (WSHP) for the Old Hickory Powerhouse. The Powerhouse has two exisƟng packaged WSHPs (AHU-1 & AHU-2) which are to be removed and replaced.

Place of Delivery:

10 Power Plant Road Hendersonville, TN 37075

Contractor shall coordinate with the POC for all site visits.

POC:

Chris Campbell 615-265-2113 christopher.j.campbell@usace.army.mil

Working days and hours: Mon.-Thu., 0600-1630, except Federal Holidays.

Scope of Work:

1. Equipment to be furnished will be in accordance with the following and installed at the Old Hickory Powerhouse as indicated by this document.

2. The equipment to be removed are the exisƟng AHU-1 and AHU-2 located on what is idenƟfied as the plaza level of the Powerhouse (at elevaƟon of 447 Ō.) in Figure 1 and Figure 2 below.

2.1. All equipment being removed as part of this contract shall become possession of the Contractor and shall be disposed of in accordance with Federal, State and Local Laws.

2.2. Equipment to be removed will be done in a manner to prevent accidental damage to other property. In the event of accidental damage, the Contractor shall repair/replace as needed to restore that item(s) condiƟon to pre-damaged state.

2.3. Refrigerant in the units to be removed shall be evacuated prior to removal of the equipment to prevent accidental release into the atmosphere.

3. The work shall consist of disconnecƟon and removal of the exisƟng air condiƟoning systems, and purchase with installaƟon of new air condiƟoning system for the Powerhouse located on the North Side of the Old Hickory Project.

3.1. The contractor shall furnish all tools, equipment, labor, and materials to conduct the work as defined by this scope of work.

3.1.1. InstallaƟon includes repairs or modificaƟons to make new flexible connecƟons to exisƟng ductwork and new flexible piping connectors and wye strainers for the new units.

3.1.2. SelecƟon and installaƟon of all connecƟons, accessories, and other appurtenances must conform with the manufacturer’s recommendaƟons. The flexible connecƟons of both units for supply air and return air to exisƟng ductwork are to be made at full size in accordance with standard industry pracƟces.

3.2. All work shall be accomplished in accordance with these specificaƟons, industry standards, and current EM 385-1-1 safety requirements.

3.3. AHU-1 shall be replaced with a model with the following characterisƟcs:

3.3.1. Packaged air handling unit with water source heat pump.

3.3.2. Nominal cooling capacity of 15 tons.

3.3.3. Minimum EER GWHP of 20.1.

3.3.4. HeaƟng capacity of 180,400 BTUH for GWHP, minimum.

3.3.5. Air flow rate of 5000 CFM at 1.2 in. W.G. ESP, minimum.

3.3.6. Electrical 460V/60hz/3-phase

3.3.7. MounƟng with 1" elastomer pad at the locaƟon of previous unit, as shown in Figure 1.

3.3.8. Replace AHU-1’s exisƟng 30kW duct heater (3-phase 460VAC, 60 Hz, nominal 37.7A) with approximately 30kW of auxiliary electric heat. This auxiliary electric heat can be integral to the new AHU-1, at its supply air discharge, or directly replacing the exisƟng duct heater downstream. Install new electric heat/duct heater in accordance with all manufacturers’ recommendaƟons and to communicate with AHU-1 and its thermostat as required.

3.4. AHU-2 shall be replaced with a model with the following characterisƟcs:

3.4.1. Packaged air handling unit with water source heat pump.

3.4.2. Nominal cooling capacity of 15 tons.

3.4.3. Minimum EER GWHP of 20.1.

3.4.4. HeaƟng capacity of 180,400 BTUH for GWHP, minimum.

3.4.5. Air flow rate of 4800 CFM at 1.7 in. W.G. ESP, minimum.

3.4.6. Electrical 460V/60hz/3-phase

3.4.7. MounƟng with 1" elastomer pad at the locaƟon of previous unit, as shown in Figure 1.

3.4.8. Replace AHU-2’s exisƟng 30kW duct heater (3-phase 460VAC, 60 Hz, nominal 37.7A) with approximately 30kW of auxiliary electric heat. This auxiliary electric heat can be integral to the new AHU-2, at its supply air discharge, or directly replacing the exisƟng duct heater downstream. Install new electric heat/duct heater in accordance with all manufacturers’ recommendaƟons and to communicate with AHU-2 and its thermostat as required.

3.5. AHU-1 and AHU-2 must both use a current low-GWP, A2L-class refrigerant. Both units must be UL 60335-2-40 compliant.

3.6. Any significant change in the footprint of AHU-1 and/or AHU-2 (equal or greater than 12 inches increase in length or width) must be coordinated and approved by POC Chris Campbell in order to ensure sufficient clearance in corridors for powerhouse personnel and equipment.

Figure 1. InstallaƟon at plaza level of both exisƟng WSHPs to be replaced (AHU-1 & AHU-2).

Figure 2. LocaƟon of AHU-1 & AHU-2 in the Powerhouse.

Security:

AT/OPSEC Form 6055 contract paragraph requirements are as follows:

Block 1: General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporƟng the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements.

QuesƟons regarding security maƩers shall be addressed to the designated Government representaƟve (e.g., ContracƟng Officer RepresentaƟve (COR), Requiring AcƟvity (RA) representaƟve, or ContracƟng Officer (if a COR or other RA representaƟve is not appointed)).

Contract personnel are criƟcal to the overall security and safety of US Army Corps of Engineers (USACE) installaƟons, faciliƟes and acƟviƟes, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete iniƟal training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the compleƟon of training, the Contractor shall provide wriƩen documentaƟon (e.g., email or memorandum) to the Government representaƟve. The documentaƟon shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training cerƟficates to the Government representaƟve. Contractor personnel and vehicles are subject to search when entering federal installaƟons. AddiƟonally, all contract personnel shall comply with Force ProtecƟon CondiƟon (FPCON) measures, Random AnƟterrorism Measures (commonly referred to as “RAMs”), and Health ProtecƟon CondiƟon (HPCON) measures. The Contractor is responsible for meeƟng performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures—this includes idenƟfying mission essenƟal and non-mission essenƟal personnel. In addiƟon to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installaƟon change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibiliƟes, including any site-specific requirements idenƟfied in local policies or procedures.

Block 3: Physical security and access control requirements: All contract personnel requiring physical access to a federal installaƟon or facility shall comply with the access control procedures of that locaƟon. Contract personnel requiring unescorted access to meet contract performance requirements on DoD property in the US shall be veƩed by the District Security Office using the NaƟonal Crime database and Terrorist Screening Database. Contract personnel shall comply with all personal idenƟty verificaƟon requirements specified in facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE faciliƟes shall coordinate escorted access with the Government representaƟve, as needed.

Contract personnel who receive keys, access cards, or lock combinaƟons that provide access to government-owned property shall comply with key and lock control procedures of the RA.

Since the work is being done within a controlled area but is expected to last less than six months, the invesƟgaƟon requirements fall under Category B1 for US CiƟzens and Category C for Foreign NaƟonals. Contract employees will need to be supervised/ escorted by a Corps employee while within the restricted area. In the event it is determined the contract will extend beyond six months, the contractor will need to comply with the requirements in Category B2 for US CiƟzens. Guidance and forms for the requirements are available on the Nashville District Public Website:

hƩps://www.lrd.usace.army.mil/Submit-ArƟcleCS/Programs/ArƟcle/3667149/contracƟng/

Contract and sub-contract employees are not authorized to begin work on any contract unƟl invesƟgaƟon requirements have been completed and noƟficaƟon has been made by the COR or the District Security Office.

Because the work is being performed in a restricted area, there are restricƟons on use of persons either imprisoned or previously convicted of a felony. The Contractor shall not employ in the performance of this contract any person undergoing a sentence of imprisonment imposed by any court of a State, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, or the U.S. Virgin Islands, or the US Federal Government. The Contractor shall not employ in the performance of this contract any person who has been convicted of a felony imposed by any court of a State, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, or the US Federal Government.

Contractors and/or potenƟal contractors wishing to aƩend a pre-bid meeƟng held at or in LRN restricted/controlled areas (such as a Power Plant or NavigaƟon Lock) shall submit a Nashville District (LRN) Security Access Form to the Nashville District Point of Contact (LRN POC) five (5) days prior to the site visit or meeƟng. If submiƫng the document in less than five days, the Offeror/Bidder may not receive approval for parƟcipaƟon. The LRN POC will noƟfy the Contractor if the request is approval or denied. Any pre-bid meeƟng which will cover anything other than public domain informaƟon shall be limited to US CiƟzens, except under unique circumstances. The Security Access Form and guidance is available at hƩps://www.lrd.usace.army.mil/Submit-ArƟcleCS/Programs/ArƟcle/3667149/contracƟng/

Contractor is expected to prescreen their own job applicants for suitable candidates before submission to the U.S. Government. The U.S. Government will not screen potenƟal candidates for you. Once the contractor has selected suitable employees to work on a government site, the contractor will submit them for processing as outlines above. Submission to the district security office must be accomplished prior to a contract employee’s site access. ACCESS NOT AUTHORIZED for any federal property nor to begin work on any part of the contract unƟl invesƟgaƟon requirements have been met/completed and noƟficaƟon has been made by the COR or the District Security Office. There is no blanket approval, no waivers, no excepƟons.

Each contractor employee is a case-by-case screening process. Preliminary results may require addiƟonal screening requirements before site access approval can be provided.

Block 6: Suspicious AcƟvity ReporƟng training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive iniƟal and annual refresher training from the RA representaƟve on the local suspicious acƟvity reporƟng program. This locally developed training provides contract personnel with general informaƟon on suspicious behavior, and guidance on reporƟng suspicious acƟvity to the project manager, security representaƟve or law enforcement enƟty.

Block 14: Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility VerificaƟon and FAR Subpart 22.18 in using the E-Verify Program at (hƩps://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigraƟon laws in accordance with FAR 22.102-1(i). An iniƟal list of verified/eligible candidates shall be provided to the COR no later than three business days aŌer the iniƟal contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility VerificaƟon, and submit it to the ContracƟng Officer to become part of the official contract file.

All contract employees and subcontractors shall always conduct themselves in a proper manner.

No alcoholic or intoxicaƟng beverages or substances or illegal drugs or controlled substances not prescribed by a physician shall be possessed, consumed, or be under the influence of any such substance while on Government property.

The Contractor shall remove from the site any individual whose conƟnued employment is deemed by the appointed receiving agent to be contrary to the public interest or inconsistent with the best interests of the U.S. Army Corps of Engineers.

The ContracƟng Officer or the appointed receiving agent will require the Contractor to immediately remove from the work site anyone who is incompetent or who endangers persons or property or whose physical or mental condiƟon is such that it would impair the employee’s ability to saƟsfactorily perform the work. NoƟficaƟon to the Contractor will be made in wriƟng if Ɵme and circumstances permit. Otherwise, noƟficaƟon will be verbal and will be confirmed in wriƟng as soon as possible. No such removal, however, will reduce the Contractor's obligaƟon to perform all work required under this contract and immediate replacement shall be made as required.

The Contractor is responsible for taking the acƟon necessary to protect Contractor supplies, materials and equipment, and the personal property of Contractor employees from loss, damage, or theŌ. The Government assumes no responsibility for theŌ, damage, etc., of the above. All incidents of theŌ (or suspected theŌ) of contractor materials, supplies, or equipment from project lands shall be reported to the COR.