W912P525QA032_TPLANS_NIL_Tow Haulage High Speed Gear Box and Limit Switch Rehab_RTA_June2025.pdf

PDF 3 MB Posted

Attached to
Nickajack Lock Tow Haulage Gearbox Rehab
Solicitation number
W912P525QA0320001
Issued by

About this file

These are technical drawings for a Tow Haulage High Speed Gearbox and Limit Switch Rehabilitation project for the Nickajack Auxiliary Lock, located in Hardin County, Tennessee, within the Tennessee River Basin. The project, identified by contract number W912P5-25-Q-A032 and prepared by the U.S. Army Corps of Engineers Nashville District, is scheduled for June 2025. The technical documentation includes a detailed parts replacement list for the gearbox, specifying seven specific components to be replaced: a bearing bushing, multiple bearings, oil seals, and a note that any unlisted gaskets must also be replaced. Additional specifications cover limit switch replacement, requiring a NEMA 4X enclosure, stub shaft replacements, and mandating that all replacement shafts match original dimensions and material specifications as detailed in the project specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submitted:

Waldy F. Pichardo

(2.) The approval signatures appearing in the signature block on this sheet constitute approval of all drawings listed in the sheet index.

of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.

(1.) This project was designed by the Nashville District of the U.S. Army Corps of Engineers. The initials or signatures and registration designations

Note:

Steven J. Duncan, P.E.

Chief, Mechanical Section

Approved:

Zachary A. Langel, P.E.

Chief, Design Branch

Project Engineer

Approval Recommended:

Plans For

Tow Haulage High Speed Gearbox and Limit Switch Rehab

Nickajack Auxiliary Lock

Tennessee River Basin

Hardin County, Tennessee

W912P5-25-Q-A032

June 2025

Certified Final Documents - RTA

Nashville District of Engineers

US Army Corps

DRAWING INDEX

REFERENCE DRAWINGS:

DIMENSION SHEET031730025.pdf03-173-0025-3

PART LIST011730040.pdf01-173-0040-4

TITLEFILE NAMEDWG #

Tennessee River

Parts to be Replaced

1. Bearing bushing #11

2. Bearing #19

3. Bearing #20

4. Bearing #21

5. Oil seal #22

6. Bearing #27

7. Oil seal #28

Notes:

1. Highlighted parts are to be replaced as part of the refurbishment of the gearbox.

2. Any gaskets not listed here must also be replaced.

FOR REFERENCE ONLY

FOR REFERENCE ONLY

Notes:

1. See specs for limit switch information.

2. Under base contract, stub shaft must be replaced to fit new limit switch

3. Under base contract, stub shaft must be replaced to fit new limit switch

4. NEMA 4X limit switch enclosure to be provided by contractor.

5. Shafts must be replaced "In-Kind" to original dimensions. See specs for Shaft material.

6. Under option 1 of the contract, Shafts must be replaced "In-Kind" to original dimensions. See specs for Shaft material

2025-06-17T14:50:00-0500
PICHARDO.WALDY.FELIX.1408797140
I am the author of this document
2025-06-20T06:54:54-0500
DUNCAN.STEVEN.JAMES.1541095876
2025-06-20T07:49:29-0500
LANGEL.ZACHARY.A.1381404567

File details come from the government source that posted it. Updated .