These documents are technical plans for the rehabilitation of a tow haulage high speed gearbox and limit switch at the Nickajack Auxiliary Lock in Hardin County, Tennessee, prepared by the U.S. Army Corps of Engineers Nashville District. The project (Contract W912P5-25-Q-A032) involves replacing multiple components including bearing bushings, bearings, oil seals, and stub shafts, with specific requirements that shafts must be replaced "In-Kind" to original dimensions. The technical drawings specify a NEMA 4X limit switch enclosure to be provided by the contractor, and include detailed part lists and dimensional specifications for the gearbox rehabilitation, with a projected completion date of June 2025.
The associated federal contract opportunity is a small business set-aside solicitation for commercial and industrial machinery equipment repair and maintenance (NAICS 811310). A mandatory site visit is scheduled for July 16, 2025, at 10:30 AM CST, with strict security access requirements for both U.S. citizens and foreign nationals. Interested contractors must be registered in the System for Award Management (SAM) and submit appropriate security access forms. The primary point of contact is Jori Cox, and potential bidders are required to provide company details, CAGE/UEI numbers, and contact information when expressing interest in the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submitted:
Waldy F. Pichardo
(2.) The approval signatures appearing in the signature block on this sheet constitute approval of all drawings listed in the sheet index.
of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.
(1.) This project was designed by the Nashville District of the U.S. Army Corps of Engineers. The initials or signatures and registration designations
Note:
Steven J. Duncan, P.E.
Chief, Mechanical Section
Approved:
Zachary A. Langel, P.E.
Chief, Design Branch
Project Engineer
Approval Recommended:
Plans For
Tow Haulage High Speed Gearbox and Limit Switch Rehab
Nickajack Auxiliary Lock
Tennessee River Basin
Hardin County, Tennessee
W912P5-25-Q-A032
June 2025
Certified Final Documents - RTA
Nashville District of Engineers
US Army Corps
DRAWING INDEX
REFERENCE DRAWINGS:
DIMENSION SHEET031730025.pdf03-173-0025-3
PART LIST011730040.pdf01-173-0040-4
TITLEFILE NAMEDWG #
Tennessee River
Parts to be Replaced
1. Bearing bushing #11
2. Bearing #19
3. Bearing #20
4. Bearing #21
5. Oil seal #22
6. Bearing #27
7. Oil seal #28
Notes:
1. Highlighted parts are to be replaced as part of the refurbishment of the gearbox.
2. Any gaskets not listed here must also be replaced.
FOR REFERENCE ONLY
FOR REFERENCE ONLY
Notes:
1. See specs for limit switch information.
2. Under base contract, stub shaft must be replaced to fit new limit switch
3. Under base contract, stub shaft must be replaced to fit new limit switch
4. NEMA 4X limit switch enclosure to be provided by contractor.
5. Shafts must be replaced "In-Kind" to original dimensions. See specs for Shaft material.
6. Under option 1 of the contract, Shafts must be replaced "In-Kind" to original dimensions. See specs for Shaft material
| 2025-06-17T14:50:00-0500 | |
| PICHARDO.WALDY.FELIX.1408797140 | |
| I am the author of this document |
| 2025-06-20T06:54:54-0500 | |
| DUNCAN.STEVEN.JAMES.1541095876 |
| 2025-06-20T07:49:29-0500 | |
| LANGEL.ZACHARY.A.1381404567 |
File details come from the government source that posted it. Updated .