These are U.S. Army Corps of Engineers certified final documents for the Cleveland Flood Reduction Project, specifically the Blount Avenue Channel Modification in Cleveland, Tennessee. The project involves channel modification and horizontal control work spanning from Station 0+00 to Station 13+05, with key characteristics including grading limits, work area limits, and a staging area. The documents include detailed plan and profile sheets (C-101 through C-105) showing existing and proposed grades, control lines, slope details, and site topography.

The project requires careful coordination with Cleveland Utilities and includes multiple technical considerations, such as protecting existing infrastructure like overhead power lines, sewer lines, guy wires, power poles, and sewer manholes. Demolition and construction notes emphasize the need for smooth grade transitions, proper haul road construction, and adherence to safety regulations. The modification includes an access ramp and maintains a consistent grade with minimal slope changes, with the project area extending approximately 1,305 linear feet along Blount Avenue.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CERTIFIED FINAL DOCUMENTS - RTA

C L

E V

E L

A N

D T

N

B L

O U

N T

A V

E N

U E

C H

A N

N E

L M

O D

IF

IC

A T

IO

N

C L

E V

E L

A N

D F

L O

O D

R E

D U

C T

IO

N

P R

O J E

T

F

IL

E N

A M

E

A U

G

A M

D T

A D

D E

D C

L E

A R

IN

G

A N

D G

R U

B B

IN

G

G E

N E

R A

L N

O

E

N

S I

D

W

P

-2

-B -A

J U

L Y

W

P

-2

-X -X

X X

X

N A

S H

V

IL

L E

D

IS

T R

IC

T

JO

S

H U

A B

O M

R

H O

R

IZ

O N

T A

L C

O N

T R

O L

C H

A N

N E

L I

M P

R O

V E

M E

N T

C-101

B .M

.W

Z .A

.L

B L

T

C -1

.d g n

B R

A N

D O

N M

W

H

IT

L E

Y

P L

O T

S C

A L

E

T H

A V

E N

U E

S O

U T

H

N A

S H

V

IL

L E

T

N

-3

A1

SCALE: 1"=60'

CHANNEL MODIFICATION HORIZONTAL CONTROL

CONTROL LINE

GRADING LIMITS

WORK AREA LIMITS

STAGING AREA

HAUL ROUTE SEE SHEET V-103

L1 L2 L3

,3

,0

.5

E

,7

.2

N

.0

S

P

B

,3

,3

.2

E

,0

.3

.4

S

E

.8

S

T

.7

S

T

WESTOVER

BLOUNT

S M

IT

H

DRIVE SW

AVENUE SW

D R

IV

E S

W

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

LIMITS.

AT A MINIMUM, CLEAR AND GRUB WITHIN THE GRADING

CLEAR AND GRUB SITE AS NEEDED FOR CONSTRUCTION. 5.

V-103.

FOR DISPOSAL SITE HORIZONTAL CONTROL POINTS SEE 4.

FOR HAUL ROUTE, SEE V-103.3.

SEE V-102.

FOR WORK AREA WORK LIMITS HORIZONTAL CONTROL, 2.

CONSTRUCTION FOR REFERENCE.

STAKES MUST BE PRESENT ON SITE DURING

OF 50' AND AT ANY CHANGE IN GRADE AND/OR BEARING.

STAKES FOR THE CONTROL LINE AT A MINIMUM INTERVAL

WITHIN THE CONTROL LINE. CONTRACTOR MUST PLACE

SHEET V-101. PHYSICAL MONUMENTS ARE NOT SET

CONTROL LINE IS BASED ON CONTROL POINTS SEEN ON 1.

GENERAL NOTES

N O

R T

H

60' 120'0

S I

D

C E

R T

IF

IE

D F

IN

A

L D

O C

U M

E N

T S

R

E V

E L

A N

D T

N

B L

O U

N T

A V

E N

U E

C H

A N

N E

L M

O D

IF

IC

A T

IO

N

C L

E V

E L

A N

D F

L O

O D

R E

D U

C T

IO

N

P R

O J E

C T

W

P

-2

-B -A

J U

L Y

W

P

-2

-X -X

X X

X

N A

S H

V

IL

L E

T

N

-3

T H

A V

E N

U E

S O

U T

H

N A

S H

V

IL

L E

D

IS

T R

IC

O

T S

C A

L E

F

IL

E N

A M

E

JO

S

H U

A B

O M

S

A

T

O S

T A

P L

A N

A N

D P

R O

F

IL

E

C-102

B .M

.W

Z .A

.L

A U

G

D T

R E

M O

V E

D C

L E

A R

IN

G

A N

D G

R U

B B

IN

G

G E

N E

R A

L N

O

B L

T

C -1

.d g n

B R

A N

D O

N M

W

H

IT

L

Y

H1

SCALE: 1" = 20'

PLAN: STA. 0+00 TO STA. 4+00

(830

(835

(840)

(845)

(830

(83 5)

(840)

(845)

(830)

(835)

(840)

(845)

(830)

(835

(840)

(845)

(830)

(835)

(840)

(845)

(8

(830)

(835)

(830)

(830)

(830)

S

N

,3

,0

.5

E

,7

.2

.0

S

B

TOP OF SLOPE / DAYLIGHT LINE

CONTROL LINE

TOE OF SLOPE /

DAYLGHT LINE

4 4

M A

T C

H L

IN

E

S E

E S

H E

E T

C -1

WORK AREA LIMITS

WITH THE EXISTING SLOPE

GRADE TO HAVE A SMOOTH TRANSITION

0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00 3+20 3+40 3+60 3+80 4+00

822 822

824 824

826 826

828 828

830 830

832 832

834 834

836 836

838 838

.0

.3

.1

.7

.5

.5

.6

.5

.4

.8

.1

.1

.1

.2

.1

.9

.9

.7

.6

.5

.3

-0.31%GRADE =

.0

E

L E

V

.0

S

I

.0

.9

.8

.8

.7

.6

.6

.5

.5

.4

.3

.3

.2

.2

.1

.0

.0

.9

.9

.8

.7

EXISTING GRADE

TOE OF SLOPE

E L

E V

.7

S T

A

.0

P

V

IWITH THE EXISTING SLOPE

GRADE TO HAVE A SMOOTH TRANSITION

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

CLEVELAND UTILITIES.

COORDINATE, FACILITATE AND SCHEDULE WORK WITH

CLEVELAND UTILITIES. THE CONTRACTOR MUST

EXISTING GUY WIRE, REMOVED AND REPLACED BY 7

EXISTING GUY WIRE, PROTECT IN PLACE.6

PLACE.

EXISTING D.I.P. SEWER VENT ASSEMBLY, PROTECT IN 5

EXISTING POWER POLE, PROTECT IN PLACE.4

EXISTING SEWER MANHOLE, PROTECT IN PLACE.3

EXISTING SEWER LINE, PROTECT IN PLACE.2

EXISTING OVERHEAD POWER LINES, PROTECT IN PLACE.1

DEMOLITION NOTES

DETAILS ON SHEET C-301.

CONSTRUCT CHANNEL MODIFICATION PER PLAN AND 1

CONSTRUCTION NOTES

CONTRACTOR.

OBSERVATIONS AND MUST BE VERIFIED BY THE

HEIGHT. DIMENSIONS ARE BASED OFF VISUAL

WITH 25 FT SAG HEIGHT, AND 69kV LINE WITH 40 FT SAG

OPTIC LINE WITH 20 FT SAG HEIGHT, NEUTRAL CABLE

POWER LINES. VISUAL OBSERVATIONS INDICATE FIBER

EXTRA PRECAUTION WHEN OPERATING NEAR OVERHEAD

THE EXISTING CHANNEL. THE CONTRACTOR MUST TAKE

OVERHEAD POWER LINES ARE LOCATED ADJACENT TO 4.

ACCORDANCE WITH EM 385-1-1, CHAPTER 4.

HAUL ROADS MUST BE CONSTRUCTED AND USED IN 3.

SHEET C-101.

FOR CHANNEL MODIFICATION HORIZONTAL CONTROL SEE 2.

AND FEDERAL REGULATIONS.

OTHER ITEMS MUST BE DISPOSED OF PER LOCAL, STATE,

SOIL. ALL ASPHALT, CONCRETE, TRASH, DEBRIS, AND

PROVIDED CITY DISPOSAL SITE IS ONLY SUITABLE FOR 1.

GENERAL SHEET NOTES

20' 40'0

20' 40'00 2' 4'A1

PROFILE: STA. 0+00 TO STA. 4+00

VERT: 1"=2'1"=20'SCALE: HORIZ:

85 - ACCESS RAMP'

.2

A N

S I

D

C E

R T

IF

IE

D F

IN

A

L D

O C

U M

E N

T S

R

E V

E L

A N

D T

N

B L

O U

N T

A V

E N

U E

C H

A N

N E

L M

O D

IF

IC

A T

IO

N

C L

E V

E L

A N

D F

L O

O D

R E

D U

C T

IO

N

P R

O J E

C T

W

P

-2

-B -A

J U

L Y

W

P

-2

-X -X

X X

X

N A

S H

V

IL

L E

T

N

-3

T H

A V

E N

U E

S O

U T

H

N A

S H

V

IL

L E

D

IS

T R

O

T S

C A

L E

F

IL

E N

A M

E

JO

S

H U

A B

O M

A

T

O S

T A

P L

A N

A N

D P

R O

F

IL

E

C-103

B .M

.W

Z .A

.L

A U

G

D T

R E

M O

V E

D G

E N

E R

A L

N O

T E

A

N D

P R

O P

E R

T Y

L

IN

B L

T

C -1

.d g n

B R

A N

D O

N M

W

H

IT

L

(830)

(83 5)

(830)

(830)

(830)

(835

(830)

(830)

(8

S

N

DAYLIGHT LINE

TOP OF SLOPE/

CONTROL LINE

TOE OF SLOPE/

DAYLIGHT LINE

.8

S

T

M A

T C

H L

IN

E

S E

E S

H E

E T

C -1

M A

T C

H L

IN

E

S E

E S

H E

E T

C -1

WORK AREA LIMITS

S T

A . 5

S T

A . 4

S T

A . 4

S T

A . 5

S T

A . 5

4+00 4+20 4+40 4+60 4+80 5+00 5+20 5+40 5+60 5+80 6+00 6+20 6+40 6+60 6+80 7+00 7+20 7+40 7+60 7+80

822 822

824 824

826 826

828 828

830 830

832 832

834 834

836 836

838 838

.3

.2

.2

.0

.8

.6

.6

.7

.7

.8

.7

.7

.7

.7

.6

.5

.3

.4

.4

.5

.5

-0.31%GRADE =

.7

.7

.6

.5

.5

.4

.4

.3

.2

.2

.1

.1

.0

.9

.9

.8

.7

.7

.6

.6

.5

-10.00%

G R

A D

-1.00% G =

.0

E

L E

.0

S

I

.1

E

L E

.0

S

I

E L

E V

.5

S T

A

.0

V

P I

EXISTING SEWER LINE

EXISTING GRADE

TOE OF SLOPE

8+00

.9

F G

(8

.7

R

IM

S T

A

.0

ACCESS RAMP

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

CLEVELAND UTILITIES.

COORDINATE, FACILITATE AND SCHEDULE WORK WITH

CLEVELAND UTILITIES. THE CONTRACTOR MUST

EXISTING GUY WIRE, REMOVED AND REPLACED BY 7

EXISTING GUY WIRE, PROTECT IN PLACE.6

PLACE.

EXISTING D.I.P. SEWER VENT ASSEMBLY, PROTECT IN 5

EXISTING POWER POLE, PROTECT IN PLACE.4

EXISTING SEWER MANHOLE, PROTECT IN PLACE.3

EXISTING SEWER LINE, PROTECT IN PLACE.2

EXISTING OVERHEAD POWER LINES, PROTECT IN PLACE.1

DEMOLITION NOTES

DETAILS ON SHEET C-301.

CONSTRUCT CHANNEL MODIFICATION PER PLAN AND 1

CONSTRUCTION NOTES

CONTRACTOR.

OBSERVATIONS AND MUST BE VERIFIED BY THE

HEIGHT. DIMENSIONS ARE BASED OFF VISUAL

WITH 25 FT SAG HEIGHT, AND 69kV LINE WITH 40 FT SAG

OPTIC LINE WITH 20 FT SAG HEIGHT, NEUTRAL CABLE

POWER LINES. VISUAL OBSERVATIONS INDICATE FIBER

EXTRA PRECAUTION WHEN OPERATING NEAR OVERHEAD

THE EXISTING CHANNEL. THE CONTRACTOR MUST TAKE

OVERHEAD POWER LINES ARE LOCATED ADJACENT TO 4.

ACCORDANCE WITH EM 385-1-1, CHAPTER 4.

HAUL ROADS MUST BE CONSTRUCTED AND USED IN 3.

SHEET C-101.

FOR CHANNEL MODIFICATION HORIZONTAL CONTROL SEE 2.

AND FEDERAL REGULATIONS.

OTHER ITEMS MUST BE DISPOSED OF PER LOCAL, STATE,

SOIL. ALL ASPHALT, CONCRETE, TRASH, DEBRIS, AND

PROVIDED CITY DISPOSAL SITE IS ONLY SUITABLE FOR 1.

GENERAL SHEET NOTES

H1

PLAN: STA. 4+00 TO STA. 8+00

1"=20'SCALE: 20' 40'0

20' 40'00 2' 4'A1

PROFILE: STA. 4+00 TO STA. 8+00

VERT: 1"=2'1"=20'SCALE: HORIZ:

S I

D

C E

R T

IF

IE

D F

IN

A

L D

O C

U M

E N

T S

R

E V

E L

A N

D T

N

B L

O U

N T

A V

E N

U E

C H

A N

N E

L M

O D

IF

IC

A T

IO

N

C L

E V

E L

A N

D F

L O

O D

R E

D U

C T

IO

N

P R

O J E

C T

W

P

-2

-B -A

J U

L Y

W

P

-2

-X -X

X X

X

N A

S H

V

IL

L E

T

N

-3

T H

A V

E N

U E

S O

U T

H

N A

S H

V

IL

L E

D

IS

T R

O

T S

C A

L E

F

IL

E N

A M

E

JO

S

H U

A B

O M

A

T

O S

T A

P L

A N

A N

D P

R O

F

IL

E

C-104

B .M

.W

Z .A

.L

A U

G

D T

R E

M O

V E

D C

L E

A R

IN

G

A N

D G

R U

B B

IN

G

G E

N E

R A

L N

O

B L

T

C -1

.d g n

B R

A N

D O

N M

W

H

IT

L

(830)

(835)

(830)

(830)

(8

(8

(8

(8

S

N

.7

S

T

DAYLIGHT LINE

TOP OF SLOPE/DAYLIGHT LINE

TOP OF SLOPE/

CONTROL LINE

TOE OF SLOPE/

CONTROL LINE

TOE OF SLOPE/

DAYLIGHT LINE

DAYLIGHT LINE

M A

T C

H L

IN

E

S E

E S

H E

E T

C -1

M A

T C

H L

IN

E

S E

E S

H E

E T

C -1

WORK AREA LIMITS

WITH EXISTING SLOPE

GRADE TO HAVE A SMOOTH TRANSITION

8+00 8+20 8+40 8+60 8+80 9+00 9+20 9+40 9+60 9+80 10+00 10+20 10+40 10+60 10+80 11+00 11+20 11+40 11+60 11+80 12+00

822 822

824 824

826 826

828 828

830 830

832 832

834 834

836 836

838 838

.5

.3

.1

.0

.9

.8

.8

.8

.9

.7

.1

.6

.7

.4

.2

.3

.1

.4

.1

.1

.3

-0.31%GRADE =

.0

E

L E

.6

S

I

.5

.4

.4

.3

.3

.2

.1

.1

.0

.0

-0.29%GRADE =

.9

E

L E

.5

S

I

.9

.8

.8

.7

.7

.6

.5

.5

.4

.4

.3

.3

TOE OF SLOPE

TOE OF SLOPE

EXISTING GRADE

EXISTING GRADE

EXISTING SEWER LINE 2 WITH EXISTING SLOPE

GRADE TO HAVE A SMOOTH TRANSITION

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

CLEVELAND UTILITIES.

COORDINATE, FACILITATE AND SCHEDULE WORK WITH

CLEVELAND UTILITIES. THE CONTRACTOR MUST

EXISTING GUY WIRE, REMOVED AND REPLACED BY 7

EXISTING GUY WIRE, PROTECT IN PLACE.6

PLACE.

EXISTING D.I.P. SEWER VENT ASSEMBLY, PROTECT IN 5

EXISTING POWER POLE, PROTECT IN PLACE.4

EXISTING SEWER MANHOLE, PROTECT IN PLACE.3

EXISTING SEWER LINE, PROTECT IN PLACE.2

EXISTING OVERHEAD POWER LINES, PROTECT IN PLACE.1

DEMOLITION NOTES

DETAILS ON SHEET C-301.

CONSTRUCT CHANNEL MODIFICATION PER PLAN AND 1

CONSTRUCTION NOTES

CONTRACTOR.

OBSERVATIONS AND MUST BE VERIFIED BY THE

HEIGHT. DIMENSIONS ARE BASED OFF VISUAL

WITH 25 FT SAG HEIGHT, AND 69kV LINE WITH 40 FT SAG

OPTIC LINE WITH 20 FT SAG HEIGHT, NEUTRAL CABLE

POWER LINES. VISUAL OBSERVATIONS INDICATE FIBER

EXTRA PRECAUTION WHEN OPERATING NEAR OVERHEAD

THE EXISTING CHANNEL. THE CONTRACTOR MUST TAKE

OVERHEAD POWER LINES ARE LOCATED ADJACENT TO 4.

ACCORDANCE WITH EM 385-1-1, CHAPTER 4.

HAUL ROADS MUST BE CONSTRUCTED AND USED IN 3.

SHEET C-101.

FOR CHANNEL MODIFICATION HORIZONTAL CONTROL SEE 2.

AND FEDERAL REGULATIONS.

OTHER ITEMS MUST BE DISPOSED OF PER LOCAL, STATE,

SOIL. ALL ASPHALT, CONCRETE, TRASH, DEBRIS, AND

PROVIDED CITY DISPOSAL SITE IS ONLY SUITABLE FOR 1.

GENERAL SHEET NOTES

H1

PLAN: STA. 8+00 TO STA. 12+00

1"=20'SCALE: 20' 40'0

20' 40'00 2' 4'A1

PROFILE: STA. 8+00 TO STA. 12+00

VERT. 1"=2'1"=20'SCALE: HORIZ.

S I

D

C E

R T

IF

IE

D F

IN

A

L D

O C

U M

E N

T S

R

E V

E L

A N

D T

N

B L

O U

N T

A V

E N

U E

C H

A N

N E

L M

O D

IF

IC

A T

IO

N

C L

E V

E L

A N

D F

L O

O D

R E

D U

C T

IO

N

P R

O J E

C T

W

P

-2

-B -A

J U

L Y

W

P

-2

-X -X

X X

X

N A

S H

V

IL

L E

T

N

-3

T H

A V

E N

U E

S O

U T

H

N A

S H

V

IL

L E

D

IS

T R

O

T S

C A

L E

F

IL

E N

A M

E

JO

S

H U

A B

O M

A

T

O S

T A

P L

A N

A N

D P

R O

F

IL

E

C-105

B .M

.W

Z .A

.L

A U

G

D T

R E

M O

V E

D C

L E

A R

IN

G

A N

D G

R U

B B

IN

G

G E

N E

R A

L N

O

B L

T

C -1

.d g n

B R

A N

D O

N M

W

H

IT

L

(835)

(830)

(8

(830)

(835)

(830

(8

(8

(830)

(835

(830)

(830)

(835)

S

S

N

,3

,3

.2

E

,0

.3

.4

S

E

WORK AREA LIMITS

DAYLIGHT LINE

TOP OF SLOPE/

CONTROL LINE

TOE OF SLOPE/

DAYLIGHT LINE

M A

T C

H L

IN

E

S E

E S

H E

E T

C -1

WITH EXISTING SLOPE

GRADE TO HAVE A SMOOTH TRANSITION

12+00 12+20 12+40 12+60 12+80 13+00 13+20 13+40 13+60 13+80 14+00 14+20 14+40 14+60 14+80 15+00 15+20 15+40 15+60 15+80 16+00

822 822

824 824

826 826

828 828

830 830

832 832

834 834

836 836

838 838

.3

.3

.0

.9

.6

.1

-0.29%GRADE =

.0

E

L E

.4

S

I

.3

.2

.1

.1

.0

.0

TOE OF SLOPE

EXISTING GRADE

WITH EXISTING SLOPE

GRADE TO HAVE SMOOTH TRANSITION

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

CLEVELAND UTILITIES.

COORDINATE, FACILITATE AND SCHEDULE WORK WITH

CLEVELAND UTILITIES. THE CONTRACTOR MUST

EXISTING GUY WIRE, REMOVED AND REPLACED BY 7

EXISTING GUY WIRE, PROTECT IN PLACE.6

PLACE.

EXISTING D.I.P. SEWER VENT ASSEMBLY, PROTECT IN 5

EXISTING POWER POLE, PROTECT IN PLACE.4

EXISTING SEWER MANHOLE, PROTECT IN PLACE.3

EXISTING SEWER LINE, PROTECT IN PLACE.2

EXISTING OVERHEAD POWER LINES, PROTECT IN PLACE.1

DEMOLITION NOTES

DETAILS ON SHEET C-301.

CONSTRUCT CHANNEL MODIFICATION PER PLAN AND 1

CONSTRUCTION NOTES

CONTRACTOR.

OBSERVATIONS AND MUST BE VERIFIED BY THE

HEIGHT. DIMENSIONS ARE BASED OFF VISUAL

WITH 25 FT SAG HEIGHT, AND 69kV LINE WITH 40 FT SAG

OPTIC LINE WITH 20 FT SAG HEIGHT, NEUTRAL CABLE

POWER LINES. VISUAL OBSERVATIONS INDICATE FIBER

EXTRA PRECAUTION WHEN OPERATING NEAR OVERHEAD

THE EXISTING CHANNEL. THE CONTRACTOR MUST TAKE

OVERHEAD POWER LINES ARE LOCATED ADJACENT TO 4.

ACCORDANCE WITH EM 385-1-1, CHAPTER 4.

HAUL ROADS MUST BE CONSTRUCTED AND USED IN 3.

SHEET C-101.

FOR CHANNEL MODIFICATION HORIZONTAL CONTROL SEE 2.

AND FEDERAL REGULATIONS.

OTHER ITEMS MUST BE DISPOSED OF PER LOCAL, STATE,

SOIL. ALL ASPHALT, CONCRETE, TRASH, DEBRIS, AND

PROVIDED CITY DISPOSAL SITE IS ONLY SUITABLE FOR 1.

GENERAL SHEET NOTES

H1

PLAN: STA. 12+00 TO STA. 13+05

1"=20'SCALE: 20' 40'0

20' 40'00 2' 4'A1

PROFILE: STA. 12+00 TO STA. 13+05

VERT. 1"=2'1"=20'SCALE: HORIZ.

122761BLT_C-101
122761BLT_C-102
122761BLT_C-103
122761BLT_C-104
122761BLT_C-105

File details come from the government source that posted it. Updated .