About this file
This document contains a market survey for a federal contract opportunity to replace transformers at a Wolf Creek power plant. The opportunity involves removing nine existing single-phase transformers and installing three new three-phase transformers rated at 90,000/150,000 kVA at 161 kV, including design, manufacturing, installation of transformers and associated medium voltage bus system and foundations. Respondents are asked to provide details of relevant past project experience, small business status, subcontracting plans, bonding capacity, cost drivers, and pricing adjustments related to materials. A period of performance of 10-12 months is suggested. The Army Corps of Engineers Engineering District Nashville is listed as the contracting agency, with an anticipated solicitation number of W912P524R0004.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Market Survey_WOL GSU Replacement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Name of your firm:
2. CAGE:
3. Point of Contact, Phone number, and Email address:
4. Please provide responses to the following:
List three (3) projects completed within ten (10) years of the date of this notice that demonstrates experience, as a prime contractor or subcontractor, with work similar to that described above:
1. Project Name:
Contract Number (if applicable):
Year completed:
Prime or Subcontractor:
Type and percentage of work self-performed (based on contract value):
Dollar Amount:
General Description of project:
2. Project Name:
Contract Number (if applicable):
Year completed:
Prime or Subcontractor:
Type and percentage of work self-performed (based on contract value):
Dollar Amount:
General Description of project:
3. Project Name:
Contract Number (if applicable):
Year completed:
Prime or Subcontractor:
Type and percentage of work self-performed (based on contract value):
Dollar Amount:
General Description of project:
5. Are you a Small Business classified under the above NAICS code? If so, do you fall into a sub-category (e.g., Hubzone, 8(a), SDVOSB, WOSB, etc.)?
6. For this requirement, what percentage of this work would you subcontract (reference FAR
52.219-14, Limitations on Subcontracting, Class Deviation 2019-O0003)?
7. Do you plan to subcontract to only small businesses?
8. If the answer to question 7 is “yes”, are these small businesses with a sub-category (e.g., HubZone, 8(a), SDVOSB, WOSB, etc.)?
9. What is your bonding capacity per contract?
10. What is your aggregate bonding capacity per contract?
11. Please describe major cost drivers for quoting similarly scoped work features:
12. Please indicate ways in which the Government bonding requirements could be adjusted to minimize costs, but still provide adequate coverage.
13. Please describe an ideal period of performance requirement:
14. Please describe an ideal duration for bid openings:
15. Please indicate any major design-bid concepts or unknowns in the solicitation that are major cost drivers:
16. Please indicate cost impacts from any interim milestones identified in the solicitation:
17. Please indicate any possible commodities pricing adjustments (e.g: copper, grain-oriented electrical steel, etc.) that are being hedged and could be used to limit cost inflation at time of bid:
18. Are unknowns regarding PCB in soil driving costs?
19. If this requirement is advertised, do you anticipate submitting a bid?
20. Please provide any additional information you feel is necessary:
21. What is a reasonable period of performance for replacing 9 single phase transformer with 3 three phase transformers (90,000/150,000 kVA, 161 KV ) to include the following;
- Removal of existing transformers and bus work (one transformer bank (3 transformers) at time)
- Design and manufacture of the new transformers
- Design and Install of new medium voltage tubular bus system
- Design and install Oil Containment and foundations
- Installation of each transformer (one at a time)
- Commissioning one transformer at a time
- Work to be performed with 10 hour/6 day work week
22. Please indicate any possible commodities pricing adjustments (e.g: copper, grain-oriented electrical steel, etc.) that are being hedged and could be used to limit cost inflation at time of bid.
23. Please provide the current anticipated dollar value and delivery lead time duration for the transformers.
NAMEPLATE DATA:
∙ MAXIMUM TOTAL OIL VOLUME: 10,000 GALLONS
∙ MAXIMUM TOTAL WEIGHT: 300,000 POUNDS
∙ FREQUENCY: 60 HZ
∙ MAXIMUM LOAD LOSSES @ 90,000 KVA: 280 KW
∙ MAXIMUM NO-LOAD LOSSES: 65 KW
∙ MAXIMUM SOUND LEVEL @ 150,000 KVA: 80 DB
∙ OIL PRESERVATION SYSTEM: NITROGEN GAS BLANKETED
∙ TEMPERATURE RISE: 65 ºC
∙ SECONDARY WINDING (H) DETC(S): 5 TAPS; 2 @ +2.5%, 2 @ -2.5% OF NOMINAL
∙ IMPEDANCE: 8.8 % (H-X, @ 90,000 kVA)
∙ PHASING: THREE-PHASE
∙ BIL LEVELS, KV: 750 (H) / 110 (X) / 150 (H0)
∙ VOLTAGE RATINGS, V: 161,000 Y (H) - 13,200 DELTA (X)
∙ KVA RATING: 90,000 / 150,000
∙ COOLING CLASS: OFAF/OFAF
∙ TYPE: CLASS II GSU POWER TRANSFORMER
24. If an Equitable Price Adjustment is included, unit weight and unit cost would be proposed bid items in which the provided basis of adjustment would be made against. This may include both increases and decreases of the indices over the period of adjustment. Would this address potential bid risk in unanticipated changes in major materials pricing volatility?
25. Aside from rolling bonds, what other factors are driving cost that the Government should consider and potentially address in the contract requirements (i.e., contractor financing, purchase order agreement terms and conditions, etc.)?
Blank Page