W912P524R0001-0005 (final).pdf

PDF 378 KB Posted

Attached to
W912P524R0001 Chickamauga Lock Replacement Approach Wall and Decommissioning Federal contract opportunity
Solicitation number
W912P524R0001
Issued by
Department of the Army Corps of Engineers Engineering District Nashville

About this file

This document is Amendment 0005 to Solicitation W912P524R0001 for the Chickamauga Lock Replacement Approach Wall and Decommissioning project in Chattanooga, TN. The purpose of this amendment is to cancel the solicitation entirely in accordance with FAR 52.215-1(f)(2), as the requirement has undergone a change that necessitates this cancellation. The amendment also updates FAR Provision 52.252-3, Alterations in Solicitation.

The original solicitation was for a single firm fixed-price construction contract to construct downstream approach walls, demolish the cofferdam structure and portions of the existing dam spillway, bring the new lock online, and decommission the existing lock. The estimated price range for the project was between $100,000,000 and $250,000,000. The solicitation was subject to Project Labor Agreement (PLA) requirements in accordance with Executive Order 14063.

View the file

Other files for this federal contract opportunity

Other files attached to W912P524R0001 Chickamauga Lock Replacement Approach Wall and Decommissioning, newest first.
File Type Posted
W912P5-24-R-0001_Am4_Price Schedule_.xlsx XLSX spreadsheet
W912P524R0001-0004 (final).pdf PDF
W912P5-24-R-0001_Am3_Price Schedule.xlsx XLSX spreadsheet
W912P524R0001-0003 (final).pdf PDF
W912P524R0001-0002 (final).pdf PDF
W912P5-24-R-0001_Am2_Price Schedule.xlsx XLSX spreadsheet
W912P524R0001-0001 (final).pdf PDF
W912P5-24-R-0001_Am1_Price Schedule.xlsx XLSX spreadsheet
Pre-Proposal Site Visit Sign-In Sheet 8 April 2024 - CKL AWD.pdf PDF
Foreign National Security Form.pdf PDF
W912P524R0001_Final 4 Apr 24.pdf PDF
US Citizen Security Form.pdf PDF
JA for Brand Name (CKL AWD)_fully signed ssw_11 Dec 23_Redacted.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W38XDD40383003

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT: Chickamauga Lock Replacement and Approach Wall and Decommissioning, Chattanooga, TN.

The purpose of Amendment 0005 to Solicitation W912P524R0001 is as follow s:

a.) In accordance w ith FAR 52.215-1(f)(2), the Government is exercising its right to reject all proposal(s) because it is in the Government's best interest to cancel the solicitation in its entirety. The requirement has undergone a change that requires this cancellation.

b.) Update FAR Provision 52.252-3, Alterations in Solicitation.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Oct-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P524R0001

X 9B. DATED (SEE ITEM 11)

04-Apr-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Oct-2024

CODE

CELRN-CT CONTRACTING BRANCH

110 9TH AVE S STE A405

NASHVILLE TN 37203

W912P5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P524R0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 0001:

PROJECT: Chickamauga Lock Replacement Approach Wall and Decommissioning Project, Chattanooga, TN PURPOSE: The purpose of Amendment 0001 to Solicitation W912P524R0001 is to incorporate the following changes:

a.) Provide Sign-in Sheet and PowerPoint slides from Pre-Proposal Site Visit.

b.) Revise Specification/Section detailed in FAR 52.211-10, Commencement, Prosecution, and Completion of Work.

c.) Provide the 100% Technical Plans and Specifications; and Summary of Changes.

d.) Update DFARS Clause 252.236-7001, Contract Drawings and Specifications, and FAR Provision 52.252-3, Alterations in Solicitation.

Amendment 0002:

PROJECT: Chickamauga Lock Replacement Approach Wall and Decommissioning Project, Chattanooga, TN PURPOSE: The purpose of Amendment 0002 to Solicitation W912P524R0001 is to incorporate the following changes:

a.) Extend Solicitation closing date from 20 May 2024 to 31 May 2024 at 1:00 PM CDT.

b.) Extend Bidder Inquiry question closing date from 6 May 2024 to 21 May 2024.

c.) All technical changes are specified in the Summary of Changes.

d.) Update DFARS Clause 252.236-7001, Contracts Drawings and Specifications, and FAR Provision 52.252-3, Alterations in Solicitation.

Amendment 0003:

PROJECT TITLE: Chickamauga Lock Replacement Approach Wall and Decommissioning, Chattanooga, TN PURPOSE: The purpose of Amendment 0003 to Solicitation W912P524R0001 is to incorporate the following changes:

a.) Extend Solicitation closing date from 31 May 2024 to 14 June 2024 at 1:00 PM CDT.

b.) Extend Bidder Inquiry question closing date from 21 May 2024 to 23 May 2024.

c.) All technical changes are specified in the Summary of Changes.

d.) Update DFARS Clause 252.236-7001, Contracts Drawings and Specifications, and FAR Provision 52.252-3, Alterations in Solicitation.

Amendment 0004:

PROJECT TITLE: Chickamauga Lock Replacement Approach Wall and Decommissioning, Chattanooga, TN

W912P524R0001

PURPOSE: The purpose of Amendment 0004 to Solicitation W912P524R0001 is to incorporate the following changes:

a.) Extend Period of Performance from 1,825 to 1,916 calendar days after Admin NTP.

b.) Revise FAR Clause 52.211-10, Commencement, Prosecution, and Completion of Work.

c.) Revise FAR Clause 52.211-12, Liquidated Damages - Construction.

d.) All technical changes are specified in the Summary of Changes.

e.) Update DFARS Clause 252.236-7001, Contracts Drawings and Specifications, and FAR Provision 52.252-3, Alterations in Solicitation.

Amendment 0005:

PROJECT: Chickamauga Lock Replacement and Approach Wall and Decommissioning, Chattanooga, TN.

PURPOSE: The purpose of Amendment 0005 to Solicitation W912P524R0001 is as follows:

a.) In accordance with FAR 52.215-1(f)(2), the Government is exercising its right to reject all proposal(s) because it is in the Government's best interest to cancel the solicitation in its entirety. The requirement has undergone a change that requires this cancellation.

b.) Update FAR Provision 52.252-3, Alterations in Solicitation.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .