This document appears to be a Price Schedule for the Chickamauga Lock Replacement Approach Wall and Decommissioning project, Solicitation Number W912P524R0001, issued by the U.S. Army Corps of Engineers, Nashville District. The 95% Technical Plans and Specifications for this project are available through the SAM.gov website, and access must be requested through the appropriate security forms for U.S. citizens or foreign nationals.
The project scope includes constructing the downstream approach walls, demolishing the cofferdam structure and portions of the existing dam spillway, bringing the new lock online, and decommissioning the existing lock. The estimated price range for this firm fixed-price construction contract is between $100,000,000 and $250,000,000. The project is subject to Project Labor Agreement (PLA) requirements, and all offerors must submit a PLA with their proposal. The Price Schedule provides a detailed breakdown of the various work items and estimated quantities for this project.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
| PRICE SCHEDULE |
| Approach Wall and Lock Decommissioning |
| Chickamauga Lock Replacement |
| W912P5-24-R-0001 |
| PRICE ITEM | DESCRIPTION | SPECIFICATION NUMBER | EST. QTY. | UNIT | UNIT | |
| PRICE | ESTIMATED |
AMOUNT
| 01 | Div 01 GENERAL REQUIREMENTS | |||||
| 0101 | Formal Partnering Meeting | 01 00 00 | 1 | JB | $ | $ |
| 0102 | Helper Boat | 01 00 00 | 18 | MO | $ | $ |
| 0103 | Mobilization and Demobilization | 01 22 00 | 1 | JB | $ | $ |
| 0104 | Premiums for Performance and Payment Bonds | 01 22 00 | 1 | JB | $ | $ |
| 0105 | Railroad Flagman | 01 22 00 | 1 | JB | $ | $ |
| 0106 | Data Management | 01 31 00 | 1 | JB | $ | $ |
| 0107 | Maintenance and Protection of Traffic | 01 50 00 | 1 | JB | $ | $ |
| 0108 | Maintain QA Testing Lab and QA Field Office | 01 50 00 | 1 | JB | $ | $ |
| 0109 | Bathymetry Survey | 01 50 01 | 2 | EA | $ | $ |
| 0110 | Diversion and Care of Water | 01 57 24 | 1 | JB | $ | $ |
| 0111 | As-Built Drawings | 01 78 00 | 1 | JB | $ | $ |
| 0112 | Commissioning - Individual System Testing | 01 91 13 | 1 | JB | $ | $ |
| 0113 | Commissioning - Fully Integrated System Testing | 01 91 13 | 1 | JB | $ | $ |
| 02 | Div 02 EXISTING CONDITIONS | |||||
| 0201 | Overburden Drilling | 02 32 00 | 300 | LF | $ | $ |
| 0202 | Overburden - Split Spoon Sampling | 02 32 00 | 135 | EA | $ | $ |
| 0203 | Verification Core Drilling, Vertical Holes HQ | 02 32 00 | 695 | LF | $ | $ |
| 0204 | Core Drilling, Vertical Holes | 02 32 00 | 245 | LF | $ | $ |
| 0205 | Lab Testing- Direct Shear | 02 32 00 | 20 | EA | $ | $ |
| 0206 | Downhole Imaging | 02 32 00 | 940 | LF | $ | $ |
| 0207 | Concrete Conduit Box Removal | 02 41 13 | 1 | JB | $ | $ |
| 0208 | Existing Pullbox Modifications | 02 41 13 | 1 | JB | $ | $ |
| 0209 | Contractor Access Ramp and Work Bench Restoration | 02 41 13 | 1 | JB | $ | $ |
| 0210 | Maintenance shop existing access demolition | 02 41 13 | 1 | JB | $ | $ |
| 0211 | Maintenance shop parking lot milling for Resurfacing | 02 41 13 | 1 | JB | $ | $ |
| 0212 | Existing 24 inch CMP demolition (61W525-03-AWD) | 02 41 13 | 1 | JB | $ | $ |
| 0213 | Toe Drain & Manhole Demolition (61W525-03-AWD) | 02 41 13 | 1 | JB | $ | $ |
| 0214 | Dam Toe Light Pole Removal (61W525-03-AWD) | 02 41 13 | 1 | JB | $ | $ |
| 0215 | Overhead electrical line removal (61W525-04-AWD) | 02 41 13 | 1 | JB | $ | $ |
| 0216 | Eastern Lake Access Stripping | 02 41 13 | 1 | JB | $ | $ |
| 0217 | Trailhead Parking Lot Milling (61W525-06-AWD) | 02 41 13 | 1 | JB | $ | $ |
| 0218 | Contractor Parking lots Stripping as required (61W525-07-AWD) | 02 41 13 | 1 | JB | $ | $ |
| 0219 | Existing Maintenance BLDG Canopy Shed Demolition | 02 41 13 | 1 | JB | $ | $ |
| 0220 | Segmental Cofferdam Modifications and Standard Light and Fixture Removal | 02 41 13 and 02 41 17 | 1 | JB | $ | $ |
| 0221 | Demolition of Spillway Deck and Piers | 02 41 17 | 1 | JB | $ | $ |
| 0222 | Demolition and Disposal of Spillway Gate | 02 41 17 | 1 | EA | $ | $ |
| 0223 | Removal of Spillway Gates (4) and Disposal of Gates (2) to Include Salvaging Components | 02 41 17 | 4 | EA | $ | $ |
| 0224 | Demolition of Existing Lock Machinery | 02 41 17 | 1 | JB | $ | $ |
| 0225 | Demolition of Existing Lock Operations Building | 02 41 17 | 1 | JB | $ | $ |
| 0226 | Demolition of Mooring Cells | 02 41 17 | 4 | EA | $ | $ |
| 0227 | Demolition and Relocation of Existing Lock Upper Guidewall Beams and Piers Above EL 660.0 | 02 41 17 | 1 | JB | $ | $ |
| 0228 | Place Rock Fill in Existing Lock Recesses | 02 41 17 | 1 | JB | $ | $ |
| 0229 | Cofferdam and Protection Cell Removal | 02 41 18 | 1 | JB | $ | $ |
| 0230 | Downstream Cofferdam Stability Berm Removal | 02 41 18 | 1 | JB | $ | $ |
| 0231 | Salvage of Floating Mooring Bitts | 02 42 91 | 1 | JB | $ | $ |
| 0232 | Salvage of the Culvert Valves | 02 42 91 | 1 | JB | $ | $ |
| 0233 | Remediation and Restoration of the Electrical Service Rooms | Various | 1 | JB | $ | $ |
| 0234 | Remediation and Restoration of the Hazmat Room | Various | 1 | JB | $ | $ |
| 0235 | Strip or Cover of Operations Building and Parking Lot Area | Various | 1 | JB | $ | $ |
| 0236 | Catch basin and drain removal (61W525-2-AWD) | 02 42 91 | 1 | JB | $ | $ |
| 0237 | Trailhead Drive Milling, Stripping and Roadbed Preparation | 02 42 91 | 1 | JB | $ | $ |
| 0238 | Trailhead Drive Parking Lot Milling in Preparation for Resurfacing | 02 42 91 | 1 | JB | $ | $ |
| 0239 | Trailer Removal X 2 and Foundation Demolition (61W525-04-AWD) | Various | 1 | JB | $ | $ |
| 0240 | Trailer Relocation x 1 and Foundation Demolition (61W525-04-AWD) | Various | 1 | JB | $ | $ |
| 0241 | Future Greenway Area Stripping | 32 92 19 | 1 | JB | $ | $ |
| 0242 | Stripping of area west of Maintenance Shop | 32 92 19 | 1 | JB | $ | $ |
| 03 | Div 03 CONCRETE | |||||||
| 0301 | Waterstop | 03 15 14 | 1 | JB | $ | $ | ||
| 0302 | 2" LDPE Foam Expansion Joint | 03 15 14 | 1 | JB | $ | $ | ||
| 0303 | Reinforcing Steel - Material | 03 20 02 | 1050 | Ton | $ | $ | ||
| 0304 | Place Rebar | 03 20 02 | 1050 | Ton | $ | $ | ||
| 0305 | Drill and Grout #6 Dowels; Waterstop Recess | 03 20 02 | 72 | EA | $ | $ | ||
| 0306 | Drill and Grout #8 Dowels; Existing Culverts and Cable Tunnel | 03 20 02 | 26 | EA | $ | $ | ||
| 0307 | Drill and Grout #11 Dowels; Monolith M1 Second Placement | 03 20 02 | 25 | EA | $ | $ | ||
| 0308 | Cement, Type II, MH - Low Alkali and Moderate Heat | 03 30 01 | 8400 | Ton | $ | $ | ||
| 0309 | Class F Fly Ash | 03 30 01 | 3300 | Ton | $ | $ | ||
| 0310 | Roughen Concrete Surface in Culverts and Cable Tunnel | 03 30 04 | 8045 | SF | $ | $ | ||
| 0311 | Tremie Concrete (5ksi) | 03 31 07 | 6000 | CY | $ | $ | ||
| 0312 | Downstream Government Directed Additional Tremie Concrete | 03 31 07 | 100 | CY | $ | $ | ||
| 0313 | Culvert Valve and Cable Tunnel Plugs | 03 31 07 and 03 80 00 | 1000 | CY | $ | $ | ||
| 0314 | Inspection Shafts | 03 41 33 and 03 80 00 | 1 | JB | $ | $ | ||
| 0315 | Downstream Install Precast Beams and Appurtenances | 03 41 34 | 1 | JB | $ | $ | ||
| 0316 | Upstream Install Precast Beams and Appurtenances | 03 41 34 | 1 | JB | $ | $ | ||
| 0317 | Upstream Skirt Panels and Appurtenances | 03 41 34 | 1 | JB | $ | $ | ||
| 0318 | Contact Grout for Culverts and Cable Tunnel Plugs | 03 61 00 | 162 | CF | $ | $ | ||
| 0319 | Structural Concrete (5ksi) | 03 70 00 | 44000 | CY | $ | $ | ||
| 0320 | 10in. Paved Portland cement pavement (4 ksi) with dowels | 03 70 01 | 4050 | SY | $ | $ | ||
| 0321 | Culvert Valve Display Slab (4 ksi) | 03 70 01 | 1 | JB | $ | $ | ||
| 0322 | Operations Lot 30 x 50 ft Concrete Slab (4 ksi) | 03 70 01 | 1 | JB | $ | $ | ||
| 0323 | Miscellaneous Concrete (3ksi) | 03 70 01 | 900 | CY | $ | $ | ||
| 0324 | Pier Concrete (5.5ksi) | 03 80 00 | 6500 | CY | $ | $ | ||
| 0325 | Concrete Slot Cutting | 03 81 19 | 1 | JB | $ | $ | ||
| 0326 | Precast Beams Non-destructive Testing | 03 41 34 | 1 | JB | $ | ___________________________ | $ | _____________ |
| 0327 | Precast Beams Crack Repair | 03 41 34 | 4000 | LF | $ | ___________________________ | $ | _____________ |
| 0328 | Precast Beams Defect Repair | 03 41 34 | 4000 | SF | $ | ___________________________ | $ | _____________ |
| 0329 | Precast Beams Surface Coating | 03 41 34 | 90000 | SF | $ | ___________________________ | $ | _____________ |
| 05 | Div 05 METALS | |||||
| 0501 | Spillway Operating Deck Access Stairway | 05 51 00 | 1 | JB | $ | $ |
| 0502 | Crane Stops | 05 50 14 | 1 | JB | $ | $ |
| 0503 | Nose Pier and Intermediate Pier Metals | 05 59 20 | 1 | JB | $ | $ |
| 0504 | Steel Setting Piles | 05 50 14 | 1200 | LF | $ | $ |
| 0505 | Miscellaneous Metal | 05 50 15 | 1 | JB | $ | $ |
| 0506 | Wall Armor | 05 50 15 | 1 | JB | $ | $ |
| 0507 | Prefabricated Guardrail Installation | 05 50 15 | 450 | LF | $ | $ |
| 09 | Div 09 FINISHES | |||||
| 0901 | Painting - Hazmat Room | 09 97 00 | 1 | JB | $ | $ |
| 0902 | Painting - Electrical Service Rooms | 09 97 00 | 1 | JB | $ | $ |
| 0903 | Painting - Mooring Cells | 09 97 00 | 1 | JB | $ | $ |
| 10 | Div 10 SPECIALTIES | |||||
| 1001 | Permanent Exterior Signage | 10 14 03 and 10 14 04 | 1 | JB | $ | $ |
| 1002 | Fire Sprinkler System | 10 44 17 | 1 | JB | $ | $ |
| 1003 | Plumbing System | 10 44 17 | 1 | JB | $ | $ |
| 1004 | Operations Building Commissioning | 10 44 17 | 1 | JB | $ | $ |
| 13 | Div 13 SPECIAL CONSTRUCTION | |||||
| 1301 | Instrumentation Program | 13 50 00 | 1 | JB | $ | $ |
| 1302 | Cylinder Storage Building | 13 34 19.06 and others | 1 | JB | $ | $ |
| 1303 | Crane Storage Shed Construction (61W525-24-AWD) | Various | 1 | JB | $ | $ |
| 23 | Div 23 HEATING, VENTILATIONS, AND AIR CONDITIONING (HVAC) | |||||
| 2301 | Testing, Adjusting, and Balancing (TAB) | 23 05 95 | 1 | JB | $ | $ |
| 2302 | Heating and Ventilation Equipment - Cylinder Storage Building | Division 23, Section 08 91 00 | 1 | JB | $ | $ |
| 2303 | Heating and Ventilation Equipment - Hazmat Room | Division 23, Section 08 91 00 | 1 | JB | $ | $ |
| 2304 | Heating and Ventilation Equipment - Electrical Service Rooms | Division 23, Section 08 91 00 | 1 | JB | $ | $ |
| 25 | Div 25 CYBER SECURITY | |||||
| 2501 | Cyber Security Requirements and Validation | 25 05 11 | 1 | JB | $ | $ |
| 26 | Div 26 ELECTRICAL | |||||
| 2601 | Replacement Lock Upstream Approach Wall Electrical Systems | 26 00 00 | 1 | JB | $ | $ |
| 2602 | Replacement Lock Downstream Approach Wall Electrical Systems | 26 00 00 | 1 | JB | $ | $ |
| 2603 | HAZMAT Room Electrical Systems/Lighting | 26 00 00/26 51 00.06 | 1 | JB | $ | $ |
| 2604 | Replacement Lock Exterior Lighting | 26 56 00 | 1 | JB | $ | $ |
| 2605 | Existing Lock Exterior Lighting | 26 56 00 | 1 | JB | $ | $ |
| 2606 | Site Exterior Lighting | 26 56 00 | 1 | JB | $ | $ |
| 2607 | Landside Electrical Room Systems/Lighting | 26 00 00/26 51 00.06 | 1 | JB | $ | $ |
| 2608 | Riverside Electrical Room Systems/Lighting | 26 00 00/26 51 00.06 | 1 | JB | $ | $ |
| 2609 | Existing Maintenance Building Interior Electrical Systems | 26 00 00 | 1 | JB | $ | $ |
| 2610 | Cylinder Storage Building Interior Electrical Systems/Lighting | 26 20 00.00 06/26 51 00.00 06 | 1 | JB | $ | $ |
| 2611 | Relocation of Miscellaneous Electrical Systems On Existing Lock | 26 00 00/33 71 02 | 1 | JB | $ | $ |
| 27 | Div 27 COMMUNICATIONS | |||||
| 2701 | Fiber Optic Data Transmission System - Maintenance Building | 27 21 10 | 1 | JB | $ | $ |
| 2702 | Fiber Optic Data Transmission System - Cylinder Storage Building | 27 21 10 | 1 | JB | $ | $ |
| 2703 | Fiber Optic Data Transmission System - Site ESS | 27 21 10 | 1 | JB | $ | $ |
| 2704 | Telecom Cabling System - Maintenance Building | 27 21 10 | 1 | JB | $ | $ |
| 2705 | Telecom Cabling System - Cylinder Storage Building | 27 21 10 | 1 | JB | $ | $ |
| 28 | Div 28 ELECTRONIC SAFETY AND SECURITY | |||||
| 2801 | ESS/Access Control - Site Perimeter and Buildings | 28 20 01 | 1 | JB | $ | $ |
| 2802 | Lock Operations CCTV System | 28 23 23 | 1 | JB | $ | $ |
| 2803 | Security CCTV System | 28 23 23 | 1 | JB | $ | $ |
| 2804 | Fire Detection System - HAZMAT Room | 28 31 00 / 28 31 64 | 1 | JB | $ | $ |
| 2805 | Fire Detection System - Maintenance Building | 28 31 00 / 28 31 64 | 1 | JB | $ | $ |
| 2806 | Fire Detection System - Cylinder Storage Building | 28 31 00 / 28 31 64 | 1 | JB | $ | $ |
| 31 | Div 31 EARTHWORK | |||||
| 3101 | Manage, and Place Material for New Maintenance Shop Ramp | 31 00 00 | 1 | JB | $ | $ |
| 3102 | Earthwork for Operations Parking Lot Area | 31 00 00 | 1 | JB | $ | $ |
| 3103 | Manage, and Place Material for Maint. Shop lot and Thrust Block access | 31 00 00 | 1 | JB | $ | $ |
| 3104 | Manage, and Place Material for New Operations Building Ramp | 31 00 00 | 1 | JB | $ | $ |
| 3105 | Maintenance Ramp Retaining Wall Construction (61W525-15-AWD) | 31 00 00 | 1 | JB | $ | $ |
| 3106 | Manage, and Place Downstream Lock Chamber Fill | 31 00 00 | 1 | JB | $ | $ |
| 3107 | Manage, and Place Upstream Lock Chamber Fill | 31 00 00 | 1 | JB | $ | $ |
| 3108 | Mooring Cell Aggregate Fill | 31 00 00 | 1 | JB | $ | $ |
| 3109 | Geotextile Installations | 31 05 22 | 13000 | SY | $ | $ |
| 3110 | Rock Excavation | 31 23 05 | 6034 | CY | $ | $ |
| 3111 | Dental Excavation (15% surface area) | 31 23 05 | 247 | CY | $ | $ |
| 3112 | Line Drilling (6" Spacing) | 31 23 05 | 844 | SY | $ | $ |
| 3113 | Thrust Block Overburden Excavation | 31 23 05 | 13338 | CY | $ | $ |
| 3114 | Redrilling Grouted Holes | 31 32 12 | 575 | LF | $ | $ |
| 3115 | Install Downstream Approach Wall Intermediate Piers | 31 32 23 | 8 | EA | $ | $ |
| 3116 | Install Downstream Approach Wall Nose Piers | 31 32 23 | 2 | EA | $ | $ |
| 3117 | Drill Grout Holes in Rock | 31 32 23 | 8,068 | LF | $ | $ |
| 3118 | Pressure Washing (Hydraulic) | 31 32 23 | 72 | HR | $ | $ |
| 3119 | Pressure Testing (Hydraulic) | 31 32 23 | 884 | EA | $ | $ |
| 3120 | Grout Mixes | 31 32 23 | 1,195 | CY | $ | $ |
| 3121 | Placing Grout | 31 32 23 | 1,195 | CY | $ | $ |
| 3122 | Government Requested Standby - Grouting | 31 32 23 | 24 | HR | $ | $ |
| 3123 | Metal Sheet Piling | 31 41 16 | 1 | JB | $ | $ |
| 3124 | Construction of Mooring Cells | 31 41 16 | 2 | EA | $ | $ |
| 3125 | Dental Concrete | 31 60 00 | 247 | CY | $ | $ |
| 3126 | Foundation Preparation | 31 60 00 | 1645 | SY | $ | $ |
| 3127 | 48" Downstream Approach Wall Pier Guide Pipe Pile Rock Sockets | 31 63 28 | 480 | LF | $ | $ |
| 3128 | Furnish and Install Post Tensioned Anchors | 31 68 15 | 3040 | LF | $ | $ |
| 3129 | Additional Performance Tests | 31 68 15 | 3 | EA | $ | $ |
| 3130 | Additional Proof Tests | 31 68 15 | 3 | EA | $ | $ |
| 3131 | Additional Watertightness Testing | 31 68 15 | 16 | EA | $ | $ |
| 3132 | Consolidation Grouting | 31 68 15 | 2337 | CF | $ | $ |
| 3133 | Redrilling Consolidation Grout | 31 68 15 | 1952 | LF | $ | $ |
| 3134 | Government Requested Standby - Consolidation Grouting | 31 68 15 | 32 | HR | $ | $ |
| 3135 | Supplementary Extended Creep Tests | 31 68 15 | 4 | EA | $ | $ |
| 3136 | Impervious Liner (Seepage Barrier) | 31 00 00 | 1 | JB | $ | $ |
| 3137 | Earth Retention System for Thrust Block Design | 31 23 05 | 1 | JB | $ | $ |
| 3138 | Earth Retention System for Thrust Block Construction | 31 23 05 | 1 | JB | $ | $ |
| 32 | Div 32 EXTERIOR IMPROVEMENTS | |||||
| 3201 | Aggregate Base Course Grade D | 32 11 23 | 3175 | Ton | $ | $ |
| 3202 | TDOT Crushed stone | 32 11 23 | 3000 | Ton | $ | $ |
| 3203 | TDOT #57 Stone | 32 11 23 | 1350 | Ton | $ | $ |
| 3204 | TDOT #2 Stone | 32 11 23 | 3715 | Ton | $ | $ |
| 3205 | Asphalt Pavement - Binder Course AC (PG64-22) GR "B-M2" | 32 12 16 | 3550 | Ton | $ | $ |
| 3206 | Asphalt Pavement - Wearing Course ACS (PG64-22) GR "D" | 32 12 16 | 1550 | Ton | $ | $ |
| 3207 | Pavement Markings | 32 17 24 | 1 | JB | $ | $ |
| 3208 | Final Security Fencing | 32 31 13 | 1 | JB | $ | $ |
| 3209 | Main Access Gate Installation | 32 31 13 | 1 | EA | $ | $ |
| 3210 | 6-Foot Personnel Gate Installation | 32 31 13 | 1 | EA | $ | $ |
| 3211 | 12-Foot Personnel Gate Installation | 32 31 13 | 1 | EA | $ | $ |
| 3212 | Double Swing Gate Installation | 32 31 13 | 1 | EA | $ | $ |
| 3213 | Barrier Swing Gate Installation | 32 31 13 | 1 | EA | $ | $ |
| 3214 | Greenway (Contractor Laydown Area) Temp, and Perm, Seeding | 32 92 19 | 1 | JB | $ | $ |
| 3215 | Designated Disposal Area Temp. and Permanent Seeding | 32 92 19 | 1 | JB | $ | $ |
| 3216 | Operations Parking Lot Area Temp, and Permanent Seeding | 32 92 19 | 1 | JB | $ | $ |
| 3217 | Contractor Parking Lot North of RE Office Temp, and Permanent Seeding | 32 92 19 | 1 | JB | $ | $ |
| 3218 | Topsoil | 32 92 19 | 19000 | TN | $ | $ |
| 3219 | Tree Plantings | 32 93 00 | 30 | EA | $ | $ |
| 3220 | Shrub Plantings | 32 93 00 | 400 | EA | $ | $ |
| 3221 | Flagpole Construction | Various | 1 | JB | $ | $ |
| 33 | Div 33 UTILITIES | |||||
| 3301 | 2-inch Domestic Water Line for Operations Building | 33 11 00 | 1 | JB | $ | $ |
| 3302 | FDC Connection for Ops Building | 33 11 00 | 1 | EA | $ | $ |
| 3303 | 8-inch Fire Protection Line for Operations Building | 33 11 00 | 1 | JB | $ | $ |
| 3304 | 6-inch Fire Protection Line for the Operations Building | 33 11 00 | 1 | JB | $ | $ |
| 3305 | Fire hydrant assemblies | 33 11 00 | 2 | EA | $ | $ |
| 3306 | 8-inch Fire Protection Line for Maintenance Building | 33 11 00 | 1 | JB | $ | $ |
| 3307 | 2 in. Force Main Sewer from Operations Building | 33 30 00 | 1 | JB | $ | $ |
| 3308 | Site Electrical Distribution - Maintenance Building | 33 71 02 | 1 | JB | $ | $ |
| 3309 | Site Electrical Distribution - Cylinder Storage Building | 33 71 02 | 1 | JB | $ | $ |
| 3310 | Site Electrical Distribution - Landside Electrical Room | 33 71 02 | 1 | JB | $ | $ |
| 3311 | Site Electrical Distribution - Site ESS/Perimeter | 33 71 02 | 1 | JB | $ | $ |
| 3312 | Medium Voltage Distribution - Bay 5 to Lock | 33 71 02 | 1 | JB | $ | $ |
| 3313 | 30 in. Class IV RCP | 33 11 00 | 70 | LF | $ | $ |
| 3314 | 24 in. Class IV RCP | 33 11 00 | 779 | LF | $ | $ |
| 3315 | 24 in. Class III RCP | 33 11 00 | 100 | LF | $ | $ |
| 3316 | 12 in. Perforated Smooth Wall HDPE (toe drain) | 33 11 00 | 315 | LF | $ | $ |
| 34 | Div 34 TRANSPORTATION | |||||
| 3401 | Curb Construction | 34 71 13 | 325 | LF | $ | $ |
| 3402 | Guardrail Installation | 34 71 13 | 1200 | LF | $ | $ |
| 3403 | Parking Bumpers | 34 71 13 | 35 | EA | $ | $ |
| 3404 | Bollards | 34 71 13 | 20 | EA | $ | $ |
| 35 | Div 35 WATERWAY AND MARINE CONSTRUCTION | |||||
| 3501 | Tow Haulage Systems | 35 01 41 | 1 | JB | $ | $ |
| 3502 | Tow Haulage Acceptance Test | 35 01 41 | 1 | JB | $ | $ |
| 3503 | Lock Machinery | 35 08 40 | 1 | JB | $ | $ |
| 3504 | Floating Mooring Bitts | 35 08 40 | 1 | JB | $ | $ |
| 3505 | Compressed Air System | 35 08 40 | 1 | JB | $ | $ |
| 3506 | Miter Gate Spray System | 35 08 40 | 1 | JB | $ | $ |
| 3507 | Service Water System | 35 08 40 | 1 | JB | $ | $ |
| 3508 | Lock Gallery Sump Pump System | 35 08 40 | 1 | JB | $ | $ |
| 3509 | Downstream Pier Excavation | 35 20 24 | 994 | CY | $ | $ |
| 3511 | Furnish, Manage, and Place TDOT Class C Riprap | Various | 2500 | TN | $ | $ |
| 3512 | Furnish, Manage, and Place TDOT Class B Riprap | Various | 1600 | TN | $ | $ |
| 3513 | Furnish, Manage, and Place TDOT Class A Riprap | Various | 1500 | TN | $ | $ |
| 46 | Div 46 WATER AND WASTEWATER EQUIPMENT | |||||
| 4601 | Aerating Fountain Construction | 46 51 00.00 10 | 1 | JB | $ | $ |
| TOTAL ESTIMATED | ||
| AMOUNT | $ |