W912P5-24-R-0001_Am2_Price Schedule.xlsx

XLSX spreadsheet 44 KB Posted

Attached to
W912P524R0001 Chickamauga Lock Replacement Approach Wall and Decommissioning
Solicitation number
W912P524R0001
Issued by

About this file

This document appears to be a Price Schedule for the Chickamauga Lock Replacement Approach Wall and Decommissioning project, Solicitation Number W912P524R0001, issued by the U.S. Army Corps of Engineers, Nashville District. The 95% Technical Plans and Specifications for this project are available through the SAM.gov website, and access must be requested through the appropriate security forms for U.S. citizens or foreign nationals.

The project scope includes constructing the downstream approach walls, demolishing the cofferdam structure and portions of the existing dam spillway, bringing the new lock online, and decommissioning the existing lock. The estimated price range for this firm fixed-price construction contract is between $100,000,000 and $250,000,000. The project is subject to Project Labor Agreement (PLA) requirements, and all offerors must submit a PLA with their proposal. The Price Schedule provides a detailed breakdown of the various work items and estimated quantities for this project.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

PRICE SCHEDULE
Approach Wall and Lock Decommissioning
Chickamauga Lock Replacement
W912P5-24-R-0001
PRICE ITEMDESCRIPTIONSPECIFICATION NUMBEREST. QTY.UNITUNIT
PRICEESTIMATED

AMOUNT

01Div 01 GENERAL REQUIREMENTS
0101Formal Partnering Meeting01 00 001JB$$
0102Helper Boat01 00 0018MO$$
0103Mobilization and Demobilization01 22 001JB$$
0104Premiums for Performance and Payment Bonds01 22 001JB$$
0105Railroad Flagman01 22 001JB$$
0106Data Management01 31 001JB$$
0107Maintenance and Protection of Traffic01 50 001JB$$
0108Maintain QA Testing Lab and QA Field Office01 50 001JB$$
0109Bathymetry Survey01 50 012EA$$
0110Diversion and Care of Water01 57 241JB$$
0111As-Built Drawings01 78 001JB$$
0112Commissioning - Individual System Testing01 91 131JB$$
0113Commissioning - Fully Integrated System Testing01 91 131JB$$
02Div 02 EXISTING CONDITIONS
0201Overburden Drilling02 32 00300LF$$
0202Overburden - Split Spoon Sampling02 32 00135EA$$
0203Verification Core Drilling, Vertical Holes HQ02 32 00695LF$$
0204Core Drilling, Vertical Holes02 32 00245LF$$
0205Lab Testing- Direct Shear02 32 0020EA$$
0206Downhole Imaging02 32 00940LF$$
0207Concrete Conduit Box Removal02 41 131JB$$
0208Existing Pullbox Modifications02 41 131JB$$
0209Contractor Access Ramp and Work Bench Restoration02 41 131JB$$
0210Maintenance shop existing access demolition02 41 131JB$$
0211Maintenance shop parking lot milling for Resurfacing02 41 131JB$$
0212Existing 24 inch CMP demolition (61W525-03-AWD)02 41 131JB$$
0213Toe Drain & Manhole Demolition (61W525-03-AWD)02 41 131JB$$
0214Dam Toe Light Pole Removal (61W525-03-AWD)02 41 131JB$$
0215Overhead electrical line removal (61W525-04-AWD)02 41 131JB$$
0216Eastern Lake Access Stripping02 41 131JB$$
0217Trailhead Parking Lot Milling (61W525-06-AWD)02 41 131JB$$
0218Contractor Parking lots Stripping as required (61W525-07-AWD)02 41 131JB$$
0219Existing Maintenance BLDG Canopy Shed Demolition02 41 131JB$$
0220Segmental Cofferdam Modifications and Standard Light and Fixture Removal02 41 13 and 02 41 171JB$$
0221Demolition of Spillway Deck and Piers02 41 171JB$$
0222Demolition and Disposal of Spillway Gate02 41 171EA$$
0223Removal of Spillway Gates (4) and Disposal of Gates (2) to Include Salvaging Components02 41 174EA$$
0224Demolition of Existing Lock Machinery02 41 171JB$$
0225Demolition of Existing Lock Operations Building02 41 171JB$$
0226Demolition of Mooring Cells02 41 174EA$$
0227Demolition and Relocation of Existing Lock Upper Guidewall Beams and Piers Above EL 660.002 41 171JB$$
0228Place Rock Fill in Existing Lock Recesses02 41 171JB$$
0229Cofferdam and Protection Cell Removal02 41 181JB$$
0230Downstream Cofferdam Stability Berm Removal02 41 181JB$$
0231Salvage of Floating Mooring Bitts02 42 911JB$$
0232Salvage of the Culvert Valves02 42 911JB$$
0233Remediation and Restoration of the Electrical Service RoomsVarious1JB$$
0234Remediation and Restoration of the Hazmat RoomVarious1JB$$
0235Strip or Cover of Operations Building and Parking Lot AreaVarious1JB$$
0236Catch basin and drain removal (61W525-2-AWD)02 42 911JB$$
0237Trailhead Drive Milling, Stripping and Roadbed Preparation02 42 911JB$$
0238Trailhead Drive Parking Lot Milling in Preparation for Resurfacing02 42 911JB$$
0239Trailer Removal X 2 and Foundation Demolition (61W525-04-AWD)Various1JB$$
0240Trailer Relocation x 1 and Foundation Demolition (61W525-04-AWD)Various1JB$$
0241Future Greenway Area Stripping32 92 191JB$$
0242Stripping of area west of Maintenance Shop32 92 191JB$$
03Div 03 CONCRETE
0301Waterstop03 15 141JB$$
03022" LDPE Foam Expansion Joint03 15 141JB$$
0303Reinforcing Steel - Material03 20 021050Ton$$
0304Place Rebar03 20 021050Ton$$
0305Drill and Grout #6 Dowels; Waterstop Recess03 20 0272EA$$
0306Drill and Grout #8 Dowels; Existing Culverts and Cable Tunnel03 20 0226EA$$
0307Drill and Grout #11 Dowels; Monolith M1 Second Placement03 20 0225EA$$
0308Cement, Type II, MH - Low Alkali and Moderate Heat03 30 018400Ton$$
0309Class F Fly Ash03 30 013300Ton$$
0310Roughen Concrete Surface in Culverts and Cable Tunnel03 30 048045SF$$
0311Tremie Concrete (5ksi)03 31 076000CY$$
0312Downstream Government Directed Additional Tremie Concrete03 31 07100CY$$
0313Culvert Valve and Cable Tunnel Plugs03 31 07 and 03 80 001000CY$$
0314Inspection Shafts03 41 33 and 03 80 001JB$$
0315Downstream Install Precast Beams and Appurtenances03 41 341JB$$
0316Upstream Install Precast Beams and Appurtenances03 41 341JB$$
0317Upstream Skirt Panels and Appurtenances03 41 341JB$$
0318Contact Grout for Culverts and Cable Tunnel Plugs03 61 00162CF$$
0319Structural Concrete (5ksi)03 70 0044000CY$$
032010in. Paved Portland cement pavement (4 ksi) with dowels03 70 014050SY$$
0321Culvert Valve Display Slab (4 ksi)03 70 011JB$$
0322Operations Lot 30 x 50 ft Concrete Slab (4 ksi)03 70 011JB$$
0323Miscellaneous Concrete (3ksi)03 70 01900CY$$
0324Pier Concrete (5.5ksi)03 80 006500CY$$
0325Concrete Slot Cutting03 81 191JB$$
0326Precast Beams Non-destructive Testing03 41 341JB$___________________________$_____________
0327Precast Beams Crack Repair03 41 344000LF$___________________________$_____________
0328Precast Beams Defect Repair03 41 344000SF$___________________________$_____________
0329Precast Beams Surface Coating03 41 3490000SF$___________________________$_____________
05Div 05 METALS
0501Spillway Operating Deck Access Stairway05 51 001JB$$
0502Crane Stops05 50 141JB$$
0503Nose Pier and Intermediate Pier Metals05 59 201JB$$
0504Steel Setting Piles05 50 141200LF$$
0505Miscellaneous Metal05 50 151JB$$
0506Wall Armor05 50 151JB$$
0507Prefabricated Guardrail Installation05 50 15450LF$$
09Div 09 FINISHES
0901Painting - Hazmat Room09 97 001JB$$
0902Painting - Electrical Service Rooms09 97 001JB$$
0903Painting - Mooring Cells09 97 001JB$$
10Div 10 SPECIALTIES
1001Permanent Exterior Signage10 14 03 and 10 14 041JB$$
1002Fire Sprinkler System10 44 171JB$$
1003Plumbing System10 44 171JB$$
1004Operations Building Commissioning10 44 171JB$$
13Div 13 SPECIAL CONSTRUCTION
1301Instrumentation Program13 50 001JB$$
1302Cylinder Storage Building13 34 19.06 and others1JB$$
1303Crane Storage Shed Construction (61W525-24-AWD)Various1JB$$
23Div 23 HEATING, VENTILATIONS, AND AIR CONDITIONING (HVAC)
2301Testing, Adjusting, and Balancing (TAB)23 05 951JB$$
2302Heating and Ventilation Equipment - Cylinder Storage BuildingDivision 23, Section 08 91 001JB$$
2303Heating and Ventilation Equipment - Hazmat RoomDivision 23, Section 08 91 001JB$$
2304Heating and Ventilation Equipment - Electrical Service RoomsDivision 23, Section 08 91 001JB$$
25Div 25 CYBER SECURITY
2501Cyber Security Requirements and Validation25 05 111JB$$
26Div 26 ELECTRICAL
2601Replacement Lock Upstream Approach Wall Electrical Systems26 00 001JB$$
2602Replacement Lock Downstream Approach Wall Electrical Systems26 00 001JB$$
2603HAZMAT Room Electrical Systems/Lighting26 00 00/26 51 00.061JB$$
2604Replacement Lock Exterior Lighting26 56 001JB$$
2605Existing Lock Exterior Lighting26 56 001JB$$
2606Site Exterior Lighting26 56 001JB$$
2607Landside Electrical Room Systems/Lighting26 00 00/26 51 00.061JB$$
2608Riverside Electrical Room Systems/Lighting26 00 00/26 51 00.061JB$$
2609Existing Maintenance Building Interior Electrical Systems26 00 001JB$$
2610Cylinder Storage Building Interior Electrical Systems/Lighting26 20 00.00 06/26 51 00.00 061JB$$
2611Relocation of Miscellaneous Electrical Systems On Existing Lock26 00 00/33 71 021JB$$
27Div 27 COMMUNICATIONS
2701Fiber Optic Data Transmission System - Maintenance Building27 21 101JB$$
2702Fiber Optic Data Transmission System - Cylinder Storage Building27 21 101JB$$
2703Fiber Optic Data Transmission System - Site ESS27 21 101JB$$
2704Telecom Cabling System - Maintenance Building27 21 101JB$$
2705Telecom Cabling System - Cylinder Storage Building27 21 101JB$$
28Div 28 ELECTRONIC SAFETY AND SECURITY
2801ESS/Access Control - Site Perimeter and Buildings28 20 011JB$$
2802Lock Operations CCTV System28 23 231JB$$
2803Security CCTV System28 23 231JB$$
2804Fire Detection System - HAZMAT Room28 31 00 / 28 31 641JB$$
2805Fire Detection System - Maintenance Building28 31 00 / 28 31 641JB$$
2806Fire Detection System - Cylinder Storage Building28 31 00 / 28 31 641JB$$
31Div 31 EARTHWORK
3101Manage, and Place Material for New Maintenance Shop Ramp31 00 001JB$$
3102Earthwork for Operations Parking Lot Area31 00 001JB$$
3103Manage, and Place Material for Maint. Shop lot and Thrust Block access31 00 001JB$$
3104Manage, and Place Material for New Operations Building Ramp31 00 001JB$$
3105Maintenance Ramp Retaining Wall Construction (61W525-15-AWD)31 00 001JB$$
3106Manage, and Place Downstream Lock Chamber Fill31 00 001JB$$
3107Manage, and Place Upstream Lock Chamber Fill31 00 001JB$$
3108Mooring Cell Aggregate Fill31 00 001JB$$
3109Geotextile Installations31 05 2213000SY$$
3110Rock Excavation31 23 056034CY$$
3111Dental Excavation (15% surface area)31 23 05247CY$$
3112Line Drilling (6" Spacing)31 23 05844SY$$
3113Thrust Block Overburden Excavation31 23 0513338CY$$
3114Redrilling Grouted Holes31 32 12575LF$$
3115Install Downstream Approach Wall Intermediate Piers31 32 238EA$$
3116Install Downstream Approach Wall Nose Piers31 32 232EA$$
3117Drill Grout Holes in Rock31 32 238,068LF$$
3118Pressure Washing (Hydraulic)31 32 2372HR$$
3119Pressure Testing (Hydraulic)31 32 23884EA$$
3120Grout Mixes31 32 231,195CY$$
3121Placing Grout31 32 231,195CY$$
3122Government Requested Standby - Grouting31 32 2324HR$$
3123Metal Sheet Piling31 41 161JB$$
3124Construction of Mooring Cells31 41 162EA$$
3125Dental Concrete31 60 00247CY$$
3126Foundation Preparation31 60 001645SY$$
312748" Downstream Approach Wall Pier Guide Pipe Pile Rock Sockets31 63 28480LF$$
3128Furnish and Install Post Tensioned Anchors31 68 153040LF$$
3129Additional Performance Tests31 68 153EA$$
3130Additional Proof Tests31 68 153EA$$
3131Additional Watertightness Testing31 68 1516EA$$
3132Consolidation Grouting31 68 152337CF$$
3133Redrilling Consolidation Grout31 68 151952LF$$
3134Government Requested Standby - Consolidation Grouting31 68 1532HR$$
3135Supplementary Extended Creep Tests31 68 154EA$$
3136Impervious Liner (Seepage Barrier)31 00 001JB$$
3137Earth Retention System for Thrust Block Design31 23 051JB$$
3138Earth Retention System for Thrust Block Construction31 23 051JB$$
32Div 32 EXTERIOR IMPROVEMENTS
3201Aggregate Base Course Grade D32 11 233175Ton$$
3202TDOT Crushed stone32 11 233000Ton$$
3203TDOT #57 Stone32 11 231350Ton$$
3204TDOT #2 Stone32 11 233715Ton$$
3205Asphalt Pavement - Binder Course AC (PG64-22) GR "B-M2"32 12 163550Ton$$
3206Asphalt Pavement - Wearing Course ACS (PG64-22) GR "D"32 12 161550Ton$$
3207Pavement Markings32 17 241JB$$
3208Final Security Fencing32 31 131JB$$
3209Main Access Gate Installation32 31 131EA$$
32106-Foot Personnel Gate Installation32 31 131EA$$
321112-Foot Personnel Gate Installation32 31 131EA$$
3212Double Swing Gate Installation32 31 131EA$$
3213Barrier Swing Gate Installation32 31 131EA$$
3214Greenway (Contractor Laydown Area) Temp, and Perm, Seeding32 92 191JB$$
3215Designated Disposal Area Temp. and Permanent Seeding32 92 191JB$$
3216Operations Parking Lot Area Temp, and Permanent Seeding32 92 191JB$$
3217Contractor Parking Lot North of RE Office Temp, and Permanent Seeding32 92 191JB$$
3218Topsoil32 92 1919000TN$$
3219Tree Plantings32 93 0030EA$$
3220Shrub Plantings32 93 00400EA$$
3221Flagpole ConstructionVarious1JB$$
33Div 33 UTILITIES
33012-inch Domestic Water Line for Operations Building33 11 001JB$$
3302FDC Connection for Ops Building33 11 001EA$$
33038-inch Fire Protection Line for Operations Building33 11 001JB$$
33046-inch Fire Protection Line for the Operations Building33 11 001JB$$
3305Fire hydrant assemblies33 11 002EA$$
33068-inch Fire Protection Line for Maintenance Building33 11 001JB$$
33072 in. Force Main Sewer from Operations Building33 30 001JB$$
3308Site Electrical Distribution - Maintenance Building33 71 021JB$$
3309Site Electrical Distribution - Cylinder Storage Building33 71 021JB$$
3310Site Electrical Distribution - Landside Electrical Room33 71 021JB$$
3311Site Electrical Distribution - Site ESS/Perimeter33 71 021JB$$
3312Medium Voltage Distribution - Bay 5 to Lock33 71 021JB$$
331330 in. Class IV RCP33 11 0070LF$$
331424 in. Class IV RCP33 11 00779LF$$
331524 in. Class III RCP33 11 00100LF$$
331612 in. Perforated Smooth Wall HDPE (toe drain)33 11 00315LF$$
34Div 34 TRANSPORTATION
3401Curb Construction34 71 13325LF$$
3402Guardrail Installation34 71 131200LF$$
3403Parking Bumpers34 71 1335EA$$
3404Bollards34 71 1320EA$$
35Div 35 WATERWAY AND MARINE CONSTRUCTION
3501Tow Haulage Systems35 01 411JB$$
3502Tow Haulage Acceptance Test35 01 411JB$$
3503Lock Machinery35 08 401JB$$
3504Floating Mooring Bitts35 08 401JB$$
3505Compressed Air System35 08 401JB$$
3506Miter Gate Spray System35 08 401JB$$
3507Service Water System35 08 401JB$$
3508Lock Gallery Sump Pump System35 08 401JB$$
3509Downstream Pier Excavation35 20 24994CY$$
3511Furnish, Manage, and Place TDOT Class C RiprapVarious2500TN$$
3512Furnish, Manage, and Place TDOT Class B RiprapVarious1600TN$$
3513Furnish, Manage, and Place TDOT Class A RiprapVarious1500TN$$
46Div 46 WATER AND WASTEWATER EQUIPMENT
4601Aerating Fountain Construction46 51 00.00 101JB$$
TOTAL ESTIMATED
AMOUNT$

Page &P of &N

File details come from the government source that posted it. Updated .