Barkley Powerhouse Replace HVAC, Zone 3
Solicitation number
W912P524Q0045
Issued by

About this file

This document is a solicitation for the replacement of the air conditioning unit and associated accessories at the Barkley Power Plant, located in Lyon County, Kentucky. The work includes the disconnection and removal of the existing air conditioning system and accessories, the purchase and installation of a new air conditioning system and accessories, and the replacement of the raw water lines.

The solicitation is for a firm-fixed price supply contract under NAICS code 333415 for air conditioning and commercial refrigeration equipment manufacturing. The Government intends to award the contract to the responsible offeror with the lowest priced, conforming offer. The period of performance is 120 calendar days after contract award. An organized site visit is scheduled for September 5, 2024, and offers are due by September 12, 2024. The solicitation is set aside for small business concerns. Relevant requirements include cybersecurity, security background checks, and compliance with federal regulations and safety standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912P524Q0045 28-Aug-2024

b. TELEPHONE NUMBER

615-330-0089

8. OFFER DUE DATE/LOCAL TIME

01:00 PM 12 Sep 2024

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912P59. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

SAMANTHA J BEDARD

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

CONTRACTING DIVISION

110 9TH AVE N

NASHVILLE TN 37203

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W912P5 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

WEST KY AREA OFC, BARKLEY LOCK

CHRISTOPHER MARSHALL

US ARMY CORPS OF ENGRS, 758 BARKLEY DAM ROAD

GRAND RIVERS KY 42045

TEL: (270) 362-4236 FAX:

615-736-7124FAX:

TEL: 615-736-7986 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

1,250

NAICS:

333415

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 30 - BLOCK 14 CONTINUATION PAGE

STATEMENT OF WORK

Statement of Work for the Replacement of the Air Conditioning Unit at Barkley Power Plant

Description of work: This is for the purchase and installation of a replacement of one air conditioning unit and associated accessories in the Barkley Power Plant. The Power Plant HVAC system is unique because the common unit has field mounted condensers that utilizes water drawn from Barkley Lake to provide a source of cooling.

The existing units are Carrier (www.Carrier.com) Model 50XCR A/C Remote CV (10 tons) with two 5 ton Model SST500A external field mounted Standard Refrigeration (www.stanref.com) water cooled shell and tube condensing units.

Type of Contract: Firm fixed Price Supply Contract

Place of Delivery: The Barkley Power Plant is located adjacent to the Barkley Dam, located at 8439 US Highway 62 West, Kuttawa, KY 42055.

Delivery Date: All requirements shall be complete within 120 calendar days after contract award.

Site Visit: Offerors should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the delivery site and the general and local conditions that can affect the delivery and material handling of the materials or the cost thereof. Failure to do so will not relieve the offeror from responsibility for estimating properly the difficulty or cost of successfully accomplishing delivery. The Government will assume no responsibility for any understanding or representations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the solicitation, the specifications or related documents.

An organized site visit to the Barkley Power Plant, 8439 US Highway 62 West, Kuttawa, KY 42055 will be conducted on Thursday, September 5th at 10:00 AM, Central Time Zone. Please reference paragraph seven

(7) in the Instructions to Offerors for more information about the scheduled site visit.

http://www.carrier.com/ http://www.stanref.com/

W912P524Q0045

Scope of Work:

1. The work shall consist of disconnection and removal of the old air conditioning system and accessories, length of 1.5” raw water lines up to the shut off valve above AC3, and purchase and installation of the new air conditioning systems and accessories and new length of 2” raw water line from the shut off valve above AC3 to air handlers’ accessories and routing of water discharge from external heat exchangers to nearby floor drain, via an overhead path to remove a tripping hazard. This work is replacing AC3 and related accessories which are located adjacent to each other.

1.1 The contractor shall furnish all tools, equipment, labor, and materials to conduct the work.

1.2 All work shall be accomplished in accordance with denoted specifications, regulations, local code and EM 385-1-1 safety requirements.

2. Equipment

2.1 Existing Air Handler and Heat Exchangers

2.1.1 The existing unit is a Carrier (www.Carrier.com) Model 50XCR A/C Remote CV (10 tons) with two

5 ton Model SST500A external field mounted Standard Refrigeration (www.stanref.com) water cooled shell and tube condensing units.

2.2 Removal of Existing Air Handler & Condensers

2.2.1 Existing air handler and external heat exchangers are to be disconnected, pipes capped and air openings covered, to protect the internal components, and components certified ready for salvage then handed over to the Government for retention. Transportation of the equipment to a warehouse on the project site may be asked for by the Plant Manager.

2.2.2 Refrigerant is to be captured and become the property of the Contractor.

2.3 New Air Handler

2.3.1 1 air handler per assembly. 1 air handler for the contract (AC3).

2.3.2 Air handler to be indoor packaged vertical cooling unit using hermetic scroll compressor for cooling duty.

2.3.3 Supply air shall be discharged vertically and return air received horizontally.

2.3.4 Air handler to be equivalent to the Carrier 40RUA, including in the size of the foot print when compared to the existing units being replaced and efficiency.

2.3.4.1 Brand name or equivalent: The Contractor shall provide the specified product (Carrier 40RUA) or approved equal. To be considered equivalent, alternate equipment proposed shall meet the salient characteristics listed herein. The Contractor shall submit catalog cut / documentation with their price quote. If an alternate is proposed, the Government shall make the comparison to verify that it is equivalent to the salient characteristics provide in these specifications. Information provided in the catalog cut documents shall be complete and of the level of detail to allow the Government to make the comparison.

2.3.5 Units shall be rated in accordance with ANSI/ASHRAE (American national Standards Institute/American Society of Heating, Refrigerating and Air-Conditioning Engineers) 15, latest revision, and designed to meet or exceed ASHRAE 90.1-2016 and DOE-2018 (Department of Energy) minimum efficiency ratios.

2.3.5.1 Flame spread and smoke generation of insulation, adhesive and liner systems shall comply with NFPA (National Fire protection Association) 90A.

2.3.6 Air handler to be factory-assembled, single-piece, cooling unit. Unit to consist of scroll refrigerant compressors, evaporator fan section with belt drive centrifugal fans and motor, evaporator coil section with direct expansion coil and drain pan, and a system charge of refrigerant (R-410A).

Refrigerant lines for each coil to be connected to a matched external heat exchanger.

2.3.7 Cabinet construction shall be of 18 gage zinc surface alloyed steel with a baked enamel finish.

Shall be capable of withstanding ASTM (American Society for Testing and Materials) B117 500-hour salt spray test.

http://www.carrier.com/ http://www.stanref.com/

2.3.8 Cabinet to be fully insulated with vertical discharge with ducted return. Panels are to be removable for servicing of internal components.

2.3.9 Drain pan shall be stainless steel and have positive double slope to the drain to prevent standing water in pan.

2.3.10 Evaporator fan wheel and scroll shall be constructed of steel with corrosion resistant finish, statically and dynamically balanced. Fan belt drive shall be adjustable pitch motor pulley and fixed pitch fan pulley with permanently lubricated ball bearings.

2.3.10.1 Motor shall be 3-phase high-efficiency NEMA (National Electrical Manufacturing Association) frame ODP (open drip proof) of the same voltage as the compressors with permanently lubricated ball bearings.

2.3.10.2 Fan section to be a dual-stage unit to allow for operation at 67% of full speed for first stage cooling and 100% of full speed for second stage cooling.

2.3.11 Evaporator coil shall have aluminum plate fins mechanically bonded to seamless copper tubes with all joints brazed. Tube sheet openings shall be swaged to prevent tube wear. Coils shall be full face.

Direct expansion coil shall be designed and tested in accordance with ANSI/ASHRAE 15, latest revision.

2.3.12 Coil and drain pan shall be accessible through service access panels for cleaning.

2.3.13 Filter frame shall be installed upstream of the cooling coil and designed to take 2 inch thick disposable type commercially available filter. Filters shall be accessible from either side of the unit and filter rack shall be usable with ducted return.

2.3.14 Factory safeties include high and low pressure switches, motor and compressor over temperature, current lockout and inherent automatic fan motor overload.

2.3.15 Unit shall provide constant volume of conditioned air under normal operating range. Unit shall have duel-stage cooling capacity control. Unit shall be capable of starting and operating at up to 115 degrees F outdoor ambient.

2.3.16 Unit shall be furnished with a control terminal block connection to thermostats. A new digital room mounted thermostat to control the fan operation, turning unit on and off, with ability to monitor humidity levels shall be install in place of existing thermostat.

2.3.17 Air handler to have a total of 10 tons of cooling capacity consisting of two 5 ton coils.

2.3.18 Outside dimensions of the existing unit: 31.2" wide x 64" tall x 68" long.

2.3.19 Electrical power wiring shall enter the cabinet at a single location. Control circuit shall be 24- volt.

2.3.20 Refrigerant circuit components shall include thermal expansion valves, distributor with nozzle, filter driers, and charging service valves on each circuit. Suction line shall have a refrigerant loop to prevent refrigerant drain back to the compressor. Suction piping shall be insulated with closed cell piping insulation.

2.4 External Condensers

2.4.1 Total of 2 external condensers for each air handler assembly. 2 external condensers for contract (2 for AC3).

2.4.2 Shall be sized at 5 tons (60000 BTU/hr or 17.4 kw) capacity each and to be plumbed directly to a coil within the air handler via a brazed copper pipe connection.

2.4.3 Brazed plate heat exchanger shall be equivalent to DHT P-Type, be in compliance with ISO 9001

(quality) and ISO 14001 (environmental), rated for max working pressure of 650 psi. Each unit is to be pressure and leak tested in the factory. Unit shall resist scaling and fouling by effective self-cleaning due to turbulent flow.

2.4.4 Tailored for use with refrigerant identified by air handler manufacturer for their equipment, typically R-410R.

2.4.5 Water connections are to be threaded ISO 228/1-G female.

2.4.6 Refrigerant connections are to be brazed. Connecting ports are to be on the back side of the heat exchanger.

2.4.7 Refrigerant relief valve installed on the refrigerant connections to the condensers and set no higher than the specified pressure rating for that condenser.

2.4.8 Mounted with vibration absorbing pads between the condenser and mounting surface.

2.4.9 An electrically actuated water control valve shall be located upstream of the water intake for each condenser that will open when the corresponding coil in the air handler is activated. Actuators to be wired per AHU manufacturer installation instructions to control board.

2.5 Strainers

2.5.1 Total of 2 strainers for one air handler assembly. 2 strainers for the contract.

2.5.2 Parallel strainers with 304 stainless steel mesh of minimum screen gage of 20.

2.5.3 Each strainer is to have shut off valves on inlet and discharge ends to allow for them to be isolated for maintenance without shutting down the system.

2.5.4 Each strainer is to have capacity to maintain flow to both condensers by itself.

2.5.5 Strainers to be Y type, threaded, bronze body, conforms to ASTM B 584 C84400 and max working pressure of 200 psi.

2.5.6 Strainers are to be easy to clean.

2.6 Ball Valve

2.6.1 Total of 6 ball valves for one air handler assembly. 6 ball valves for the contract.

2.6.2 Shall be installed on either side of each strainer to facilitate maintenance.

2.6.3 Shall be installed on either side of each heat exchanger to facilitate maintenance.

2.6.4 Shall be bronze B584 FNPT x FNPT ball valve with lever, 316 stainless steel ball and stem, inline body style, seat material to be MPTFE (Modified PolyTetraFluoroEthylene), max pressure of 600 psi, suitable for 2” diameter pipe and conforms to MSS SP-110 (Manufacturers Standardization Society Standard Practice) https://msshq.org.

2.7 Control Valves

2.7.1 Total of 2 control valves for one air handler assembly. 2 control valves for the contract.

2.7.2 Electrically actuated control valve for the supply water for each shell and tube heat exchange shall be controlled by the thermostat and open when the signal for cooling is given. The actuators are to remain close when the signal for heating or just fan are given.

2.7.3 Actuators are to be spring return, normally closed, type. 24V control voltage.

2.7.4 Valve and actuator are to be separate components that can be replaced independently of each other.

2.8 Equipment Rack

2.8.1 Total of 1 equipment rack for one air handler assembly. 1 equipment racks for the contract.

2.8.2 External condensers, strainers and valves are to be mounted onto or support by a common support structure to aid in maintenance of the components as well as protect them from accidental damage.

2.8.3 Support rack is to be comprised of angle iron welded together as indicated.

2.8.4 Support rack to have surface finish as indicated.

3. Raw Water Line Replacement

3.1 Existing raw water lines are 1.25” diameter PVC pipes and are to be replaced with 2” schedule 80 304 stainless steel, ASTM A312, pipes for the branches to the strainers and condensers. 2” pipes are to continue to floor drain.

3.2 Tee connections are to be provided on either side of the heat exchangers, between the ball valves, with screwed on caps. These connections are to be used for the manufacturers recommended maintenance of the heat exchangers.

3.3 All plumbing is to be done in accordance with International Plumbing Code (IPC) 2018.

3.4 Cooling water piping shall have vinyl covering to protect the insulation from accidental damage during maintenance activities.

4. Ductwork & Insulation

4.1 All duct and insulation work is to be in accordance with Sheet Metal and Air Conditioning

Contractors National Association (SMACNA) 2006 and American Society of Heating, Refrigeration and Air-Conditioning Engineers (ASHRAE) 2016.

4.2 All duct work removed for the installation of the new air handlers is to be replaced in kind. Any bends with turning veins removed shall be replaced with new bends with turning veins meeting current standards.

5. Power

5.1 The nearby electrical board contains the breakers for the existing AC unit. The existing breaker is to be reused.

5.2 The electrical board is in the same room as the existing AC unit.

5.3 Existing power wires from the breaker to the unit are to be tested to ensure no issues with the insulation. If the megger test comes back low then the conductor shall be replaced.

6. Security

6.1 General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract.

Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures— this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

6.2 Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on DoD property in the US shall be vetted by the District Security Office using the National Crime database and Terrorist Screening Database. Contract personnel shall comply with all personal identity verification requirements specified in facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.

Since the work is being done within a controlled area but is expected to last less than six months, the investigation requirements fall under Category B1 for US Citizens and Category C for Foreign Nationals. Contract employees will need to be supervised/ escorted by a Corps employee while within the restricted area. In the event it is determined the contract will extend beyond six months, the contractor will need to comply with the requirements in Category B2 for US Citizens. Guidance and forms for the requirements are available on the Nashville District Public Website:

https://www.lrd.usace.army.mil/Submit-ArticleCS/Programs/Article/3667149/contracting/

Contract and sub-contract employees are not authorized to begin work on any contract until investigation requirements have been completed and notification has been made by the COR or the District Security Office.

Because the work is being performed in a restricted area, there are restrictions on use of persons either imprisoned or previously convicted of a felony. The Contractor shall not employ in the performance of this contract any person undergoing a sentence of imprisonment imposed by any court of a State, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, or the U.S.

Virgin Islands, or the US Federal Government. The Contractor shall not employ in the performance of this contract any person who has been convicted of a felony imposed by any court of a State, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, or the US Federal Government.

Contractors and/or potential contractors wishing to attend a pre-bid meeting held at or in LRN restricted/controlled areas (such as a Power Plant or Navigation Lock) shall submit a Nashville District (LRN) Security Access Form to the Nashville District Point of Contact (LRN POC) five (5) days prior to the site visit or meeting. If submitting the document in less than five days, the Offeror/Bidder may not receive approval for participation. The LRN POC will notify the Contractor if the request is approval or denied. Any pre-bid meeting which will cover anything other than public domain information shall be limited to US Citizens, except under unique circumstances. The Security Access Form and guidance is available at https://www.lrd.usace.army.mil/Submit-ArticleCS/Programs/Article/3667149/contracting/

Contractor is expected to prescreen their own job applicants for suitable candidates before submission to the U.S. Government. The U.S. Government will not screen potential candidates for you. Once the contractor has selected suitable employees to work on a government site, the contractor will submit them for processing as outlines above. Submission to the district security office must be accomplished prior to a contract employee’s site access. ACCESS NOT AUTHORIZED for any federal property nor to begin work on any part of the contract until investigation requirements have been met/completed and notification has been made by the COR or the District Security Office. There is no blanket approval, no waivers, no exceptions.

Each contractor employee is a case-by-case screening process. Preliminary results may require additional screening requirements before site access approval can be provided.

6.3 Suspicious Activity Reporting training (e.g iWATCH, CorpsWatch, or See Something, Say Something):

All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activit5y reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

6.4 Escorting in classified and/or sensitive areas: In accordance with applicable regulations, all contract personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas. Escorts must be USACE employees and never other contractors. Note Escort Requirement will no longer be required once the Contract Representative has been notified a favorable long-term investigation (Category B3) has been completed. B3 not required for extremely short maintenance or repair contracts in which the contractor will be escorted throughout project completion (under 30 days).

6.5 Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-http://www.lrd.usace.army.mil/Submit-ArticleCS/Programs/Article/3667149/contracting/ http://www.lrd.usace.army.mil/Submit-ArticleCS/Programs/Article/3667149/contracting/

Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102- 1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

All contract employees and subcontractors shall always conduct themselves in a proper manner.

No alcoholic or intoxicating beverages or substances or illegal drugs or controlled substances not prescribed by a physician shall be possessed, consumed, or be under the influence of any such substance while on Government property.

The Contractor shall remove from the site any individual whose continued employment is deemed by the appointed receiving agent to be contrary to the public interest or inconsistent with the best interests of the U.S. Army Corps of Engineers.

The Contracting Officer or the appointed receiving agent will require the Contractor to immediately remove from the work site anyone who is incompetent or who endangers persons or property or whose physical or mental condition is such that it would impair the employee’s ability to satisfactorily perform the work. Notification to the Contractor will be made in writing if time and circumstances permit.

Otherwise, notification will be verbal and will be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor's obligation to perform all work required under this contract and immediate replacement shall be made as required.

The Contractor is responsible for taking the action necessary to protect Contractor supplies, materials and equipment, and the personal property of Contractor employees from loss, damage, or theft. The Government assumes no responsibility for theft, damage, etc., of the above. All incidents of theft (or suspected theft) of contractor materials, supplies, or equipment from project lands shall be reported to the

COR.

7. Coordination:

Contractor shall contact the Barkley Power Plant Superintendent to coordinate installation of the units no less than 30 calendar days before being on site.

POC: Jamie Holt

(270) 362-8159 Office

(270) 508-1605 Cell Jamie.T.Holt@usace.army.mil

8. Contract Authority and Contracting Officer’s Representative (COR):

The awarded firm shall only accept instruction from the USACE Contracting Officer (KO) or the duly appointed representative, and only commence work that has been negotiated and authorized. Only the USACE Contracting Officer can modify this Contract. Coordination of technical matters with USACE personnel shall be accomplished through the Contracting Officer’s Representative (COR), Chris Marshall.

Contracting Officer’s Representative (COR):

Chris Marshall

(290) 363-4236 Office Christopher.J.Marshall@usace.army.mil http://www.e-verify.gov/) mailto:Jamie.T.Holt@usace.army.mil mailto:Christopher.J.Marshall@usace.army.mil

PRICE SCHEDULE

Barkley Power Plant HVAC Unit #3 Replacement Lyon County, KY

PRICE SCHEDULE

ITEM

NO.

DESCRIPTION EST.

QTY.

UNIT UNIT

PRICE

AMOUNT

0001 Replace Barkley HVAC at Zone 3

Air Conditioning (AC) Unit No. 3 1 JOB $ $

Ductwork 1 JOB $ $

Piping, Valves and other Miscellaneous Items 1 JOB $ $

TOTAL AMOUNT $

INSTRUCTIONS TO OFFERORS

1. DESCRIPTION OF WORK: The purpose of this Scope of Work (S.O.W.) is for the purchase and installation of a replacement of one air conditioning unit and associated accessories in the Barkley Power Plant. The Power Plant HVAC system is unique because the common unit has field mounted condensers that utilizes water drawn from Lake Barkley to provide a source of cooling.

2. TYPE OF CONTRACT: The Government intends to award a Firm-Fixed Price Supply Contract under NAICS Code: 333415 – Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing, Size Standard 1,250 Employees.

3. BASIS FOR SELECTION OF AWARD: Award shall be made to the lowest priced offeror who is determined to be responsible.

4. PLACE OF PERFORMANCE: Lake Barkley Power Plant, 8439 US HWY 62 W, Kuttawa, KY 42055.

5. PERIOD OF PERFORMANCE: The work shall be completed one hundred and twenty (120) calendar days after contract award.

6.POC FOR COMMUNICATIONS: Any communications regarding this procurement before award must be made via email to the Contracting Branch to Samantha Bedard at Samantha.J.Bedard@usace.army.mil. Inquiries must identify the solicitation number, the requestor’s company name, address, email address, and telephone number to include area code.

Phone calls or requests to arrange meetings at the Nashville District during the solicitation period to discuss project requirements or company’s capabilities are highly discouraged and will not be allowed.

7. PRE-BID SITE VISIT: A site visit is scheduled for Thursday, September 5th, 2024 at Lake Barkley Power Plant, 8439 US HWY 62 W, Kuttawa, KY 42055. Offerors are highly encouraged to inspect the job site and acquaint themselves with the nature and location of the work, as well as the general and local conditions that can affect the work or the cost thereof. Offerors that do not attend the site visit will not be relieved of the responsibility of properly estimating the difficulty or cost of successfully performing the work. The Government assumes no responsibility for any understanding or representations concerning conditions made by any of its officers, agents, or employees, unless included in the solicitation, the specifications or related documents.

Please refer to FAR 52.237-1, Site Visit, incorporated by full text in this solicitation, for information pertaining to the scheduled site visit.

This is the only site visit for this project. If you miss the scheduled site visit, no other arrangements will be made due to personnel and time restrictions.

Requirements to Attend the Site Visit:

REGISTRATION: Only registered persons will be permitted to attend the site visit. In addition to the information below, please also provide your firm’s name, firm’s CAGE and/or Unique Entity Identifier number, and name and position title of primary point-of-contact and their telephone number and email address.

Only two (2) individuals from each business entity will be permitted to attend.

U.S. CITIZENS: To register, U.S. citizens interested in attending the site visit shall submit a Nashville District Corps of Engineers (LRN) U.S. Citizen Security Access Form to the LRN Point of Contacts (POCs), Contract Specialist Samantha Bedard Contracting Officer Cierra Vega, no later than five (5) business days prior to the site visit. If submitting the document in less than five business (5) days prior, the person may not receive approval for participation. Notification of approval or denial will be provided prior to the date of the site visit. The form and guidance are available as a pdf attachment on https://sam.gov with this solicitation and is titled U.S. Citizen Security Access Form.

FOREIGN NATIONALS (FNs): All non-U.S. Citizens, including permanent residents wishing to attend the site visit must be approved in advance. FNs wishing to attend a site visit shall submit a completed Nashville District Corps of Engineers Foreign National Security Access Form and legible color copies of two (2) of the following documents: Passport (unexpired or expired), Certificate of U.S. Citizenship (INS Form N-560 04 N-561), Certificate of Naturalization (INS Form N-550 or N-570), unexpired foreign Passport with I-551 stamp or attached INS Form I- 94 indicating unexpired employment authorization, an Alien Registration Receipt Card with photo (INS Form I-151 or I-551), unexpired Temporary Resident Card (INS Form I-688), unexpired Employment Authorization Card (INS Form I- 688A), unexpired Reentry Permit (INS Form I-327), unexpired Refugee Travel Document (INS Form I- 571), or unexpired Employment Authorization Documentation issued by the INS which contains a photograph (INS Form I-688B) to the LRN POCs. These documents must be submitted two (2) weeks prior to the site visit. FNrequests require approval at the Headquarters U.S. Army Corps of Engineers (HQ USACE) level. Exceptions will be considered on a case-by-case basis but will be limited. The form is available as a pdf attachment on www.sam.gov with this solicitation and is titled Foreign National Security Access Form.

LRN POCs for Registration: For questions and/or concerns regarding the Site Visit, please contact Samantha Bedard at Samantha.J.Bedard@usace.army.mil. Please submit all site visit request forms to Samantha Bedard at Samantha.J.Bedard@usace.army.mil. and Cierra Vega at Cierra.R.Vega@usace.army.mil. When you send your site visit request form, please put “W912P524Q0045 - (Foreign National or U.S. Citizen) Request Form- (Your Company Name)” in the subject line of the email. Please edit the information in parenthesis to match the request form you submit and your company name.

8.WHERE TO SUBMIT & SUBMITTAL DEADLINE

(a) SF 1449: Filled out by the vendor for: Block 17a, Block 17b (if applicable), Block 30a, Block 30b, and Block 30c https://sam.gov/ http://www.sam.gov/ mailto:Samantha.J.Bedard@usace.army.mil.

mailto:Samantha.J.Bedard@usace.army.mil.

mailto:Cierra.R.Vega@usace.army.mil.

(b) Acknowledge all SF30s, Amendment of Solicitation (if applicable).

(c) Price: Complete and sign the “Price Schedule”

The Offeror’s quote shall be submitted electronically, via Procurement Integrated Enterprise Environment (PIEE), as described below. The RFQ will provide quote submission instructions and receipt date for quote submittal. The Offeror’s quote shall not contain classified data. The use of hyperlinks in quotes is prohibited.

The Offeror’s quote must be received by the Government by the date/time specified in the Solicitation.

QUOTE SUBMISSION: ALL SUBMISSIONS TO THIS RFQ SHALL BE SUBMITTED

ELECTRONICALLY THROUGH PIEE. No paper copies, CD-ROMs or facsimile submissions will be accepted. Electronic Quote Submissions is required through the Army’s Electronic File Sharing Service in PIEE (https://piee.eb.mil/). The PIEE Application is used to send large files to individuals that would normally be too large to send via email. Information regarding how to set up a vendor registration is included in this link:

https://pieetraining.eb.mil/wbt/xhtml/wbt/portal/overview/vendorRegister.xhtml. On this page, click on the “Vendor User Registration” Doc and it will take you through the process of registering as a vendor.

If you plan on submitting a quote, be sure to select “SOL-Solicitation” in the drop-down list and choose the “Proposal Manager” role to be given the proper permissions within the PIEE application.

As stated above, the Offeror’s quote must be received by the Government by the date/time specified in the solicitation. Offerors shall submit their quote using the following link: Procurement Integrated Enterprise Environment (PIEE) – https://piee.eb.mil. Search Solicitation: W912P524Q0045

There are three (3) documents in this solicitation package: the solicitation, the plans and the specifications. The solicitation and specifications will be posted here on PIEE. the plans will be locked in the sam.gov module. To request access to the locked plans document, please submit the attached security form *completed with your firms information* to the Contract Specialist and Contracting Officer. An approved security form will provide access to the locked plans document in sam.gov as well as permit access to the site visit if your firm wishes to attend.

W912P524Q0045_TPlans_BARPH AC 3 Replacement_RTA_12Aug2024_CUI (this document will be available on sam.gov once your firm submits a completed site visit form to the Contracting POCs).

Only proposals submitted via the PIEE module for Solicitation W912P524Q0045 will be considered for award.

Further training is available at the following links:

https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml - This link shows information regarding the Solicitation application in PIEE and the different roles available.

https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml - This link is for Offerors regarding the Proposal Manager function and instruction on submitting a Quote.

a. File Size Limitations: Offerors are advised to follow the PIEE instructions for uploading files. PIEE supports delivery of up to 1.9GB per file, with no limit on the number of files, as well as multiple file formats. If needed, Offerors are advised to break the files down into smaller sections in order to upload them into the system. In such cases, please divide mailto:Samantha.J.Bedard@usace.army.mil.

mailto:Cierra.R.Vega@usace.army.mil.

the sections as logically as possible and be sure to clearly name the files as specified below.

b. File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:

- W912P524Q0045 – (FIRM NAME) – VOLUME I

- W912P524Q0045 – (FIRM NAME) – VOLUME II

Each file name shall begin with the Solicitation number followed by the firm’s name, and a brief file description. Please see the examples above.

c. Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on the Solicitation document. The time and date of quote receipt will be the upload completion/delivery time and date recorded within the PIEE site. Do not assume that electronic submission will occur instantaneously. Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.

9. SYSTEM FOR AWARD MANAGEMENT (SAM)

In accordance with FAR 52.204-7, System for Award Management, registration is required in the System for Award Management (SAM) database located at www.sam.gov. More specifically, "An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation." (See FAR 52.204-7(b)(1)).

For SAM Customer Service, contact:

Federal Service Desk URL: www.fsd.gov Hours: 8am – 8pm (Eastern Time) U.S. Calls: 866-606-8220 International Calls: 334-206-7828

DSN: 866-606-8220

IMPORTANT NOTICE: Effective June 29, 2018 vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 calendar days of activation, or the vendor risks no longer being active in SAM.

Vendors can check whether an account is active by performing a query by their Unique Entity Identifier.

The registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM.

To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).

http://www.sam.gov/ http://www.fsd.gov/ http://www.sam.gov/

10. CONTRACTOR FEEDBACK: Help us in BUILDING STRONG. Please provide us with your feedback, comments, and recommendations for improvement by visiting our Interactive Customer Evaluation (ICE) website at: https://ice.disa.mil/index.cfm?fa=cardandsp=110797ands=85

11. NOTICE TO POTENTIAL BIDDERS/OFFERORS: In accordance with DFARS 204.7302, Contractors and subcontractors are required to provide adequate security on all covered contractor information systems.

Contractors are required to implement National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 by inclusion of clause at 252.204-7012, Safeguarding Covered Defense Information and Cyber incident Reporting, are required at time of award to have at least a Basic NIST SP 800-171 DoD Assessment that is current (i.e., not more than 3 years old unless a lesser time is specified in the solicitation).

SPRS provides storage and access to the NIST SP 800-171 assessment scoring information. To access the NIST SP 800-171 Assessments module, users must be registered in the Procurement Integrated Enterprise Environment (PIEE) https://piee.eb.mil/ and be approved for access to Supplier Performance Risk System (SPRS).

The NIST SP 800-171 DoD Assessment Methodology is located at:

https://www.acq.osd.mil/asda/dpc/cp/cyber/safeguarding.html#nistSP800171

Vendor Help and Training Tutorials are available at https://www.sprs.csd.disa.mil/nistsp.htm https://ice.disa.mil/index.cfm?fa=cardandsp=110797ands=85 https://www.acq.osd.mil/asda/dpc/cp/cyber/safeguarding.html#nistSP800171 https://www.sprs.csd.disa.mil/nistsp.htm

Section SF 1449 - CONTINUATION SHEET

PLANS & SPECIFICATIONS

The following attachments are fully incorporated into this solicitation. The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

W912P524Q0045_TPlans_BARPH AC 3 Replacement_RTA_12Aug2024_CUI W912P524Q0045_TSpecs_BARPH AC 3 Replacement_RTA_06AUG2024

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Barkley Power Plant HVAC Replacement

FFP

Contractor shall provide HVAC replacement with incidental installation to include:

Air Conditioning (AC) Unit No. 3, Ductwork, Piping, Valves & other Misc. Items.

Contractor shall perform duties in accordance with the Scope of Work, Plans and Specifications.

FOB: Destination

PSC CD: 4120

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 120 dys. ADC 1 WEST KY AREA OFC, BARKLEY LOCK

CHRISTOPHER MARSHALL

US ARMY CORPS OF ENGRS, 758

BARKLEY DAM ROAD

GRAND RIVERS KY 42045

(270) 362-4236 FOB: Destination

W912P5

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.212-1 Instructions to Offerors--Commercial Products and

Commercial Services

SEP 2023

52.212-4 Contract Terms and Conditions--Commercial Products and Commercial Services

NOV 2023

52.245-1 Government Property SEP 2021 52.245-9 Use And Charges APR 2012 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

SEP 2022

252.204-7004 Antiterrorism Awareness Training for Contractors JAN 2023 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

JAN 2023

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services

JAN 2023

252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2023 252.204-7020 NIST SP 800-171 DoD Assessment Requirements NOV 2023 252.204-7022 Expediting Contract Closeout MAY 2021 252.204-7024 Notice on the Use of the Supplier Performance Risk System MAR 2023 252.223-7008 Prohibition of Hexavalent Chromium JAN 2023 252.225-7001 Buy American and Balance of Payments Program FEB 2024 252.225-7012 Preference For Certain Domestic Commodities APR 2022 252.225-7055 Representation Regarding Business Operations with the

Maduro Regime

MAY 2022

252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime

JAN 2023

252.225-7059 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region - Representation

JUN 2023

252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region

JUN 2023

252.225-7972 (Dev) Prohibition on the Procurement of Foreign-Made Unmanned Aircraft Systems (DEVIATION 2020-O0015)

MAY 2020

252.225-7973 (Dev) Prohibition on the Procurement of Foreign-Made Unmanned Aircraft Systems - Representation (DEVIATION 2020- O0015)

MAY 2020

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor

Personnel

JAN 2023

252.244-7000 Subcontracts for Commercial Products or Commercial Services

NOV 2023

252.245-7005 Management and Reporting of Government Property JAN 2024 252.246-7008 Sources of Electronic Parts JAN 2023 252.247-7023 Transportation of Supplies by Sea JAN 2023

CLAUSES INCORPORATED BY FULL TEXT

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV 2021)

(a) Definitions. As used in this clause--

Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.

Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.

Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).

Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).

Safeguarding means measures or controls that are prescribed to protect information systems.

(b) Safeguarding requirements and procedures.

(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:

(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).

(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.

(iii) Verify and control/limit connections to and use of external information systems.

(iv) Control information posted or processed on publicly accessible information systems.

(v) Identify information system users, processes acting on behalf of users, or devices.

(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.

(vii) Sanitize or…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .