About this file
This document provides details for a construction contract solicitation for a concrete stoplog storage slab at Cheatham Dam in Tennessee. The scope of work includes removing an existing asphalt slab and culvert, relocating a grounding mat, and constructing a 125-foot by 50-foot reinforced concrete slab with lateral supports to store stoplogs for the dam lock. Prior to slab construction, excavation and installation of stone and geotextiles below the slab site is required. Additional work comprises earthwork, drainage improvements, fencing options, and asphalt and landscaping options. The solicitation is expected to release on June 7, 2022 via SAM.gov. The contract value is estimated between $1-5 million. The NAICS code is 238110 for poured concrete foundation work and it is set aside 100% for small businesses with a size standard of $16.5 million. The agency is the Nashville District of the U.S. Army Corps of Engineers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 01 20 00 SLSSlab Bid Schedule.pdf | ||
| 01 20 00 SLSSlab Bid Schedule.pdf | ||
| W912P522B0007 0002.pdf | ||
| 01 20 00 Spec.pdf | ||
| 09 97 02 spec.pdf | ||
| Cheatham Stoplog Pad Bid Opening Info.pdf | ||
| Section 01 45 00 spec.pdf | ||
| CHEATHAM LOCK DAM SITE STOPLOG SLAB-ACCESS ROAD WIDENING (Amendment 01).docx | DOCX document | |
| Section 01 20 00 spec.pdf | ||
| W912P522B0007 0001 Amendment 1.pdf | ||
| US Citizen_Site Visit Form .pdf | ||
| FN _Site Visit Form.pdf | ||
| TSpecs_W912P522B0007_Cheatham Stoplog Storage Slab_RTA.pdf | ||
| TPlans_W912P522B0007_Cheatham Stoplog Storage Slab_RTA_All Signatures.pdf | ||
| PIEE Offeror Submittal Guide.pdf | ||
| PIEE Vendor Registration Guide.pdf | ||
| W912P522B0007 Cheatham Stoplog Storage Slab.pdf | ||
| Bid Schedule W912P522B0007 Cheatham Dam Stoplog Storage Slab.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W P -2
-B -0
N A
S H
V
IL
L E D
IS
T R
IC
T
N A
S H
V
IL
L E T
N
-3
T H A
V E
N U
E S
O U
T H
SHEET ID
C U
M B
E R
L A
N D R
IV
E R
Q12-
W P -2
-X -X
X X
X
Q -3
0̂ .d g n
K E
N T
U C
K Y A
N D T
E N
N E
S S
E E
C H
E A
T H
A M L
O C
K A
N D D
A M
L O
C K
30/35
S
IT
E D
E S
IG
N
A R
C H E
A
A
B
B
40'10'0 20'
SCALE:1"=20'
MIGRATION.
SIDES OF EXCAVATION TO PREVENT
OVERLAPPED ON BOTTOM AND
MEDIUM WEIGHT GEOTEXTILE FABRIC
12" BASE MATERIAL #57 STONE AND
(ASPHALT DRIVE)
EXISTING SURFACE
ABOVE EXISTING SURFACE.
CONCRETE SLAB TO SIT APPROX. 6"
TOP OF SLAB ELEV.=391'-6"
14" CONCRETE SLAB
REPLACE WITH PROPOSED DITCH
REMOVE 18" CMP CULVERT
TO PROPOSED DITCH
GRADE AREA TO DRAIN
EDGE OF PAVEMENT
S T
O P
L O
G S
T O
R A
G E S
L A
B
I.E.=380.79
RIM=388.99
EXIST. SSMH
ASPHALT REMOVAL
SAWCUT PAVEMENT FOR
EXIST 8" SS LINE
INVERT AT PROPOSED CATCH BASIN
PROPOSED INVERT = 1% LOWER THAN
32' x 12" HDPE DRAIN PIPE
SAWCUT ASPHALT PAVEMENT TO INSTALL
CATCH BASIN
STUBBED INTO EXIST
INSTALL 15" CMP
APPROX. LOCATION
ASSUMED 6" WATERLINE
TOW MACHINERY BASE
15" CMP CULVERT
GRADE DITCH TO DRAIN TO
SILT FENCE REQUIRED
15" CMP CULVERT
GRADE DITCH TO DRAIN TO
RELOCATE GROUNDING MAT
CONC PAVEMENT TO BE REMOVED TO
SILT FENCE REQUIRED
FILTER FABRIC
WRAPPED WITH 4 OZ.
4" PERFORATED DRAIN PIPE
STOPLOG SLAB
LOCATION OF PCC
4" VENT
SILT FENCE REQUIRED
I.E.=380.19
RIM=390.99
EXIST. SSMH
TO CATCH BASIN
GRADE AREA TO DRAIN
I.E.=381.41
RIM=390.01
EXIST. CATCH BASIN
I.E.=OBSTRUCTED
RIM=388.41
EXIST. CATCH BASIN
A S P H
A
LT
P
A V E
M E N T
C O
N C R E T E W
A
LK
LO
C
K W
A
LL
EXIST.
(TYP)
GROUND
MAT COVERS
CONC.
18" C M P
A S P H
A
LT
D
R
IV
E
(CONCRETE SIDEWALK)
EXISTING SURFACE
FABRIC
WRAPPED W/ 4 OZ. FILTER
4" PERFORATED DRAIN PIPE
SURFACE
EXISTING
ABOVE EXISTING SURFACE.
CONCRETE SLAB TO SIT APPROX. 6"TOP OF SLAB ELEV.=391'-6"
14" CONCRETE SLAB
MIGRATION.
SIDES OF EXCAVATION TO PREVENT
OVERLAPPED ON BOTTOM AND
MEDIUM WEIGHT GEOTEXTILE FABRIC
12" BASE MATERIAL #57 STONE AND
SURFACE
EXISTING
NTS
SECTION DETAILA-A
NTS
SECTION DETAIL
B-B
125'-5"
50'-4"
CONTRACTION JOINTS (TYP)
4.5'
NTS
4" PVC DRAIN DETAIL
EXPANSION JOINTS (TYP)
1'
6"
"PVC PIPE
4" PERFORATED
MATERIAL
#57 BACKFILL
SLAB
EDGE OF STOPLOG
CONCRETE WALK
EDGE OF
NTS
DRAINAGE DITCH DETAIL
TO THE 24" HDPE CATCH BASIN
1. 4" PVC PERFORATED PIPE DRAINS
NOTES:
2:1 SIDE SLOPE (MIN)
BEGIN INV.=391.00'
BEGIN INV.=391.00'
END INV=389.00'
END INV=389.00'
END INV.=389.00'
BEGIN INV.=391.00'
IE-389.21
IE-389.58
SURFACE
PROPOSED GRASS
SURFACE
PROPOSED GRASS
SURFACE
PROPOSED GRASS
ABANDONED IN PLACE
ELEC TO WAREHOUSE
EXIST. UNDERGROUND 3-3F
(SEE SHEET Q12-30/37 FOR DETAILS).
GRATE ELEV.= 389.5', INV ELEV=387.5'
INSTALL 24" HDPE CATCH BASIN
(ASPHALT DRIVE)
EXISTING SURFACE
NTS
CATCH BASIN RISER DETAIL
(ASPHALT DRIVE)
EXISTING SURFACE
EXISTING CATCH BASIN
ADJACENT SLAB.
2. TOP OF GRATE TO BE FLUSH WITH TOP OF
CATCH BASIN RISER.
1. OPEN HOLED GRATE REQUIRED FOR
NOTES:
(SEE DETAIL THIS SHEET)
ENSURE MANHOLE COVER IS FLUSH WITH TOP OF SLAB.
INSTALL OPEN HOLED MANHOLE COVER FOR ACCESS.
CONSTRUCT RISER OVER EXISTING CATCH BASIN AND
(SEE DETAIL THIS SHEET)
ENSURE MANHOLE COVER IS FLUSH WITH TOP OF SLAB
INSTALL OPEN HOLED MANHOLE COVER FOR ACCESS.
CONSTRUCT RISER OVER EXISTING CATCH BASIN AND
AND CONTRACTOR.
TO BE DETERMINED BY COR
NUMBER AND HEIGHT OF RISERS
UNLESS OTHERWISE APPROVED BY THE CONTRACTING OFFICER.
8. NO EARTHWORK TO INCLUDE EXCAVATION AND COMPACTION SHALL BE PERMITTED BETWEEN THE MONTHS OF DECEMBER AND APRIL
7. THE CONTRACTOR SHALL SUBMIT A PROPOSAL FOR RAISING THE CATCH BASIN TO ALIGN WITH THE SLAB SURFACE.
6. THE CONTRACTOR SHALL NOT EXCAVATE MORE MATERIAL THAN CAN BE BACKFILLED WITHIN A 24 HOUR PERIOD.
5. CONTRACTOR MUST SUBMIT THEIR PROPOSED DRAINAGE PLAN TO ENSURE THAT WATER DOESN'T GET INTO THE EXCAVATION AND STAGNATE.
CONTRACTOR TO UTILIZE EXCAVATED MATERIAL TO RESHAPE SURROUNDING AREAS TO ENSURE POSITIVE DRAINAGE AWAY FROM THE SLAB.
4. ENSURE THAT THE TOP OF THE SLAB IS 6" HIGHER THAN THE SURROUNDING AREA AS SHOW ON SECTION B-B OF THIS SHEET.
DRAINAGE NOTES:
3. #57 STONE FOR SLAB BASE SHALL BE PLACED AND COMPACTED INTO LIFTS NOT TO EXCEED 4 INCHES COMPACTED THICKNESS.
31 05 22. FILTER FABRIC SHALL BE NON-WOVEN AND NO LESS THAN 12 OZ. IN WEIGHT AS ACCORDING TO SPECIFICATION 31 05 22.
2. PLACE FILTER FABRIC BETWEEN #57 STONE AND SLAB FOUNDATION AS SHOWN IN SECTION B-B AND AS DIRECTED IN SPECIFICATION
1. ALL EARTHWORKS SHALL BE PROTECTED BY THE CONTRACTOR FROM THE EFFECTS OF WEATHER AND THE ENVIRONMENT AT ALL TIMES.
EARTHWORK NOTES:
PLACEMENT
CATCH BASIN TOP FOR RISER
CONSTRUCT CAST-IN-PLACE
OPEN HOLED MANHOLE GRATE
NEW SLAB DETAILS
SEE SHEET Q12-30/46 FOR PROPOSED
F
M
IL
L S
G P
A G
A N I
G P
A G
A N I
READY TO ADVERTISE
J U
N E
B
R O
H R
B A
C H
FABRIC
4 OZ. FILTER
PROPOSED CONCRETE STOPLOG SLAB
GROUNDING MAT
PAVEMENT TO BE REMOVED TO RELOCATE
3'
TO BE REMOVED
(2) 2'x4' GRATES
N
P lo t T im e
P lo t
D a te
F il e N a m e
:3
:5
A
M
/2
/2 c u s e rs \h e c x g a p \d o c u m e n ts \p w \c e lr n \d
\Q
-3
0̂ .d g n
C
D
E
F
G
H
J
K
13121110987654321
B
A SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
F
IL
E N
A M
E
P L
O T S
C A
L E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E M
A R
K D
E S
C R
IP
T
IO
N D
A T
E
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
File details come from the government source that posted it. Updated .