W912P521Q0037 -0001 BAR Sewer Line Replacement 20 Aug 2021.pdf
PDF 343 KB Posted
- Solicitation number
- W912P521Q0037
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W38XDD11604351
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE: Barkley Sew er Line Replacement Solicitation W912P5Q0037 for Barkley Sew er Line Replacement at Grand Rivers, KY is hereby amended as follow s:
1. Provide the Government's response to the contractor's questions.
2. Site Visit attendee sign-in sheet are hereby incorporated as part of this solicitation.
3. The follow ing Specif ication Sections (W912P52 _TSpecs_ Amendment 0001) is hereby amended as follow s and as indicated in the Amendment 0001 Summary of Changes to Specif ications.
4. FAR Clause 52.252-3, Alterations in Solicitation is hereby updated.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Aug-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P521Q0037
X 9B. DATED (SEE ITEM 11)
28-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Aug-2021
CODE
CELRN-RC-N CONTRACTING BRANCH
110 9TH AVE SOUTH, A405
NASHVILLE TN 37203
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P521Q0037
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
QUESTIONS AND ANSWERS
Questions and Answers Solicitation No. W912P521Q0037 0001 Project: Barkley Lock Operations Building Sewer Line Replacement Industry Questions/Comments and Government Responses
Q1. Industry Question/Comment: Can the Safety Office, the CQC officer and Site Superintendent be the person?
A1. Government Response: No, the CQC and Superintendent cannot be dual hatted, however the Safety officer can be dual hatted with one or the other.
Q2. Industry Question/Comment: Will a full-time mechanical engineer be required on staff for a project of this size?
A2. Government Response: No, a full-time mechanical engineer is not expected to always be present for a project this size. A fully licensed technician with 5 years of experience may also serve the role of ‘CQC Personnel’ instead of an mechanical engineer. Specification 01 45 00 Section 3.4 will be updated to reflect correct CQC personnel requirements.
Q3. Industry Question/Comment: The notes call for no removal of walls, but the drain connection shown on the riser diagram would require getting into the walls to connect each sink or lavatory. Should we connect below the upper floor and not inside the walls?
A3. Government Response: It is interpreted that by ‘below the upper floor’ the Contractor is referring to the ceiling of the Operations Building Basement where the sewer line is completely visible. Per Specification 02 41 00 Section 3.1.3.3, the Contractor will disassemble the pipe below the first union from the roof of the Operations building basement. Specification 22 00 00 states that the Contractor will replace all removed sewer line below that first union that was removed in Spec 02 41 00. The Contractor will not connect the new sewer line behind the wall of the sinks or toilets on the main floor of the Operations Building. The specifications of this contract supersede the drawings of this contract.
---- End of Section ----
SITE VISIT ATTENDEE LIST
Attendee List Attached Pages 1
W912P521Q0037
TECHNICAL SPECS CHANGES
Technical Specifications
Solicitation No. W912P521Q0037 Amendment No. 0001 W912P52 _TSpecs_ Amendment 0001
I. CHANGES TO TECHNICAL SPECIFICATIONS
A. Section 01 45 00 Quality Control. Remove Section 01 45 00 in its entirety (12 pages). Replace with revised Section 01 45 00 (12 pages).
II. CHANGES TO CONTRACT DRAWINGS
A. The following CONTRACT DRAWINGS have been revised and replaced:
Drawing No. Description N/A N/A
B. The following CONTRACT DRAWING has been added to the package:
Drawing No. Description N/A N/A
C. The following REFERENCE DRAWING / FOR INFORMATION ONLY DRAWING has been added to the package:
Drawing No. Description N/A N/A
The following have been added by full text:
52.252-3 Amendment 0001:
PROJECT TITLE: Barkley Sewer Line Replacement Solicitation W912P5Q0037 for Barkley Sewer Line Replacement at Grand Rivers, KY is hereby amended as follows:
1. Provide the Government's response to the contractor's questions.
2. Site Visit attendee sign-in sheet are hereby incorporated as part of this solicitation.
3. The following Specification Sections (W912P52 _TSpecs_ Amendment 0001) is hereby amended as follows and as indicated in the Amendment 0001 Summary of Changes to Technical Specifications.
4. FAR Clause 52.252-3, Alterations in Solicitation is hereby updated.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .