TPlans_W912P5-21-Q-0037_Certified Final Documents-RTA_Barkley Lock Ops Bld Sewer Line Replacement.pdf
PDF 5 MB Posted
- Attached to
- Barkley Lock Operations Building Sewer Line Replacement - Amendment 0002 Federal contract opportunity
- Solicitation number
- W912P521Q0037
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912P521Q0037 0002 - BAR Sewer Line_ Amendment 0002 Extend Quotes Due Date .pdf | ||
| W912P521Q0037_TSpecs_Amendment 0001.pdf | ||
| W912P521Q0037 -0001 BAR Sewer Line Replacement 20 Aug 2021.pdf | ||
| PRICE BREAKOUT Schedule _W912P5-Q-0037.pdf | ||
| Wage Determination 22 July 2021.pdf | ||
| W912P521Q0037 Solicitation BAR SEWERLINE REPLACEMENT 28 July 2021.pdf | ||
| TSpecs_W912P5-21-Q-0037_Certified Final Documents-RTA_Barkley Lock Ops Bld Sewerline Replacement.pdf | ||
| Site_Visit_Registration_Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
US Army Corps of Engineers
Nashville District
Cumberland River Basin
Cumberland River
Kuttawa, KY
Plans For Barkley Lock Operations Building Sewer Line Replacement
July 2021
Submitted:
(2.) The approval signatures appearing in the signature block on this sheet constitute approval of all drawings listed in the sheet index.
designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.
(1.) This project was designed by the Nashville District of the U.S. Army Corps of Engineers. The initials or signatures and registration
Note:
Project Engineer
Approval Recommended:
Robert W. Baulsir III P.E.
Chief, Civil Design Branch
Approved:
Mark P. Evans P.E.
Chief, Electrical/Mechanical Section
Jace T. Courtright
Certified Final Documents - RTA
W912P5-21-Q-0037
2021-07-01T09:51:39-0500
COURTRIGHT.JACE.T.1554074231
2021-07-01T09:16:44-0500
TRUONG.LONG.C.1244574978
2021-07-06T15:04:44-0500
BAULSIR.ROBERT.W.III.1258321525
S O
L
IC
IT
A T
IO
N
D E
IG
B
Y
C
R
IP
M
K
IZ
U
H
W
IS
SHEET ID
.S
P
F
G
IN
J
1312111098765432
®of Engineers
IL
V
G-001
X
-X
-3
IV
Q
-B
-G
-0
.d g n
-1
-2
RTA - CERTIFIED FINAL
P
-Q
G-001 INDEX
CONTRACT DRAWINGS
SHEET NO. FILE NAME TITLE
SHEET NO. FILE NAME TITLE
GENERAL
MECHANICAL
OPERATION BUILDING, WASTE LINE RISER DIAGRAM
INDEX
TITLEDRAWING NO.
REFERENCE DRAWINGS
Q9-BL-G-001
MD-101 Q9-BL-MD-101 OPERATION BUILDING, FIRST FLOOR PLAN, FIXTURES & SEWER PIPE DECONSTRUCTION
MD-102 Q9-BL-MD-102 OPERATION BUILDING, BASEMENT PLAN, SEWER PIPE DECONSTRUCTION
M-101 Q9-BL-M-101 OPERATION BUILDING, FIRST FLOOR PLAN, FIXTURE AND PIPING INSTALLATION
M-102 Q9-BL-M-102 OPERATION BUILDING, BASEMENT PLAN, SEWER PIPE INSTALLATION
M-601 Q9-BL-M-601
Q9-70/2.4 LOCK, OPERATION BUILDING, PLANS AND DETAILS
Q9-70/8.3 LOCK, OPERATION BUILDING, PLUMBING AND VENTILATING
LOCK, OPERATION BUILDING, SEWAGE CHLORINATION FACILITIES
Q9-BL-G-002G-002 LEGEND
Q9-70/14.2
Q9-BL-G-101G-101 SITE PLAN
G-002
P
CO
ABBREVIATIONS
A G
P-1
PLUMBING SYMBOLS
PIPING SYMBOLS PIPING TYPES
MISCELLANEOUS PLUMBING
SANITARY SEWER
SANITARY VENT
DOMESTIC COLD WATER
DRAWING NOTE
PLUMBING EQUIPMENT TAG
FLOOR CLEANOUT
P-TRAP
FLOOR DRAIN WITH P-TRAP
FLOOR SINK DRAIN
FLOOR DRAIN/AREA DRAIN
THERMOMETER WELL
PIPE FLANGE
FLEXIBLE CONNECTION
THERMOMETER
GAUGE COCK
PRESSURE GAUGE WITH
FLOOR CLEANOUT
LINE CLEANOUT
CAP ON END LINE
VALVE
2 WAY SELF OPERATING
3 WAY SELF OPERATING
PRESSURE REDUCING
CHECK VALVE
BALL VALVE
STRAINER
UNION
VALVE IN RISE
VALVE IN CENTER DROP
VALVE IN DROP
ELBOW DOWN
ELBOW UP
RETURN
DOMESTIC HOT WATER
SS
HWR CLEANOUTCO
ASME AMERICAN SOCIETY OF
MECHANICAL ENGINEERS
ASSE
NOT TO SCALEN.T.S.
NOT APPLICABLEN/A
HWR
HORSE POWERHP
GALLONS PER MINUTEGPM
GALLONS PER HOURGPH
GALLONSGAL
FIRE PROTECTIONFP
FLOOR DRAINFD
SANITARY SEWERSS
VENT THROUGH ROOFVTR
MINIMUMMIN
MAXIMUMMAX
KILOWATTKW
W/
WCO
WH
DIAMETERDIA
DRINKING FOUNTAINDF
DOMESTIC COLD WATERDCW
DOMESTIC HOT WATER
TYPICALTYP
TEMPERATURE AND PRESSURET&P
REVOLUTIONS PER MINUTERPM
REQUIREDREQ'D
2 1/2" OR LESS 1/4" PER FOOT
3" TO 6" 1/8" PER FOOT
8" OR LARGER 1/16" PER FOOT
SIZE MINIMUM SLOPE
HORIZONTAL DRAINAGE PIPE
MINIMUM SLOPE OF
NECESSARILY USED ON THE DRAWINGS )
(ALL ABBREVIATIONS SHOWN ARE NOT
GALLONS PER MINUTEGALLONS PER MINUTE
GALLONS PER HOURGALLONS PER HOUR
GALLONSGALLONS
SANITARY ENGINEERS
AMERICAN SOCIETY OF
CLEANOUTCLEANOUT
DIAMETERDIAMETER
DRINKING FOUNTAINDRINKING FOUNTAIN
DOMESTIC COLD WATERDOMESTIC COLD WATER
ECO EXTERIOR CLEANOUT
EPDM ETHYLENE PROPYLENE DIENE MONOMER
ETC ETCETERA
EWH ELECTRIC WATER HEATER
FLOOR DRAIN
FIRE PROTECTION
HORSE POWER
HOT WATER RETURN
KILOWATT
MAXIMUM
MINIMUM
NOT APPLICABLE
NOT TO SCALE
REQUIRED
REVOLUTIONS PER MINUTE
SANITARY SEWER
TEMPERATURE AND PRESSURE
TYPICAL
VENT THROUGH ROOF
WITH
WALL CLEAN OUT
WALL HYDRANT
WATER CLOSETWC
G-101
P
PLAN
SCALE: NOT TO SCALE
STAFF REGARDING MATERIAL LAY DOWN AREAS AND VEHICLE PARKING.
1. CONTRACTOR WILL COORDINATE AND RECEIVE APPROVAL FROM PROJECT
NOTES:
SECURITY GATE/ACCESS CARD LOCATION
CARD LOCATION
SECURITY GATE/ACCESS
OPERATIONS BUILDING
P lo t im e t a te il m
:3
:4
/1 /2 c d o u n ts d s e tt in s \h c x jd h \p w o rk \c e lr
\d
\Q
-M
13121110987654321
A SHEET ID
/8
MD -101
02 2 4FT
SCALE: …''= 1'-0''
IR
IX
3" F.D.
FIRST FLOOR PLAN
(VENTED INSIDE )
1/2" C.W. - 1 1/2" W.
ELECTRIC WATER COOLER
2" C.W. RISER
EXHAUST FAN
.C
-1
.W
LAV.
1-1/2" VENT
2" V
SHOWER
SERVICE SINK
-1
2" RE-VENT LINE ABOVE
4" WASTE
4" V THRU. ROOF
4" W.
1-1/2" W 1-1/4" V.
1/2" C.W.-1/2" H.W.
KITCHEN UNIT
VENT
S.S.
2" V. THRU. ROOF
1-1/4" VENT
W.C.
U.
(COVERED )
4" V. 2" V 1-1/4" V.
BATHROOM
WOMEN'S VISTOR
MEN'S VISTOR
EMPLOYEE
LAV.LAV.
BARS
GRAB
ON DWG M-601)
(SEE NOTE 3
DRAIN AT WALL.
CAP KITCHEN SINK
WALL (SEE NOTE 7 )
BE CAPPED BEHIND THE
PIPE CONNECTION TO
WALL (SEE NOTE 7 )
BE CAPPED BEHIND THE
PIPE CONNECTION TO
SEE NOTE 9
DURING PROJECT DURATION.
9. CONTRACTOR IS PROHIBITED FROM BLOCKING ANY EXTERIOR BUILDING ACCESS
CONTRACTOR.
8. ANY DAMAGED STRUCTURAL GLAZED TILE MUST BE REPLACED IN KIND BY THE
CAPPING PIPE BEHIND WALLS.
7. STRUCTURAL GLAZED TILES CAN BE REMOVED AND REUSED TO MAKE ROOM FOR
6. ALL DECONSTRUCTION WORK TO BE DONE BY CONTRACTOR IS COLORED GREEN.
5. ALL DECONSTRUCTED FIXTURES WILL BECOME GOVERNMENT PROPERTY.
4. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND FIXTURE LOCATIONS.
DECONSTRUCTION WITH SIMILAR OR COMPROBABLE MATERIALS.
3. CONTRACTOR SHALL REPLACE ANY DAMAGED MATERIALS NOT AFFLIATED WITH
MEET ABA COMPLIANCE WITHOUT CAUSING DAMAGE TO EXISTING FIXTURES.
2. CONTRACTOR SHALL DECONSTRUCT ALL NECESSARY FIXTURES TO
1. SEE REFERENCE DRAWINGS Q9-70/2.4, Q9-70/8.3, AND Q9-70/14.2.
DECONSTRUCTION NOTES:
P t
:5
:4 d o n s e c rk \c e lr
MD-102
18'-0"
1" COMP. AIR LINE
WATER
4" C.I. POTABLE
2" W
C.O.
9'-9" ABOVE FLOOR
BASEMENT PLAN
0 TO 200 PSI.
W/ SHUT-OFF COCK
PRESS. GAGE
HOSE CONN.
VALVE W/
1" GATE
6'-6" ABOVE FLOOR
HOUSE (SEE DWG. 27/9)
SUPPLY TO POWER
" POTABLE WATER2
" GALV.2
" COPPER2
FIRST FLOOR
2" C.W. TO
ADAPTER
TO SCREWED JOINT
GALV. CPLG. & SWEAT
POINT
INSULATED FROM THIS
ALL POTABLE LINES
1-1/2" C.W.
VALVE SET @ 30 PSI.
3/4" PRESS. RELIEF
COPPER
" SWEAT JOINT2
W/ GRD. STRAP
INSULATING FLANGE
BETWEEN FLANGES
" SCR. GALV.2
4" X 2-1/2" REDUCING FLANGE
3" C.I. RAINLEADER
WALL
SUPPORT ON FOUNDATION
4" C.I. RAINWATER LINE
TRAP
3" R.L.
(BELL & GOSSETT )
VALVE SET @ 12 PSI.
3/4" PRESS. REDUCING
NEAR FLOOR
1-1/2" W. ALONG WALL
TO CHILLER
3/4" MAKE-UP
E.W.H.
4"
1W
1L
EYE WASH & LAV.
3/4" COPPER TO E.W.C.,
3" W.
3/4" C.W.-3/4" H.W.
PLUG.
CAP
4" W. C.O.
" W.2
" H.W.2 1" C.W.-2
CLEAN OUT
1-1/2" PLUGGED TEE
THRU. WALL NEAR FLOOR
DROP WASTE AND CARRY
5"X8" INCREASER
3" R.L
EMPTY INTO OPEN DITCH
2" W.
5" O.D. WASTE LINE
SEE NOTE 10
(COORDINATE WITH PROJECT STAFF )
CONTRACTOR GARAGE ACCESS
MUST BE APPROVED BY THE CONTRACTING OFFICER.
12. ANY REPLACEMENT MATERIALS FOR DAMAGE CAUSED BY THE CONTRACTOR
STAFF NORMAL OPERATION AS LITTLE AS POSSIBLE.
TO MAKE SURE THAT THE CONTRACTOR'S WORK INHIBITS THE OPERATIONS
11. CONTRACTOR WILL WORK WITH BARKLEY LOCK OPERATIONS PERSONNEL
10. CONTRACTOR WILL NOT DEMOLISH THE WALL TO REMOVE THE PIPE.
9. ALL DECONSTRUCTION WORK TO BE DONE BY CONTRACTOR IS COLORED GREEN.
8. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND PIPE LAYOUT.
7. EXISTING SEWER PIPE SHALL BE RECYCLED AT CONTRACTORS EXPENSE.
IS PRESENT CONTRACTOR SHALL ADHEAR TO SPECIFICATION 02-83-20.
6. CONTRACTOR SHALL TEST SEWER PIPE PAINT FOR LEAD. IF LEAD BASED PAINT
RELATED TO THE KITCHEN SINK DRAIN.
5. CONTRACTOR SHALL AVOID CUTTING INTO CONCRETE EXCEPT FOR TASKS
FIRST UNION.
4. ALL WALL AND CEILING PIPE PENETRATIONS WILL REMAIN IN PLACE UP TO THE
THE SEWER PIPE DECONSTRUCTION WITH SIMILAR OR COMPROBABLE MATERIALS.
3. CONTRACTOR SHALL REPLACE ANY DAMAGED MATERIALS NOT AFFLIATED WITH
UNION WITHOUT THE USE OF CUTTING TOOLS.
2. ALL SEWER PIPE WILL BE DECONSTRUCTED AT EACH JOINT OR
DECONSTRUCTION NOTES:
P
M-101 t
:0 d o n s e c rk \c e lr
IR
IX
P
I
(VENTED INSIDE)
1/2" C.W. - 1 1/2" W.
-1
1-1/2" VENT
2" V
-1
S.S.
1-1/4" VENT
W.C.
(COVERED )
4" V. 2" V 1-1/4" V.
WOMEN'S VISTOR
MEN'S VISTOR
1/2" C.W.-1/2" H.W.
EMPLOYEE
DRAIN PIPE (SEE NOTE 4 )
NEW 1-1/2" KITCHEN SINK
WALL (SEE NOTE 10 )
EXISTING PIPE AT
CAP AND COVER
WALL (SEE NOTE 10 )
EXISTING PIPE AT
CAP AND COVER
SEE NOTE 11
SEE NOTE 11
SEE NOTE 2
TYPICAL TOILET ELEVATION TYPICAL TOILET PLAN
SCALE: NOT TO SCALE SCALE: NOT TO SCALE
DISPENSER
TOILET PAPER
GRAB BARS
GRAB BARS DISPENSER
TOILET PAPER
TOILET
EXISTING
EXISTING
SPACE
60" TURNING
SPACE
60" TURNING
KITCHEN SINK.
14. CONTRACTOR WILL COORDINATE WITH PROJECT STAFF FOR ACCESS TO THE
THE EXTERIOR DOORS.
13. CONTRACTOR WILL HAVE ACCESS TO BOTH VISITOR BATHROOMS FROM
FEATURES WITHOUT GOVERNMENT APPROVAL.
12. NEW SINK DRAIN WILL NOT INTERFERE WITH ANY OF THE EXISTING UTILITY
11. CONTRACTOR SHALL INSTALL LOCKS ON BOTH VISTOR RESTROOM DOORS.
CAPPING PIPE BEHIND WALLS.
10. STRUCTURAL GLAZED TILES CAN BE REMOVED AND REUSED TO MAKE ROOM FOR
9. ALL ITEMS COLORED IN RED INDICATE NEW WORK TO BE DONE BY CONTRACTOR.
AFFILIATED WITH THE NEW PIPING INSTALL.
8. CONTRACTOR SHALL REPLACE ANY DAMAGED MATERIALS OR EQUIPMENT NOT
7. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND FIXTURE LOCATIONS.
WILL BE PRESENTED FOR RECEIVING TO THE CONTRACTING OFFICER.
6. ALL DECONSTRUCTED FIXTURES WILL BECOME GOVERNMENT PROPERTY AND
CAPPED BEHIND THE WALL AND COVERED TO MATCH EXISTING WALL.
5. ALL SUPPLY AND WASTE PIPES ASSOCIATED WITH REMOVED FIXTURES WILL BE
ADHERE TO SPECIFICATION 22-00-00.
SHOP CEILING AS SHOWN WILL CONNECT BACK TO THE MAIN SEWER LINE AND
4. NEW DRAIN PIPE CONNECTED TO KITCHEN SINK THAT PENETRATES THROUGH THE
ABA GUIDELINES.
3. TOILETS MUST BE IN ACCORDANCE WITH ARMY REG. 600-7 AND DOD
2. SINKS MUST BE IN ACCORDANCE WITH ARMY REG. 600-7 AND DOD ABA GUIDELINES.
INSTALLATION NOTES:
P
M-102 t
:0 d o n s e c rk \c e lr
18'-0"
3/4" PRESS. RELIEF
4" X 2-1/2" REDUCING FLANGE
FOUNTAIN
DRINKING
(BELL & GOSSETT )
3/4" PRESS. REDUCING
1-1/2" W. ALONG WALL
3/4" MAKE-UP
3/4" C.W.-3/4" H.W.
CONTINUATION, SEE DRAWING 3/15
5" O.D. WASTE LINE FOR
3" R.L
(SEE NOTE 2 )
SEWER PIPE
NEW 1-1/2" KITCHEN SINK
CAPPED AT FIRST UNION
EXISTING PIPE
( SEE NOTE 5 )
NEW P-TRAP
P-TRAP
SEE NOTE 4
8. ALL NEW CONTRACTOR WORK IS COLORED IN RED.
OR EXISTING MATERIALS OR EQUIPMENT.
AFFILIATED WITH THE NEW PIPING INSTALL AND SHALL MATCH THE ORIGINAL
7. CONTRACTOR SHALL REPLACE ANY DAMAGED MATERIALS OR EQUIPMENT NOT
FROM THE COR TO MEET FIELD CONDITION.
PIPE FITTINGS SHALL BE MADE BY THE CONTRACTOR WITH THE APPROVAL
PIPE LAYOUT IS A SCHEMATIC DIAGRAM. THE EXACT LAYOUT OF PIPE AND
6. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND PIPE LAYOUT.
5. NEW P-TRAP WILL CONNECT BETWEEN 1-1/2" AND 2" PIPE
4. NEW 2" SEWER PIPE SHALL BE HUNG USING NEW HANGERS.
SEWER PIPE EXCEPT WHERE NOTED.
3. NEW SEWER PIPE SHALL FOLLOW SAME LAYOUT AS DECONSTRUCTED
GRAVITY FED SEWER PIPE AS DESCRIBED IN SPECIFICATION 33-30-00.
2. NEW 1-1/2" SINK SEWER PIPE SHALL MEET REQUIREMENTS FOR
INSTALL NOTES:
P t
:2 d o n s e c rk \c e lr
-6
0 1"1" 2"
SCALE: 12''=1'-0'' M-601
IA
L.
2"
E.
3"
.D
ASHEYE
WASTE LINE RISER DIAGRAM
C.
O.
" W
D.
F.
" V
. C.
5"
HOW
ER
DRAI
S.
." W
D.F.
5" WASTE LINE
OM
EN
OM
.M
.M
EM
P.
.EM
P.
SEE
NOTE
SI
NK
SEE
NOTE
KI
TCHEN
SHOWN. SEE DRAWING M-102 FOR NEW LOCATION OF PEATRAP.
THROUGH NEW FLOOR PENETRATION WILL CONNECT AT JUNCTION
3. KITCHEN SINK PIPE SHALL BE CAPPED AT FIRST UNION. NEW PIPE
BY CONTRACTOR.
2. ALL PIPING COLORED IN GREEN SHALL BE REMOVED AND REPLACED
NOTES:
VISITORS LOBBY
FLOOR WALL CEILING BASEROOM
OPERATIONS ROOM
PASSAGE
STORAGE
WOMEN'S TOILET
MEN'S TOILET
JANITOR CLOSET
LOCKER ROOM-SHOWER
KITCHEN
COMPUTER ROOM
LOCKMASTER'S OFFICE
CONFERENCE ROOM
BASEMENT STAIR
EQUIPMENT ROOM
SHOP
STORAGE (TOOL)
PAINT, OIL STORAGE
TERRAZZO PLASTER ACOUSTICAL TILE
TERRAZZO ACOUSTICAL -
TERRAZZO ACOUSTICAL -
CONCRETE PLASTER PLASTER CONCRETE
TERRAZZO TILE PLASTER -
TERRAZZO PLASTER -TILE
TILE
PLASTER
CONCRETE
TERRAZZO
ACOUSTICAL
NONE
ROOM FINISH SCHEDULE
CHIEF, CIVIL DESIGN BRANCH
CHIEF, ENGR. CONST. DIVISION
OMPUTER
IDED
RAFTING
ESIGN &
12345
Graphic Scale
Drawn By:
Date:
Drawing
Number
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
NASHVILLE, TENNESSEE
Checked By:
Record Drawing as constructed dated
Approved By:
ENGINEER
Scale:
REV. DESCRIPTION DATE APPROVED
REVISIONS
BY
2'-9"1'-4"
1'-4" 22'-6" 12'-10" 1'-4" 29'-0" 1'-0" 15'-2" 1'-4"
38'-0" 46'-6"
4'-10""8 34'-09'-6""8
34'-0"4 123'-1
45'-6"
84'-6"
39'-0"
6'-7" 1'-4" 9'-3" 1'-4"
21'-0"
5'-0" 3'-8" 1'-4" 5'-4"
1'-4" 5'-11"
5'-0" 3'-0" 3'-0"2'-6" 2'-8" 2'-6" 5'-0" 4'-0"
3'-0"3'-0"
1" 2'-6"
BASEMENT VENT DETAIL
SCALE 1"=1'-0"
SCALE 3"=1'-0"
SECTION A
DOOR SCHEDULE
DESIGN LIVE LOADS:
FIRST FLOOR-125 OSF
STORAGE ROOM-250 PSF
BASEMENT FLOORS, MACHINERY ROOM AND SHOP-150 PSF
4" 8"
1'-4"1'-10"
TYPE LTYPE K
TYPE A TYPE B TYPE C TYPE D & E TYPE F TYPE G & H TYPE JTYPE I
TYPE OTYPE N
1'-4"
8"
TYPE M
12" 10'5'0
SECTION B-B
"=1'-0"4
3SCALE:
8'-6"
6'-0"
"8 14 9" "8
34'-8 "2 18 "8
34'-8 "8 55'-2 3'-4" 2'-5" 2'-10" "8
31'-4 "8 33'-4 "8
31'-4 2'-10"
39'-0"
58 "8
15'-5
14 9"
34'-8
15'-5
10'-1" "8
34'-8 "8
36'-7 "2 15'-2 "8
34'-0 "2 15'-2 "8
34'-0 "8 14'-10 "8
13'-1 "8
13'-1 "8
34'-0 4'-10"
84'-6"
46'-6"38'-0"
21'-6"
26'-0"
45'-6"
4'-10""8 34'-04'-6""8
34'-03'-4""2 11'-8"8
33'-46'-3""8 33'-4"2
16'-7
2'-10" 6"
4'-1"
1'-0" 14'-0" 6" 5'-0" 6" 9'-0" 9'-0" 8" 7'-0" 7'-0" 12'-0" 11'-6" 1'-0"6" 6" 6"
1'-0"24'-0"6"8'-6"6"12'-0"1'-0"
5'-6"6'-0"
4"4"X 8"
6"
"2 14"4
"4
13'-5
11'-0 "8
33'-4
3'-10"6"
5'-8"
1'-5" l i t
:2 e r e c x j d s k t o p r o j e c t s r la n
G.B.H.
R.H.T.
SEPTEMBER 1958 1/4"=1'-0"
1 11-21-58
12-27-612
6-27-863
C.W.B.
M.F.
ADDED DESIGN LIVE LOADS (AMEND. #4)
REVISED TO CONFORM WITH SHOP DRAWINGS
REVISED TO SHOW UPDATED AS CONSTRUCTED STATUS
EQUIPMENT ROOM
STORAGE (TOOL)
PAINT & OIL STORAGE
-4
DH
5-6
B B
GLASS
TINTED
PANEL
METAL
" THICK8
11 " THICK ALUMINUM8
-8
UP 20R.
OBSCURE
ALL DIMENSIONS SHOWN ARE OPENING SIZE
OTHERWISE NOTED
" THICK, UNLESS4
3ALL DOORS TO BE HOLLOW METAL, 1
D.N.
-9
-7TOILETH
-6H
-5
MEN'S TOILETPASSAGE
VISITORS LOBBY
PIPE SPACE
ROOM
COMPUTER
OFFICE
LOCKMASTERS
H H
DESK DESK
B H
LOCKER ROOM
CONTROL JOINT
CONCRETE WALK
8 A.M-4 P.M.
INFORMATION CENTER
RAMP TO DRIVE
TELEPHONE
PUBLIC
3" DIA. RAIN LEADER
FAN COIL UNIT
MOUNTED
FLOOR
CONCRETE WALK
LOCK WALL
FLOOR-MOUNTED
SEE DETAILS SHEET 4
METAL STOOL AND MULLION
EXPANSION JOINTEXPANSION JOINT
CABINET
FIRST AID
DISPLAY CABINET
SHELF
TRANSCRIBER
OPERATIONS ROOM
F.E.
OPEN
BOARD
BULLETIN
SWITCHBOARD
M.T. M.T.
EXPANSION JOINT
OVER
MIRROR
TOWEL HOLDER
PAPER
H.C. SINK
M.T.
HMETAL PARTITION
WOMEN'S TOILET
E.W.C. CABINET
KEY
BULLETIN
FOR DETAILS
SEE DWG. 70/5
6"X4" ANGLE
TILE CURB
LOCKERS
CAB.
CAB. F.E.
THRESHOLD
METAL METAL STOOL
FAN UNIT
METAL STOOL
STONE SILL
HANDRAIL
16"
3X2
1L4X3TERRAZZO FLOOR & BASE
"R 4
"R 4
WIRE MESH 10"X10"X10/10
MORTAR
LINE VENT WITH
6-B OR EQUAL.
CONSTRUCTION SPECIALTIES INC.
CONTROL, KEY TYPE OPERATOR.
VENT WITH EXTERIOR DAMPER
8"X16" ALUMINUM BRICK SIZE
THIS SIDE.
ROOM VENT FROM
AND ADJACENT STORAGE
PAINT & OIL STORAGE
LOCATION
PLAN FOR
SEE BASEMENT
CURRENT
DRILL PRESS
E.W.C.
WORK BENCH HAND PRESS WORK BENCHGRINDER
DRILL PRESS
WORK BENCHLOCKERS
LOCKERSSHELVES
SHELVES
WATER CHILLER
8"X16" VENT, SEE DETAIL
3" DIA. C.I. RAINLEADER
PUMP BASES
RELAY CABINET
LEADER STORAGE
STORAGE TANK
HYDRAULIC OIL
INDIVIDUAL DOGGED DOOR
26"X48" WATER-TIGHT
HEINTZ MFG CO. OR EQUAL
TRANSFORMER
PANEL
DISTRIBUTION
HOSE RACKS
MISC. EQUIPMENT HANGERS
LOCKERS
CONCRETE MASONRY UNIT
LOCK WALLSLAB LINE ABOVE
MON. JOINT
LOCKER
STRAPS-24" C.C.
"X0'-10" ANCHOR4
1SIDES. 2"X
" ANGLE FRAME, TOP AND2
14"X4"X
DOOR
OVERHEAD
CARRIER
PERSONNEL
PANEL BOX
TELEPHONE TERMINAL CABINET
LATHE
LOUVER
ONLY)
(LOCKSIDE
PLATE GLASS
CLEAR
METAL PANEL
DOOR "H"
LOUVER IN
DOOR "E" ONLY
LOUVER IN
SCREEN
OR EQUAL
KINNEAR, ROL-TOP STEEL DOOR
10'-0"x9'-0" OPENING SIZE, WEATHER STRIP
RUBBER
SCREEN
PLATE
CLEAR GLASSOBSCURE GL.
ALUMINUM PANEL
LUNCH ROOM
EMPLOYEE'S
DN. 20R.
THRESHOLD
METAL
OO
ROOM
CONFERENCE
9'-6" OPG.
FLOOR MOUNTED
JOINT
CONTROL
DRYER
HAND
HOT AIR
INTERCOM
H'D CAP DRINKING
BULLETIN THERMOMETER
EYE WASH
WH
J.D.H.2-17-214 CONVERTED TO CAD
Q9-70/2.4
PLANS AND DETAILS
OPERATION BUILDING
LOCK
BARKLEY DAM PROJECT
KENTUCKY AND TENNESSEE
CUMBERLAND RIVER
REFERENCE O
NLY
SECTION A-A
WASTE LINE RISER DIAGRAM
WATER SUPPLY RISER DIAGRAM
TYPICAL WATER CLOSET CONN.
EXHAUST FAN DETAIL
4"10"4"
9'-0"
A A
HOW
SEE DRAWING 3/15
5" WASTE LINE
NKKI
EYE
ASH
5"
LAV.W.C.
(COVERED)
S.S.T
3" F.D.3" F.D.
ROOF
THRU
" VENT2
FACING UNITS
STRUCTURAL GLAZED
FIN. FLOOR
CHAIR
2" VENT
CLOSET FITTING
HORIZONTAL WALL
(VENTED INSIDE)
1" C.W.-12
" V.4 1" W-12
SHOW
.H
DRI
NKI
NG
FOUNTAI
KI
NK
" C
. S
UPP
LY
" H
ATE
SUPP
LY
OTABLE
43 " H t e r e c x j d s k t o o j e c t s r n
1 12-28-61
6-27-862
REVISED TO CONFORM WITH SHOP DRAWINGS
REVISED TO SHOW UPDATED AS-CONSTRUCTED STATUS
C.W.B.
JRL
CEILING, GRILLE, & DAMPER
8" DIA. GRAVITY VENT
GRAB BARS
HANDICAP
" VENT2
2" V.
4" V. 2" V " V.4
" VENT4
(0 TO 100 PSI.)
HOSE CONNECTOR
PLUG-IN TYPE AIR
1" GATE VALVE
AIR HOSE CPLG.
1" QUICK-DISCONNECT
THRU WALL
1" AIR SUPPLY
PRESS. REGULATING
SUPPLY PRESSURE.)
WHEN USING FULL AIR
(MAY BE DISCONNECTED
FLEXIBLE HOSE
BUSHING
"4 11"X
" REDUCING FLANGE2
14"X2
" C.W.2
" PRESS. RELIEF4
(BELL & GOSSETT)
" PRESS. REDUCING4
EYE WASH & LAV.
" COPPER TO E.W.C.,4
CLEAN OUT
" PLUGGED TEE2
" C.W.2
CONTINUATION, SEE DRAWING 3/15
5" O.D. WASTE LINE FOR
VALVESTOP
AND
ASTE
PLUG
TO
POW
HOUSE
BIRD SCREEN
FLASHING
24" C.C.
14" BAR JOIST
CEILING REGISTER
CONCRETE CURB
ROOF
ACOUSTICAL CEILING
LOUVER
AUTOMATIC
" S.P.8
1LESS THAN 3000 C.F.M. @
SPEED MAX. HIGH SPEED NOT
FAN. 700 R.P.M.-4000 F.P.M. TIP
2-SPEED, BELT DRIVEN CENTRIFUGAL
" W. ALONG WALL2
" MAKE-UP4
" H.W.4 3" C.W.-4
G.B.H.
R.H.T.
SEPTEMBER 1958 1/2"=1'-0"
3 CONVERTED TO CAD 2-17-21 JDH
Q9-70/8.3
PLUMBING AND VENTILATING
FRAME TO TOP OF MANHOLE
TO MANHOLE WALL, AND COVER/
INLET/OUTLET PIPE CONNECTIONS
NOTE: GROUT R.C. PIPE JOINTS,
EXISTING CONTOUR LINE
EXISTING SANITARY SEWER
EXISTING STORM SEWER
EXISTING WATER & AIR LINES, AS NOTED
18"
DETAIL, THIS DRAWING
NOTE: SEE PIPE SUPPORT
8'-0" 6'-9" 21'-2"
20'-0"
2'-0"
" 1
5'-0"
21'-2"
20'-0"
" 1
5'-0"
6'-8"
21'-10"
7"
"3"
3"2'-0"
7"7"
5'-0"10'-4"
12"
4""2
9"
1'-0"
SEPTIC TANK OUTFALL
TYPICAL DETAIL
"=1'-0"2
1SCALE:
PLAN
CHLORINATION MANHOLE & SEPTIC TANK DETAIL
SECTION SCALE 1"=30'
SITE PLAN
SECTION B-B
SECTION A-A
1SCALE: 1
PIPE SUPPORT DETAIL
IE
6'-0" 5'-0" 4'-0"
ST
LEGEND
MACHINERY ROOM
W.H.
-C
.0
.0
C LOCKL
15" PERF.
.8
8" C.I.
Y18"
6" CLAY PIPE
ROCK FILL
TOP OF LOCK WALL, EL. 382.0
CABLE TRAYS
3" RAW WATER
2" AIR
3" POTABLE WATER 11
2" P.V.C.
CHLOR. LINE
SIDE BEAM BRACKET WITH SPLIT PIPE
RINGS (10'-0" CENTERS)
ANCHOR CHAIR AND 3" RAW
WATER LINE NOT SHOWN
ADJUSTABLE RING, FED. SPEC. WW-H-171C,
TYPE 7, GRINNELL FIG. 269, OR EQUAL (5'-0" CENTERS)
16" HOLES FOR ANCHOR BOLTS
ANCHOR CHAIR, FED. SPEC.
WW-H-171, TYPE 13
2" BLACK STEEL SCHEDULE
40 PIPE (AIR LINE)
3" POTABLE WATER
TOP OF PIPE EL. 370
LOCK WALL 6" C.I. PIPE
SEPTIC TANK
TO PIPE GALLERY
INDIVIDUAL DOGGED DOOR
26"X48" WATER-TIGHT
I, 2 #122
PANEL LC5
2" P.V.C. CHLORINE LINE
MAINTAIN EXISTING
INVERT ELEVATION
ECCENTRIC CONE (R.C.P.)
8"X6" CISP TEE
8" C.I.S.P.
REMOVE 6" C.I.P.
8" C.I.S.P. CROSS
R.C. PIPE
#6 BARS @ 12" O.C.
EL. 370
WATER SURFACE
REINFORCEMENT NOT SHOWN
8" C.I. PIPE
CHLORINATION MANHOLE
MANHOLE FRAME AND COVER, JOHN BOUCHARD
& SONS CO. NO.1210, OR EQUAL. (WATERTIGHT)
ACCESS M.H.
2" AIR 3" RAW WATER
3" GATE VALVE IN
POTABLE WATER LINE
SEPTIC TANK
CHLORINATION MANHOLE
2" PVC CHLORINE LINE
PARKING
CATCH BASIN
D.F.
THIS DRAWING
SEE TYP. DETAIL,
ACCESS M.H.
CABLE TRAYS
2" AIR
EL. 370.0
" PVC CHLORINE LINE2
C PIPE GALLERY
" CONDUIT TO SWITCH (1' ABOVE PVC PIPE)2
2" P.V.C. CHLORINE LINE
EXIST. 6" CLAY PIPE
C.I.P.)
(CUT. EXIST.
2" P.V.C. CHLORINE LINE,
SCHEDULE 80, THREADED
FITTINGS
MEDIUM WELDED STEEL BRACKET. FED.
SPEC. WW-H-171, TYPE 23
t e r e c x j d s k t o o j e c t s r n
E.P.D.
1/4"=1'-0"APRIL 1970
JTP
1 11-21-58
AS-CONSTRUCTED STATUS
REVISED TO SHOW UPDATED
CMC
Q9-70/14.2
SEWAGE CHLORINATION FACILITIES
2 CONVERTED TO CAD 02-17-21 JDH
Contract Drawings
Q9-BL-G-001
Q9-BL-G-002
Q9-BL-G-101
Q9-BL-MD-101
Q9-BL-MD-102
Q9-BL-M-101
Q9-BL-M-102
Q9-BL-M-601
Reference Drawings q9-70^2.4 q9-70^8.3 q9-70^14.2
File details come from the government source that posted it. Updated .