W38XDD80791023
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912P519B0009 for Operations and Maintenacne Services at Dale Hollow Lake is hereby amended as follow s:
A) The site visit roster and minutes are hereby attached and made a part of this solicitation.
B) Contractor Questions and Government Responses as of 31 January 2019 are hereby incorporated and made a part of this solicitation.
C) Bid Schedule Section 2 for the base and all subsequent option years is hereby amended.
D) Performance Work Statement Section C-4 Janitorial Services, Tables 4.3-A and 4.4-A are hereby amended.
E) Performance Work Statement Section C-10 System Monitoring and Testing, Section C Septic Tank Pumping is hereby amended.
F) Exhibits C and G are hereby amended per the Contractor Questions and Government Responses.
G) FAR 52.252-3-Alterations in Solicitation is hereby updated.
H) Due date for bids remains the same at 1:00 PM Local Time (Central Time) on 22 February 2019.
I) All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 110
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Feb-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P519B0009
X 9B. DATED (SEE ITEM 11)
22-Jan-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Feb-2019
CODE
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, RM A405
NASHVILLE TN 37203
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P519B0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
BID SCHEDULE
Dale Hollow Lake - Operation and Maintenance Services This is a Requirements Type Contract to furnish all necessary management, personnel, materials, supplies, tools, parts, equipment, and vehicles required to perform operations and maintenances services at Lake Barkley with options to extend the term of the contract.
Offerors are strongly encouraged to attend the site inspection meeting and tour as discussed in Section L.
BASE YEAR
SECTION 2 - Grass Mowing NTE Unit Item # Quant. Unit Price Total 0001 Administration Resource Area 20 Ea. $__________ $_____________ 0002 Butler's Landing 14 Ea. $__________ $_____________ 0003 Cove Creek Recreation Area 20 Ea. $__________ $_____________ 0004 Dale Hollow Dam Campground 20 Ea. $__________ $_____________ 0005 Dale Hollow Day Use 20 Ea. $__________ $_____________ 0006 Donaldson Park 20 Ea. $__________ $_____________ 0007 Lillydale Campground 18 Ea. $__________ $_____________ 0008 Lillydale Peninsula 18 Ea. $__________ $_____________ 0009 Lillydale Day Use 18 Ea. $__________ $_____________ 0010 Moody’s Access 14 Ea. $__________ $_____________ 0011 Obey River Campground 20 Ea. $__________ $_____________ 0012 Obey River Day Use 20 Ea. $__________ $_____________ 0013 Obey River Launching Area and Parking Lot 20 Ea. $__________ $_____________ 0014 Overlook, S.E. Dam and Dam Site, Powerhouse Compound 20 Ea. $__________ $_____________ 0015 Pleasant Grove Day Use 20 Ea. $__________ $_____________ 0016 Radio Tower Area 14 Ea. $__________ $_____________ 0017 Transient Quarters and Field 20 Ea. $__________ $_____________ 0018 Willow Grove Recreation Area 18 Ea. $__________ $_____________ 0019 Taylor's Ford 13 Ea. $__________ $_____________ 0020 Plankyard 13 Ea. $__________ $_____________
SECTION 2 - Subtotal $_____________
SECTION 3 - Cleaning Services - Recreational Facilities and Areas NTE Unit Item # Quant. Unit Price Total 0021 Amphitheaters 100 Ea. $__________ $_____________ 0022 Camp Sites 11,000 Ea. $__________ $_____________ 0023 Fish Cleaning Stations 175 Ea. $__________ $_____________
0024 Litter Removal 2,000 Ea. $__________ $_____________ 0025 Picnic Shelters 800 Ea. $__________ $_____________ 0026 Picnic Sites 3,500 Ea. $__________ $_____________ 0027 Restrooms/Washhouses 2,900 Ea. $__________ $_____________ 0028 Sanitary Dump Stations 210 Ea. $__________ $_____________
SECTION 3 - Subtotal $_____________
SECTION 4 - Janitorial Services NTE Unit Item # Quant. Unit Price Total 0029 Resource Office 12 Mo. $__________ $_____________ 0030 Contracting/Maintenance Compound 12 Mo. $__________ $_____________ 0031 Transient Quarters 45 Ea. $__________ $_____________ 0032 Power Plant 12 Mo. $__________ $_____________
SECTION 4 - Subtotal $_____________
SECTION 5- Facility Repair, Maintenance, and Other Non-Routine Work These items should include operators when applicable. NTE Unit Item # Quant. Unit Price Total Note: Item # 0033 - 0073: Bid should be based on Davis Bacon Wage Act Wage Rates 0033 Carpenter 250 Hr. $__________ $_____________ 0034 Concrete Finisher 200 Hr. $__________ $_____________ 0035 Electrician 300 Hr. $__________ $_____________ 0036 Equipment Operator 40 Hr. $__________ $_____________ 0037 Laborer 2,000 Hr. $__________ $_____________ 0038 Mason (Rock/Brick/Block) 200 Hr. $__________ $_____________ 0039 Painter 200 Hr. $__________ $_____________ 0040 Plumber 300 Hr. $__________ $_____________ 0041 Truck Driver 60 Hr. $__________ $_____________ 0042 Air Compressor (equiv. Joy 175)* 20 Hr. $__________ $_____________ 0043 Backhoe (80-100 HP)* 300 Hr. $__________ $_____________ 0044 Brush Clipper 12' Intake* 50 Hr. $__________ $_____________ 0045 Cement Mixer (Portable 1/4 yd) 30 Hr. $__________ $_____________ 0046 Chain Saw (HL XL 16" equiv.)* 100 Hr. $__________ $_____________ 0047 Concrete/Pavement Saw 12" * 60 Hr. $__________ $_____________ 0048 Crane, Truck Mounted 4 Ton Capacity * 20 Hr. $__________ $_____________ 0049 Dozer (equiv. D3) * 100 Hr. $__________ $_____________ 0050 Dozer (equiv. D6) * 60 Hr. $__________ $_____________ 0051 Drum Roller, Vibratory (6-8 Ton) * 40 Hr. $__________ $_____________ 0052 Generator, (3500 w min. portable) 20 Hr. $__________ $_____________ 0053 Hoe Ram (4-6") * 40 Hr. $__________ $_____________ 0054 Pavement Sweeper with Vacuum 20 Hr. $__________ $_____________ 0055 Personnel Lift (Bucket Truck) 40' Minimum * 40 Hr. $__________ $_____________ 0056 Pressure Washer 3600 PSI * 40 Hr. $__________ $_____________ 0057 Pump 2" Portable 20 Hr. $__________ $_____________ 0058 Skid Steer Loader (30-60 HP) * 300 Hr. $__________ $_____________ 0059 Staw Blower* 40 Hr. $__________ $_____________ 0060 Track Loader 20 Hr. $__________ $_____________ 0061 Trackhoe (equiv. Case CX 160B, 120 hp 1/2 yd bucket* 80 Hr. $__________ $_____________
0062 Trackhoe (equiv. Case CX 50B, 41 hp) 24" bucket* 150 Hr. $__________ $_____________ 0063 Tractor with attachments 20 Hr. $__________ $_____________ 0064 Trailer, Equipment (12 TN) 60 Hr. $__________ $_____________ 0065 Trailer, flatbed, 12 ton 60 Hr. $__________ $_____________ 0066 Trailer, utility 16-20' 100 Hr. $__________ $_____________ 0067 Trencher w/Rock Saw Attachment* 50 Hr. $__________ $_____________ 0068 Trencher (Rockwell V120 equivalent)* 100 Hr. $__________ $_____________ 0069 Truck Boom* 20 Hr. $__________ $_____________ 0070 Truck, Dump (22 TN)* 100 Hr. $__________ $_____________ 0071 Truck, Light (under 1 ton)* 100 Hr. $__________ $_____________ 0072 Vibrator (Compactor Plate) 24"* 50 Hr. $__________ $_____________ 0073 Welder, Portable (equiv. Lincoln K1292)* 20 Hr. $__________ $_____________
Note: Item # 0074 - 0095: Bid should be based on Service Contract Act Wage Rates 0074 Emergency Work 10 Hr. $__________ $_____________ 0075 Carpenter, Maintenance 100 Hr. $__________ $_____________ 0076 Chainsaw, gas, minimal 40cc w/16" bar* 300 Hr. $__________ $_____________ 0077 Electrician, Maintenance 100 Hr. $__________ $_____________ 0078 General Maintenance Worker 200 Hr. $__________ $_____________ 0079 Heavy Equipment /Truck Operator 20 Hr. $__________ $_____________ 0080 Concrete Finisher 50 Hr. $__________ $_____________ 0081 Laborer 2,000 Hr. $__________ $_____________ 0082 Painter, Maintenance 200 Hr. $__________ $_____________ 0083 Plumber, Maintenance 200 Hr. $__________ $_____________ 0084 Welder, Combination, Maintenance* 20 Hr. $__________ $_____________ 0085 Backhoe/Loader (> 70 HP)* 400 Hr. $__________ $_____________ 0086 Chipper, Brush > 100 HP & 12"* 300 Hr. $__________ $_____________ 0087 Dozer, 65-95 HP* 100 Hr. $__________ $_____________ 0088 Excavator, Mini Trackhoe < 75 HP* 150 Hr. $__________ $_____________ 0089 Grinder, Stump < 50 HP* 75 Hr. $__________ $_____________ 0090 Personnel Lift, Towed, scissor, bucket* 100 Hr. $__________ $_____________ 0091 Skid Loader * 250 Hr. $__________ $_____________ 0092 Trencher, 5 ft. Depth* 40 Hr. $__________ $_____________ 0093 Truck, dump (14 ton cap.) * 150 Hr. $__________ $_____________ 0094 Truck, pick-up, 1/2 ton* 200 Hr. $__________ $_____________ 0095 Tractor w/attachments (40-60 HP) 60 Hr. $__________ $_____________
SECTION 5 - Subtotal $_____________
SECTION 6 - Cleaning Services at Primitive Sites
Item # Quant. Unit Price Total 0096 Primitive Area Litter Removal and Cleaning 480 Ea. $__________ $_____________
SECTION 6 - Subtotal $_____________
SECTION 7 - Herbicide Application
Item # Quant. Unit Price Total 0097 Herbicide Application 24,000 SY $__________ $_____________
SECTION 7 - Subtotal $_____________
SECTION 8 - Dumpster Collection Service
Item # Quant. Unit Price Total 0098 Dumpsters 900 Ea. $__________ $_____________
SECTION 8 - Subtotal $_____________
SECTION 9- Marking and Painting Boundary Lines
Item # Quant. Unit Price Total 0099 Mark and Paint Boundary Line 80 Mi. $__________ $_____________
SECTION 9 - Subtotal $_____________
SECTION 10- System Monitoring and Testing
Item # Quant. Unit Price Total 0100 Beach Water Samples 40 Ea. $__________ $_____________ 0101 Monitor No Flow/Closed Filters 12 Ea. $__________ $_____________ 0102 Operate Sand Filter w/Lab Test 400 Ea. $__________ $_____________ 0103 Septic Tank Pumping 30,000 Gal. $__________ $_____________ 0104 Pit Toilet Pumping (Primitive Sites) 50 Ea. $__________ $_____________
SECTION 10 - Subtotal $_____________
SECTION 11 - Beach and Playground Maintenance NTE Unit Item # Quant. Unit Price Total 0105 Routine Beach Maintenance 88 Ea. $__________ $_____________ 0106 Routine Playground Maintenance 225 Ea. $__________ $_____________
SECTION 11 - Subtotal $_____________
SECTION 12 - Pavement Striping and Sealing NTE Unit Item # Quant. Unit Price Total 0107 Pavement Striping (include layout) 50,000 LF $__________ $_____________ 0108 Pavement Sealing 50,000 SY $__________ $_____________
SECTION 12 - Subtotal $_____________
SECTION 13 - Maintenance of Navigation Aids NTE Unit Item # Quant. Unit Price Total 0109 Buoy Setting, Replacing, Relocation and Disposal (all buoys with the exception of the "Danger Dam" buoys.) 40 Ea. $__________ $_____________ 0110 Buoy Setting ("Danger Dam") Replacing, Relocation and Disposal 5 Ea. $__________ $_____________
SECTION 13 - Subtotal $_____________
SUMMARY OF BID SCHEDULE BASE YEAR
C-2 Mowing $_____________ C-3 Cleaning Services - Recreational Facilities and Areas $_____________ C-4 Janitorial Services $_____________ C-5 Facility Repair, Maintenance, and other Non-Routine Work $_____________ C-6 Cleaning Services at Primitive Sites $_____________ C-7 Herbicide Application $_____________ C-8 Dumpster Collection $_____________ C-9 Marking and Painting Boundary Lines $_____________ C-10 System Monitoring and Testing $_____________ C-11 Beach and Playground Maintenance $_____________ C-12 Pavement Striping and Sealing $_____________ C-13 Maintenance of Navigation Aids $_____________ Base Year - Grand Total $_____________
Option Year 1 - Bid Schedule
SECTION 2 - Grass Mowing NTE Unit Item # Quant. Unit Price Total 1001 Administration Resource Area 20 Ea. $__________ $_____________ 1002 Butler's Landing 14 Ea. $__________ $_____________ 1003 Cove Creek Recreation Area 20 Ea. $__________ $_____________ 1004 Dale Hollow Dam Campground 20 Ea. $__________ $_____________ 1005 Dale Hollow Day Use 20 Ea. $__________ $_____________ 1006 Donaldson Park 20 Ea. $__________ $_____________ 1007 Lillydale Campground 18 Ea. $__________ $_____________ 1008 Lillydale Peninsula 18 Ea. $__________ $_____________ 1009 Lillydale Day Use 18 Ea. $__________ $_____________ 1010 Moody’s Access 14 Ea. $__________ $_____________ 1011 Obey River Campground 20 Ea. $__________ $_____________ 1012 Obey River Day Use 20 Ea. $__________ $_____________ 1013 Obey River Launching Area and Parking Lot 20 Ea. $__________ $_____________ 1014 Overlook, S.E. Dam and Dam Site, Powerhouse Compound 20 Ea. $__________ $_____________ 1015 Pleasant Grove Day Use 20 Ea. $__________ $_____________ 1016 Radio Tower Area 14 Ea. $__________ $_____________ 1017 Transient Quarters and Field 20 Ea. $__________ $_____________ 1018 Willow Grove Recreation Area 18 Ea. $__________ $_____________ 1019 Taylor's Ford 13 Ea. $__________ $_____________ 1020 Plankyard 13 Ea. $__________ $_____________
SECTION 2 - Subtotal $_____________
SECTION 3 - Cleaning Services - Recreational Facilities and Areas NTE Unit Item # Quant. Unit Price Total 1021 Amphitheaters 100 Ea. $__________ $_____________ 1022 Camp Sites 11,000 Ea. $__________ $_____________ 1023 Fish Cleaning Stations 175 Ea. $__________ $_____________ 1024 Litter Removal 2,000 Ea. $__________ $_____________
1025 Picnic Shelters 800 Ea. $__________ $_____________ 1026 Picnic Sites 3,500 Ea. $__________ $_____________ 1027 Restrooms/Washhouses 2,900 Ea. $__________ $_____________ 1028 Sanitary Dump Stations 210 Ea. $__________ $_____________
Item # Quant. Unit Price Total 1029 Resource Office 12 Mo. $__________ $_____________ 1030 Contracting/Maintenance Compound 12 Mo. $__________ $_____________ 1031 Transient Quarters 45 Ea. $__________ $_____________ 1032 Power Plant 12 Mo. $__________ $_____________
Item # Quant. Unit Price Total Note: Item # 1033 - 1073: Bid should be based on Davis Bacon Wage Act Wage Rates 1033 Carpenter 250 Hr. $__________ $_____________ 1034 Concrete Finisher 200 Hr. $__________ $_____________ 1035 Electrician 300 Hr. $__________ $_____________ 1036 Equipment Operator 40 Hr. $__________ $_____________ 1037 Laborer 2,000 Hr. $__________ $_____________ 1038 Mason (Rock/Brick/Block) 200 Hr. $__________ $_____________ 1039 Painter 200 Hr. $__________ $_____________ 1040 Plumber 300 Hr. $__________ $_____________ 1041 Truck Driver 60 Hr. $__________ $_____________ 1042 Air Compressor (equiv. Joy 175)* 20 Hr. $__________ $_____________ 1043 Backhoe (80-100 HP)* 300 Hr. $__________ $_____________ 1044 Brush Clipper 12' Intake* 50 Hr. $__________ $_____________ 1045 Cement Mixer (Portable 1/4 yd) 30 Hr. $__________ $_____________ 1046 Chain Saw (HL XL 16" equiv.)* 100 Hr. $__________ $_____________ 1047 Concrete/Pavement Saw 12" * 60 Hr. $__________ $_____________ 1048 Crane, Truck Mounted 4 Ton Capacity * 20 Hr. $__________ $_____________ 1049 Dozer (equiv. D3) * 100 Hr. $__________ $_____________ 1050 Dozer (equiv. D6) * 60 Hr. $__________ $_____________ 1051 Drum Roller, Vibratory (6-8 Ton) * 40 Hr. $__________ $_____________ 1052 Generator, (3500 w min. portable) 20 Hr. $__________ $_____________ 1053 Hoe Ram (4-6") * 40 Hr. $__________ $_____________ 1054 Pavement Sweeper with Vacuum 20 Hr. $__________ $_____________ 1055 Personnel Lift (Bucket Truck) 40' Minimum * 40 Hr. $__________ $_____________ 1056 Pressure Washer 3600 PSI * 40 Hr. $__________ $_____________ 1057 Pump 2" Portable 20 Hr. $__________ $_____________ 1058 Skid Steer Loader (30-60 HP) * 300 Hr. $__________ $_____________ 1059 Staw Blower* 40 Hr. $__________ $_____________ 1060 Track Loader 20 Hr. $__________ $_____________ 1061 Trackhoe (equiv. Case CX 160B, 120 hp 1/2 yd bucket* 80 Hr. $__________ $_____________ 1062 Trackhoe (equiv. Case CX 50B, 41 hp)
24" bucket* 150 Hr. $__________ $_____________ 1063 Tractor with attachments 20 Hr. $__________ $_____________ 1064 Trailer, Equipment (12 TN) 60 Hr. $__________ $_____________ 1065 Trailer, flatbed, 12 ton 60 Hr. $__________ $_____________ 1066 Trailer, utility 16-20' 100 Hr. $__________ $_____________ 1067 Trencher w/Rock Saw Attachment* 50 Hr. $__________ $_____________ 1068 Trencher (Rockwell V120 equivalent)* 100 Hr. $__________ $_____________ 1069 Truck Boom* 20 Hr. $__________ $_____________ 1070 Truck, Dump (22 TN)* 100 Hr. $__________ $_____________ 1071 Truck, Light (under 1 ton)* 100 Hr. $__________ $_____________ 1072 Vibrator (Compactor Plate) 24"* 50 Hr. $__________ $_____________ 1073 Welder, Portable (equiv. Lincoln K1292)* 20 Hr. $__________ $_____________
Note: Item # 1074 - 1095: Bid should be based on Service Contract Act Wage Rates 1074 Emergency Work 10 Hr. $__________ $_____________ 1075 Carpenter, Maintenance 100 Hr. $__________ $_____________ 1076 Chainsaw, gas, minimal 40cc w/16" bar* 300 Hr. $__________ $_____________ 1077 Electrician, Maintenance 100 Hr. $__________ $_____________ 1078 General Maintenance Worker 200 Hr. $__________ $_____________ 1079 Heavy Equipment /Truck Operator 20 Hr. $__________ $_____________ 1080 Concrete Finisher 50 Hr. $__________ $_____________ 1081 Laborer 2,000 Hr. $__________ $_____________ 1082 Painter, Maintenance 200 Hr. $__________ $_____________ 1083 Plumber, Maintenance 200 Hr. $__________ $_____________ 1084 Welder, Combination, Maintenance* 20 Hr. $__________ $_____________ 1085 Backhoe/Loader (> 70 HP)* 400 Hr. $__________ $_____________ 1086 Chipper, Brush > 100 HP & 12"* 300 Hr. $__________ $_____________ 1087 Dozer, 65-95 HP* 100 Hr. $__________ $_____________ 1088 Excavator, Mini Trackhoe < 75 HP* 150 Hr. $__________ $_____________ 1089 Grinder, Stump < 50 HP* 75 Hr. $__________ $_____________ 1090 Personnel Lift, Towed, scissor, bucket* 100 Hr. $__________ $_____________ 1091 Skid Loader * 250 Hr. $__________ $_____________ 1092 Trencher, 5 ft. Depth* 40 Hr. $__________ $_____________ 1093 Truck, dump (14 ton cap.) * 150 Hr. $__________ $_____________ 1094 Truck, pick-up, 1/2 ton* 200 Hr. $__________ $_____________ 1095 Tractor w/attachments (40-60 HP) 60 Hr. $__________ $_____________
Item # Quant. Unit Price Total 1096 Primitive Area Litter Removal and Cleaning 480 Ea. $__________ $_____________
Item # Quant. Unit Price Total 1097 Herbicide Application 24,000 SY $__________ $_____________
Item # Quant. Unit Price Total 1098 Dumpsters 900 Ea. $__________ $_____________
Item # Quant. Unit Price Total 1099 Mark and Paint Boundary Line 80 Mi. $__________ $_____________
Item # Quant. Unit Price Total 1100 Beach Water Samples 40 Ea. $__________ $_____________ 1101 Monitor No Flow/Closed Filters 12 Ea. $__________ $_____________ 1102 Operate Sand Filter w/Lab Test 400 Ea. $__________ $_____________ 1103 Septic Tank Pumping 30,000 Gal. $__________ $_____________ 1104 Pit Toilet Pumping (Primitive Sites) 50 Ea. $__________ $_____________
SECTION 10 - Subtotal $_____________
SECTION 11 - Beach and Playground Maintenance NTE Unit Item # Quant. Unit Price Total 1105 Routine Beach Maintenance 88 Ea. $__________ $_____________ 1106 Routine Playground Maintenance 225 Ea. $__________ $_____________
SECTION 11 - Subtotal $_____________
SECTION 12 - Pavement Striping and Sealing NTE Unit Item # Quant. Unit Price Total 1107 Pavement Striping (include layout) 50,000 LF $__________ $_____________ 1108 Pavement Sealing 50,000 SY $__________ $_____________
SECTION 12 - Subtotal $_____________
SECTION 13 - Maintenance of Navigation Aids NTE Unit Item # Quant. Unit Price Total 1109 Buoy Setting, Replacing, Relocation and Disposal (all buoys with the exception of the "Danger Dam" buoys.) 40 Ea. $__________ $_____________ 1110 Buoy Setting ("Danger Dam")
SUMMARY OF BID SCHEDULE OPTION YEAR 1
C-2 Mowing $_____________ C-3 Cleaning Services - Recreational Facilities and Areas $_____________ C-4 Janitorial Services $_____________ C-5 Facility Repair, Maintenance, and other Non-Routine Work $_____________ C-6 Cleaning Services at Primitive Sites $_____________ C-7 Herbicide Application $_____________ C-8 Dumpster Collection $_____________ C-9 Marking and Painting Boundary Lines $_____________ C-10 System Monitoring and Testing $_____________ C-11 Beach and Playground Maintenance $_____________ C-12 Pavement Striping and Sealing $_____________ C-13 Maintenance of Navigation Aids $_____________ Option Year 1 - Grand Total $_____________
Option Year 2 - Bid Schedule
SECTION 2 - Grass Mowing NTE Unit Item # Quant. Unit Price Total 2001 Administration Resource Area 20 Ea. $__________ $_____________ 2002 Butler's Landing 14 Ea. $__________ $_____________ 2003 Cove Creek Recreation Area 20 Ea. $__________ $_____________ 2004 Dale Hollow Dam Campground 20 Ea. $__________ $_____________ 2005 Dale Hollow Day Use 20 Ea. $__________ $_____________ 2006 Donaldson Park 20 Ea. $__________ $_____________ 2007 Lillydale Campground 18 Ea. $__________ $_____________ 2008 Lillydale Peninsula 18 Ea. $__________ $_____________ 2009 Lillydale Day Use 18 Ea. $__________ $_____________ 2010 Moody’s Access 14 Ea. $__________ $_____________ 2011 Obey River Campground 20 Ea. $__________ $_____________ 2012 Obey River Day Use 20 Ea. $__________ $_____________ 2013 Obey River Launching Area and Parking Lot 20 Ea. $__________ $_____________ 2014 Overlook, S.E. Dam and Dam Site, Powerhouse Compound 20 Ea. $__________ $_____________ 2015 Pleasant Grove Day Use 20 Ea. $__________ $_____________ 2016 Radio Tower Area 14 Ea. $__________ $_____________ 2017 Transient Quarters and Field 20 Ea. $__________ $_____________ 2018 Willow Grove Recreation Area 18 Ea. $__________ $_____________ 2019 Taylor's Ford 13 Ea. $__________ $_____________ 2020 Plankyard 13 Ea. $__________ $_____________
SECTION 2 - Subtotal $_____________
SECTION 3 - Cleaning Services - Recreational Facilities and Areas NTE Unit Item # Quant. Unit Price Total 2021 Amphitheaters 100 Ea. $__________ $_____________ 2022 Camp Sites 11,000 Ea. $__________ $_____________ 2023 Fish Cleaning Stations 175 Ea. $__________ $_____________ 2024 Litter Removal 2,000 Ea. $__________ $_____________ 2025 Picnic Shelters 800 Ea. $__________ $_____________
2026 Picnic Sites 3,500 Ea. $__________ $_____________ 2027 Restrooms/Washhouses 2,900 Ea. $__________ $_____________ 2028 Sanitary Dump Stations 210 Ea. $__________ $_____________
Item # Quant. Unit Price Total 2029 Resource Office 12 Mo. $__________ $_____________ 2030 Contracting/Maintenance Compound 12 Mo. $__________ $_____________ 2031 Transient Quarters 45 Ea. $__________ $_____________ 2032 Power Plant 12 Mo. $__________ $_____________
Item # Quant. Unit Price Total Note: Item # 2033 - 2073: Bid should be based on Davis Bacon Wage Act Wage Rates 2033 Carpenter 250 Hr. $__________ $_____________ 2034 Concrete Finisher 200 Hr. $__________ $_____________ 2035 Electrician 300 Hr. $__________ $_____________ 2036 Equipment Operator 40 Hr. $__________ $_____________ 2037 Laborer 2,000 Hr. $__________ $_____________ 2038 Mason (Rock/Brick/Block) 200 Hr. $__________ $_____________ 2039 Painter 200 Hr. $__________ $_____________ 2040 Plumber 300 Hr. $__________ $_____________ 2041 Truck Driver 60 Hr. $__________ $_____________ 2042 Air Compressor (equiv. Joy 175)* 20 Hr. $__________ $_____________ 2043 Backhoe (80-100 HP)* 300 Hr. $__________ $_____________ 2044 Brush Clipper 12' Intake* 50 Hr. $__________ $_____________ 2045 Cement Mixer (Portable 1/4 yd) 30 Hr. $__________ $_____________ 2046 Chain Saw (HL XL 16" equiv.)* 100 Hr. $__________ $_____________ 2047 Concrete/Pavement Saw 12" * 60 Hr. $__________ $_____________ 2048 Crane, Truck Mounted 4 Ton Capacity * 20 Hr. $__________ $_____________ 2049 Dozer (equiv. D3) * 100 Hr. $__________ $_____________ 2050 Dozer (equiv. D6) * 60 Hr. $__________ $_____________ 2051 Drum Roller, Vibratory (6-8 Ton) * 40 Hr. $__________ $_____________ 2052 Generator, (3500 w min. portable) 20 Hr. $__________ $_____________ 2053 Hoe Ram (4-6") * 40 Hr. $__________ $_____________ 2054 Pavement Sweeper with Vacuum 20 Hr. $__________ $_____________ 2055 Personnel Lift (Bucket Truck) 40' Minimum * 40 Hr. $__________ $_____________ 2056 Pressure Washer 3600 PSI * 40 Hr. $__________ $_____________ 2057 Pump 2" Portable 20 Hr. $__________ $_____________ 2058 Skid Steer Loader (30-60 HP) * 300 Hr. $__________ $_____________ 2059 Staw Blower* 40 Hr. $__________ $_____________ 2060 Track Loader 20 Hr. $__________ $_____________ 2061 Trackhoe (equiv. Case CX 160B, 120 hp 1/2 yd bucket* 80 Hr. $__________ $_____________ 2062 Trackhoe (equiv. Case CX 50B, 2063 Tractor with attachments 20 Hr. $__________ $_____________ 2064 Trailer, Equipment (12 TN) 60 Hr. $__________ $_____________ 2065 Trailer, flatbed, 12 ton 60 Hr. $__________ $_____________ 2066 Trailer, utility 16-20' 100 Hr. $__________ $_____________ 2067 Trencher w/Rock Saw Attachment* 50 Hr. $__________ $_____________ 2068 Trencher (Rockwell V120 equivalent)* 100 Hr. $__________ $_____________ 2069 Truck Boom* 20 Hr. $__________ $_____________ 2070 Truck, Dump (22 TN)* 100 Hr. $__________ $_____________ 2071 Truck, Light (under 1 ton)* 100 Hr. $__________ $_____________ 2072 Vibrator (Compactor Plate) 24"* 50 Hr. $__________ $_____________ 2073 Welder, Portable (equiv. Lincoln K1292)* 20 Hr. $__________ $_____________
Note: Item # 2074 - 2095: Bid should be based on Service Contract Act Wage Rates 2074 Emergency Work 10 Hr. $__________ $_____________ 2075 Carpenter, Maintenance 100 Hr. $__________ $_____________ 2076 Chainsaw, gas, minimal 40cc w/16" bar* 300 Hr. $__________ $_____________ 2077 Electrician, Maintenance 100 Hr. $__________ $_____________ 2078 General Maintenance Worker 200 Hr. $__________ $_____________ 2079 Heavy Equipment /Truck Operator 20 Hr. $__________ $_____________ 2080 Concrete Finisher 50 Hr. $__________ $_____________ 2081 Laborer 2,000 Hr. $__________ $_____________ 2082 Painter, Maintenance 200 Hr. $__________ $_____________ 2083 Plumber, Maintenance 200 Hr. $__________ $_____________ 2084 Welder, Combination, Maintenance* 20 Hr. $__________ $_____________ 2085 Backhoe/Loader (> 70 HP)* 400 Hr. $__________ $_____________ 2086 Chipper, Brush > 100 HP & 12"* 300 Hr. $__________ $_____________ 2087 Dozer, 65-95 HP* 100 Hr. $__________ $_____________ 2088 Excavator, Mini Trackhoe < 75 HP* 150 Hr. $__________ $_____________ 2089 Grinder, Stump < 50 HP* 75 Hr. $__________ $_____________ 2090 Personnel Lift, Towed, scissor, bucket* 100 Hr. $__________ $_____________ 2091 Skid Loader * 250 Hr. $__________ $_____________ 2092 Trencher, 5 ft. Depth* 40 Hr. $__________ $_____________ 2093 Truck, dump (14 ton cap.) * 150 Hr. $__________ $_____________ 2094 Truck, pick-up, 1/2 ton* 200 Hr. $__________ $_____________ 2095 Tractor w/attachments (40-60 HP) 60 Hr. $__________ $_____________
Item # Quant. Unit Price Total 2096 Primitive Area Litter Removal and Cleaning 480 Ea. $__________ $_____________
Item # Quant. Unit Price Total 2097 Herbicide Application 24,000 SY $__________ $_____________
Item # Quant. Unit Price Total 2098 Dumpsters 900 Ea. $__________ $_____________
Item # Quant. Unit Price Total 2099 Mark and Paint Boundary Line 80 Mi. $__________ $_____________
Item # Quant. Unit Price Total 2100 Beach Water Samples 40 Ea. $__________ $_____________ 2101 Monitor No Flow/Closed Filters 12 Ea. $__________ $_____________ 2102 Operate Sand Filter w/Lab Test 400 Ea. $__________ $_____________ 2103 Septic Tank Pumping 30,000 Gal. $__________ $_____________ 2104 Pit Toilet Pumping (Primitive Sites) 50 Ea. $__________ $_____________
SECTION 10 - Subtotal $_____________
SECTION 11 - Beach and Playground Maintenance NTE Unit Item # Quant. Unit Price Total 2105 Routine Beach Maintenance 88 Ea. $__________ $_____________ 2106 Routine Playground Maintenance 225 Ea. $__________ $_____________
SECTION 11 - Subtotal $_____________
SECTION 12 - Pavement Striping and Sealing NTE Unit Item # Quant. Unit Price Total 2107 Pavement Striping (include layout) 50,000 LF $__________ $_____________ 2108 Pavement Sealing 50,000 SY $__________ $_____________
SECTION 12 - Subtotal $_____________
SECTION 13 - Maintenance of Navigation Aids NTE Unit Item # Quant. Unit Price Total 2109 Buoy Setting, Replacing, Relocation and Disposal (all buoys with the exception of the "Danger Dam" buoys.) 40 Ea. $__________ $_____________ 2110 Buoy Setting ("Danger Dam")
SUMMARY OF BID SCHEDULE OPTION YEAR 2
C-2 Mowing $_____________ C-3 Cleaning Services - Recreational Facilities and Areas $_____________ C-4 Janitorial Services $_____________ C-5 Facility Repair, Maintenance, and other Non-Routine Work $_____________ C-6 Cleaning Services at Primitive Sites $_____________ C-7 Herbicide Application $_____________ C-8 Dumpster Collection $_____________ C-9 Marking and Painting Boundary Lines $_____________ C-10 System Monitoring and Testing $_____________ C-11 Beach and Playground Maintenance $_____________ C-12 Pavement Striping and Sealing $_____________ C-13 Maintenance of Navigation Aids $_____________ Option Year 2 - Grand Total $_____________
Option Year 3 - Bid Schedule
SECTION 2 - Grass Mowing NTE Unit Item # Quant. Unit Price Total 3001 Administration Resource Area 20 Ea. $__________ $_____________ 3002 Butler's Landing 14 Ea. $__________ $_____________ 3003 Cove Creek Recreation Area 20 Ea. $__________ $_____________ 3004 Dale Hollow Dam Campground 20 Ea. $__________ $_____________ 3005 Dale Hollow Day Use 20 Ea. $__________ $_____________ 3006 Donaldson Park 20 Ea. $__________ $_____________ 3007 Lillydale Campground 18 Ea. $__________ $_____________ 3008 Lillydale Peninsula 18 Ea. $__________ $_____________ 3009 Lillydale Day Use 18 Ea. $__________ $_____________ 3010 Moody’s Access 14 Ea. $__________ $_____________ 3011 Obey River Campground 20 Ea. $__________ $_____________ 3012 Obey River Day Use 20 Ea. $__________ $_____________ 3013 Obey River Launching Area and Parking Lot 20 Ea. $__________ $_____________ 3014 Overlook, S.E. Dam and Dam Site, Powerhouse Compound 20 Ea. $__________ $_____________ 3015 Pleasant Grove Day Use 20 Ea. $__________ $_____________ 3016 Radio Tower Area 14 Ea. $__________ $_____________ 3017 Transient Quarters and Field 20 Ea. $__________ $_____________ 3018 Willow Grove Recreation Area 18 Ea. $__________ $_____________ 3019 Taylor's Ford 13 Ea. $__________ $_____________ 3020 Plankyard 13 Ea. $__________ $_____________
SECTION 2 - Subtotal $_____________
SECTION 3 - Cleaning Services - Recreational Facilities and Areas NTE Unit Item # Quant. Unit Price Total 3021 Amphitheaters 100 Ea. $__________ $_____________ 3022 Camp Sites 11,000 Ea. $__________ $_____________ 3023 Fish Cleaning Stations 175 Ea. $__________ $_____________ 3024 Litter Removal 2,000 Ea. $__________ $_____________ 3025 Picnic Shelters 800 Ea. $__________ $_____________ 3026 Picnic Sites 3,500 Ea. $__________ $_____________
3027 Restrooms/Washhouses 2,900 Ea. $__________ $_____________ 3028 Sanitary Dump Stations 210 Ea. $__________ $_____________
Item # Quant. Unit Price Total 3029 Resource Office 12 Mo. $__________ $_____________ 3030 Contracting/Maintenance Compound 12 Mo. $__________ $_____________ 3031 Transient Quarters 45 Ea. $__________ $_____________ 3032 Power Plant 12 Mo. $__________ $_____________
Item # Quant. Unit Price Total Note: Item # 3033 - 3073: Bid should be based on Davis Bacon Wage Act Wage Rates 3033 Carpenter 250 Hr. $__________ $_____________ 3034 Concrete Finisher 200 Hr. $__________ $_____________ 3035 Electrician 300 Hr. $__________ $_____________ 3036 Equipment Operator 40 Hr. $__________ $_____________ 3037 Laborer 2,000 Hr. $__________ $_____________ 3038 Mason (Rock/Brick/Block) 200 Hr. $__________ $_____________ 3039 Painter 200 Hr. $__________ $_____________ 3040 Plumber 300 Hr. $__________ $_____________ 3041 Truck Driver 60 Hr. $__________ $_____________ 3042 Air Compressor (equiv. Joy 175)* 20 Hr. $__________ $_____________ 3043 Backhoe (80-100 HP)* 300 Hr. $__________ $_____________ 3044 Brush Clipper 12' Intake* 50 Hr. $__________ $_____________ 3045 Cement Mixer (Portable 1/4 yd) 30 Hr. $__________ $_____________ 3046 Chain Saw (HL XL 16" equiv.)* 100 Hr. $__________ $_____________ 3047 Concrete/Pavement Saw 12" * 60 Hr. $__________ $_____________ 3048 Crane, Truck Mounted 4 Ton Capacity * 20 Hr. $__________ $_____________ 3049 Dozer (equiv. D3) * 100 Hr. $__________ $_____________ 3050 Dozer (equiv. D6) * 60 Hr. $__________ $_____________ 3051 Drum Roller, Vibratory (6-8 Ton) * 40 Hr. $__________ $_____________ 3052 Generator, (3500 w min. portable) 20 Hr. $__________ $_____________ 3053 Hoe Ram (4-6") * 40 Hr. $__________ $_____________ 3054 Pavement Sweeper with Vacuum 20 Hr. $__________ $_____________ 3055 Personnel Lift (Bucket Truck) 40' Minimum * 40 Hr. $__________ $_____________ 3056 Pressure Washer 3600 PSI * 40 Hr. $__________ $_____________ 3057 Pump 2" Portable 20 Hr. $__________ $_____________ 3058 Skid Steer Loader (30-60 HP) * 300 Hr. $__________ $_____________ 3059 Staw Blower* 40 Hr. $__________ $_____________ 3060 Track Loader 20 Hr. $__________ $_____________ 3061 Trackhoe (equiv. Case CX 160B, 120 hp 1/2 yd bucket* 80 Hr. $__________ $_____________ 3062 Trackhoe (equiv. Case CX 50B, 3063 Tractor with attachments 20 Hr. $__________ $_____________
3064 Trailer, Equipment (12 TN) 60 Hr. $__________ $_____________ 3065 Trailer, flatbed, 12 ton 60 Hr. $__________ $_____________ 3066 Trailer, utility 16-20' 100 Hr. $__________ $_____________ 3067 Trencher w/Rock Saw Attachment* 50 Hr. $__________ $_____________ 3068 Trencher (Rockwell V120 equivalent)* 100 Hr. $__________ $_____________ 3069 Truck Boom* 20 Hr. $__________ $_____________ 3070 Truck, Dump (22 TN)* 100 Hr. $__________ $_____________ 3071 Truck, Light (under 1 ton)* 100 Hr. $__________ $_____________ 3072 Vibrator (Compactor Plate) 24"* 50 Hr. $__________ $_____________ 3073 Welder, Portable (equiv. Lincoln K1292)* 20 Hr. $__________ $_____________
Note: Item # 3074 - 3095: Bid should be based on Service Contract Act Wage Rates 3074 Emergency Work 10 Hr. $__________ $_____________ 3075 Carpenter, Maintenance 100 Hr. $__________ $_____________ 3076 Chainsaw, gas, minimal 40cc w/16" bar* 300 Hr. $__________ $_____________ 3077 Electrician, Maintenance 100 Hr. $__________ $_____________ 3078 General Maintenance Worker 200 Hr. $__________ $_____________ 3079 Heavy Equipment /Truck Operator 20 Hr. $__________ $_____________ 3080 Concrete Finisher 50 Hr. $__________ $_____________ 3081 Laborer 2,000 Hr. $__________ $_____________ 3082 Painter, Maintenance 200 Hr. $__________ $_____________ 3083 Plumber, Maintenance 200 Hr. $__________ $_____________ 3084 Welder, Combination, Maintenance* 20 Hr. $__________ $_____________ 3085 Backhoe/Loader (> 70 HP)* 400 Hr. $__________ $_____________ 3086 Chipper, Brush > 100 HP & 12"* 300 Hr. $__________ $_____________ 3087 Dozer, 65-95 HP* 100 Hr. $__________ $_____________ 3088 Excavator, Mini Trackhoe < 75 HP* 150 Hr. $__________ $_____________ 3089 Grinder, Stump < 50 HP* 75 Hr. $__________ $_____________ 3090 Personnel Lift, Towed, scissor, bucket* 100 Hr. $__________ $_____________ 3091 Skid Loader * 250 Hr. $__________ $_____________ 3092 Trencher, 5 ft. Depth* 40 Hr. $__________ $_____________ 3093 Truck, dump (14 ton cap.) * 150 Hr. $__________ $_____________ 3094 Truck, pick-up, 1/2 ton* 200 Hr. $__________ $_____________ 3095 Tractor w/attachments (40-60 HP) 60 Hr. $__________ $_____________
Item # Quant. Unit Price Total 3096 Primitive Area Litter Removal
Item # Quant. Unit Price Total 3097 Herbicide Application 24,000 SY $__________ $_____________
Item # Quant. Unit Price Total 3098 Dumpsters 900 Ea. $__________ $_____________
Item # Quant. Unit Price Total 3099 Mark and Paint Boundary Line 80 Mi. $__________ $_____________
Item # Quant. Unit Price Total 3100 Beach Water Samples 40 Ea. $__________ $_____________ 3101 Monitor No Flow/Closed Filters 12 Ea. $__________ $_____________ 3102 Operate Sand Filter w/Lab Test 400 Ea. $__________ $_____________ 3103 Septic Tank Pumping 30,000 Gal. $__________ $_____________ 3104 Pit Toilet Pumping (Primitive Sites) 50 Ea. $__________ $_____________
SECTION 10 - Subtotal $_____________
SECTION 11 - Beach and Playground Maintenance NTE Unit Item # Quant. Unit Price Total 3105 Routine Beach Maintenance 88 Ea. $__________ $_____________ 3106 Routine Playground Maintenance 225 Ea. $__________ $_____________
SECTION 11 - Subtotal $_____________
SECTION 12 - Pavement Striping and Sealing NTE Unit Item # Quant. Unit Price Total 3107 Pavement Striping (include layout) 50,000 LF $__________ $_____________ 3108 Pavement Sealing 50,000 SY $__________ $_____________
SECTION 12 - Subtotal $_____________
SECTION 13 - Maintenance of Navigation Aids NTE Unit Item # Quant. Unit Price Total 3109 Buoy Setting, Replacing, Relocation and Disposal (all buoys with the exception of the "Danger Dam" buoys.) 40 Ea. $__________ $_____________ 3110 Buoy Setting ("Danger Dam")
SUMMARY OF BID SCHEDULE OPTION YEAR 3
C-3 Cleaning Services - Recreational Facilities and Areas $_____________ C-4 Janitorial Services $_____________ C-5 Facility Repair, Maintenance, and other Non-Routine Work $_____________ C-6 Cleaning Services at Primitive Sites $_____________ C-7 Herbicide Application $_____________ C-8 Dumpster Collection $_____________ C-9 Marking and Painting Boundary Lines $_____________ C-10 System Monitoring and Testing $_____________ C-11 Beach and Playground Maintenance $_____________ C-12 Pavement Striping and Sealing $_____________ C-13 Maintenance of Navigation Aids $_____________ Option Year 3 - Grand Total $_____________
Option Year 4 - Bid Schedule
SECTION 2 - Grass Mowing NTE Unit Item # Quant. Unit Price Total 4001 Administration Resource Area 20 Ea. $__________ $_____________ 4002 Butler's Landing 14 Ea. $__________ $_____________ 4003 Cove Creek Recreation Area 20 Ea. $__________ $_____________ 4004 Dale Hollow Dam Campground 20 Ea. $__________ $_____________ 4005 Dale Hollow Day Use 20 Ea. $__________ $_____________ 4006 Donaldson Park 20 Ea. $__________ $_____________ 4007 Lillydale Campground 18 Ea. $__________ $_____________ 4008 Lillydale Peninsula 18 Ea. $__________ $_____________ 4009 Lillydale Day Use 18 Ea. $__________ $_____________ 4010 Moody’s Access 14 Ea. $__________ $_____________ 4011 Obey River Campground 20 Ea. $__________ $_____________ 4012 Obey River Day Use 20 Ea. $__________ $_____________ 4013 Obey River Launching Area and Parking Lot 20 Ea. $__________ $_____________ 4014 Overlook, S.E. Dam and Dam Site, Powerhouse Compound 20 Ea. $__________ $_____________ 4015 Pleasant Grove Day Use 20 Ea. $__________ $_____________ 4016 Radio Tower Area 14 Ea. $__________ $_____________ 4017 Transient Quarters and Field 20 Ea. $__________ $_____________ 4018 Willow Grove Recreation Area 18 Ea. $__________ $_____________ 4019 Taylor's Ford 13 Ea. $__________ $_____________ 4020 Plankyard 13 Ea. $__________ $_____________
SECTION 2 - Subtotal $_____________
SECTION 3 - Cleaning Services - Recreational Facilities and Areas NTE Unit Item # Quant. Unit Price Total 4021 Amphitheaters 100 Ea. $__________ $_____________ 4022 Camp Sites 11,000 Ea. $__________ $_____________ 4023 Fish Cleaning Stations 175 Ea. $__________ $_____________ 4024 Litter Removal 2,000 Ea. $__________ $_____________ 4025 Picnic Shelters 800 Ea. $__________ $_____________ 4026 Picnic Sites 3,500 Ea. $__________ $_____________ 4027 Restrooms/Washhouses 2,900 Ea. $__________ $_____________
4028 Sanitary Dump Stations 210 Ea. $__________ $_____________
Item # Quant. Unit Price Total 4029 Resource Office 12 Mo. $__________ $_____________ 4030 Contracting/Maintenance Compound 12 Mo. $__________ $_____________ 4031 Transient Quarters 45 Ea. $__________ $_____________ 4032 Power Plant 12 Mo. $__________ $_____________
Item # Quant. Unit Price Total Note: Item # 3033 - 3073: Bid should be based on Davis Bacon Wage Act Wage Rates 4033 Carpenter 250 Hr. $__________ $_____________ 4034 Concrete Finisher 200 Hr. $__________ $_____________ 4035 Electrician 300 Hr. $__________ $_____________ 4036 Equipment Operator 40 Hr. $__________ $_____________ 4037 Laborer 2,000 Hr. $__________ $_____________ 4038 Mason (Rock/Brick/Block) 200 Hr. $__________ $_____________ 4039 Painter 200 Hr. $__________ $_____________ 4040 Plumber 300 Hr. $__________ $_____________ 4041 Truck Driver 60 Hr. $__________ $_____________ 4042 Air Compressor (equiv. Joy 175)* 20 Hr. $__________ $_____________ 4043 Backhoe (80-100 HP)* 300 Hr. $__________ $_____________ 4044 Brush Clipper 12' Intake* 50 Hr. $__________ $_____________ 4045 Cement Mixer (Portable 1/4 yd) 30 Hr. $__________ $_____________ 4046 Chain Saw (HL XL 16" equiv.)* 100 Hr. $__________ $_____________ 4047 Concrete/Pavement Saw 12" * 60 Hr. $__________ $_____________ 4048 Crane, Truck Mounted 4 Ton Capacity * 20 Hr. $__________ $_____________ 4049 Dozer (equiv. D3) * 100 Hr. $__________ $_____________ 4050 Dozer (equiv. D6) * 60 Hr. $__________ $_____________ 4051 Drum Roller, Vibratory (6-8 Ton) * 40 Hr. $__________ $_____________ 4052 Generator, (3500 w min. portable) 20 Hr. $__________ $_____________ 4053 Hoe Ram (4-6") * 40 Hr. $__________ $_____________ 4054 Pavement Sweeper with Vacuum 20 Hr. $__________ $_____________ 4055 Personnel Lift (Bucket Truck) 40' Minimum * 40 Hr. $__________ $_____________ 4056 Pressure Washer 3600 PSI * 40 Hr. $__________ $_____________ 4057 Pump 2" Portable 20 Hr. $__________ $_____________ 4058 Skid Steer Loader (30-60 HP) * 300 Hr. $__________ $_____________ 4059 Staw Blower* 40 Hr. $__________ $_____________ 4060 Track Loader 20 Hr. $__________ $_____________ 4061 Trackhoe (equiv. Case CX 160B, 120 hp 1/2 yd bucket* 80 Hr. $__________ $_____________ 4062 Trackhoe (equiv. Case CX 50B, 41 hp) 24" bucket* 150 Hr. $__________ $_____________ 4063 Tractor with attachments 20 Hr. $__________ $_____________ 4064 Trailer, Equipment (12 TN) 60 Hr. $__________ $_____________
4065 Trailer, flatbed, 12 ton 60 Hr. $__________ $_____________ 4066 Trailer, utility 16-20' 100 Hr. $__________ $_____________ 4067 Trencher w/Rock Saw Attachment* 50 Hr. $__________ $_____________ 4068 Trencher (Rockwell V120 equivalent)* 100 Hr. $__________ $_____________ 4069 Truck Boom* 20 Hr. $__________ $_____________ 4070 Truck, Dump (22 TN)* 100 Hr. $__________ $_____________ 4071 Truck, Light (under 1 ton)* 100 Hr. $__________ $_____________ 4072 Vibrator (Compactor Plate) 24"* 50 Hr. $__________ $_____________ 4073 Welder, Portable (equiv. Lincoln K1292)* 20 Hr. $__________ $_____________
Note: Item # 3074 - 3095: Bid should be based on Service Contract Act Wage Rates 4074 Emergency Work 10 Hr. $__________ $_____________ 4075 Carpenter, Maintenance 100 Hr. $__________ $_____________ 4076 Chainsaw, gas, minimal 40cc w/16" bar* 300 Hr. $__________ $_____________ 4077 Electrician, Maintenance 100 Hr. $__________ $_____________ 4078 General Maintenance Worker 200 Hr. $__________ $_____________ 4079 Heavy Equipment /Truck Operator 20 Hr. $__________ $_____________ 4080 Concrete Finisher 50 Hr. $__________ $_____________ 4081 Laborer 2,000 Hr. $__________ $_____________ 4082 Painter, Maintenance 200 Hr. $__________ $_____________ 4083 Plumber, Maintenance 200 Hr. $__________ $_____________ 4084 Welder, Combination, Maintenance* 20 Hr. $__________ $_____________ 4085 Backhoe/Loader (> 70 HP)* 400 Hr. $__________ $_____________ 4086 Chipper, Brush > 100 HP & 12"* 300 Hr. $__________ $_____________ 4087 Dozer, 65-95 HP* 100 Hr. $__________ $_____________ 4088 Excavator, Mini Trackhoe < 75 HP* 150 Hr. $__________ $_____________ 4089 Grinder, Stump < 50 HP* 75 Hr. $__________ $_____________ 4090 Personnel Lift, Towed, scissor, bucket* 100 Hr. $__________ $_____________ 4091 Skid Loader * 250 Hr. $__________ $_____________ 4092 Trencher, 5 ft. Depth* 40 Hr. $__________ $_____________ 4093 Truck, dump (14 ton cap.) * 150 Hr. $__________ $_____________ 4094 Truck, pick-up, 1/2 ton* 200 Hr. $__________ $_____________ 4095 Tractor w/attachments (40-60 HP) 60 Hr. $__________ $_____________
Item # Quant. Unit Price Total 4096 Primitive Area Litter Removal
Item # Quant. Unit Price Total 4097 Herbicide Application 24,000 SY $__________ $_____________
Item # Quant. Unit Price Total 4098 Dumpsters 900 Ea. $__________ $_____________
Item # Quant. Unit Price Total 4099 Mark and Paint Boundary Line 80 Mi. $__________ $_____________
Item # Quant. Unit Price Total 4100 Beach Water Samples 40 Ea. $__________ $_____________ 4101 Monitor No Flow/Closed Filters 12 Ea. $__________ $_____________ 4102 Operate Sand Filter w/Lab Test 400 Ea. $__________ $_____________ 4103 Septic Tank Pumping 30,000 Gal. $__________ $_____________ 4104 Pit Toilet Pumping (Primitive Sites) 50 Ea. $__________ $_____________
SECTION 10 - Subtotal $_____________
SECTION 11 - Beach and Playground Maintenance NTE Unit Item # Quant. Unit Price Total 4105 Routine Beach Maintenance 88 Ea. $__________ $_____________ 4106 Routine Playground Maintenance 225 Ea. $__________ $_____________
SECTION 11 - Subtotal $_____________
SECTION 12 - Pavement Striping and Sealing NTE Unit Item # Quant. Unit Price Total 4107 Pavement Striping (include layout) 50,000 LF $__________ $_____________ 4108 Pavement Sealing 50,000 SY $__________ $_____________
SECTION 12 - Subtotal $_____________
SECTION 13 - Maintenance of Navigation Aids NTE Unit Item # Quant. Unit Price Total 4109 Buoy Setting, Replacing, Relocation and Disposal (all buoys with the exception of the "Danger Dam" buoys.) 40 Ea. $__________ $_____________ 4110 Buoy Setting ("Danger Dam") Replacing, Relocation and Disposal 5 Ea. $__________ $_____________
SUMMARY OF BID SCHEDULE OPTION YEAR 4
C-3 Cleaning Services - Recreational Facilities and Areas $_____________ C-4 Janitorial Services $_____________ C-5 Facility Repair, Maintenance, and other Non-Routine Work $_____________ C-6 Cleaning Services at Primitive Sites $_____________ C-7 Herbicide Application $_____________ C-8 Dumpster Collection $_____________ C-9 Marking and Painting Boundary Lines $_____________ C-10 System Monitoring and Testing $_____________ C-11 Beach and Playground Maintenance $_____________ C-12 Pavement Striping and Sealing $_____________ C-13 Maintenance of Navigation Aids $_____________ Option Year 4 - Grand Total $_____________
Totals by Contract Year Base Year $_____________ Option Year #1 $_____________ Option Year #2 $_____________ Option Year #3 $_____________ Option Year #4 $_____________
Grand Total (Base + 4 option years) $_____________
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been added by full text:
CONTRACTOR Q & A'S
QUESTIONS—W912P519B0009
1. What licenses have normally be required (other than the ones for Herbicide treatment and Sand filter testing) for this contract? Section C1.7
GOVERNMENT RESPONSE: Normally, licenses such as: Water Testing (Beach Samples), TN Electrical License, TN Plumbers License are required. However, other licenses may be required based upon the most recent publication of Corps of Engineers Safety Manual, EM 385-1-1.
2. Could space be made available or is there space available at a more central location to all the work sites?
GOVERNMENT RESPONSE: No, contractor storage site and operations center is based at the Dale Hollow Lake Resource Maintenance Compound near Celina, TN.