Amendment 0001 - dated 14 May 2019: answers questions received during question period, updates plans and clauses and provisions
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTING DIVISION (DAB)
110 9TH AVENUE SOUTH, RM A680
NASHVILLE TN 37203
W38XDD80379477
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Purpose of this Amendment is to:
1. Answ er questions received during the question period.
2. Update the Plans as a result of questions received during the question period.
3. Update DFARS 252.236-7001: Contract Draw ings and Specifications and FAR 52.252-3: Alterations in Solicitation
All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-May-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P519B0007
X 9B. DATED (SEE ITEM 11)
19-Apr-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-May-2019
CODE
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, RM A405
NASHVILLE TN 37203
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912P5
FACILITY CODECODE
EMAIL:TEL:
W912P519B0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
QUESTIONS AND ANSWERS
Questions and Answers for the Tennessee River Mile (TRM) 303 Mooring Cell Construction W912P519B0007
1. Question: When was the outer band wrapped around the current cells?
Answer: Approximately 1994.
2. Question: Is there a better clarity drawing for the original cells?
Answer: No. The drawing contained in the Plans is the only one.
3. Question: Is there a location for the Contractor to place supplies and materials coming off of trucks at or near the work site?
Answer: See Revised Drawing 02-L3-W01, specifically Note 6 and 7.
4. Question: Can you elaborate on the Mussel concerns associated with this project?
Answer: Technical specification 02 41 00 paragraphs 1.3 and 1.4 discusses mussel avoidance. See also Revised Drawing 02-L3-W01 for permitted work barge spudding locations.
5. Question: Do the Mussel concerns affect the spudding location?
Answer: Yes. Reference the Government's Response to Question # 4.
6. Question: Will floating plants be allowed to stay on-site 24 hours per day, or will they be required to be moved in and out daily?
Answer: See Revised Drawing 02-L3-W01; specifically Note 6, which states: At their own risk and in compliance with all other applicable stipulations in this contract, the Contractor will be permitted to leave Floating Plants at the site 24 Hours a day throughout the duration of the project, including overnight and weekends. The Contractor shall ensure compliance with all EM 385-1-1 and U.S. Coast Guard Regulations.
SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS
The following have been modified:
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 0001 - The purpose of this amendment is to:
1. Answer questions received during the question period.
2. Update the Plans as a result of questions received during the question period.
3. Update DFARS 252.236-7001: Contract Drawings and Specifications.
All other terms and conditions remain the same.
(End of Provision)
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
AMENDMENT 0001 - Changes to Drawing 02-L3-W01 include:
Addition of NOTE 6 and Note 7 and the movement of Mooring Cell Coordinates to below the Exclusion Zone Drawing.
DRAWING # DESCRIPTION
Cover Page PLANS FOR TENNESSEE RIVER MOORING CELLS –
REPLACEMENT TRM 303.5 & 303.6
02-L3-W01 PROJECT AERIALS & SPUDDING LOCATION
10W501 NEW CELL DESIGN
INFORMATION ONLY DRAWINGS
02-L3-W02 HYDROLOGICAL DATA SHEET 1
02-L3-W03 HYDROLOGICAL DATA SHEET 2
02-L3-W04 REPLACEMENT MOORING CELLS MILE 303.5
294N505-1 MOORING CELLS at DECATUR, AL –
MI. 303.5 SOUNDING & PROBING
(End of clause)