TRM_303_-_DGN_RTA_Package.Revised.pdf

PDF 15 MB Posted

Attached to
TRM 303 Mooring Cell Construction Federal contract opportunity
Solicitation number
W912P519B0007
Issued by
Department of the Army Corps of Engineers Engineering District Nashville

About this file

Revised Technical Plans - Amendment 0001 changes to technical plans only applies to drawing 02-L3-W01: Aerials Site.

View the file

Other files for this federal contract opportunity

Other files attached to TRM 303 Mooring Cell Construction, newest first.
File Type Posted
W912P519B0007_-_Bid_Abstract.pdf PDF
W912P519B0007_0001_-_Amendment_to_Solicitation_for_TRM_303_Mooring_Cell_Construction.pdf PDF
W912P519B0007_-_Technical_Drawings_-_RTA.pdf PDF
W912P519B0007_-_Technical_Specifications_-_RTA.pdf PDF
W912P519B0007_-_TRM_303_Mooring_Cells_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NUMBERS REPRESENT DEPTHS TO REACH TOP OF OVERBUDEN SEDIMENT LAYER.

CELL 1: STA 6+60

UPPER PROBING - TOP OF OVERBURDEN (544.8) - TO REFUSAL (529.5)

LOWER PROBING - TOP OF OVERBURDEN (539.4) - TO REFUSAL (527.9)

CELL 2: STA 10+50

UPPER PROBING - TOP OF OVERBURDEN (542.0) - TO REFUSAL (528.6)

LOWER PROBING - TOP OF OVERBURDEN (537.7) - TO REFUSAL (528.3)

GROUND LEVEL ELEVATION IS

RECORDED IN 1973

TOP OF OVERBURDEN LAYER IS

INDICATED APPROXIMATELY (538)

00 - CVR
02-L3-W01 - Aerials Site
02-L3-W02- Hydro 1
02-L3-W03- Hydro 2
02-L3-W06- 10W501 Cell Design