W912P518T0075_Amendment__0005.pdf
PDF 58 KB Posted
- Attached to
- Barkley Lock Miter Gate Strut Arm Assemblies Federal contract opportunity
- Solicitation number
- W912P518T0075
About this file
Amendment 0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912P518T0075_TSpecs_BAR_miter_gate_strut_AM4Sheet.pdf | ||
| W912P518T0075_Amendment_0004.pdf | ||
| W912P518T0075_TPlans_BAR_miter_gate_strut_AM1Sheets.pdf | ||
| W91P518T0075_0003.pdf | ||
| W912P518T0075_TPlans_BAR_miter_gate_strut_AM1Sheets.pdf | ||
| 05_TSpecs_RTA_-_Certified_Final_Barkley_Lock_Miter_Gate_Strut_Replacemen....pdf | ||
| W912P518T0075_Amendment.pdf | ||
| 06_TPlans_RTA_-_Certified_Final_Barkley_Lock_Miter_Gate_Strut_Replacemen....pdf | ||
| W912P518T0075_Barkley_Strut_Arm_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W38XDD82125951
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to revise and replace Section 05 50 38 in its entirety, answ er questions received, update FAR Clause 52.252-3 and extend the due date to 24 September 2018 at 10:00 Central Time.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P518T0075
X 9B. DATED (SEE ITEM 11)
30-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Sep-2018
CODE
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, RM A405
NASHVILLE TN 37203
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P518T0075
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 19-Sep-2018 10:00 AM to 24-Sep-2018 10:00 AM.
The following have been modified:
Q&A
1. Industry Question/Comment: Are only those items shown on drawings Q9-22/14, 22/15 & 22/16 and parts list on Q9-22/14 to be considered to totally comprise the four complete struts, 2 CLIN 0001 and 2 CLIN 0002?
Government Response: The complete struts are comprised of items shown on contract drawings Q9-22/14, 22/15, 22/16, parts list on 22/14 along with other items as required in the contract specifications. Items shown on reference drawings Q9-21/4.4, 22/A, 22/1.3, 22/3.4, 22/4.4 and 22/5.3 are for information only and shall not be included in this contract.
2. Industry Question/Comment: To clarify, are additional internal items of the struts, as shown on the reference drawings, such as the disk or Bellville springs, followers, thrust washers etc excluded?
Government Response: Items shown on reference drawings Q9-21/4.4, 22/A, 22/1.3, 22/3.4, 22/4.4 and 22/5.3 are for information only and shall not be provided by the Contractor.
3. Industry Question/Comment: The components shown on drawing Q9-22/14, 22/15 & 22/16 do not completely/exactly match the same items shown in the reference drawings. Is the contractor to adjust the Q9 drawings to achieve compatibility with the reference drawings as to configuration, dimensions surface finishes etc?
Government Response: Please fabricate the new struts as shown on contract drawings Q9-22/14, 22/15, 22/16, parts list on 22/14 and the contract specifications. Unless otherwise approved by the Government, Contractor shall not adjust the contract drawings to achieve compatibility with the reference drawings.
Contractor shall be required to submit the detail drawings for approval prior to fabrication as required in Section 05 50 38, Paragraph 1.3 – Submittals.
4. Industry Question/Comment: Are patterns available for the cast components?
Government Response: Patterns for the cast components are not available.
5. Industry Question/Comment: If the contractor is to provide patterns, are they to become property of the
Corps of Engineers and therefore to be wooden (as opposed to foam) patterns? Can specs be provided to define the type of patterns required?
Government Response: Contractor shall provide patterns for the cast components. They shall become the property of the Contractor. See specifications Section 05 50 30, Paragraph – Castings for details.
6. Industry Question/Comment: Per 52.217-7 the option can be made within 90 days ADC. Can the anticipated time interval between award and potential exercise of the option be here stated, so as to allow the construction (or at least the acquisition of material) for/of four struts at the same time?
Government Response: Please refer to the delivery date section of the quote instructions.
7. Industry Question/Comment: Specification section 05 50 38 Paragraph 1.1 states: “… to complete the miter gate strut assemblies as specified herein and on the drawings.” The “Strut Assembly” shown on drawing Q9- 22/14 does not show/include all items shown on drawing Q9-22/16. It is assumed that the scope of supply for each proposed Strut Arm assembly is to include the Sector Arm and other parts shown on drawing Q9-22/16
– even though they are not physically attached to the subassembly identified on the drawing as “Strut Assembly”. In other words, it is understood that each Line Item unit for this solicitation is to include ALL parts listed in the parts list on drawing Q9-22/14. The subcomponent quantities for each of these solicitation Line Item units is to be one fourth (1/4) the quantities shown on the drawing Q9-22/14 parts list. Can you please confirm that our understanding/assumption about scope of supply is correct?
Government Response: Contractor shall provide all items as shown on contract drawings Q9-22/14, 22/15, 22/16 along with other items as required in the contract specifications. Quantities of parts listed on DWG Q9-22/14 are for four (4) complete miter strut assemblies. Two complete miter strut assemblies are required in the base contract. The remaining two miter strut assemblies are required in option 1.
8. Industry Question/Comment: It is currently assumed that each solicitation Line Item is to include a set of two (2) each Strut Shims (MK. 22/15-1) of thicknesses 1/8”, ¼”, ½”, and 1” . Is this correct?
Government Response: Each miter gate strut assembly requires two 1/8” thick shims, two ¼” thick shims, two ½” thick shims and two 1” thick shims.
9. Industry Question/Comment: ASTM A325 Type 3 material is called out for Heavy Hex Bolt (MK 22/14-4) on drawing Q9-22/14. This is weathering type steel material. Specification section 05 50 38 Paragraph 2.1.4 lists other ASTM bolt specifications and requires all fasteners to be hot-dipped galvanized. Custom structural bolt suppliers indicate that the raw material to manufacturer A325 Type 3 weathering steel heavy hex bolts is not always stocked and a custom mill run could be necessary. It is assumed that hot-dipped galvanized fasteners in accordance with the written specification will be accepted in lieu of the material specified on the drawing. Can you please confirm?
Government Response: Hop-dipped galvanized fasteners in accordance with technical specifications Section 05 50 38, Paragraph Bolts, Turn Bolts and Screws shall be accepted.
10. Industry Question/Comment: It is assumed that machined, fabricated, or forged parts of materials with equivalent or better mechanical properties and weldability will be accepted (upon formal post-award technical submittal) in lieu of cast steel parts. Can you please confirm?
Government Response: See revised paragraphs “submittal” and “Cast Steel” of Section 05 50 38 for details.
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 0001
The purpose of this amendment is to provide the Scope of Work as a separate file on FBO.gov due to pages missing in the original solicitation and extend the quote due date. Quotes are now due on 17 Sept 2018 at 10:00 a.m central time.
Amendment 0002
The purpose of this amendment is to post the amended technical specifications, drawings and answer question received during the question period. No additional question will be answered after the issuance of this amendment.
Amendment 0003
The purpose of this amendment is to extend the quote due date. Quotes are now due on 19 September 2018 at 10:00 am central time.
Amendment 0004
The purpose of this amendment is to revise and replace Section 05 50 38 in its entirety, answer questions received, update FAR Clause 52.252-3 and extend the due date to 24 September 2018 at 10:00 Central Time.
(End of Summary of Changes)