W912P5-17-T-0053_Attachment_1_Specs_and_Drawings.pdf

PDF 852 KB Posted

Attached to
CHICKAMAUGA LOCK LOAD CELLS AND PINS
Solicitation number
W912P5-17-T-0053
Issued by

About this file

Attachment 1_Specs and Drawings

View the file

Other files

File Type Posted
W912P5-17-T-0053-0001.pdf PDF
W912P5-17-T-0053.pdf PDF
W912P5-17-T-0053_Attachment_2_Eng_Form_4025_2017May.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 00 00

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 SCOPE

This section of the Specifications provides general information and requirements. The work covered by these Specifications consists of furnishing all equipment, labor, and materials required for the fabrication, painting, and delivery of the load cells and pins for the upper miter gates anchorage replacements for the Chickamauga Lock project, as required in the contract drawings and technical specifications.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Pre-Fabrication Submittals

Delivery / Shipping Plan; G

A plan describing in detail the proposed delivery methods of the fabrications shall be submitted for approval. The plan shall be submitted at least 30 calendar days prior to the proposed delivery of any item.

Fabrication Schedule; G

A schedule outlining the fabrication and delivery dates shall be submitted for approval. The schedule shall be submitted within 30 days of the contract award and monthly thereafter.

1.3 FABRICATION SCHEDULE

A fabrication schedule shall be submitted within 30 days of the contract award and monthly thereafter. Schedule shall reflect major milestones for the contract, i.e. material procurement, plate cutting, fabrication, machining, painting, delivery, etc. Completed work shall be clearly identified on the schedule updates.

1.4 INSPECTIONS AND ACCEPTANCE OF WORK

1.4.1 General

Not withstanding other provisions of this contract, all materials and work to be performed under this contract shall be inspected and accepted by the Contracting Officer or his authorized representative(s). The Contracting Officer or his authorized representative shall be the individual(s) solely authorized to reject materials, disapprove or approve any work in progress, or order or direct any revision or change to the plans and specifications as presently shown and stated.

1.4.2 Access to Work

The Contractor shall provide safe access to the fabrication facility and any other areas where work on this contract is performed to permit inspection by the Government.

1.5 FABRICATION SHOP STORAGE

Mill steel, fabricated items, and appurtenances shall be stored in a manner to prevent permanent deflection, distortion, or other damage. Rubber seals and UHMW blocks shall be stored in as cool a place as practicable, preferably at 70 degrees F or less; and in no case shall the rubber or UHMW be stored in the open or exposed to the direct rays of the sun.

1.6 DELIVERY OF FABRICATIONS

All fabrications shall be delivered to Chickamauga Lock, 5400 Lake Resort Dr., Chattanooga, TN 37415. The Government will inspect and accept (or reject) all deliveries. The Government will off-load and store the fabrications. The structures shall be arranged on the delivery vehicles such that no damage occurs during shipping. All sling lifting lugs shall be directed up.

The Contractor must submit a Delivery / Shipping Plan for approval by the Contracting Officer. The plan shall describe in detail the proposed methods of delivery of the fabricated items. The plan shall address equipment, machinery and site limitations identified in the specifications and discussed at a pre-delivery meeting between the Contractor and the Contracting Officer. The plan shall be submitted at least 30 calendar days prior to proposed delivery of any item. The plan shall include, but not be limited to the following:

a. Type and size of truck and/or trailer to be used for delivery.

b. Location and description of intermediate assembly or handling areas (if any) between the fabrication location and the delivery location.

c. Cranes and other lifting and positioning equipment that will be required.

d. Packaging of components.

e. Blocking.

Deliveries shall be made between 7:00 a.m. and 3:00 p.m.

local time, Mondays through Thursdays, except on Federal Holidays.

Neither the Contractor, nor Contractor personnel, shall divulge or release data or information developed or obtained under performance of this work statement, except to authorized Government personnel or upon written

NON-DISCLOSURE OF GOVERNMENT INFORMATION1.7

Deliveries shall be arranged with the government POC at least 72 hours before they can accur.

approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data which bears a restrictive legend, other than as specified in this work statement.

Neither the Contractor nor the Contractor's employees shall disclose or cause to be disseminated, any information concerning the operations of the activity which could result in, or increase the likelihood of, the possibility of a breach of the activities, security or interrupt the continuity of its operation.

All inquiries received by the Contractor for information concerning work performed under this contract shall be referred to the Government for evaluation under the Freedom of Information Act of 1975, Public Law 93-502, 5 U.S.C., Section 552. The determination of whether records will be released will remain with the Government. The Contractor shall assist the governemnt point of contact (POC) in compiling information or records for submission upon request by the Government.

The Contractor shall not release any information (including photographs, files, public announcements, statements, denials, or confirmations) on any portion of the subject matter of this contract or any phase of any program hereunder without the prior written approval of the government POC. All documentation showing individuals, names or other personal information will be controlled and protected. The provisions of the Privacy Act of 1974, Public Law 93-579, 5 U.S.C., Section 552a, shall apply.

1.8 MEDIA FREE OF VIRUSES, ETC

The contractor shall ensure all media, electronic files, etc., it provides to the government shall be free of viruses, Trojan horses, bots, worms, malware, defects, or any other harmful item of a destructive nature.

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section --

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SCOPE

The scope of this Section covers the submittal procedures required by this contract. All required submittals shall be provided in both hard copy and electronic format (PDF). Electronic submittals shall be sent to the Contracting Officer or designated representative via E-Mail to the extent possible.

1.2 SUMMARY

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.

Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.

Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.

Contractor's Quality Control (CQC) System Manager to check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as:

Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.

Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.

1.3 DEFINITIONS

1.3.1 Submittal Descriptions (SD)

Submittals requirements are specified in the technical sections.

Submittals are identified by Submittal Description (SD) numbers and titles as follows:

SD-01 Pre-Fabrication Submittals

Submittals which are required prior to or the start of the next major phase of the fabrication on a multi-phase contract, includes schedules, tabular list of data, or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work.

Certificates of insurance

Surety bonds

List of proposed Subcontractors

List of proposed products

Progress schedule

Submittal register

Schedule of prices

Work plan

Quality Control(QC) plan

SD-02 Shop Drawings

Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.

Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.

Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.

SD-03 Product Data

Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.

Samples of warranty language when the contract requires extended product warranties.

SD-05 Design Data

Design calculations, mix designs, analyses or other data pertaining to a part of work.

SD-06 Test Reports

Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accordance with specified requirements. (Testing must have been within three years of date of contract award for the project.)

Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.

Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.

Investigation reports.

Daily logs and checklists.

Final acceptance test and operational test procedure.

SD-07 Certificates

Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.

Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.

Text of posted operating instructions.

SD-08 Manufacturer's Instructions

Preprinted material describing installation of a product, system or material, including special notices and (MSDS)concerning impedances, hazards and safety precautions.

SD-09 Manufacturer's Field Reports

Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and must state the test results; and indicate whether the material, product, or system has passed or failed the test.

Factory test reports.

SD-10 Operation and Maintenance Data

Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer's help and product line documentation necessary to maintain and install equipment. This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.

This data is intended to be incorporated in an operations and maintenance manual or control system.

SD-11 Closeout Submittals

Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.

Special requirements necessary to properly close out a contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of work on a multi-phase contract.

1.3.2 Approving Authority

Office or designated person authorized to approve submittal.

1.3.3 Work

As used in this section, off-site fabrication required by contract documents, including labor necessary to produce submittals, except those SD-01 Pre-Fabrication Submittals noted above, fabrication, materials, products, equipment, and systems incorporated or to be incorporated in such fabrication.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with this section.

SD-01 Pre-Fabrication Submittals

Submittal Register; G

1.5 SUBMITTAL CLASSIFICATION

Submittals are classified as follows:

1.5.1 Government Approved G

Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer.

Within the terms of the contract, they are considered to be "shop drawings."

1.5.2 Information Only

Submittals not requiring Government approval will be for information only.

They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.

1.6 PREPARATION

1.6.1 Transmittal Form

Use the attached sample transmittal form (ENG Form 4025) for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms will be furnished to the Contractor. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.

1.6.2 Electronic File Format

Provide submittals other than material samples in both hard copy (paper) and electronic formats. The electronic submittal file must be compiled as a single, complete document, to include the Transmittal Form described in paragraph 1.6.1 Transmittal Form. The electronic submittal file must be named specifically according to its contents (e.g. 01 45 01-1.2_Quality Control Plan.pdf).

Electronic files must be of sufficient quality that all information is legible. Electronic format shall be in Adobe.PDF format, unless otherwise specified or directed by the government POC. Whenever possible, PDF files shall be generated from original documents so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR) routines are required. Files exceeding 30 pages shall be indexed and bookmarked to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature.

Email electronic submittal documents fewer than 10MB to an email address as directed by the government POC. Electronic documents over 10MB shall be provided on a CD/DVD, or through an electronic file sharing system such as the AMRDEC SAFE Web Application located at the following website:

https://safe.amrdec.army.mil/safe/

Provide hard copies of submittals as specified in this or other specification sections.

1.7 QUANTITY OF SUBMITTALS

1.7.1 Number of Copies of SD-02 Shop Drawings

Submit one electronic (PDF format) and two hard copies of submittals of shop drawings requiring review and approval only by QC organization and one electronic (PDF format) and two hard copies of shop drawings requiring review and approval by Contracting Officer.

1.7.2 Number of Copies of SD-03 Product Data and SD-08 Manufacturer's Instructions

Submit in compliance with quantity requirements specified for shop drawings.

1.7.3 Number of Copies SD-05 Design Data and SD-07 Certificates

Submit in compliance with quantity requirements specified for shop drawings.

1.7.4 Number of Copies SD-06 Test Reports and SD-09 Manufacturer's Field Reports

Submit in compliance with quantity and quality requirements specified for shop drawings other than field test results that will be submitted with QC reports.

1.7.5 Number of Copies of SD-10 Operation and Maintenance Data

Submit one electronic (PDF format) and two hard copies of O&M Data to the Contracting Officer for review and approval.

1.7.6 Number of Copies of SD-01 Pre-Fabrication Submittals and SD-11 Closeout Submittals

Unless otherwise specified, submit one electronic (PDF format) and two hard sets of administrative submittals.

1.8 INFORMATION ONLY SUBMITTALS

Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals.

The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work;

and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.

1.9 VARIATIONS

Variations from contract requirements will be considered where advantageous to the Government and require both Designer of Record (DOR) and Government approval.

1.9.1 Considering Variations

Discussion with Contracting Officer prior to submission, after consulting with the DOR, will help ensure functional and quality requirements are met and minimize rejections and re-submittals.

Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.

1.9.2 Proposing Variations

When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government, including the DOR's written analysis and approval. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item.

Clearly mark the proposed variation in all documentation.

Check the column "variation" of ENG Form 4025 for submittals which include proposed deviations requested by the Contractor. Set forth in writing the reason for any deviations and annotate such deviations on the submittal.

The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.

1.9.3 Warranting That Variations Are Compatible

When delivering a variation for approval, Contractor, including its Designer(s) of Record, warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.

1.9.4 Review Schedule Is Modified

In addition to normal submittal review period, a period of 5 working days will be allowed for consideration by the Government of submittals with variations.

1.10 SUBMITTAL REGISTER

Prepare and maintain SUBMITTAL REGISTER, as the work progresses. Do not change data which is output in columns (c), (d), (e), and (f) as delivered by Government; retain data which is output in columns (a), (g), (h), and

(i) as approved. A submittal register showing items of equipment and materials for which submittals are required by the specifications is provided as an attachment. This list may not be all inclusive and additional submittals may be required. The Government will provide the initial submittal register with the following fields completed, to the extent that will be required by the Government during subsequent usage.

Column (c): Lists specification section in which submittal is required.

Column (d): Lists each submittal description (SD No. and type, e.g. SD-02 Shop Drawings) required in each specification section.

Column (e): Lists one principal paragraph in specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting project requirements.

Thereafter, the Contractor is to track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.

1.10.1 Use of Submittal Register

Submit submittal register. Verify that all submittals required for project are listed and add missing submittals. Coordinate and complete the following fields on the register:

Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.

Column (h) Contractor Approval Date: Date Contractor needs approval of submittal.

Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.

1.10.2 Contractor Use of Submittal Register

Update the following fields in the Government-furnished submittal register or equivalent fields in program utilized by Contractor with each submittal throughout contract.

Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.

Column (j) Action Code (k): Date of action used to record Contractor's review when forwarding submittals to QC.

Column (l) List date of submittal transmission.

Column (q) List date approval received.

1.10.3 Approving Authority Use of Submittal Register

Update the following fields in the Government-furnished submittal register program or equivalent fields in program utilized by Contractor.

Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.

Column (l) List date of submittal receipt.

Column (m) through (p) List Date related to review actions.

Column (q) List date returned to Contractor.

1.10.4 Copies Delivered to the Government

Deliver one copy of submittal register updated by Contractor to Government.

1.11 SCHEDULING

Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals.

a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of requirements.

b. Submittals called for by the contract documents will be listed on the register. If a submittal is called for but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the contract documents but which have been omitted from the register or marked "N/A."

c. Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.

d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."

e. Except as specified otherwise, allow review period, beginning with receipt by approving authority, that includes at least 30 working days for Contracting Officer approval. Period of review for submittals with Contracting Officer approval begins when Government receives submittal from Contractor.

f. Period of review for each resubmittal is the same as for initial submittal.

1.12 GOVERNMENT APPROVING AUTHORITY

When approving authority is Contracting Officer, the Government will:

a. Note date on which submittal was received.

b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.

c. Identify returned submittals with one of the actions defined in paragraph entitled, "Review Notations," of this section and with markings appropriate for action indicated.

Upon completion of review of submittals requiring Government approval, stamp and date approved submittals. One copy of the approved submittal will be retained by the Contracting Officer and one copy of the submittal will be returned to the Contractor. If the Government performs a conformance review of other Designer of Record approved submittals, the submittals will be so identified and returned, as described above.

1.12.1 Review Notations

Contracting Officer review will be completed within 30 calendar days after date of submission. Submittals will be returned to the Contractor with the following notations:

a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.

b. Submittals marked "approved as noted" "or approved except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided he takes no exception to the corrections.

c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until resubmittal is approved.

d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.

1.13 DISAPPROVED OR REJECTED SUBMITTALS

Contractor shall make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the clause entitled, "Changes," is to be given to the Contracting Officer. Contractor is responsible for the dimensions and design of connection details and execution of work. Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.

If changes are necessary to submittals, the Contractor shall make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.

1.14 APPROVED/ACCEPTED SUBMITTALS

The Contracting Officer's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that the general method of fabrication, materials, detailing and other information are satisfactory.

Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory fabrication of all work.

After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

1.15 APPROVED SAMPLES

Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, the Contractor to assure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.

Match the approved samples for materials and equipment incorporated in the work. If requested, approved samples, including those which may be damaged in testing, will be returned to the Contractor, at his expense, upon completion of the contract. Samples not approved will also be returned to the Contractor at its expense, if so requested.

Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.

Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals.

Contractor to replace such materials or equipment to meet contract requirements.

Approval of the Contractor's samples by the Contracting Officer does not relieve the Contractor of his responsibilities under the contract.

1.16 WITHHOLDING OF PAYMENT

Payment for materials incorporated in the work will not be made if required approvals have not been obtained.

1.17 STAMPS

Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements is to be similar to the following:

| CONTRACTOR |

| (Firm Name) | | _____ Approved | | _____ Approved with corrections as noted on submittal data and/or | | attached sheets(s) |

| SIGNATURE: __________________________________________________________ |

| TITLE: ______________________________________________________________ |

| DATE: _______________________________________________________________ |

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 35 20 28

GATE ANCHORAGE LOAD MEASUREMENT INSTRUMENTATION

PART 1 GENERAL

1.1 SCOPE

The scope of work is to design, furnish materials, fabricate, load test, and calibrate the load pins and compression load cells output signals. The load pins and compression load cells shall be supplied with connecting cables in conformance with the details and specifications included here

in. The connecting cables and signal output will be compatible with Digital readout box SD41-4PTL-100 manufactured by McCoy Global, Inc.

Substitutes are to be proposed in writing and are subject to the USACE Engineers approval. Any exceptions to the specifications are to be clearly denoted in writing. Calculation requirements shall be submitted for USACE review prior to delivery of the load pins and compression load cells.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A29/A29M (2013) Standard Specification for General Requirements for Steel Bars, Carbon and Alloy, Hot-Wrought

ASTM A564/A564M (2013) Standard Specification for Hot-Rolled and Cold-Finished Age-Hardening Stainless Steel Bars and Shapes

ASTM E74 (2006) Standard Practice of Calibration of Force-Measuring Instruments for Verifying the force Indication of Testing Machines

1.3 UNIT PRICE

1.3.1 Load Pins and Compression Load Cells, Complete

1.3.1.1 Payment

Payment for all work covered by this section will be made at the applicable contract unit price for "Load Pins and Compression Load Cells, Complete," which price shall be full compensation for all costs associated with designing, machining, testing, calibrating, and furnishing load pins and compression load cells, complete in place which are accepted. No payment will be made for anchors which do not meet the acceptance criteria.

1.3.1.2 Measurement

Load Pins and Compression Load Cells, Complete will be measured based upon the number furnished and accepted in accordance with the specifications.

1.3.1.3 Unit of Measure

Unit of measure: each.

1.4 DEFINITIONS

Load Pin - A structural pin fitted with internal stress and strain measurement devices and signal processing equipment. The internal strain gauges measure shear strain which is then converted into an electrical output signal. The output signal has been calibrated to correspond to a structural load output.

Compression Load Cell - Functions similar to a load pin except the measured load is a direct axial compression load instead of a shear.

Load Read Out Box - A portable electrical device capable of providing excitation to load pins and compression load cells, receiving the signal readoutand converting the electrical signal to a structural load and displaying the load.

Data Logger - A load readout box that has been custom designed and fabricated for permanent mounting to read and record data from load pins, compression load cells and other load monitoring equipment.

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Design Calculations; G

Design calculations for each load pin and compression load cell shall be submitted prior to commencement of manufacture of load measurement instrumentation. Calculations shall identify design criteria and applicable codes and verify structural adequacy for static load rating and cyclic life where required.

Manufacturer Qualifications; G

The load measurement instrumentation shall be provided by a manufacturer that has been in the practice of designing and manufacturing measurement instruments similar in size and scope to this project for at least five years.

SD-02 Shop Drawings

Fabrication And Installation Drawings; G

Manufacturer's drawings showing outline dimensions, machining details, location size and depth of grooves, location of receptacles, location of positive load axis scribe mark, loading diagrams and minimum and maximum rated load capacity and cyclic load ranges for load pins and compression load cells for approval by the Contracting Officer. Once reviewed by the Contracting Officer, no changes or deviation from shop drawings shall be permitted without further review by the Contracting Officer.

SD-03 Product Data

Installation Plan; G

The Contractor shall submit to the Contracting Officer for review and comment a plan for installing the load measurement instrumentation along with any permanently mounting data loggers, readout equipment, etc.

Load Pins/Compression Load Cells

Load Pins and Compression Load Cells Calibration Data Sheets shall be submitted with delivery of Load Pins/Compression Load Cells and as specified in this Section.

SD-06 Test Reports

Structural Steel

Certified test reports for each heat or lot of steel used in the manufacture of the load instrumentation shall be submitted with load pins and compression load cells delivered to the site.

SD-10 Operation and Maintenance Data

Load Pins And Compression Load Cells

The Contractor shall furnish calibration data sheets for each sensor of each load measurement instrument. Calibration data points shall cover the full load range readout and including zero load readout. Shunt calibration readout points shall be provided.

Provide temperature offset correction for each load pin and compression load cell if applicable.

Provide cross axis load correction factors for dual axis load pins

Load Readout Boxes And Data Loggers

The Contractor shall provide comprehensive user instruction manuals for each readout and recorder device provided.

Connector Cables

Provide Pin connector definitions.

1.6 QUALIFICATIONS

Structural instrumentation manufacturer qualifications shall be submitted for approval in accordance with paragraph SUBMITTALS. The submittals shall, where applicable, identify individuals who will be working on this contract and their relevant experience. No changes shall be made in approved personnel without prior approval of the Contracting Officer.

1.7 PREPARATORY MEETING

Prior to commencing any installation work, the Contractor shall meet with the Contracting Officer to review the plans and specifications, work plans, and submittals.

1.8 DELIVERY, STORAGE AND HANDLING

Load measurement instrumentation and readout devices shall be suitably wrapped, packaged or covered at the factory or shop to prevent being affected by dirt, water, oil, grease, and rust. Instrumentation shall be protected against abrasion or damage during shipment and handling.

1.9 SITE CONDITIONS

The Contractor shall review the existing structure as-built drawings prior to starting work at the site.

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 Structural Steel

ASTM A564/A564M, Type 630, Condition H1150 (17-4 PH) Stainless Steel Fy = 105 ksi min Ft = 140 ksi max

ASTM A29/A29M, Grade 4340 Q & T Tempered Alloy Steel Fy = 100 ksi min Ft = 140 ksi max

2.2 MANUFACTURED ITEMS

2.2.1 Load Pins and Compression Load Cells

2.2.1.1 General

a. Load pins and compression load cells shall be designed to operate in an inland freshwater marine environment, exposed to the atmosphere but not submerged. Operation will be in close proximity to heavy electromechanical equipment and ship to shore radio equipment. An EMI/RF physical barrier with at least 8 transient voltage suppressors will be built in to limit signal interference. The load pins and compression load cells sensing elements will be full bridge 350 ohm strain gages. The bridge wiring will be 4 wire and it will be configured for single axis loading. Redundant bridges, signal conditioners, outputs with shunt calibration capability will be built into the load pins and compression load cells as a backup against malfunction. Dual connectors will be provided with protective covers and permanently identified consistent with the dual calibrations.

b. A minimum rated fatigue life of 300,000 cycles at 99.9% reliability is required. The supplier will provide detailed outline drawings of the load pins and calculations to verify that the static and cyclic requirements have been met. The static design is required to provide for a 150% overload without calibration shift and 300% without failure.

The load pin material will preferably be 17-4 PH stainless steel, Condition 1150 except as noted below with tensile strength not exceeding 140 ksi and 105 ksi min yield strength. Other materials will be accepted providing they meet all of the other structural requirements stated here in.

c. The compression load cell material will preferably be ANSI 4340, quenched and tempered alloy steel with tensile strength not exceeding 140 ksi and 100 ksi min yield strength. Other materials will be accepted providing they meet all of the other structural requirements stated here in.

d. The load pins/compression load cells will be calibrated while supported as shown on the drawings. Calibration will be in accordance with ASTM E74 for the full range of loads shown on the drawings and stated herein.

e. Load pins are to be permanently identified with the direction of the sensitive load axis and mark numbers as shown. These markings shall preferably be on the top end of the load pins unless noted otherwise.

f. The head section of each load pin will include a threaded hole for a 5/8-inch diameter eye bolt for the purpose of removing the load pins.

g. The load pin head section is to be integral with the load pin body.

Welding of load pin head to load pin body is only with submission of weld detail and calculations and permission of the Contracting Officer.

h. Size and location of external grooves and internal borings for placement of instrumentation inside of load pins and compression load cells is at discretion of the manufacturer but must be reflected in the structural calculations.

i. Surface finish bearing surfaces of load pins and compression load cells to 63 µ in average.

j. Only one known load point for calibrating the load pins and compression load cells is available and so the supplier is required to provide shunt calibration with the load pins and compression load cells. The shunt calibrations should be set at 70-80% of the full load scale. A calibration sheet shall be provided for each bridge of each load cell.

k. The signal conditioners provided in each load pin and compression load cell will be 2 conductor loop powered 24 volt 4-20mA output with two additional conductors for the shunt calibration.

l. Static error band +/- 1% of full scale output including nonlinearity, non-repeatability, and hysteresis based on best fit line.

m. Zero Balance +/- 2% of full scale maximum.

n. Operating Temperature: -30 to +130 °F.

o. Temperature effects unless noted otherwise.

Zero Shift: less than 0.01% of capacity per °F Sensitivity shift: Less than 0.01% of capacity per °F

p. Electrical Connection. Supplier shall specify connector type and pin outputs. Cables are to be 5 wire shielded conductor cable. Cable connectors will be compatible with the load cells at one end and Brad Harrison Stainless Steel part No. BH 8R4006A18A120 in order to match existing readout equipment. Pin 1 = +24VDC, Pin 2 = +Shuntcal, Pin 3 = -shuntcal, Pin 4 = + signal

2.2.2 Load Pin

a. Design and calibrate Anchor Frame A load pin for loading of 251 kips tension and 110 kips compression.

b. With Anchor Frame A load pin under compression load as shown on drawing, calibrate for approximately 4ma output at 110 kip load.

c. Design and calibrate Anchor Frame B load pin for loading of 161 kips tension and 123 kips compression.

d. With Anchor Frame B load pin under compression load as shown on drawing, calibrate for approximately 4ma output at 123 kip tension load.

e. Permanently inscribe tension (positive) load scribe oriented as shown on top end of load pin.

f. Load Pins must be oriented with load scribe as shown in field.

g. Provide one 35-foot long connecting cable with each load pin.

2.2.3 Compression Load Cell Assembly

a. Compression load cell assemblies are to be installed in line with the anchor bars and placed in between the anchor bar nut and the anchor frame. Overall height of the assembly including load washers will not exceed 5-1/2-inches and the diameter shall be approximately 8 inches.

b. Compression load cells, matching base plate and load washers are to be manufactured and provided as an assembly by the compression load cell manufacturer. The compression load cell and base plate will be bolted together for load testing and calibration as an assembly.

c. In conjunction with compression load cell calibration, the manufacturer will specify the temperature load shift if any to be applied.

d. Two physically identical compression load cell assemblies are required capable of supporting a one time 312 kip anchor bar pull test load but with different calibration requirements as specified below.

e. The required calibration range for the Anchor Frame A compression load cell is from 10 kips to 239 kips. The anchor bar will be initially post tensioned to 211 kips but due to the effects of concrete growth in the lock wall, the load will gradually increase to 239 kips over a period of several years.

f. The required calibration range for the Anchor Frame B compression load cell is from 10 kips to 145 kips. The anchor bar will be initially post-tensioned to 128 kips but due to the effects of concrete growth in the lock wall, the load will gradually increase to 145 kips over a period of several years.

g. Provide one 35-foot long connector cable for each compression load cell.

PART 3 EXECUTION

3.1 INSTALLATION OF PINS (Work by Others)

3.1.1 Anchor Load Pins

Before installing the load pins, connect the load pins to the available readout box and enter the calibration data for each sensor into the readout box per the manufacturer's instructions.

Install load pins with the positive load scribe mark pointing toward the gudgeon pin and in line with the anchor rod. Connect the connection cables to load sensors "A".

3.1.2 Compression Load Cells

3.1.2.1 Compression Load Cell A

Before installing the compression load cell, connect the compression load cell to the available readout box and enter the calibration data for each sensor into the readout box per the manufacturer's instructions.

Install Compression Load Cell A onto the Anchor Frame A Anchor bar as shown on the drawings. Note: Compression Load Cell A and B are physically identicalexcept for I.D. number and calibration. Each will include a matching baseplate as part of the assembly.

3.1.2.2 Compression Load Cell B

Before installing the compression load cell, connect the compression load cell to the available readout box and enter the calibration data for each sensor into the read out box per the manufacturer's instructions.

Install Compression Load Cell B onto the Anchor Frame B Anchor bar as shown on the drawings. Note: Compression Load Cell A and B are physically identicalexcept for I.D. number and calibration. Each will include a matching base plate as part of the assembly.

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES

Chi UG Anchor Job

35 20 28 SD-01 Preconstruction Submittals GDesign Calculations

1.6 GManufacturer Qualifications

SD-02 Shop Drawings

GFabrication And Installation Drawings

SD-03 Product Data Installation Plan; G The Contractor shall submit to the Contracting Officer for review and comment a plan for installing the load measurement instrumentation along with any permanently mounting data loggers, readout equipment, etc. Load Pins/Compression Load Cells

SD-06 Test Reports 2.1.1Structural Steel

SD-10 Operation and Maintenance Data Load Pins And Compression Load Cells

Load Readout Boxes And Data Loggers

Connector Cables

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

20°

GUDGEON PIN

FRAME "B"

ANCHOR

BAR CAP

ANCHOR

ANCHOR ROD "B"

2" DIA. DRAIN

LOAD CELL "B"

COMPRESSION

(TYP.)

STRAND ANCHOR

POST-TENSIONED

EXISTING VERTICAL

64W220-34 & 35 (TYP)

NOT SHOWN. SEE SHEETS

BEARING ANGLE INSTALLATION

CUT FOR GRATING,

EL. 687’-7�"

HIGH POINT

ANCHOR LOAD PIN "A"

FRAME INSTALLED

AFTER ANCHOR

EL. 687’-7�"

ANCHOR BAR CAP

ANCHOR FRAME "A"

LOAD CELL

COMPRESSION

ROD "A"

ANCHOR

ANCHOR LOAD PIN "B"

"2

10’-2

"2

1’-3

N

SITE

FLOW

A

FLOW

SLOPE

SCALE: 1" = 1’-0"

PLAN

KEY PLAN

SCALE:

DO NOT ALTER MANUALLY

C.A.D. DRAWING

ISSUED BY:

R

TENNESSEE VALLEY AUTHORITY

FOSSIL AND HYDRO ENGINEERING

AUTOCAD R

DATE

PLOT FACTOR:

REVIEWED BY: APPROVED BY:

AS CONST

EXCEPT AS NOTED

NO.

REV.

DATE

R

R

DRWNDSGN CHKD RVWDSUPV APPD

PROJECT

ISSD

ID

CD

REV

DISCIPLINE

INTERFACE

US Army Corps of Engineers

Nashville District

SUBMITTED BY:

APPROVED BY:

P l o t

T i m e

P l

D a t e

F i l e

N m e

T im e

D a t e

F il e

DESIGNED BY:

DRAWN BY:

CHECKED BY:

CHIEF, ENGINEERING CONSTRUCTION DIVISION

H

F

G

E

3 4 5 6

D

C

B

A

2 3 4 5 6

7 8

REV NO.TASK COMPLETED BY:

F

E

7 8 9 10

D

C

B

11 12

A

C

W_TVA

--------0

XX

INITIAL ISSUE

CHICKAMAUGA PROJECT

CHIEF, CIVIL DESIGN BRANCH

US Army Corps of Engineers

Huntington District

SUBMITTED BY:

CHIEF, CIVIL DESIGN BRANCH

W. MILLER D.A.K.

A.B.C.

J.C.C.

#X

C 7

GENERAL ARRANGEMENT

PLAN

CHICKAMAUGA LOCK FINAL SUBMITTAL

UPPER MITER GATE ANCHORAGE REPLACEMENT

1" = 1’-0"

64W220-25

64W220-25

JAN/17

B

NOTES:

64W220-26

W

UPPER LAND BLOCK NO. 22 OPPOSITE HAND & SIMILAR

UPPER RIVER BLOCK NO. 37 AS SHOWN

S L

O P

E

NOTE: GRATING & HANDRAIL NOT SHOWN.

1. SEE SHEET 64W220-33 FOR DETAILS OF ANCHOR

LOAD PINS "A" AND "B" AND COMPRESSION LOAD

CELLS "A" AND "B".

M O

N O

L

IT

H

J

O

IN

T

S T

A

.6

B

G U

D D

G E

O

P

IN

S T

A

.0

L

M O

N O

L

IT

H

J

O

IN

T

S T

A

.0

LC GUDDGEON PIN

10’-2�"

RECESS EL. 687’-9�"

EXISTING ANCHOR

C ANCHORAGE "B"

LC

A

C H

O R

A G

E

A

(TYP)

TRENCH CUT

L

TOP OF WALL

EL. 692’-3�"

C PIN

EL. 686’-2�" EL. 687’-7�"

LINK PIN

01’ 1’ 2’

SCALE: 1’’=1’-0"

JAMES A. NIZNIK KRISTEN L. SMITH NICOLE C. BERGER

JAN KLS NCB

1’-9"

4"

R

O U

T

1 2

F

W

S H

E

A T

E

BY WILLIAMS FORM CORP. OR EQUAL

PROTECTION ANCHOR AS MANUFACTURED

PREGROUTED MCP3-MULTIPLE CORROSION

HOLE IN CONCRETE

6" DIA. DRILLED

AND DRILLED HOLE FOR ANCHOR

ENCAPSULATION PIPE O.D.

�" MIN. ANNULUS BETWEEN

CENTRALIZER

ENCAPSULATION PIPE

GROUT

ENCAPSULATION PIPE

(GRADE 150 KSI)

THREADED ASTM A722

PRE-GROUTED 1�" DIA.

PROTECTIVE CAP GUIDE

CORRUGATED PIPE CAP

PTI RECOMMENDED ANCHOR HEAD CAP

INHIBITING WAX

FILL WITH CORROSION

WASHER AS REQUIRED BY MANUFACTURER

ANCHOR HEAD NUT AND HARDENED

2�" DIA. HOLE

2" X 8" DIA. PLATE W/

TO INSTALLING ANCHOR HEAD CAP

CUT BAR WITH BLADE AS SHOWN PRIOR

PROTECTIVE CAP GUIDE

CORRUGATED PIPE CAP

ENCAPSULATION PIPE

(GRADE 150 KSI)

THREADED ASTM A722

PRE-GROUTED 1�" DIA.

HOLE IN CONCRETE

6" DIA. DRILLED

AND DRILLED HOLE FOR ANCHOR

ENCAPSULATION PIPE O.D.

�" MIN. ANNULUS BETWEEN

GROUT

BY WILLIAMS FORM CORP. OR EQUAL

PROTECTION ANCHOR AS MANUFACTURED

PREGROUTED MCP3-MULTIPLE CORROSION

PTI RECOMMENDED ANCHOR HEAD CAP

INHIBITING WAX

FILL WITH CORROSION

WASHER AS REQUIRED BY MANUFACTURER

ANCHOR HEAD NUT AND HARDENED

2�" DIA. HOLE

2" X 8" DIA. PLATE W/

TO INSTALLING ANCHOR HEAD CAP

CUT BAR WITH BLADE AS SHOWN PRIOR

F

W

S H

A T

O U

T

8" DIA. X 5" THICK W/ 2�" DIA. HOLE

LOAD CELL/ BEARING PLATE

CLOSED CELL NEOPRENE GASKET

2" THICK X 2�" I.D. 6�" O.D.

HEAT SHRINK SEAL

HEAT SHRINK SEAL

CENTRALIZER

ENCAPSULATION PIPE

HEAT SHRINK SEAL

CLOSED CELL NEOPRENE GASKET

2" THICK…