W912P5-17-T-0053-0001.pdf

PDF 201 KB Posted

Attached to
CHICKAMAUGA LOCK LOAD CELLS AND PINS Federal contract opportunity
Solicitation number
W912P5-17-T-0053
Issued by
Department of the Army Corps of Engineers Engineering District Nashville

About this file

Amendment 0001 Q&A

View the file

Other files for this federal contract opportunity

Other files attached to CHICKAMAUGA LOCK LOAD CELLS AND PINS, newest first.
File Type Posted
W912P5-17-T-0053.pdf PDF
W912P5-17-T-0053_Attachment_2_Eng_Form_4025_2017May.pdf PDF
W912P5-17-T-0053_Attachment_1_Specs_and_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W38XDD72122178

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Chickamauga Lock- Upper Miter Gate Achorage Compression Cells and Load Pins

This solicitation is being amended to address questions asked by potential offerers. The questions w ere received after the question deadline; how ever, it has been determined to be in the best interest of the government to provide answ ers.

There w ill be no additional questions accepted follow ing the issuance of this amendment. As the answ ers are clarif ication for location of information w ithin the issued specifications and no changes have been made the request for quotes due date remains unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Aug-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P517T0053

X 9B. DATED (SEE ITEM 11)

17-Aug-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Aug-2017

CODE

US ARMY CORPS OF ENGINEERS-CELRN-RC-N

DIRECTORATE OF CONTRACTING

110 9TH AVENUE SOUTH, ROOM A680

NASHVILLE TN 37203

W912P5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P517T0053

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

Q&A Question (1) Is this load cell an actual electronic device to measure the force on the cell?

Answer (1) The compression cells and load pins are both physical devices that house electronic sensors which measure shear strain on the device. This strain is converted to electrical signal to monitor the structural component the device interfaces with. The compression cell reads the axial load in post‐tensioned rods. The load cell monitors the sheer load at a connection point between two separate axially loaded members. See Paragraph

1.4 in Section 35 20 28 of the specifications

Question (2) What is the actual height of the load cell without the base plate?

Answer (2) The required dimensions of both the compression cell and load pin are shown on drawing 64W220‐33.

Question (3) What is the type and grade of material the load cell is to be made of?

Answer (3) The compression cells and load pins are to be made of ASTM A564/A564M, Type 630 stainless steel.

The load washer required for the compression cells are ASTM A29/A29M, Grade 4340 steel. See Paragraph 2.1 of Section 35 20 28 of the specifications.

Question (4) Page 3 of 35 from W912P517T0053 section sf 1449, states in the description of the supplies/services, the word “ assembly”. So the question we have is, are we to quote on more than the load cells and the load pins?

Answer (4) Yes, this contract requirement is for more than the physical compression cells and load pins. The assembly includes calibration of the devices, connecting cables and signal output to existing data loggers shown in the specs.

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 0001- This solicitation is being amended to address questions asked by potential offerers. The questions were received after the question deadline; however, it has been determined to be in the best interest of the government to provide answers.

W912P517T0053

Questions and Answers have been added by full text.

(End of Summary of Changes)