W912P5-17-B-0004_TSpecs_RTA_2017-10-03.pdf
PDF 4 MB Posted
- Attached to
- Removal and Replacement of Medium Voltage Cables
- Solicitation number
- W912P5-17-B-0004
About this file
Specifications W912P5-17-B-0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 17B0004_Bid_Abstract.pdf | ||
| W912P5-17-B-0004_TSpecs_Am1Pages.pdf | ||
| Prebid_Sign_In.pdf | ||
| W912P517B00040001.pdf | ||
| W912P5-17-B-0004_Tplans_RTA_2017-10-06.pdf | ||
| W912P517B0004_final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. W912P5-17-B-0004
US Army Corps Of Engineers Nashville District
MEDIUM VOLTAGE CABLE
REPLACEMENT
Barkley Power Plant Lyon County, Kentucky
Technical Specifications
RTA - Certified Final
July 2017
THIS PAGE INTENTIONALLY LEFT BLANK
FOR DUPLEX PRINTING
Medi um Vol t age Cabl e Repl acement Bar kl ey Power Pl ant W912P5-17-B-0004 Lyon Count y, Kent ucky
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 00 00 GENERAL REQUI REMENTS
01 11 10 STATEMENT OF WORK
01 22 00 MEASUREMENT AND PAYMENT
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMI TTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 35 50 PROJECT SI TE SECURI TY AND AT/ OPSEC PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00 QUALI TY CONTROL
01 45 00. 15 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE( RMS CM)
01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS
01 78 00 CLOSEOUT SUBMI TTALS
01 78 23 OPERATI ONS AND MAI NTENANCE DATA
01 95 00 FORMS AND ATTACHMENTS
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 81 13 TRANPORTATI ON, DI SPOSAL, AND RECYCLI NG OF EXI STI NG
EQUIPMENT
02 82 14 ASBESTOS ABATEMENT
02 83 13 LEAD I N CONSTRUCTI ON
DI VI SI ON 03 - CONCRETE
03 30 70. 00 26 CONCRETE FOR MI NOR STRUCTURES
03 60 00. 00 26 CONCRETE DEMOLI TI ON, REPAI R OF CONCRETE SURFACES, AND
EQUI PMENT FOUNDATI ONS
DI VI SI ON 05 - METALS
05 50 03. 00 26 METALWORK FABRI CATI ON, MACHI NE WORK, AND MI SCELLANEOUS
PROVISIONS
05 50 04. 00 26 METALS: MI SCELLANEOUS, STANDARD ARTI CLES, SHOP FABRI CATED
ITEMS
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 48 00. 00 26 SEI SMI C RESTRAI NT FOR MECHANI CAL AND ELECTRI CAL EQUI PMENT
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS
DI VI SI ON 26 - ELECTRI CAL
26 05 00. 00 26 BASI C ELECTRI CAL MATERI ALS AND METHODS
26 05 13. 00 26 MEDI UM- VOLTAGE CABLE
26 05 19. 00 26 I NSULATED WI RE AND CABLE
26 05 26. 00 26 GROUNDING
26 05 33. 00 26 RACEWAYS AND BOXES FOR ELECTRI CAL SYSTEMS
26 05 36. 10 26 CABLE TRAY FOR TEMPORARY ELECTRI CAL SYSTEMS
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 10. 00 26 LI NEAR HEAT DETECTI ON SYSTEM FOR CABLE TRAYS
PROJECT TABLE OF CONTENTS Page 1
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 2
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 00 00
GENERAL REQUI REMENTS
PART 1 GENERAL
1. 1 GENERAL
1. 2 SI TE WORKI NG HOURS
1. 2. 1 Gover nment Pr oj ect Per sonnel Wor ki ng Hour s
1. 2. 2 Cont r act or ' s Wor ki ng Hour s
1. 3 COORDI NATI ON CONFERENCES
1. 4 PARTNERI NG
1. 5 REFERENCES
1. 6 SUBMI TTALS
1. 7 PROJECT SI GNS
1. 8 CONTRACTOR' S STAGI NG AREA
1. 9 CONTRACTOR' S EQUI PMENT
1. 9. 1 Cont r act or ' s Pl anned Equi pment Met hods
1. 9. 2 Pl ant and Equi pment Li st
1. 9. 3 Movement of Equi pment by t he Cont r act or
1. 10 CRANES AND HEAVY EQUI PMENT
1. 10. 1 Cont r act or Cr ane Saf et y
1. 10. 2 Cont r act or Cr ane Test i ng
1. 10. 3 Cont r act or ' s Cr anes and Heavy Equi pment
1. 11 SAFE CLEARANCE PROCEDURES
1. 12 DAI LY CLEANUP AND DI SPOSAL
1. 13 STORAGE OF EQUI PMENT AND MATERI ALS
1. 14 PROTECTI ON AND RESTORATI ON OF EXI STI NG FACI LI TI ES
1. 15 WORK BY THE GOVERNMENT CONCURRENT WI TH CONTRACTOR WORK
1. 16 EVALUATI ON OF CONTRACTOR PERFORMANCE
1. 17 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS
CONTRACTS
1. 18 MEASUREMENT AND PAYMENT
PART 2 PRODUCTS ( NOT USED)
PART 3 EXECUTI ON
3. 1 AVAI LABI LI TY AND USE OF UTI LI TY SERVI CES
3. 1. 1 Cont r act or Responsi bi l i t i es
3. 1. 2 I nt er r upt i ons of Ut i l i t i es
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 00 00 Page 1
SECTI ON 01 00 00
GENERAL REQUI REMENTS
PART 1 GENERAL
1. 1 GENERAL
Thi s sect i on compr i ses an expl anat i on of t he gener al cont r act r equi r ement s needed t o accompl i sh t he wor k i n accor dance wi t h t he cont r act speci f i cat i ons and dr awi ngs. Any engi neer i ng desi gns r equi r ed by t hese speci f i cat i ons t hat r equi r e cer t i f i cat i on, or a st amp, f r om a Pr of essi onal Engi neer must be per f or med by a t hi r d par t y vendor .
1. 2 SI TE WORKI NG HOURS
1. 2. 1 Gover nment Pr oj ect Per sonnel Wor ki ng Hour s
The schedul ed wor ki ng hour s of t he Pr oj ect st af f ar e Mondays t hr ough Thur sdays f r om 6: 30 a. m. unt i l 5: 00 p. m. Fr i days, Sat ur days and Sundays ar e non- wor k days. Al l Pr oj ect suppor t r equi r ed by t he Cont r act or shal l be schedul ed dur i ng t he Pr oj ect st af f wor ki ng hour s.
1. 2. 2 Cont r act or ' s Wor ki ng Hour s
The Cont r act or ' s nor mal wor ki ng hour s shal l be bet ween 6: 30 a. m. and 5: 00
p. m. , Monday t hr ough Thur sday. Once t he pl ant i s pl aced on t empor ar y power , t he Cont r act or i s expect ed t o wor k 24 hour s per day, 7 days per week. The schedul e of wor k hour s, shi f t s and days of t he week shal l be coor di nat ed wi t h t he Gover nment Qual i t y Assur ance Repr esent at i ve ( GQAR) .
Not i f i cat i on of any pr oposed changes of t he schedul e of r egul ar wor k hour s, over t i me wor k hour s, and shi f t s of wor k cr ews and per sonnel at t he s i t e shal l be coor di nat ed wi t h t he GQAR.
1. 3 COORDI NATI ON CONFERENCES
Rout i ne coor di nat i on conf er ences wi l l be schedul ed by t he Cont r act i ng Of f i cer t hr oughout t he l i f e of t hi s cont r act . Coor di nat i on conf er ences wi l l be hel d t o di scuss cont r act admi ni st r at i on, Cont r act or qual i t y cont r ol , phasi ng, schedul i ng, and ot her aspect s r el at i ng t o t he r equi r ed wor k. The Cor ps of Engi neer s and t he Cont r act or wi l l be r epr esent ed at each of t hese meet i ngs. Coor di nat i on conf er ences wi l l be schedul ed t o occur when not i f i ed by t he Cont r act i ng Of f i cer .
1. 4 PARTNERING
I n or der t o most ef f ect i vel y accompl i sh t he wor k, t he Gover nment ur ges t he Cont r act or t o j oi n t he Gover nment i n est abl i shi ng a cohesi ve and pr of essi onal pr oj ect management t eam. Thr ough t hi s " par t ner i ng" r el at i onshi p bot h ent i t i es woul d st r i ve t o dr aw on t he st r engt hs of each or gani zat i on f or t he ul t i mat e goal of assur i ng t hat t he pr oj ect ’ s i nt ended r esul t s ar e achi eved, wi t hi n budget and on schedul e. Thi s endeavor seeks an envi r onment t hat nur t ur es t eam bui l di ng, cooper at i on and t r ust bet ween t he Gover nment and t he Cont r act or . The par t ner i ng r el at i onshi p woul d be bi l at er al i n make- up, and par t i c i pat i on wi l l be t ot al l y vol unt ar y.
SECTI ON 01 00 00 Page 2
The f i r st st ep i n i ni t i at i ng t he concept woul d be a j oi nt pr oj ect management t eam " par t ner i ng" conf er ence at t ended by mul t i pl e of f i cer s f r om each or gani zat i on r epr esent i ng management and t he key j obsi t e st af f of each ent i t y. The i ni t i al conf er ence woul d be hel d wi t hi n t he f i r st t hi r t y ( 30) days f ol l owi ng cont r act awar d. The Resi dent Engi neer woul d chai r t he conf er ence, est abl i sh i t s agenda and di st r i but e mi nut es of t he meet i ng. A pr of essi onal f aci l i t at or accept abl e t o bot h par t i es woul d l ead t he par t i c i pant s of t he sessi on, t hr ough t he st eps of t eam bui l di ng and t he f or mat i on of a pr obl em sol v i ng mechani sm wi t hi n t he gr oup. The conf er ence dur at i on woul d be no mor e t han one day. Locat i on of t he conf er ence woul d be of f s i t e wi t hi n a 60 mi l e r adi us of t he j obsi t e at a f aci l i t y whi ch of f er s conf er ence r ooms and f ood ser vi ce. Al l cost s i n connect i on wi t h r ent ed f aci l i t i es and t he f aci l i t at or woul d be shar ed equal l y by t he Gover nment and t he Cont r act or . Each or gani zat i on woul d pay ot her cost s of i t s r espect i ve empl oyees at t endi ng t he conf er ence.
Addi t i onal par t ner i ng sessi ons woul d be hel d no l ess t han bi annual l y.
I mpl ement at i on of t he par t ner i ng concept and phi l osophy woul d be an on- goi ng pr ocess.
1. 5 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s sect i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual
EP 310- 1- 6a ( 2006) Si gn St andar ds Manual , VOL 1
ER 385- 1- 31 ( 2009) The Cont r ol of Hazar dous Ener gy
1. 6 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Cont r act or ' s Pl anned Equi pment Met hods; G Loadi ng Pl an For Cr anes And Heavy Equi pment ; G Pl ant and Equi pment Li st ; G Loadi ng Di agr am; G Li f t i ng Di agr am; G
1. 7 PROJECT SI GNS
a. Gener al . Fur ni sh and er ect wi t hi n 30 days af t er i ssue of t he Not i ce t o Pr oceed at t he l ocat i on di r ect ed, a PROJECT I DENTI FI CATI ON SI GN and a SAFETY PERFORMANCE SI GN. The si gns must be l et t er ed on one si de onl y and conf or m t o EP 310- 1- 6a and t o t he det ai l s and col or s shown on t he sket ches i ncl uded i n Sect i on 01 95 00 FORMS AND ATTACHMENTS. The name of t he pr oj ect shal l be as f ol l ows:
SECTI ON 01 00 00 Page 3
MEDI UM VOLTAGE CABLE REPLACEMENT
b. Mat er i al s. Const r uct t he s i gn wi t h a f ace sheet of 3/ 4 i nch ext er i or gr ade pl ywood mount ed on a subst ant i al f r amewor k of t r eat ed 4- i nch by 4- i nch mat er i al . Scr ews must be commer ci al qual i t y and of s i zes shown.
c. Pai nt i ng. The si gns and post s must be gi ven one pr i me coat and t wo f i ni sh coat s of ext er i or oi l pai nt bef or e l et t er i ng. Appl y l et t er s and t r i m t o one si de onl y usi ng one coat of enamel of col or , st y l e, and si ze shown.
d. Er ect i on and Mai nt enance. Er ect t he s i gns at t he desi gnat ed l ocat i ons. Si gns must be pl umb and backf i l l of post hol es must be wel l t amped t o pr oper l y suppor t t he s i gns. Mai nt ai n t he s i gns i n good condi t i on unt i l compl et i on of t he cont r act . Si gns r emai n t he pr oper t y of t he Cont r act or and must be r emoved f r om t he si t e upon f i nal accept ance of t he cont r act wor k.
1. 8 CONTRACTOR' S STAGI NG AREA
The Cont r act or wi l l be assi gned a por t i on of t he war ehouse ar ea on t he power pl ant s i de f or use as a st agi ng ar ea. The bui l di ng of st r uct ur es, t he er ect i on of t ent s or ot her f or ms of pr ot ect i on wi l l be per mi t t ed onl y at such pl aces as t he Gover nment shal l appr ove, and t he sani t ar y condi t i ons of t he gr ounds i n or about such st r uct ur es shal l at al l t i mes be mai nt ai ned i n a sat i sf act or y manner . Tempor ar y Cont r act or f aci l i t i es pr ovi ded dur i ng Const r uct i on shal l be r emoved pr i or t o f i nal accept ance f r om t he Gover nment . As a mi ni mum t he ar ea shal l be l ef t l ooki ng " br oom cl ean" and at l east as c l ean as bef or e t he st r uct ur e pl acement .
1. 9 CONTRACTOR' S EQUI PMENT
1. 9. 1 Cont r act or ' s Pl anned Equi pment Met hods
The pr oposed met hods of t r anspor t at i on and oper at i on of cr anes and ot her heavy equi pment shal l be submi t t ed by t he Cont r act or t o t he Gover nment and accept ed by t he Gover nment bef or e commencement of t hose oper at i ons.
Submi t t al s shal l i ncl ude t he t ype, s i ze, and l oadi ngs of equi pment , and t he pr oposed t r anspor t at i on r out es and wor k ar eas t o be used on t he project.
Oper at i on of heavy equi pment adj acent t o exi st i ng st r uct ur es shal l be avoi ded when possi bl e. Test i ng r equi r ement s and oper at i on of cr anes and ot her heavy equi pment shal l be i n accor dance wi t h Sect i on 01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS, EM 385- 1- 1, and as speci f i ed bel ow. Al l cr anes, r i ggi ng, l i f t s , oper at or s, and ot her necessar y means t o move equi pment or i t ems shal l be Cont r act or - f ur ni shed and shal l compl y wi t h
EM 385- 1- 1.
1. 9. 2 Pl ant and Equi pment Li st
Pr ovi de a compl et e l i s t of al l pl ant and equi pment , excl usi ve of shop equi pment , t o be used on t he pr oj ect at l east 7 days pr i or t o commenci ng si t e oper at i ons. An up t o dat e pl ant and equi pment l i s t shal l be submi t t ed wi t h t he end of t he mont h r equest f or payment , t hr oughout t he l i f e of t he cont r act . The l i s t s shal l i ncl ude r ent ed equi pment as wel l as l ease pur chase or sal e l easeback equi pment . The i ni t i al l i s t and t he r evi sed
SECTI ON 01 00 00 Page 4 mont hl y l i s t s shal l i ndi cat e dat es equi pment i s assi gned t o or r emoved f r om t he pr oj ect , dat es deadl i ned f or r epai r s and r et ur ned f or use, and adequat e i dent i f i cat i on or descr i pt i on of each i t em of equi pment i ncl udi ng manuf act ur er ' s name ( abbr evi at ed) , model number , manuf act ur er ' s ser i al number , year of manuf act ur e, and Cont r act or ' s assi gned ser i al or r ecor d number.
1. 9. 3 Movement of Equi pment by t he Cont r act or
Al l cr anes, r i ggi ng, l i f t s , oper at or s, and ot her necessar y means t o move equi pment or i t ems shal l be Cont r act or - f ur ni shed as r equi r ed t o pur sue and compl et e t he wor k, and shal l meet t he r equi r ement s of EM 385- 1- 1 and Sect i on 01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS. For mobi l e cr anes a l oadi ng di agr am may need t o be submi t t ed f or r evi ew and appr oval showi ng t he wheel l oads and wheel spaci ng. The Cont r act or shal l pr ovi de a Cr ane Cr i t i cal Li f t Pl an as r equi r ed i n Sect i on 01 35 26 and det ai l ed i n EM 385- 1- 1, par agr aph 16. H. 02. The l oadi ng di agr am and cr i t i cal l i f t pl an shal l addr ess l ar ge component l aydown on t he power house f l oor .
1. 10 CRANES AND HEAVY EQUI PMENT
1. 10. 1 Cont r act or Cr ane Saf et y
Cont r act or ' s cr anes and equi pment f ur ni shed f or t hi s wor k shal l conf or m wi t h al l appl i cabl e OSHA r equi r ement s and r ef er enced EM 385- 1- 1 i n Sect i on 00700 CONTRACT CLAUSES, Cont r act Cl ause 52. 236- 13 Al t I , ACCI DENT PREVENTI ON and Sect i on 01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS.
Cont r act or shal l submi t a l i f t i ng di agr am addr essi ng such i ssues as l i f t , t r i m, maxi mum l oad, maxi mum wi nd speed, l i f t i ng r adi us, cr ane oper at or ( s) qual i f i cat i ons and cur r ent medi cal exam, cr ane r i gger ( s) qual i f i cat i ons, and al l ot her appl i cabl e i nf or mat i on r equi r ed by EM 385- 1- 1 and OSHA. The l i f t i ng di agr am shal l be submi t t ed 30- days pr i or t o s i t e wor k.
1. 10. 2 Cont r act or Cr ane Test i ng
Al l Cont r act or cr anes shal l be t est ed i n accor dance wi t h EM 385- 1- 1 pr i or t o use on t he pr oj ect and t he t est s shal l be wi t nessed by t he COR.
For t y- ei ght hour s not i ce of t he t est , excl udi ng weekends and f eder al hol i days, shal l be gi ven by t he Cont r act or .
1. 10. 3 Cont r act or ' s Cr anes and Heavy Equi pment
The pl anned met hod of t r anspor t at i on and oper at i on of Cont r act or pr ovi ded cr anes and ot her heavy equi pment t o be used i n t he per f or mance of t hi s cont r act shal l be submi t t ed f or gover nment accept ance and coor di nat ed wi t h t he COR. Thi s l oadi ng pl an f or cr anes and heavy equi pment shal l i ncl ude t he t ype, s i ze, l oadi ng, and pl acement of out r i gger s of al l cr anes or heavy equi pment and t he pr oposed t r anspor t at i on r out es and wor k ar eas t o be used on t he pr oj ect . Oper at i on of heavy equi pment adj acent t o exi st i ng st r uct ur es shal l be avoi ded when possi bl e.
1. 11 SAFE CLEARANCE PROCEDURES
Pr oj ect per sonnel use A Saf e Cl ear ance Syst em, as st at ed i n ER 385- 1- 31 and amended by t he Nashvi l l e Di st r i ct t o ensur e cont i nui t y of ser vi ce and saf et y t o per sonnel and equi pment . Any wor k per f or med whi ch r equi r es t aki ng t he Pr oj ect ' s oper at i ng equi pment out of ser vi ce wi l l be done onl y af t er a f or mal c l ear ance i s obt ai ned by t he Cont r act i ng Of f i cer wi t h 48- hour mi ni mum not i ce. Cont r act or per sonnel shal l not v i ol at e
SECTI ON 01 00 00 Page 5 cl ear ance. Any vi ol at i on of Saf e Cl ear ance Pr ocedur es wi l l be gr ounds f or r emoval of t he of f ender ( s) . Up t o f i ve copi es of t he Nashvi l l e Di st r i ct Saf e Cl ear ance Pr ocedur e wi l l be suppl i ed t o t he Cont r act or upon r equest .
1. 12 DAI LY CLEANUP AND DI SPOSAL
Wor k ar eas shal l be kept r easonabl y neat on a dai l y basi s. Debr i s r esul t i ng f r om t he wor k, such as empt y pai nt cans, packi ng cases, scr ap l umber , oi l and gr ease spi l l s , and ot her debr i s shal l be col l ect ed, r emoved, and di sposed of of f - s i t e at l east once per week. Gover nment t r ash cans, dump boxes and ot her cont ai ner s shal l not be used. Li qui d wast e shal l not be di sposed of i n exi st i ng dr ai ns.
1. 13 STORAGE OF EQUI PMENT AND MATERI ALS
St or age of equi pment and mat er i al s wi l l be per mi t t ed onl y i n desi gnat ed st agi ng ar eas. A mi ni mum access space of t hr ee f eet shal l be mai nt ai ned bet ween t he Cont r act or ' s st or ed i t ems and exi st i ng f aci l i t y equi pment .
1. 14 PROTECTI ON AND RESTORATI ON OF EXI STI NG FACI LI TI ES
Exi st i ng f aci l i t i es shal l be pr ot ect ed whet her or not shown on t he dr awi ngs. Upon compl et i on of t he wor k, exi st i ng f aci l i t i es, not i ncl uded as a por t i on of t he wor k, shal l be l ef t i n a condi t i on equal t o t he or i gi nal condi t i on pr i or t o t he cont r act . Cost s f or r epai r and r est or at i on of any f aci l i t i es shal l be consi der ed t o be i nci dent al t o and i ncl uded i n t he cont r act pr i ce.
1. 15 WORK BY THE GOVERNMENT CONCURRENT WI TH CONTRACTOR WORK
The Gover nment wi l l l i mi t i nt er f er ence wi t h t he Cont r act or ' s wor k t o t he maxi mum r easonabl e ext ent and t he Gover nment and Cont r act or shal l coor di nat e as necessar y.
1. 16 EVALUATI ON OF CONTRACTOR PERFORMANCE
The Cont r act or ' s per f or mance wi l l be eval uat ed i n accor dance wi t h FAR Par t
42. 15 i n t he ar eas of qual i t y, schedul e, cost cont r ol , management , ut i l i zat i on of smal l busi nesses, and r egul at or y compl i ance at mi ni mum.
The eval uat i on wi l l i ncl ude a wr i t t en nar r at i ve and r at i ng of ei t her except i onal , ver y good, sat i sf act or y, mar gi nal , or unsat i sf act or y f or each ar ea. The f or mat f or t he eval uat i on i s at t ached at t he end of Sect i on
01 95 00 FORMS AND ATTACHMENTS.
The Cont r act or ' s r evi ew of t he eval uat i on shal l be compl et ed el ect r oni cal l y at t he CPARS websi t e, http://www.cpars.gov . Thi s websi t e al so i ncl udes gui dance and t he user ' s manual .
Upon cont r act awar d, t he Cont r act or shal l pr ovi de t he Cont r act i ng Of f i cer wi t h t he name and e- mai l addr ess of t he Cont r act or ' s Repr esent at i ve t o be r egi st er ed i nt o t he syst em. Fol l owi ng i ni t i al compl et i on by t he Gover nment , t he Cont r act or wi l l have si xt y ( 60) cal endar days t o r evi ew, comment , and r et ur n t he eval uat i on.
1. 17 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS
CONTRACTS
I n addi t i on t o compl yi ng wi t h t he r equi r ement s out l i ned i n FAR Par t 22. 13, FAR Pr ovi s i on 52. 222- 38, FAR Cl ause 52. 222- 35, FAR Cl ause 52. 222- 37, DFARS
SECTI ON 01 00 00 Page 6
222. 13 and Depar t ment of Labor r egul at i ons, U. S. Ar my Cor ps of Engi neer s ( USACE) cont r act or s and subcont r act or s at al l t i er s ar e encour aged t o pr omot e t he t r ai ni ng and empl oyment of U. S. vet er ans whi l e per f or mi ng under a USACE cont r act . Whi l e no set - asi de, eval uat i on pr ef er ence, or i ncent i ve appl i es t o t he sol i c i t at i on or per f or mance under t he r esul t ant cont r act , USACE cont r act or s ar e encour aged t o seek out hi ghl y qual i f i ed vet er ans t o per f or m ser vi ces under t hi s cont r act . The f ol l owi ng r esour ces ar e avai l abl e t o assi st USACE cont r act or s i n t hei r out r each ef f or t s:
a. U. S. Depar t ment of Labor Vet er ans empl oyment : www.vets.gov/
b. Feder al vet er an empl oyment i nf or mat i on: www.fedshirevets.gov/index.aspx
c. Vet er ans’ Empl oyment and Tr ai ni ng Ser vi ce ( VETS) :
http://www.dol.gov/vets/
d. Vet er ans Oppor t uni t y t o Wor k ( VOW) Pr ogr am: http://benefits.va.gov/vow/
e. U. S. Ar my War r i or Tr ansi t i on Command Empl oyment I ndex:
http://www.wct.army.mil/modules/employers/index.html f . Hi r i ng Our Her oes i ni t i at i ve:
www.uschamberfoundation.org/hiring-our-heroes
g. Gui de t o Hi r i ng Vet er ans:
www.whitehouse.gov/sites/default/files/docs/white_house_business_council_ -_guide_to_hiring_veterans_0.pdf
1. 18 MEASUREMENT AND PAYMENT
No separ at e payment wi l l be made f or t he wor k cover ed under t hi s sect i on.
The cost s t her eof shal l be i ncl uded i n t he i t em t o whi ch t he wor k per t ai ns.
PART 2 PRODUCTS ( NOT USED)
PART 3 EXECUTI ON
3. 1 AVAI LABI LI TY AND USE OF UTI LI TY SERVI CES
3. 1. 1 Cont r act or Responsi bi l i t i es
a. The Cont r act or shal l be r esponsi bl e f or t he avai l abi l i t y of ut i l i t i es f or use on t he pr oj ect . Raw wat er i s avai l abl e wi t h no char ge at t he s i t e. The Cont r act or shal l suppl y any ot her ut i l i t i es needed at hi s cost . The Cont r act or shal l car ef ul l y conser ve any ut i l i t i es f ur ni shed wi t hout char ge.
b. The Cont r act or , at i t s expense and i n a wor kmanl i ke manner sat i sf act or y t o t he Cont r act i ng Of f i cer , shal l i nst al l and mai nt ai n al l necessar y t empor ar y connect i ons and di st r i but i on l i nes. Bef or e f i nal accept ance of t he wor k by t he Gover nment , t he Cont r act or shal l r emove al l t he t empor ar y connect i ons, di st r i but i on l i nes, and associ at ed par apher nal i a.
c. The Cont r act or i s r esponsi bl e f or pr ovi di ng dr i nki ng wat er f aci l i t i es f or al l per sonnel associ at ed wi t h t hi s cont r act .
SECTI ON 01 00 00 Page 7
3. 1. 2 I nt er r upt i ons of Ut i l i t i es
a. No ut i l i t y ser vi ces shal l be i nt er r upt ed by t he Cont r act or t o make connect i ons, t o r el ocat e, or f or any pur pose wi t hout appr oval of t he Cont r act i ng Of f i cer .
b. Request f or Per mi ssi on t o shut down ser vi ces shal l be submi t t ed i n wr i t i ng t o t he Cont r act i ng Of f i cer not l ess t han sevent een ( 17) days pr i or t o dat e of pr oposed i nt er r upt i on. The r equest shal l gi ve t he f ol l owi ng i nf or mat i on:
( 1) Nat ur e of Ut i l i t y ( Gas, L. P. or H. P. , Wat er , et c. ) ( 2) Si ze of l i ne and l ocat i on of shut of f .
( 3) Bui l di ngs and ser vi ces af f ect ed.
( 4) Hour s and dat e of shut of f .
( 5) Est i mat ed l engt h of t i me ser vi ces wi l l be i nt er r upt ed.
c. Ser vi ces shal l not be shut of f unt i l r ecei pt of appr oval of t he pr oposed hour s and dat e f r om t he Cont r act i ng Of f i cer .
d. Shut of f s whi ch wi l l cause i nt er r upt i on of Gover nment wor k oper at i ons as det er mi ned by t he Cont r act i ng Of f i cer shal l be accompl i shed dur i ng r egul ar non- wor k hour s or on non- wor k days of t he Usi ng Agency.
e. Oper at i on of val ves on wat er mai ns wi l l be by Gover nment per sonnel .
Wher e shut of f of wat er l i nes i nt er r upt s ser vi ce t o f i r e hydr ant s or f i r e spr i nkl er syst ems, t he Cont r act or shal l ar r ange hi s oper at i ons and have suf f i c i ent mat er i al and per sonnel avai l abl e t o compl et e t he wor k wi t hout undue del ay or t o r est or e ser vi ce wi t hout del ay i n event of emer gency.
- - End of Sect i on - -
SECTI ON 01 00 00 Page 8
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 11 10
STATEMENT OF WORK
PART 1 GENERAL
1. 1 DESCRI PTI ON OF WORK
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTI ON - NOT USED
SECTI ON 01 11 10 Page 1
SECTI ON 01 11 10
STATEMENT OF WORK
PART 1 GENERAL
1. 1 DESCRI PTI ON OF WORK
The scope of wor k f or t hi s cont r act consi st s of t he Cont r act or f ur ni shi ng al l super vi s i on, engi neer i ng, l abor , mat er i al s, and equi pment t o per f or m t he f ol l owi ng wor k i n st r i ct accor dance wi t h t he det ai l ed r equi r ement s of t hi s cont r act :
a. Remove exi st i ng Low Pr essur e Gas Fi l l ed ( LPGF) 15kV cabl es and associ at ed Cl ass 1C t emi nat i ons ( pot heads) Feeder Nos. 1, 2, 3, and 4, and t wo ni t r ogen st at i ons i ncudi ng cyl i nder s, cabi net , cont r ol s, and copper t ubi ng t o each pot head, i ncl udi ng envi r onment al mi t i gat i on f or oi l and l ead r emoval .
b. Fur ni sh and i nst al l 15kV MV- 105 cabl es and associ at ed Cl ass 1A t er mi nat i ons t o r epl ace t he exi st i ng cabl es, usi ng exi st i ng cabl e t r ay and cabl e r i ser s, Feeder Nos. 1, 2, 3, and 4.
c. Fur ni sh and i nst al l t empor ar y 15kV Feeder No. 2 compl et e wi t h Cont r act or - desi gned cabl e t r ay and suppor t i ng syst em out si de t he power house t o t he swi t chyar d, t o al l ow t empor ar y swi t chyar d power dur i ng cabl e r epl acement i n t he Cabl e Tunnel . Absoul t el y no wor k shal l be per f or med i nsi de t he Cabl e Tunnel whi l e any of t he f our 15kV f eeder s ar e ener gi zed. Remove al l t empor ar y cabl es, t er mi nat i ons, t r ay, and t empor ar y st r uct ur es af t er accept ance of t he per manent r epl acement f eeder s.
d. Fur ni sh and i nst al l a t empor ar y bar r i er wal l i nsi de t he Cabl e Tunnel t o pr ot ect t he Cont r ol Cabl e Tr ays, on t he opposi t e s i de of t he t unnel f r om t he 15kV f eeder s. Cont r ol cabl es wi l l r emai n ener gi zed i nsi de t he Cabl e Tunnel dur i ng const r uct i on. Remove bar r i er wal l af t er accept ance of t he per manent r epl acement f eeder s.
e. Fur ni sh and i nst al l l i near heat det ect i on cabl es i n each of t he 15kV cabl e t r ays i n t he Cabl e Tunnel , wi t h a super vi sor y cont r ol panel and al ar ms t o be l ocat ed i n t he power house Cont r ol Room. I ncl udes Oper at i on and Mai nt enance ( O&M) Manual s f or t he f i r e det ect i on and al ar m syst em.
f . Tempor ar y 15kV f eeder s f or t he t hr ee r emai ni ng per manent f eeder s dur i ng t hei r r epl acement wi l l each be an opt i onal cont r act i t em, each bei ng si mi l ar i n scope t o Tempor ar y Feeder No. 2.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTI ON - NOT USED
SECTI ON 01 11 10 Page 2
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1. 1 GENERAL I NFORMATI ON
1. 2 MEASUREMENT
1. 3 PAYMENT
1. 4 RETAI NAGE OF PAYMENT
PART 2 PRODUCTS
PART 3 EXECUTI ON
SECTI ON 01 22 00 Page 1
SECTI ON 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1. 1 GENERAL I NFORMATI ON
I n each i nst ance, t he cont r act pr i ce f or a cont r act l i ne i t em number ( CLI N) wi l l const i t ut e f ul l compensat i on as her ei n speci f i ed, as shown, or as ot her wi se appr oved. The cont r act pr i ce and payment wi l l al so const i t ut e f ul l compensat i on f or al l wor k i nci dent al t o compl et i on of t he CLI N, unl ess such wor k i s ot her wi se speci f i cal l y ment i oned f or separ at e payment under anot her CLI N. I n t he event any wor k i s r equi r ed by t he speci f i cat i on sect i ons or by t he dr awi ngs and not speci f i cal l y ment i oned i n t he measur ement and payment par agr aphs separ at e or di r ect payment wi l l not be made. Al l cost s ar e t her ef or e i nci dent al t o, and i ncl uded i n, t he cont r act pr i ces and payment f or al l CLI Ns l i s t ed i n t he pr i ce schedul e.
1. 2 MEASUREMENT
CLI Ns measur ed as a per j ob wi l l be measur ed f or payment as a compl et e j ob i n t he l ocat i ons i ndi cat ed. Thi s measur ement i ncl udes al l i nci dent al wor k and mat er i al s such as f ast ener s, el ect r i cal mat er i al s, and O&M manual s t hat ar e necessar y t o make a compl et e j ob. Unl ess t he CLI N par agr aph makes a speci f i c except i on of any i t em, i nci dent al i t ems wi l l not be measur ed under any ot her CLI N, even t hough t her e i s anot her l i s t i ng f or t he wor k or mat er i al .
1. 3 PAYMENT
Payment f or al l wor k speci f i ed, shown, or i nci dent al t o compl et e t he wor k wi l l be made as f ol l ows:
CLI N 0001 Mobi l i zat i on and Demobi l i zat i on
Payment wi l l be made on a per j ob basi s under CLI N 0001. Payment shal l be made f or al l cost s i ncur r ed pr i or t o ar r i v i ng onsi t e ( mobi l i zat i on) or i mmedi at el y af t er depar t i ng t he wor k s i t e ( demobi l i zat i on) . These cost s i ncl ude, but ar e not l i mi t ed t o, al l pr epar at or y wor k at t he cont r act or s shop, l abor cost s associ at ed wi t h t r avel t o and f r om t he wor k s i t e, and t r anspor t at i on cost s.
CLI N 0002 Remove and Di spose of Exi st i ng LPGF Cabl e Compl et e wi t h Potheads
Payment wi l l be made on a per j ob basi s under CLI N 0002. Payment shal l be made f or al l mat er i al s, l abor , and equi pment needed t o r emove and di spose of t he exi st i ng 3/ c 15kV 600kcmi l LPGF cabl e, pot heads and encl osur es, and t wo ni t r ogen st at i ons i ncudi ng cyl i nder s, cabi net , cont r ol s, and copper t ubi ng t o each pot head, al l i ncl udi ng hazar dous mi t i gat i on and di sposal cost s r equi r ed by t he oi l i nsul at i on medi um and t he l ead sheat hs i n accor dance wi t h speci f i cat i on Sect i ons 01 11 10, 01 57 19, 02 81 13, and 26 05 00. 00 26.
CLI N 0003 Fur ni sh and I nst al l New 3/ c 15kV 750kcmi l MV- 105 Cabl e, SECTI ON 01 22 00 Page 2
Compl et e wi t h Cl ass 1A Ter mi nat i ons, 15kV, and Fi el d Accept ance Test s
Payment wi l l be made on a per j ob basi s under CLI N 0003. Payment shal l be made f or al l mat er i al s, l abor , and equi pment needed t o f ur ni sh and i nst al l 3/ c 15kV 750kcmi l MV- 105 copper cabl e i n exi st i ng cabl e t r ay af t er r emoval of t he exi st i ng cabl e. I ncl udes cl eani ng oi l f r om t he exi st i ng cabl e t r ays and t unnel f l oor wi t h oi l - r emovi ng pr oduct pr i or t o i nst al l i ng new cabl e, and 15kV Cl ass 1A cabl e t er mi nat i ons wi t h Cont r act or - desi gned encl osur es, r econnect i on t o exi st i ng bus at each end. Al so i ncl udes f i el d accept ance t est i ng and cost s of t he cabl e manuf act ur er ' s f i el d ser vi ces engi neer , and pr epar at i on of as- const r uct ed dr awi ngs.
Al l i n accor dance wi t h speci f i cat i on Sect i ons 01 11 10, 26 05 00. 00 26, and 26 05 13. 00 26.
CLI N 0004 Fur ni sh, I nst al l and Remove Tempor ar y 15kV Feeder No. 2 Compl et e wi t h Cont r act or - Desi gned Tempor ar y Cabl e Tr ays and Suppor t s, and Cont r act or - Desi gned Tempor ar y Bar r i er i n t he Cabl e Tunnel
Payment wi l l be made on a per j ob basi s under CLI N 0004. Payment shal l be made f or al l mat er i al s, l abor , and equi pment needed t o pr ovi de par t i al power t o t he swi t chyar d dur i ng per manent cabl e r epl acement . I ncl udes desi gn, f ur ni shi ng and i nst al l i ng, and l at er r emovi ng, t he t empor ar y cabl e t r ay syst em and suppor t i ng st r uct ur es, 3/ c 15kV ar mor ed 750kcmi l al umi num cabl es and Cl ass 1A t er mi nat i ons, cut t i ng openi ngs i n power house concr et e wal l f or passage of t empor ar y cabl es and r epai r of t hese openi ngs af t er r emoval of t empor ar y cabl es, r epai r of any damage r esul t i ng t o t he r oof of t he El ect r i cal Equi ment Gal l er y by er ect i on of t he t empor ay cabl e t r ay suppor t i ng st r uct ur es af t er r emoval of t he t empor ar y st r uct ur es, t empor ar y swi t chyar d st r uct ur es usi ng t empor ar y t ubul ar bus ext ensi ons, r i ser s, post i nsul at or s, pedest al s, saf et y bar r i er s, and f oundat i ons or bases f or al l component s sui t abl e t o meet sei smi c cr i t er i a. I ncl udes bar r i er wal l i n Cabl e Tunnel . Al l i n accor dance wi t h t he speci f i cat i on Sect i ons 01 11 10, 03 30 70. 00 26, 03 60 00. 00 26, 05 50 03. 00 26, 05 50 04. 00 26, 13 48 00. 00 26, 26 05 00. 00 26, 26 05 13. 00 26, and 26 05 36. 10 26.
CLI N 0005 Fur ni sh and I nst al l New Li near Heat Det ect or Syst em i n t he Cabl e Tunnel , Compl et e wi t h Cont r ol Panel Remot e Mount ed i n t he Cont r ol Room, and Oper at i on & Mai nt enance Manual
Payment wi l l be made on a per j ob basi s under CLI N 0005. Payment shal l be made f or al l mat er i al s, l abor , and equi pment needed t o f ur ni sh and i nst al l t he l i near heat det ect or cabl e syst em i n each of t he f our 15kV cabl e t r ays i n t he Cabl e Tunnel , super vi sor y cont r ol panel i n t he power house Cont r ol Room wi t h s i gnal l i ng devi ces, and al l i nt er connect i i ng wi r i ng, i ncl udi ng pr epar at i on of t he O&M Manual s, and pr epar at i on of t he as- const r uct ed dr awi ngs.
Al l i n accor dance wi t h t he speci f i cat i on Sect i ons 01 11 10, 01 78 00, 01 78 23, 26 05 00. 00 26, 26 05 19. 00 26, 26 05 33. 00 26, and 28 31 10. 00 26.
CLI N 0006 Ai r Suppl y, Di st r i but i on, Vent i l at i on, and exhaust syst ems. I nst al l and t est exhaust mechani cal and el ect r i cal syst em.
Admi ni st er f ul l oper at i onal t est of f an, sensor , and cont r ol s
Payment wi l l be made on a per j ob basi s under CLI N 0006. Payment
SECTI ON 01 22 00 Page 3 shal l be made f or al l mat er i al s, l abor , and equi pment needed t o pr ovi de ai r suppl y, di st r i but i on, vent i l at i on, and exhaust syst ems. I nst al l and t est exhaust mechani cal and el ect r i cal syst em. Admi ni st er f ul l oper at i onal t est of f an, sensor , and cont r ol s. Al l wor k shal l be i n accor dance wi t h speci f i cat i on Sect i ons 23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND
EXHAUST SYSTEMS.
CLI N 0007 ( OPTI ONAL) Fur ni sh, I nst al l and Remove Tempor ar y 15kV Feeder No. 1 Compl et e wi t h Cont r act or - Desi gned Tempor ar y Cabl e Tr ays and Suppor t s
Payment wi l l be made on a per j ob basi s under CLI N 0007. Payment shal l be made f or al l mat er i al s, l abor , and equi pment needed t o pr ovi de par t i al power t o t he swi t chyar d dur i ng per manent cabl e r epl acement . I ncl udes desi gn, f ur ni shi ng and i nst al l i ng, and l at er r emovi ng, t he t empor ar y cabl e t r ay syst em and suppor t i ng st r uct ur es, 3/ c 15kV ar mor ed 750kcmi l al umi num cabl es and Cl ass 1A t er mi nat i ons, cut t i ng openi ngs i n power house concr et e wal l f or passage of t empor ar y cabl es and r epai r of t hese openi ngs af t er r emoval of t empor ar y cabl es, r epai r of any damage r esul t i ng t o t he r oof of t he El ect r i cal Equi ment Gal l er y by er ect i on of t he t empor ay cabl e t r ay suppor t i ng st r uct ur es af t er r emoval of t he t empor ar y st r uct ur es, t empor ar y swi t chyar d st r uct ur es usi ng t empor ar y t ubul ar bus ext ensi ons, r i ser s, post i nsul at or s, pedest al s, saf et y bar r i er s, and f oundat i ons or bases f or al l component s sui t abl e t o meet sei smi c cr i t er i a. I ncl udes bar r i er wal l i n Cabl e Tunnel . Al l i n accor dance wi t h t he speci f i cat i on Sect i ons 01 11 10, 03 30 70. 00 26, 03 60 00. 00 26, 05 50 03. 00 26, 05 50 04. 00 26, 13 48 00. 00 26, 26 05 00. 00 26, 26 05 13. 00 26, and 26 05 36. 10 26.
CLI N 0008 ( OPTI ONAL) Fur ni sh, I nst al l and Remove Tempor ar y 15kV Feeder No. 4 Compl et e wi t h Cont r act or - Desi gned Tempor ar y Cabl e Tr ays and Suppor t s
Payment wi l l be made on a per j ob basi s under CLI N 0008. Payment shal l be made f or al l mat er i al s, l abor , and equi pment needed t o pr ovi de par t i al power t o t he swi t chyar d dur i ng per manent cabl e r epl acement . I ncl udes desi gn, f ur ni shi ng and i nst al l i ng, and l at er r emovi ng, t he t empor ar y cabl e t r ay syst em and suppor t i ng st r uct ur es, 3/ c 15kV ar mor ed 750kcmi l al umi num cabl es and Cl ass 1A t er mi nat i ons, cut t i ng openi ngs i n power house concr et e wal l f or passage of t empor ar y cabl es and r epai r of t hese openi ngs af t er r emoval of t empor ar y cabl es, r epai r of any damage r esul t i ng t o t he r oof of t he El ect r i cal Equi ment Gal l er y by er ect i on of t he t empor ay cabl e t r ay suppor t i ng st r uct ur es af t er r emoval of t he t empor ar y st r uct ur es, t empor ar y swi t chyar d st r uct ur es usi ng t empor ar y t ubul ar bus ext ensi ons, r i ser s, post i nsul at or s, pedest al s, saf et y bar r i er s, and f oundat i ons or bases f or al l component s sui t abl e t o meet sei smi c cr i t er i a. I ncl udes bar r i er wal l i n Cabl e Tunnel . Al l i n accor dance wi t h t he speci f i cat i on Sect i ons 01 11 10, 03 30 70. 00 26, 03 60 00. 00 26, 05 50 03. 00 26, 05 50 04. 00 26, 13 48 00. 00 26, 26 05 00. 00 26, 26 05 13. 00 26, and 26 05 36. 10 26.
CLI N 0009 ( OPTI ONAL) Fur ni sh, I nst al l and Remove Tempor ar y 15kV Feeder No. 3 Compl et e wi t h Cont r act or - Desi gned Tempor ar y Cabl e Tr ays
SECTI ON 01 22 00 Page 4 and Suppor t s
Payment wi l l be made on a per j ob basi s under CLI N 0009. Payment shal l be made f or al l mat er i al s, l abor , and equi pment needed t o pr ovi de par t i al power t o t he swi t chyar d dur i ng per manent cabl e r epl acement . I ncl udes desi gn, f ur ni shi ng and i nst al l i ng, and l at er r emovi ng, t he t empor ar y cabl e t r ay syst em and suppor t i ng st r uct ur es, 3/ c 15kV ar mor ed 750kcmi l al umi num cabl es and Cl ass 1A t er mi nat i ons, cut t i ng openi ngs i n power house concr et e wal l f or passage of t empor ar y cabl es and r epai r of t hese openi ngs af t er r emoval of t empor ar y cabl es, r epai r of any damage r esul t i ng t o t he r oof of t he El ect r i cal Equi ment Gal l er y by er ect i on of t he t empor ay cabl e t r ay suppor t i ng st r uct ur es af t er r emoval of t he t empor ar y st r uct ur es, t empor ar y swi t chyar d st r uct ur es usi ng t empor ar y t ubul ar bus ext ensi ons, r i ser s, post i nsul at or s, pedest al s, saf et y bar r i er s, and f oundat i ons or bases f or al l component s sui t abl e t o meet sei smi c cr i t er i a. I ncl udes bar r i er wal l i n Cabl e Tunnel . Al l i n accor dance wi t h t he speci f i cat i on Sect i ons 01 11 10, 03 30 70. 00 26, 03 60 00. 00 26, 05 50 03. 00 26, 05 50 04. 00 26, 13 48 00. 00 26, 26 05 00. 00 26, 26 05 13. 00 26, and 26 05 36. 10 26.
1. 4
RETAI NAGE OF PAYMENT
Ret ai nage i n t he amount of $50, 000. 00 of or i gi nal cont r act amount wi l l be wi t hhel d unt i l t he f i nal submi t t al s f or Oper at i on and Mai nt enance Dat a, Fi nal Appr oved Ver si on of Cont r act or Pr epar ed Dr awi ngs and AS- BUI LT CONTRACT DRAWI NGS AND FI O DRAWI NGS have been appr oved by t he Gover nment .
PART 2 PRODUCTS
( NOT USED)
PART 3 EXECUTI ON
( NOT USED)
SECTI ON 01 22 00 Page 5
THIS PAGE INTENTIONALLY LEFT BLANK
FOR DUPLEX PRINTING
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 32 01
PROJECT SCHEDULE
PART 1 GENERAL
1. 1 REFERENCES
1. 2 SUBMI TTALS
1. 3 PROJECT SCHEDULER QUALI FI CATI ONS
PART 2 PRODUCTS
2. 1 SOFTWARE
PART 3 EXECUTI ON
3. 1 GENERAL REQUI REMENTS
3. 2 BASI S FOR PAYMENT AND COST LOADI NG
3. 2. 1 Act i v i t y Cost Loadi ng
3. 2. 2 Wi t hhol di ngs / Payment Rej ect i on
3. 3 PROJECT SCHEDULE DETAI LED REQUI REMENTS
3. 3. 1 Level of Det ai l Requi r ed
3. 3. 2 Act i v i t y Dur at i ons
3. 3. 3 Pr ocur ement Act i v i t i es
3. 3. 4 Mandat or y Tasks
3. 3. 5 Gover nment Act i v i t i es
3. 3. 6 St andar d Act i v i t y Codi ng Di ct i onar y
3. 3. 6. 1 Wor ker s Per Day ( WRKP)
3. 3. 6. 2 Responsi bl e Par t y Codi ng ( RESP)
3. 3. 6. 3 Ar ea of Wor k Codi ng ( AREA)
3. 3. 6. 4 Modi f i cat i on Number ( MODF)
3. 3. 6. 5 Bi d I t em Codi ng ( BI DI )
3. 3. 6. 6 Phase of Wor k Codi ng ( PHAS)
3. 3. 6. 7 Cat egor y of Wor k Codi ng ( CATW)
3. 3. 6. 8 Feat ur e of Wor k Codi ng ( FOW)
3. 3. 7 Cont r act Mi l est ones and Const r ai nt s
3. 3. 7. 1 Pr oj ect St ar t Dat e Mi l est one and Const r ai nt
3. 3. 7. 2 End Pr oj ect Fi ni sh Mi l est one and Const r ai nt
3. 3. 7. 3 I nt er i m Compl et i on Dat es and Const r ai nt s
3. 3. 7. 3. 1 St ar t Phase
3. 3. 7. 3. 2 End Phase
3. 3. 8 Cal endar s
3. 3. 9 Open Ended Logi c
3. 3. 10 Def aul t Pr ogr ess Dat a Di sal l owed
3. 3. 11 Out - of - Sequence Pr ogr ess
3. 3. 12 Added and Del et ed Act i v i t i es
3. 3. 13 Or i gi nal Dur at i ons
3. 3. 14 Leads, Lags, and St ar t t o Fi ni sh Rel at i onshi ps
3. 3. 15 Ret ai ned Logi c
3. 3. 16 Per cent Compl et e
SECTI ON 01 32 01 Page 1
3. 3. 17 Remai ni ng Dur at i on
3. 3. 18 Cost Loadi ng of Cl oseout Act i v i t i es
3. 3. 18. 1 As- Bui l t Dr awi ngs
3. 3. 18. 2 O & M Manual s
3. 3. 19 Ant i c i pat ed Adver se Weat her
3. 3. 20 Ear l y Compl et i on Schedul e and t he Ri ght t o Fi ni sh Ear l y
3. 4 PROJECT SCHEDULE SUBMI SSI ONS
3. 4. 1 Pr el i mi nar y Pr oj ect Schedul e Submi ssi on
3. 4. 2 I ni t i al Pr oj ect Schedul e Submi ssi on
3. 4. 3 Per i odi c Schedul e Updat es
3. 5 SUBMI SSI ON REQUI REMENTS
3. 5. 1 Dat a CD/ DVDs
3. 5. 2 Nar r at i ve Repor t
3. 5. 3 Schedul e Repor t s
3. 5. 3. 1 Act i v i t y Repor t
3. 5. 3. 2 Logi c Repor t
3. 5. 3. 3 Tot al Fl oat Repor t
3. 5. 3. 4 Ear ni ngs Repor t by CLI N
3. 5. 3. 5 Schedul e Log
3. 5. 4 Net wor k Di agr am
3. 5. 4. 1 Cont i nuous Fl ow
3. 5. 4. 2 Pr oj ect Mi l est one Dat es
3. 5. 4. 3 Cr i t i cal Pat h
3. 5. 4. 4 Bandi ng
3. 5. 4. 5 Cash Fl ow / Schedul e Var i ance Cont r ol ( SVC) Di agr am
3. 6 PERI ODI C SCHEDULE UPDATE
3. 6. 1 Per i odi c Schedul e Updat e Meet i ngs
3. 6. 2 Updat e Submi ssi on Fol l owi ng Pr ogr ess Meet i ng
3. 7 WEEKLY PROGRESS MEETI NGS
3. 8 REQUESTS FOR TI ME EXTENSI ONS
3. 8. 1 Just i f i cat i on of Del ay
3. 8. 2 Ti me I mpact Anal ysi s ( Pr ospect i ve Anal ysi s)
3. 8. 3 For ensi c Schedul e Anal ysi s ( Ret r ospect i ve Anal ysi s)
3. 8. 4 Fr agment ar y Net wor k ( Fr agnet )
3. 8. 5 Ti me Ext ensi on
3. 8. 6 I mpact t o Ear l y Compl et i on Schedul e
3. 9 FAI LURE TO ACHI EVE PROGRESS
3. 9. 1 Ar t i f i c i al l y I mpr ovi ng Pr ogr ess
3. 9. 2 Fai l ur e t o Per f or m
3. 9. 3 Recover y Schedul e
3. 10 OWNERSHI P OF FLOAT
3. 11 TRANSFER OF SCHEDULE DATA I NTO RMS/ QCS
3. 12 PRI MAVERA P6 MANDATORY REQUI REMENTS
SECTI ON 01 32 01 Page 2
SECTI ON 01 32 01
PROJECT SCHEDULE
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AACE I NTERNATI ONAL ( AACE)
AACE 29R- 03 ( 2011) For ensi c Schedul e Anal ysi s
AACE 52R- 06 ( 2006) Ti me I mpact Anal ysi s - As Appl i ed i n Const r uct i on
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
ER 1- 1- 11 ( 1995) Admi ni st r at i on - - Pr ogr ess, Schedul es, and Net wor k Anal ysi s Syst ems
1. 2 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Pr oj ect Schedul er Qual i f i cat i ons; G Pr el i mi nar y Pr oj ect Schedul e; G I ni t i al Pr oj ect Schedul e; G Per i odi c Schedul e Updat e; G
1. 3 PROJECT SCHEDULER QUALI FI CATI ONS
Desi gnat e an aut hor i zed r epr esent at i ve t o be r esponsi bl e f or t he pr epar at i on of t he schedul e and al l r equi r ed updat i ng and pr oduct i on of r epor t s. The aut hor i zed r epr esent at i ve must have a mi ni mum of 2- year s exper i ence schedul i ng const r uct i on pr oj ect s s i mi l ar i n s i ze and nat ur e t o t hi s pr oj ect wi t h schedul i ng sof t war e t hat meet s t he r equi r ement s of t hi s speci f i cat i on. Repr esent at i ve must have a compr ehensi ve knowl edge of CPM schedul i ng pr i nci pl es and appl i cat i on.
PART 2 PRODUCTS
2. 1 SOFTWARE
Use Pr i maver a P6 ver si on 7. 0 or l at er as t he schedul i ng sof t war e t o pr oduce and updat e t he schedul es r equi r ed her ei n.
SECTI ON 01 32 01 Page 3
PART 3 EXECUTI ON
3. 1 GENERAL REQUI REMENTS
Pr epar e f or appr oval a Pr oj ect Schedul e, as speci f i ed her ei n. Show i n t he schedul e t he pr oposed sequence t o per f or m t he wor k and dat es cont empl at ed f or st ar t i ng and compl et i ng al l schedul e act i v i t i es. The schedul i ng of t he ent i r e pr oj ect i s r equi r ed. The schedul i ng of construction i s t he r esponsi bi l i t y of t he Cont r act or . Cont r act or management per sonnel must act i vel y par t i c i pat e i n i t s devel opment . Subcont r act or s and suppl i er s wor ki ng on t he pr oj ect must al so cont r i but e i n devel opi ng and mai nt ai ni ng an accur at e Pr oj ect Schedul e. Pr ovi de a schedul e t hat i s a f or war d pl anni ng as wel l as a pr oj ect moni t or i ng t ool . Use t he Cr i t i cal Pat h Met hod ( CPM) of net wor k cal cul at i on t o gener at e al l Pr oj ect Schedul es.
Pr epar e each Pr oj ect Schedul e usi ng t he Pr ecedence Di agr am Met hod ( PDM) .
3. 2 BASI S FOR PAYMENT AND COST LOADI NG
The schedul e i s t he basi s f or det er mi ni ng cont r act ear ni ngs dur i ng each updat e per i od and t her ef or e t he amount of each pr ogr ess payment . The aggr egat e val ue of al l act i v i t i es coded t o a cont r act CLI N must equal t he val ue of t he CLI N.
3. 2. 1 Act i v i t y Cost Loadi ng
Act i v i t y cost l oadi ng must be r easonabl e and wi t hout f r ont - end l oadi ng.
Pr ovi de addi t i onal document at i on t o demonst r at e r easonabl eness i f r equest ed by t he Cont r act i ng Of f i cer .
3. 2. 2 Wi t hhol di ngs / Payment Rej ect i on
Fai l ur e t o meet t he r equi r ement s of t hi s speci f i cat i on may r esul t i n t he di sappr oval of t he pr el i mi nar y, i ni t i al or per i odi c schedul e updat es and subsequent r ej ect i on of payment r equest s unt i l compl i ance i s met .
I n t he event t hat t he Cont r act i ng Of f i cer di r ect s schedul e r evi s i ons and t hose r evi s i ons have not been i ncl uded i n subsequent Pr oj ect Schedul e r evi s i ons or updat es, t he Cont r act i ng Of f i cer may wi t hhol d 10 per cent of pay r equest amount f r om each payment per i od unt i l such r evi s i ons t o t he pr oj ect schedul e have been made.
3. 3 PROJECT SCHEDULE DETAI LED REQUI REMENTS
3. 3. 1 Level of Det ai l Requi r ed
Devel op t he Pr oj ect Schedul e t o t he appr opr i at e l evel of det ai l t o addr ess maj or mi l est ones and t o al l ow f or sat i sf act or y pr oj ect pl anni ng and execut i on. Fai l ur e t o devel op t he Pr oj ect Schedul e t o an appr opr i at e l evel of det ai l wi l l r esul t i n i t s di sappr oval . The Cont r act i ng Of f i cer wi l l consi der , but i s not l i mi t ed t o, t he f ol l owi ng char act er i st i cs and r equi r ement s t o det er mi ne appr opr i at e l evel of det ai l :
3. 3. 2 Act i v i t y Dur at i ons
Reasonabl e act i v i t y dur at i ons ar e t hose t hat al l ow t he pr ogr ess of ongoi ng act i v i t i es t o be accur at el y det er mi ned bet ween updat e per i ods.
Less t han 2 per cent of al l non- pr ocur ement act i v i t i es may have Or i gi nal Dur at i ons ( OD) gr eat er t han 20 wor k days or 30 cal endar days.
SECTI ON 01 32 01 Page 4
3. 3. 3 Pr ocur ement Act i v i t i es
I ncl ude act i v i t i es associ at ed wi t h t he cr i t i cal submi t t al s and t hei r appr oval s, pr ocur ement , f abr i cat i on, and del i ver y of l ong l ead mat er i al s, equi pment , f abr i cat ed assembl i es, and suppl i es. Long l ead pr ocur ement act i v i t i es ar e t hose wi t h an ant i c i pat ed pr ocur ement sequence of over 90 cal endar days.
3. 3. 4 Mandat or y Tasks
I ncl ude t he f ol l owi ng act i v i t i es/ t asks i n t he i ni t i al pr oj ect schedul e and al l updat es.
a. Submi ssi on, r evi ew and accept ance of SD- 01 Pr econst r uct i on Submi t t al s ( i ndi v i dual act i v i t y f or each) .
b. Submi ssi on, r evi ew and accept ance of f eat ur es r equi r e desi gn compl et i on
c. Submi ssi on of mechani cal / el ect r i cal / i nf or mat i on syst ems l ayout drawings.
d. Long pr ocur ement act i v i t i es
e. Submi ssi on and appr oval of O & M manual s.
f . Submi ssi on and appr oval of as- bui l t dr awi ngs.
g. Submi ssi on and appr oval of DD1354 dat a and i nst al l ed equi pment l i s t s.
h. Submi ssi on and appr oval of t est i ng and ai r bal ance ( TAB) .
i . Submi ssi on of TAB speci al i st desi gn r evi ew r epor t .
j . Submi ssi on and appr oval of f i r e pr ot ect i on speci al i st .
k. Submi ssi on and appr oval of Bui l di ng Commi ssi oni ng Pl an, t est dat a, and r epor t s: Devel op t he schedul e l ogi c associ at ed wi t h t est i ng and commi ssi oni ng of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .