W912P5-16-T-0031-U0002.pdf
PDF 31 KB Posted
- Attached to
- HVAC at Center Hill Federal contract opportunity
- Solicitation number
- W912P5-16-T-0031
About this file
W912P5-16-T-0031-U0002 Set 2 Questions Answers Posting Pre-Quote Meeting and Site Visit and Request for Quotes due date extended to 6 June 2016 at 4 00 p.m. CST.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912P5-15-T-0031-0001.pdf | ||
| W912P5-16-T-0031.pdf | ||
| Site_Visit_Registration_Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTING BRANCH (EJC)
EUGENIA.J.CORDER@USACE.ARMY.MIL
110 NINTH AVE SOUTH, ROOM A405
NASHVILLE TN 37203-3817
W38XDD60693504
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Project: Center Hill HVAC Replacement
This solicitation is being amended to address the questions asked during the scheduled Pre-Quote meeting and Site Visit on 24 May 2016 and to include the minutes of the Pre-Quote meeting. There w ill be no additional questions accepted follow ing the issuance of this amendment.
The request for quotes due date is extended to 6 June 2016 at 4:00 p.m. CST.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-May-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P5-16-T-0031
X 9B. DATED (SEE ITEM 11)
13-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-May-2016
CODE
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, ROOM A680
NASHVILLE TN 37202-1070
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912P5
FACILITY CODECODE
EMAIL:TEL:
W912P5-16-T-0031
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
MINUTES OF PRE-QUOTE MTG.
CELRN-RC-N 24 May 2016
MEMORANDUM FOR RECORD
SUBJECT: Minutes for Nashville Center Hill Lake, Resource Management and Maintenance Compound HVAC Replacements (W912P5-16-T-0031) Pre-Quote Meeting/Site Visit
1. Purpose: To summarize the Pre-Quote Meeting and Site Visit held on 24 May 2016 at Center Hill Lake.
2. Attendees:
Government:
Mr. Anthony Crow, CELRN-OP-MCA-CEN/R Mr. Larry Sutton, CELRN-OP-MCA-CEN/R Mr. Michael Roysden, CELRN-OP-MCA-CEN/R
Contractors/Other Attendees:
James E. Dunham – Jackson H&C David S. Campbell – Lee Company Vernon Pendley – TMC Carlon Graham – Graham Services Chris Fox – Volunteer Heating & Cooling Michael LaBroski – RPM Jon Wood – International Systems Dwight Watson – International Systems Steve Grant - E Solutions Daniel Barnes – Sparta Heat & Air Donishia Morgan – Teed, Inc.
Tommy Morgan – Teed, Inc.
3. Summary of Discussions: The Government started the meeting at 9:00 a.m. Central Time with a brief overview of the project and contracting requirements.
a. INTRODUCTIONS: Government employees/other attendees introduced themselves and attendees signed-in.
b. Solicitation W912P5-16-T-0031, HVAC Replacement is a firm fixed price contract with a 100% set aside for Woman-Owned Small Business (WOSB).
c. PROJECT DESCRIPTION: To supply and deliver Brand Name or Approved Equal HVAC
Replacement at Resource Management Office and Maintenance Compound, which includes One, five ton [5TN] split unit; One, two ton [2TN] split unit; and One, one and a half Ton split unit [1.5TN]. The contractor shall be responsible for removal and disposal of the existing units. The government shall be provided documentation assuring Freon has been collected according to all required laws and regulations.
This documentation shall be provided prior to removal of the units from the worksite. The contractor shall provide all necessary supplies to install the new units. This shall include new concrete pads, any additional wiring (copper), breakers, conduit, and drain pans with float switches to include any plumbing to carry overflow condensation from the drain pans to a waste line. This work shall include programmable thermostats for each of the newly installed units etc. All of the new systems shall be electric with the capacity to supply emergency heat properly rated for each unit, shall hold an energy star rating, and standard warranty for commercial applications. All units shall have a minimum 13 seer.
d. QUESTIONS: Questions were addressed to the best of the Government’s ability, but anything said at the Pre-Quote Meeting or Site Visit are considered not official unless it is in writing in the issued amendment to the solicitation. Questions shall be in writing and sent to Eugenia Corder at email address eugenia.j.corder@usace.army.mil no later than May 26, 2016 at 2:00 pm Central Time. Questions received after this deadline will not be addressed.
(1) An amendment will be posted with the information and questions from the meeting on www.fbo.gov website.
e. SOLICITATION OVERVIEW:
(1) Quotes are due on June 2 by 4:00 pm Central Time. (Since the meeting, the Quote due date is now June 6 by 4:00 pm Central Time.)
(2) Quotes may be sent either by email, postal service or courier.
(3) This contract will be a firm fixed price procurement which means all costs, including administrative, need to be figured in the line items.
(4) Award shall be made to the lowest priced contractor who is found to be responsible. Quotes must meet or exceed the technical specifications to be considered for award.
(5) To ensure the Brand Name or Equal equipment meets the technical specifications, product data sheets are required with the submitted quote.
(6) To be awarded this contract, Contractors will have to be registered in SAM (System for
Award Management, www.sam.gov).
(7) Contractors MUST include in their quote a signed copy of the SF 1449. Contractors also MUST acknowledge all amendments (if applicable).
(8) The instructions for preparing quotes can be found in the Quote Instructions section of the solicitation.
f. Comments from Technical:
4. Attendees toured the site which ended approximately at 10:15 a.m. Central Time.
Signed-ejc
EUGENIA CORDER
Contract Specialist
SET 2 Q&A
Question and Answers for Center Hill Lake, Maintenance Shop & Resource Manager’s Office, HVAC Replacements
2. Question: Do all concrete pads need to be replaced?
Answer: Scope of work states, “work shall include new concrete pads.”
3. Question: Is the 5 Ton unit in Section One a package unit or split unit?
Answer: To clarify, Section One of the scope of work is: “One five ton [5] TN package unit.”
4. Question: Who is responsible to repair the dry wall upstairs [RMO] if it has to be modified to install new air handlers?
Answer: It will be the contractor's responsibility to repair any modifications made to any structure or walls to remove existing equipment or install new equipment.
5. Question: What is the estimated size or magnitude of this project in dollars?
Answer: Since this is a service contract, the government will not provide a magnitude for this project.
Disclosure of the magnitude is only required on construction projects.
6. Question: The maintenance compound split system condensing unit appears to be installed on a poured concrete base. Given the difficulty and expense of breaking up this concrete slab, can the pad be re-used and/or just expanded if needed?
Answer: Refer back to Question 2’s answer.
7. Question: Will Lennox be considered as an approved manufacturer?
Answer: Yes
8. Question: The Scope and Specifications reference split systems; does the government want heat pump condensing units or straight AC condensing units?
Answer: In Section One and Section Two, the Scope of Work specifies, "All new systems shall be electric with the capacity to supply emergency heat properly rated for each unit". The government requires units designed to heat and cool, and in addition to have emergency heat.
9. Question: The Scope and Specifications references a 5 ton split system for the office building, the existing unit is a packaged unit. Does the government want the unit replaced with a packaged heat pump with auxiliary electric heat, a packaged straight cooling unit with auxiliary electric heat or the packaged system converted to a split system?
Answer: The government requires a packaged heat pump with auxiliary heat. This means the unit will be air conditioning and heating with auxiliary heat.
10. Question: The five ton system is controlled with what appears to be a Honeywell zoning system.
Does the government want this system to remain or to be removed and replaced with the programmable thermostat referenced in the Scope and Specifications?
Answer: The government requires the zoning system to remain. There are two thermostats that control the unit, and these two thermostats will be replaced.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 02-Jun-2016 04:00 PM to 06-Jun-2016 04:00 PM.