W912P516R0003.pdf
PDF 819 KB Posted
- Attached to
- Old Hickory Lake O & M Requirements Contract
- Solicitation number
- W912P5-16-R-0003
About this file
Solicitation W912P5-16-R-0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sample_MOR.pdf | ||
| QA_W912P516R0003.docx | DOCX document | |
| Summary_of_Changes_16R0003Amend1.docx | DOCX document | |
| Price_Schedule_-_OLD_-_Amendment.xlsx | XLSX spreadsheet | |
| W912P516R0003_0001.pdf | ||
| US_Citizen_Pre-Bid_or_Site_Visit_Form_JUL_2014.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 16 Feb 2016
A X B X C
D
EX
X G F 146 - 155
156 - 160 X H 161 - 178
Kristal.R.Jones@usace.army.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 178
(If other than Item 7) W912P5
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W912P5 8. ADDRESS OFFER TO
9. Sealed offers in original and 4 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Room A405 conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
KRISTAL JONES (615) 736-7916
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 34
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
35 - 101 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
103 - 104
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 105 - 107 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
108 - 119
PART II - CONTRACT CLAUSES
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, ROOM A680
NASHVILLE TN 37202-1070
CONTRACTING DIVISION (KRJ)
KRISTAL.R.JONES@USACE.ARMY.MIL
PHONE (615) 736-7916
FAX (615) 736-7124
NASHVILLE TN 37202
615-736-7932
615-736-7124FAX:
TEL:
615-736-7124FAX:
TEL: 615-736-7916
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
120 - 145
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
21 Jan 2016
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W912P5-16-R-0003
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Operations and Maintenance Requirements
FFP
Contract for Old Hickory Lake - Base Period (1 March 2016 through 31 December 2016)
NOTE: PLEASE FILL IN THE PRICE BREAKOUT SCHEDULE ONLY.
FOB: Destination
NET AMT
0002 1 Job OPTION Operations and Maintenance Requirements
FFP
Contract for Old Hickory Lake - Option Year One (1 January 2017 through 31 December 2017)
0003 1 Job OPTION Operations and Maintenance Requirements
FFP
Contract for Old Hickory Lake - Option Year Two (1 January 2018 through 31 December 2018)
0004 1 Job OPTION Operations and Maintenance Requirements
FFP
Contract for Old Hickory Lake - Option Year Three (1 January 2019 through 31 December 2019)
0005 1 Job OPTION Operations and Maintenance Requirements
FFP
Contract for Old Hickory Lake - Option Year Four (1 January 2020 through 31 December 2020)
PRICE SCHEDULE
Section B - Schedule of Prices Old Hickory Lake - Operation and Maintenance Services This is a Requirements Type Contract to furnish all necessary management, personnel, materials, supplies, tools, parts, equipment, and vehicles required to perform operations and maintenances services at Old Hickory Lake with options to extend the term of the contract.
NOTE: Offerors are strongly encouraged to attend the site inspection meeting and tour as discussed in Section L.
BASE YEAR
Section C‐2: Grass Mowing and Maintenance of Landscaped Areas Quantity Unit
Item # Title/Description (Max) Unit Price Total
0001 Avondale Day Use Area 20 Ea. ‐$
0002 Barton Creek Access 8 Ea. ‐$
0003 Bentleys Landing Access 8 Ea. ‐$
0004 Bull Creek Access 15 Ea. ‐$
0005 Cages Bend Camping Area 20 Ea. ‐$
0006 Cairo Access 8 Ea. ‐$
0007 Cedar Creek Camping Area 20 Ea. ‐$
0008 Cedar Creek Day Use Area 20 Ea. ‐$
0009 Coles Ferry Access 8 Ea. ‐$
0010 Davis Corner Access 15 Ea. ‐$
0011 Electronic Service Station 20 Ea. ‐$
0012 Environmental Study Area 15 Ea. ‐$
0013 Hartsville Access 8 Ea. ‐$
0014 Hunters Point Access 8 Ea. ‐$
0015 Laguardo Day Use Area 20 Ea. ‐$
0016 Left Bank ‐ Recreation Area 20 Ea. ‐$
0017 Left Bank ‐ Field Area 20 Ea. ‐$
0018 Left Bank ‐ Nature Trail 20 Ea. ‐$
0019 Left Bank ‐ CROC 20 Ea. ‐$
0020 Left Bank ‐ Operations Area 20 Ea. ‐$
0021 Lock 3 Day Use Area 20 Ea. ‐$
0022 Lone Branch Day Use Area 20 Ea. ‐$
0023 Martha Gallatin Day Use Area 15 Ea. ‐$
0024 Nat Caldwell Park 20 Ea. ‐$
0025 Old Hickory Beach Area 20 Ea. ‐$
0026 Old Union Access 8 Ea. ‐$
0027 Right Bank/Archery/Power Plant 20 Ea. ‐$
0028 RMO Office/Operation Area 20 Ea. ‐$
0029 Rockland Day Use Area 20 Ea. ‐$
0030 Sandy Chapel Access 8 Ea. ‐$
0031 Saundersville Access 8 Ea. ‐$
0032 Shutes Branch Day Use Area 20 Ea. ‐$
0033 Stark Knob Access 8 Ea. ‐$
0034 Station Camp Creek Access 15 Ea. ‐$
0035 Walton Ferry Day Use Area 8 Ea. ‐$
SECTION C‐2 ‐ Subtotal ‐$
Section C‐3: Cleaning Services of Recreational Facilities and Areas Quantity Unit
Item # Title/Description (Max) Unit Price Total
0036 Comfort Stations 1,650 EA ‐$
0037 Showerhouses 750 EA ‐$
0038 Portable Toilets/Handicap Accessible Portable Toilets 1,500 EA ‐$
0039 Picnic Shelters 4,000 EA ‐$
0040 Picnic Sites 36,000 EA ‐$
0041 Campsites 25,000 EA ‐$
0042 Litter 5,000 EA ‐$
0043 Trash Receptacles 37,000 EA ‐$
0044 Dumpsters 600 EA ‐$
0045 Sanitary Dump Stations 200 EA ‐$
0046 Tailwater Fishing Platform 250 EA ‐$
SECTION C‐3 ‐ Subtotal ‐$
Section C‐4: Janitorial Services Quantity Unit
Item # Title/Description (Max) Unit Price Total
0047 RMO's Office/Visitors Center 12 MO ‐$
0048 Operations Area 12 MO ‐$
0049 ESS and Communications Building 12 MO ‐$
0050 OHL Lock Office, Control Stands and Ops Mgr Office 12 MO ‐$
SECTION C‐4 ‐ Subtotal ‐$
Section C‐5: Facility Repair, Maintenance and Other Non‐Routine Work
Item # Title/Description (Max) Unit Price Total
NOTE: Item #'s 0051 ‐ 0079: Bid should be based on Service Wage Rates
0051 Emergency Work Surcharge 20 HR ‐$
0052 Carpenter 240 HR ‐$
0053 General Maintenance Worker Concrete/Masonry 100 HR ‐$
0054 Electrician 150 HR ‐$
0055 Equipment Operator/Truck Driver 20 HR ‐$
0056 Laborer 1,000 HR ‐$
0057 Painter 100 HR ‐$
0058 Plumber 40 HR ‐$
0059 Backhoe/Loader (Case 580 or Equiv.) 60 HR ‐$
0060 Boom Lift (40' min working height) 40 HR ‐$
0061 Brush Chipper (12‐inch intake) 40 HR ‐$
0062 Chainsaw 150 HR ‐$
0063 Generator, Portable (3000 watt) 20 HR ‐$
0064 Log splitter (portable, gas operated) 20 HR ‐$
0065 Pressure Washer (portable, gas, 2.000 psi) 40 HR ‐$
0066 Pump, Trash (Gas 300 GPM) 20 HR ‐$
0067 Saw, Concrete/Pavement 12" 20 HR ‐$
0068 Skidsteer, Loader (Bobcat 700‐800 series) 120 HR ‐$
0069 Angle Broom attachment 20 HR ‐$
0070 Pavement Breaker attachment 20 HR ‐$
0071 Auger attachment 20 HR ‐$
0072 Stump Cutter 20 HR ‐$
0073 Tractor (Ford 3600 or Eq.) 100 HR ‐$
0074 Trencher (Ditchwitch 3700 or Eq.) 40 HR ‐$
0075 Trencher w/Rock saw attachment 20 HR ‐$
0076 Truck 3/4 Ton Pickup 50 HR ‐$
0077 Truck, Dump (14 ton load capacity) 100 HR ‐$
0078 Truck, Stake Bed (10 ton load capacity) 20 HR ‐$
0079 Welder, portable, 200 amp 20 HR ‐$
The following equipment shall be available and compatable with the above listed tractor, and included in the hourly price of the tractor.
+ Rotary Mower, Heavy Duty 5 ft. Minimum
+ Fertilizer/Seed Spreader
+ Power Broom Min. 6'
NOTE: Item #'s 0080 ‐ 0108: Bid should be based on Davis Bacon Wage Act wage rates
0080 Carpenter 240 HR ‐$
0081 Concrete Finisher 100 HR ‐$
0082 Electrician 100 HR ‐$
0083 Heavy Equipment Operator/Truck Driver 20 HR ‐$
0084 Mason (Rock, Brick, Block) 100 HR ‐$
0085 Laborer 1,000 HR ‐$
0086 Painter 100 HR ‐$
0087 Plumber 40 HR ‐$
0088 Air Compressor (20 cfm w/rock drill) 20 HR ‐$
0089 Chainsaw 40 HR ‐$
0090 Compactor , vibratory plate 40 HR ‐$
0091 Drum Roller, Vibratory (6‐8 ton per. wt.) 20 HR ‐$
0092 Generator, Portable (3000 watt) 20 HR ‐$
0093 Saw, Concrete/Pavement 12" 20 HR ‐$
0094 Track Loader (Komatsu D57S) 20 HR ‐$
0095 Trackhoe (equiv. Case CX 50B, 41hp) 24" bucket 20 HR ‐$
0096 Trackhoe (equiv. Case CX 160B, 120hp) 1/2 yd bucket 20 HR ‐$
0097 Backhoe/Loader (Case 580 or Equiv.) 120 HR ‐$
0098 Skidsteer, Loader (Bobcat 700‐800 series) 120 HR ‐$
0099 Auger attachment 20 HR ‐$
0100 Pavement Breaker attachment 20 HR ‐$
0101 Bulldozer (Caterpillar D‐3 or Eq) 40 HR ‐$
0102 Tractor (Ford 3600 or Eq.) 40 HR ‐$
0103 Trencher (Ditchwitch 3700 or Eq.) 40 HR ‐$
0104 Trencher w/Rock saw attachment 20 HR ‐$
0105 Truck 3/4 Ton Pickup 20 HR ‐$
0106 Truck, Dump (14 ton load capacity) 200 HR ‐$
0107 Truck, Stake Bed (10 ton load capacity) 20 HR ‐$
0108 Welder, portable, 200 amp 20 HR ‐$
SECTION C‐5 ‐ Subtotal ‐$
Section C‐6: Maintenance of Landscaped Areas and Herbiciding
Item # Title/Description (Max) Unit Price Total
0109 Seeding 10 AC. ‐$
0110 Overseeding 75 AC. ‐$
0111 Fertilizing 75 AC. ‐$
0112 Herbiciding 80,000 SY. ‐$
SECTION C‐6 ‐ Subtotal ‐$
Section C‐7: Marking and Painting Boundary Lines Quantity Unit
Item # Title/Description (Max) Unit Price Total
0113 Mark and Paint Boundary Lines 75 MI. ‐$
SECTION C‐7 ‐ Subtotal ‐$
Section C‐8: Beach and Playground Maintenance and Beach Water Testing Quantity Unit
Item # Title/Description (Max) Unit Price Total
0114 Routine Beach Maintenance 100 EA ‐$
0115 Routine Playground Maintenance 300 EA ‐$
0116 Beach Water Testing 50 EA ‐$
SECTION C‐8 ‐ Subtotal ‐$
Section C‐9: Pavement Striping and Sealing Quantity Unit
Item # Title/Description (Max) Unit Price Total
0117 Pavement Sealing 30,000 SY ‐$
0118 Restriping / Layout and Striping 4,000 LF ‐$
SECTION C‐9 ‐ Subtotal ‐$
Section C‐10: Portable Toilets and Sewage Systems
Item # Title/Description (Max) Unit Price Total
0119 Holding Tanks or Pump Stations 100 EA ‐$
0120 Portable Toilets 350 EA ‐$
0121 Portable Toilets ‐ Handicap Accessible 425 EA ‐$
0122 Wastewater Treatment Plant LB 12 EA ‐$
SECTION C‐10 ‐ Subtotal ‐$
Quantity Unit
Item # Title/Description (Max) Unit Price Total
0123 Payment and Performance Bonds ‐$
SECTION C‐14 ‐ Subtotal ‐$
Base Year Total ‐$
Section C‐11: Bonding
OPTION YEAR 1
Quantity Unit
Item # Title/Description (Max) Unit Price Total
1001 Avondale Day Use Area 20 Ea. ‐$
1002 Barton Creek Access 8 Ea. ‐$
1003 Bentleys Landing Access 8 Ea. ‐$
1004 Bull Creek Access 15 Ea. ‐$
1005 Cages Bend Camping Area 20 Ea. ‐$
1006 Cairo Access 8 Ea. ‐$
1007 Cedar Creek Camping Area 20 Ea. ‐$
1008 Cedar Creek Day Use Area 20 Ea. ‐$
1009 Coles Ferry Access 8 Ea. ‐$
1010 Davis Corner Access 15 Ea. ‐$
1011 Electronic Service Station 20 Ea. ‐$
1012 Environmental Study Area 15 Ea. ‐$
1013 Hartsville Access 8 Ea. ‐$
1014 Hunters Point Access 8 Ea. ‐$
1015 Laguardo Day Use Area 20 Ea. ‐$
1016 Left Bank ‐ Recreation Area 20 Ea. ‐$
1017 Left Bank ‐ Field Area 20 Ea. ‐$
1018 Left Bank ‐ Nature Trail 20 Ea. ‐$
1019 Left Bank ‐ CROC 20 Ea. ‐$
1020 Left Bank ‐ Operations Area 20 Ea. ‐$
1021 Lock 3 Day Use Area 20 Ea. ‐$
1022 Lone Branch Day Use Area 20 Ea. ‐$
1023 Martha Gallatin Day Use Area 15 Ea. ‐$
1024 Nat Caldwell Park 20 Ea. ‐$
1025 Old Hickory Beach Area 20 Ea. ‐$
1026 Old Union Access 8 Ea. ‐$
1027 Right Bank/Archery/Power Plant 20 Ea. ‐$
1028 RMO Office/Operation Area 20 Ea. ‐$
1029 Rockland Day Use Area 20 Ea. ‐$
1030 Sandy Chapel Access 8 Ea. ‐$
1031 Saundersville Access 8 Ea. ‐$
1032 Shutes Branch Day Use Area 20 Ea. ‐$
1033 Stark Knob Access 8 Ea. ‐$
1034 Station Camp Creek Access 15 Ea. ‐$
1035 Walton Ferry Day Use Area 8 Ea. ‐$
Item # Title/Description (Max) Unit Price Total
1036 Comfort Stations 1,650 EA ‐$
1037 Showerhouses 750 EA ‐$
1038 Portable Toilets/Handicap Accessible Portable Toilets 1,500 EA ‐$
1039 Picnic Shelters 4,000 EA ‐$
1040 Picnic Sites 36,000 EA ‐$
1041 Campsites 25,000 EA ‐$
1042 Litter 5,000 EA ‐$
1043 Trash Receptacles 37,000 EA ‐$
1044 Dumpsters 600 EA ‐$
1045 Sanitary Dump Stations 200 EA ‐$
1046 Tailwater Fishing Platform 250 EA ‐$
SECTION C‐3 ‐ Subtotal ‐$
Section C‐4: Janitorial Services Quantity Unit
Item # Title/Description (Max) Unit Price Total
1047 RMO's Office/Visitors Center 12 MO ‐$
1048 Operations Area 12 MO ‐$
1049 ESS and Communications Building 12 MO ‐$
1050 OHL Lock Office, Control Stands and Ops Mgr Office 12 MO ‐$
Item # Title/Description (Max) Unit Price Total
NOTE: Item #'s 0051 ‐ 0079: Bid should be based on Service Wage Rates
1051 Emergency Work Surcharge 20 HR ‐$
1052 Carpenter 240 HR ‐$
1053 General Maintenance Worker Concrete/Masonry 100 HR ‐$
1054 Electrician 150 HR ‐$
1055 Equipment Operator/Truck Driver 20 HR ‐$
1056 Laborer 1,000 HR ‐$
1057 Painter 100 HR ‐$
1058 Plumber 40 HR ‐$
1059 Backhoe/Loader (Case 580 or Equiv.) 60 HR ‐$
1060 Boom Lift (40' min working height) 40 HR ‐$
1061 Brush Chipper (12‐inch intake) 40 HR ‐$
1062 Chainsaw 150 HR ‐$
1063 Generator, Portable (3000 watt) 20 HR ‐$
1064 Log splitter (portable, gas operated) 20 HR ‐$
1065 Pressure Washer (portable, gas, 2.000 psi) 40 HR ‐$
1066 Pump, Trash (Gas 300 GPM) 20 HR ‐$
1067 Saw, Concrete/Pavement 12" 20 HR ‐$
1068 Skidsteer, Loader (Bobcat 700‐800 series) 120 HR ‐$
1069 Angle Broom attachment 20 HR ‐$
1070 Pavement Breaker attachment 20 HR ‐$
1071 Auger attachment 20 HR ‐$
1072 Stump Cutter 20 HR ‐$
1073 Tractor (Ford 3600 or Eq.) 100 HR ‐$
1074 Trencher (Ditchwitch 3700 or Eq.) 40 HR ‐$
1075 Trencher w/Rock saw attachment 20 HR ‐$
1076 Truck 3/4 Ton Pickup 50 HR ‐$
1077 Truck, Dump (14 ton load capacity) 100 HR ‐$
1078 Truck, Stake Bed (10 ton load capacity) 20 HR ‐$
1079 Welder, portable, 200 amp 20 HR ‐$ included in the hourly price of the tractor.
+ Rotary Mower, Heavy Duty 5 ft. Minimum
+ Fertilizer/Seed Spreader
+ Power Broom Min. 6'
NOTE: Item #'s 0080 ‐ 0108: Bid should be based on Davis Bacon Wage Act wage rates
1080 Carpenter 240 HR ‐$
1081 Concrete Finisher 100 HR ‐$
1082 Electrician 100 HR ‐$
1083 Heavy Equipment Operator/Truck Driver 20 HR ‐$
1084 Mason (Rock, Brick, Block) 100 HR ‐$
1085 Laborer 1,000 HR ‐$
1086 Painter 100 HR ‐$
1087 Plumber 40 HR ‐$
1088 Air Compressor (20 cfm w/rock drill) 20 HR ‐$
1089 Chainsaw 40 HR ‐$
1090 Compactor , vibratory plate 40 HR ‐$
1091 Drum Roller, Vibratory (6‐8 ton per. wt.) 20 HR ‐$
1092 Generator, Portable (3000 watt) 20 HR ‐$
1093 Saw, Concrete/Pavement 12" 20 HR ‐$
1094 Track Loader (Komatsu D57S) 20 HR ‐$
1095 Trackhoe (equiv. Case CX 50B, 41hp) 24" bucket 20 HR ‐$
1096 Trackhoe (equiv. Case CX 160B, 120hp) 1/2 yd bucket 20 HR ‐$
1097 Backhoe/Loader (Case 580 or Equiv.) 120 HR ‐$
1098 Skidsteer, Loader (Bobcat 700‐800 series) 120 HR ‐$
1099 Auger attachment 20 HR ‐$
1100 Pavement Breaker attachment 20 HR ‐$
1101 Bulldozer (Caterpillar D‐3 or Eq) 40 HR ‐$
1102 Tractor (Ford 3600 or Eq.) 40 HR ‐$
1103 Trencher (Ditchwitch 3700 or Eq.) 40 HR ‐$
1104 Trencher w/Rock saw attachment 20 HR ‐$
1105 Truck 3/4 Ton Pickup 20 HR ‐$
1106 Truck, Dump (14 ton load capacity) 200 HR ‐$
1107 Truck, Stake Bed (10 ton load capacity) 20 HR ‐$
1108 Welder, portable, 200 amp 20 HR ‐$
Item # Title/Description (Max) Unit Price Total
1109 Seeding 10 AC. ‐$
1110 Overseeding 75 AC. ‐$
1111 Fertilizing 75 AC. ‐$
1112 Herbiciding 80,000 SY. ‐$
SECTION C‐6 ‐ Subtotal ‐$
Section C‐7: Marking and Painting Boundary Lines Quantity Unit
Item # Title/Description (Max) Unit Price Total
1113 Mark and Paint Boundary Lines 75 MI. ‐$
SECTION C‐7 ‐ Subtotal ‐$
Section C‐8: Beach and Playground Maintenance and Beach Water Testing Quantity Unit
Item # Title/Description (Max) Unit Price Total
1114 Routine Beach Maintenance 100 EA ‐$
1115 Routine Playground Maintenance 300 EA ‐$
1116 Beach Water Testing 50 EA ‐$
SECTION C‐8 ‐ Subtotal ‐$
Section C‐9: Pavement Striping and Sealing
Item # Title/Description (Max) Unit Price Total
1117 Pavement Sealing 30,000 SY ‐$
1118 Restriping / Layout and Striping 4,000 LF ‐$
SECTION C‐9 ‐ Subtotal ‐$
Section C‐10: Portable Toilets and Sewage Systems Quantity Unit
Item # Title/Description (Max) Unit Price Total
1119 Holding Tanks or Pump Stations 100 EA ‐$
1120 Portable Toilets 350 EA ‐$
1121 Portable Toilets ‐ Handicap Accessible 425 EA ‐$
1122 Wastewater Treatment Plant LB 12 EA ‐$
SECTION C‐10 ‐ Subtotal ‐$
Quantity Unit
Item # Title/Description (Max) Unit Price Total
1123 Payment and Performance Bonds ‐$
SECTION C‐14 ‐ Subtotal ‐$
Option Year 1 Total ‐$
OPTION YEAR 2
Quantity Unit
Item # Title/Description (Max) Unit Price Total
2001 Avondale Day Use Area 20 Ea. ‐$
2002 Barton Creek Access 8 Ea. ‐$
2003 Bentleys Landing Access 8 Ea. ‐$
2004 Bull Creek Access 15 Ea. ‐$
2005 Cages Bend Camping Area 20 Ea. ‐$
2006 Cairo Access 8 Ea. ‐$
2007 Cedar Creek Camping Area 20 Ea. ‐$
2008 Cedar Creek Day Use Area 20 Ea. ‐$
2009 Coles Ferry Access 8 Ea. ‐$
2010 Davis Corner Access 15 Ea. ‐$
2011 Electronic Service Station 20 Ea. ‐$
2012 Environmental Study Area 15 Ea. ‐$
2013 Hartsville Access 8 Ea. ‐$
2014 Hunters Point Access 8 Ea. ‐$
2015 Laguardo Day Use Area 20 Ea. ‐$
2016 Left Bank ‐ Recreation Area 20 Ea. ‐$
2017 Left Bank ‐ Field Area 20 Ea. ‐$
2018 Left Bank ‐ Nature Trail 20 Ea. ‐$
2019 Left Bank ‐ CROC 20 Ea. ‐$
2020 Left Bank ‐ Operations Area 20 Ea. ‐$
2021 Lock 3 Day Use Area 20 Ea. ‐$
2022 Lone Branch Day Use Area 20 Ea. ‐$
2023 Martha Gallatin Day Use Area 15 Ea. ‐$
2024 Nat Caldwell Park 20 Ea. ‐$
2025 Old Hickory Beach Area 20 Ea. ‐$
2026 Old Union Access 8 Ea. ‐$
2027 Right Bank/Archery/Power Plant 20 Ea. ‐$
2028 RMO Office/Operation Area 20 Ea. ‐$
2029 Rockland Day Use Area 20 Ea. ‐$
2030 Sandy Chapel Access 8 Ea. ‐$
2031 Saundersville Access 8 Ea. ‐$
2032 Shutes Branch Day Use Area 20 Ea. ‐$
2033 Stark Knob Access 8 Ea. ‐$
2034 Station Camp Creek Access 15 Ea. ‐$
2035 Walton Ferry Day Use Area 8 Ea. ‐$
Item # Title/Description (Max) Unit Price Total
2036 Comfort Stations 1,650 EA ‐$
2037 Showerhouses 750 EA ‐$
2038 Portable Toilets/Handicap Accessible Portable Toilets 1,500 EA ‐$
2039 Picnic Shelters 4,000 EA ‐$
2040 Picnic Sites 36,000 EA ‐$
2041 Campsites 25,000 EA ‐$
2042 Litter 5,000 EA ‐$
2043 Trash Receptacles 37,000 EA ‐$
2044 Dumpsters 600 EA ‐$
2045 Sanitary Dump Stations 200 EA ‐$
2046 Tailwater Fishing Platform 250 EA ‐$
SECTION C‐3 ‐ Subtotal ‐$
Section C‐4: Janitorial Services Quantity Unit
Item # Title/Description (Max) Unit Price Total
2047 RMO's Office/Visitors Center 12 MO ‐$
2048 Operations Area 12 MO ‐$
2049 ESS and Communications Building 12 MO ‐$
2050 OHL Lock Office, Control Stands and Ops Mgr Office 12 MO ‐$
Item # Title/Description (Max) Unit Price Total
NOTE: Item #'s 0051 ‐ 0079: Bid should be based on Service Wage Rates
2051 Emergency Work Surcharge 20 HR ‐$
2052 Carpenter 240 HR ‐$
2053 General Maintenance Worker Concrete/Masonry 100 HR ‐$
2054 Electrician 150 HR ‐$
2055 Equipment Operator/Truck Driver 20 HR ‐$
2056 Laborer 1,000 HR ‐$
2057 Painter 100 HR ‐$
2058 Plumber 40 HR ‐$
2059 Backhoe/Loader (Case 580 or Equiv.) 60 HR ‐$
2060 Boom Lift (40' min working height) 40 HR ‐$
2061 Brush Chipper (12‐inch intake) 40 HR ‐$
2062 Chainsaw 150 HR ‐$
2063 Generator, Portable (3000 watt) 20 HR ‐$
2064 Log splitter (portable, gas operated) 20 HR ‐$
2065 Pressure Washer (portable, gas, 2.000 psi) 40 HR ‐$
2066 Pump, Trash (Gas 300 GPM) 20 HR ‐$
2067 Saw, Concrete/Pavement 12" 20 HR ‐$
2068 Skidsteer, Loader (Bobcat 700‐800 series) 120 HR ‐$
2069 Angle Broom attachment 20 HR ‐$
2070 Pavement Breaker attachment 20 HR ‐$
2071 Auger attachment 20 HR ‐$
2072 Stump Cutter 20 HR ‐$
2073 Tractor (Ford 3600 or Eq.) 100 HR ‐$
2074 Trencher (Ditchwitch 3700 or Eq.) 40 HR ‐$
2075 Trencher w/Rock saw attachment 20 HR ‐$
2076 Truck 3/4 Ton Pickup 50 HR ‐$
2077 Truck, Dump (14 ton load capacity) 100 HR ‐$
2078 Truck, Stake Bed (10 ton load capacity) 20 HR ‐$
2079 Welder, portable, 200 amp 20 HR ‐$ included in the hourly price of the tractor.
+ Rotary Mower, Heavy Duty 5 ft. Minimum
+ Fertilizer/Seed Spreader
+ Power Broom Min. 6'
NOTE: Item #'s 0080 ‐ 0108: Bid should be based on Davis Bacon Wage Act wage rates
2080 Carpenter 240 HR ‐$
2081 Concrete Finisher 100 HR ‐$
2082 Electrician 100 HR ‐$
2083 Heavy Equipment Operator/Truck Driver 20 HR ‐$
2084 Mason (Rock, Brick, Block) 100 HR ‐$
2085 Laborer 1,000 HR ‐$
2086 Painter 100 HR ‐$
2087 Plumber 40 HR ‐$
2088 Air Compressor (20 cfm w/rock drill) 20 HR ‐$
2089 Chainsaw 40 HR ‐$
2090 Compactor , vibratory plate 40 HR ‐$
2091 Drum Roller, Vibratory (6‐8 ton per. wt.) 20 HR ‐$
2092 Generator, Portable (3000 watt) 20 HR ‐$
2093 Saw, Concrete/Pavement 12" 20 HR ‐$
2094 Track Loader (Komatsu D57S) 20 HR ‐$
2095 Trackhoe (equiv. Case CX 50B, 41hp) 24" bucket 20 HR ‐$
2096 Trackhoe (equiv. Case CX 160B, 120hp) 1/2 yd bucket 20 HR ‐$
2097 Backhoe/Loader (Case 580 or Equiv.) 120 HR ‐$
2098 Skidsteer, Loader (Bobcat 700‐800 series) 120 HR ‐$
2099 Auger attachment 20 HR ‐$
2100 Pavement Breaker attachment 20 HR ‐$
2101 Bulldozer (Caterpillar D‐3 or Eq) 40 HR ‐$
2102 Tractor (Ford 3600 or Eq.) 40 HR ‐$
2103 Trencher (Ditchwitch 3700 or Eq.) 40 HR ‐$
2104 Trencher w/Rock saw attachment 20 HR ‐$
2105 Truck 3/4 Ton Pickup 20 HR ‐$
2106 Truck, Dump (14 ton load capacity) 200 HR ‐$
2107 Truck, Stake Bed (10 ton load capacity) 20 HR ‐$
2108 Welder, portable, 200 amp 20 HR ‐$
Item # Title/Description (Max) Unit Price Total
2109 Seeding 10 AC. ‐$
2110 Overseeding 75 AC. ‐$
2111 Fertilizing 75 AC. ‐$
2112 Herbiciding 80,000 SY. ‐$
SECTION C‐6 ‐ Subtotal ‐$
Section C‐7: Marking and Painting Boundary Lines Quantity Unit
Item # Title/Description (Max) Unit Price Total
2113 Mark and Paint Boundary Lines 75 MI. ‐$
SECTION C‐7 ‐ Subtotal ‐$
Section C‐8: Beach and Playground Maintenance and Beach Water Testing Quantity Unit
Item # Title/Description (Max) Unit Price Total
2114 Routine Beach Maintenance 100 EA ‐$
2115 Routine Playground Maintenance 300 EA ‐$
2116 Beach Water Testing 50 EA ‐$
Item # Title/Description (Max) Unit Price Total
2117 Pavement Sealing 30,000 SY ‐$
2118 Restriping / Layout and Striping 4,000 LF ‐$
SECTION C‐9 ‐ Subtotal ‐$
Section C‐10: Portable Toilets and Sewage Systems Quantity Unit
Item # Title/Description (Max) Unit Price Total
2119 Holding Tanks or Pump Stations 100 EA ‐$
2120 Portable Toilets 350 EA ‐$
2121 Portable Toilets ‐ Handicap Accessible 425 EA ‐$
2122 Wastewater Treatment Plant LB 12 EA ‐$
SECTION C‐10 ‐ Subtotal ‐$
Quantity Unit
Item # Title/Description (Max) Unit Price Total
2123 Payment and Performance Bonds ‐$
SECTION C‐14 ‐ Subtotal ‐$
Option Year 2 Total ‐$
OPTION YEAR 3
Quantity Unit
Item # Title/Description (Max) Unit Price Total
3001 Avondale Day Use Area 20 Ea. ‐$
3002 Barton Creek Access 8 Ea. ‐$
3003 Bentleys Landing Access 8 Ea. ‐$
3004 Bull Creek Access 15 Ea. ‐$
3005 Cages Bend Camping Area 20 Ea. ‐$
3006 Cairo Access 8 Ea. ‐$
3007 Cedar Creek Camping Area 20 Ea. ‐$
3008 Cedar Creek Day Use Area 20 Ea. ‐$
3009 Coles Ferry Access 8 Ea. ‐$
3010 Davis Corner Access 15 Ea. ‐$
3011 Electronic Service Station 20 Ea. ‐$
3012 Environmental Study Area 15 Ea. ‐$
3013 Hartsville Access 8 Ea. ‐$
3014 Hunters Point Access 8 Ea. ‐$
3015 Laguardo Day Use Area 20 Ea. ‐$
3016 Left Bank ‐ Recreation Area 20 Ea. ‐$
3017 Left Bank ‐ Field Area 20 Ea. ‐$
3018 Left Bank ‐ Nature Trail 20 Ea. ‐$
3019 Left Bank ‐ CROC 20 Ea. ‐$
3020 Left Bank ‐ Operations Area 20 Ea. ‐$
3021 Lock 3 Day Use Area 20 Ea. ‐$
3022 Lone Branch Day Use Area 20 Ea. ‐$
3023 Martha Gallatin Day Use Area 15 Ea. ‐$
3024 Nat Caldwell Park 20 Ea. ‐$
3025 Old Hickory Beach Area 20 Ea. ‐$
3026 Old Union Access 8 Ea. ‐$
3027 Right Bank/Archery/Power Plant 20 Ea. ‐$
3028 RMO Office/Operation Area 20 Ea. ‐$
3029 Rockland Day Use Area 20 Ea. ‐$
3030 Sandy Chapel Access 8 Ea. ‐$
3031 Saundersville Access 8 Ea. ‐$
3032 Shutes Branch Day Use Area 20 Ea. ‐$
3033 Stark Knob Access 8 Ea. ‐$
3034 Station Camp Creek Access 15 Ea. ‐$
3035 Walton Ferry Day Use Area 8 Ea. ‐$
Item # Title/Description (Max) Unit Price Total
3036 Comfort Stations 1,650 EA ‐$
3037 Showerhouses 750 EA ‐$
3038 Portable Toilets/Handicap Accessible Portable Toilets 1,500 EA ‐$
3039 Picnic Shelters 4,000 EA ‐$
3040 Picnic Sites 36,000 EA ‐$
3041 Campsites 25,000 EA ‐$
3042 Litter 5,000 EA ‐$
3043 Trash Receptacles 37,000 EA ‐$
3044 Dumpsters 600 EA ‐$
3045 Sanitary Dump Stations 200 EA ‐$
3046 Tailwater Fishing Platform 250 EA ‐$
SECTION C‐3 ‐ Subtotal ‐$
Section C‐4: Janitorial Services Quantity Unit
Item # Title/Description (Max) Unit Price Total
3047 RMO's Office/Visitors Center 12 MO ‐$
3048 Operations Area 12 MO ‐$
3049 ESS and Communications Building 12 MO ‐$
3050 OHL Lock Office, Control Stands and Ops Mgr Office 12 MO ‐$
Item # Title/Description (Max) Unit Price Total
NOTE: Item #'s 0051 ‐ 0079: Bid should be based on Service Wage Rates
3051 Emergency Work Surcharge 20 HR ‐$
3052 Carpenter 240 HR ‐$
3053 General Maintenance Worker Concrete/Masonry 100 HR ‐$
3054 Electrician 150 HR ‐$
3055 Equipment Operator/Truck Driver 20 HR ‐$
3056 Laborer 1,000 HR ‐$
3057 Painter 100 HR ‐$
3058 Plumber 40 HR ‐$
3059 Backhoe/Loader (Case 580 or Equiv.) 60 HR ‐$
3060 Boom Lift (40' min working height) 40 HR ‐$
3061 Brush Chipper (12‐inch intake) 40 HR ‐$
3062 Chainsaw 150 HR ‐$
3063 Generator, Portable (3000 watt) 20 HR ‐$
3064 Log splitter (portable, gas operated) 20 HR ‐$
3065 Pressure Washer (portable, gas, 2.000 psi) 40 HR ‐$
3066 Pump, Trash (Gas 300 GPM) 20 HR ‐$
3067 Saw, Concrete/Pavement 12" 20 HR ‐$
3068 Skidsteer, Loader (Bobcat 700‐800 series) 120 HR ‐$
3069 Angle Broom attachment 20 HR ‐$
3070 Pavement Breaker attachment 20 HR ‐$
3071 Auger attachment 20 HR ‐$
3072 Stump Cutter 20 HR ‐$
3073 Tractor (Ford 3600 or Eq.) 100 HR ‐$
3074 Trencher (Ditchwitch 3700 or Eq.) 40 HR ‐$
3075 Trencher w/Rock saw attachment 20 HR ‐$
3076 Truck 3/4 Ton Pickup 50 HR ‐$
3077 Truck, Dump (14 ton load capacity) 100 HR ‐$
3078 Truck, Stake Bed (10 ton load capacity) 20 HR ‐$
3079 Welder, portable, 200 amp 20 HR ‐$ included in the hourly price of the tractor.
+ Rotary Mower, Heavy Duty 5 ft. Minimum
+ Fertilizer/Seed Spreader
+ Power Broom Min. 6'
NOTE: Item #'s 0080 ‐ 0108: Bid should be based on Davis Bacon Wage Act wage rates
3080 Carpenter 240 HR ‐$
3081 Concrete Finisher 100 HR ‐$
3082 Electrician 100 HR ‐$
3083 Heavy Equipment Operator/Truck Driver 20 HR ‐$
3084 Mason (Rock, Brick, Block) 100 HR ‐$
3085 Laborer 1,000 HR ‐$
3086 Painter 100 HR ‐$
3087 Plumber 40 HR ‐$
3088 Air Compressor (20 cfm w/rock drill) 20 HR ‐$
3089 Chainsaw 40 HR ‐$
3090 Compactor , vibratory plate 40 HR ‐$
3091 Drum Roller, Vibratory (6‐8 ton per. wt.) 20 HR ‐$
3092 Generator, Portable (3000 watt) 20 HR ‐$
3093 Saw, Concrete/Pavement 12" 20 HR ‐$
3094 Track Loader (Komatsu D57S) 20 HR ‐$
3095 Trackhoe (equiv. Case CX 50B, 41hp) 24" bucket 20 HR ‐$
3096 Trackhoe (equiv. Case CX 160B, 120hp) 1/2 yd bucket 20 HR ‐$
3097 Backhoe/Loader (Case 580 or Equiv.) 120 HR ‐$
3098 Skidsteer, Loader (Bobcat 700‐800 series) 120 HR ‐$
3099 Auger attachment 20 HR ‐$
3100 Pavement Breaker attachment 20 HR ‐$
3101 Bulldozer (Caterpillar D‐3 or Eq) 40 HR ‐$
3102 Tractor (Ford 3600 or Eq.) 40 HR ‐$
3103 Trencher (Ditchwitch 3700 or Eq.) 40 HR ‐$
3104 Trencher w/Rock saw attachment 20 HR ‐$
3105 Truck 3/4 Ton Pickup 20 HR ‐$
3106 Truck, Dump (14 ton load capacity) 200 HR ‐$
3107 Truck, Stake Bed (10 ton load capacity) 20 HR ‐$
3108 Welder, portable, 200 amp 20 HR ‐$
Item # Title/Description (Max) Unit Price Total
3109 Seeding 10 AC. ‐$
3110 Overseeding 75 AC. ‐$
3111 Fertilizing 75 AC. ‐$
3112 Herbiciding 80,000 SY. ‐$
SECTION C‐6 ‐ Subtotal ‐$
Section C‐7: Marking and Painting Boundary Lines Quantity Unit
Item # Title/Description (Max) Unit Price Total
3113 Mark and Paint Boundary Lines 75 MI. ‐$
SECTION C‐7 ‐ Subtotal ‐$
Section C‐8: Beach and Playground Maintenance and Beach Water Testing Quantity Unit
Item # Title/Description (Max) Unit Price Total
3114 Routine Beach Maintenance 100 EA ‐$
3115 Routine Playground Maintenance 300 EA ‐$
3116 Beach Water Testing 50 EA ‐$
Item # Title/Description (Max) Unit Price Total
3117 Pavement Sealing 30,000 SY ‐$
3118 Restriping / Layout and Striping 4,000 LF ‐$
SECTION C‐9 ‐ Subtotal ‐$
Section C‐10: Portable Toilets and Sewage Systems Quantity Unit
Item # Title/Description (Max) Unit Price Total
3119 Holding Tanks or Pump Stations 100 EA ‐$
3120 Portable Toilets 350 EA ‐$
3121 Portable Toilets ‐ Handicap Accessible 425 EA ‐$
3122 Wastewater Treatment Plant LB 12 EA ‐$
SECTION C‐10 ‐ Subtotal ‐$
Quantity Unit
Item # Title/Description (Max) Unit Price Total
3123 Payment and Performance Bonds ‐$
SECTION C‐14 ‐ Subtotal ‐$
Option Year 3 Total ‐$
OPTION YEAR 4
Quantity Unit
Item # Title/Description (Max) Unit Price Total
4001 Avondale Day Use Area 20 Ea. ‐$
4002 Barton Creek Access 8 Ea. ‐$
4003 Bentleys Landing Access 8 Ea. ‐$
4004 Bull Creek Access 15 Ea. ‐$
4005 Cages Bend Camping Area 20 Ea. ‐$
4006 Cairo Access 8 Ea. ‐$
4007 Cedar Creek Camping Area 20 Ea. ‐$
4008 Cedar Creek Day Use Area 20 Ea. ‐$
4009 Coles Ferry Access 8 Ea. ‐$
4010 Davis Corner Access 15 Ea. ‐$
4011 Electronic Service Station 20 Ea. ‐$
4012 Environmental Study Area 15 Ea. ‐$
4013 Hartsville Access 8 Ea. ‐$
4014 Hunters Point Access 8 Ea. ‐$
4015 Laguardo Day Use Area 20 Ea. ‐$
4016 Left Bank ‐ Recreation Area 20 Ea. ‐$
4017 Left Bank ‐ Field Area 20 Ea. ‐$
4018 Left Bank ‐ Nature Trail 20 Ea. ‐$
4019 Left Bank ‐ CROC 20 Ea. ‐$
4020 Left Bank ‐ Operations Area 20 Ea. ‐$
4021 Lock 3 Day Use Area 20 Ea. ‐$
4022 Lone Branch Day Use Area 20 Ea. ‐$
4023 Martha Gallatin Day Use Area 15 Ea. ‐$
4024 Nat Caldwell Park 20 Ea. ‐$
4025 Old Hickory Beach Area 20 Ea. ‐$
4026 Old Union Access 8 Ea. ‐$
4027 Right Bank/Archery/Power Plant 20 Ea. ‐$
4028 RMO Office/Operation Area 20 Ea. ‐$
4029 Rockland Day Use Area 20 Ea. ‐$
4030 Sandy Chapel Access 8 Ea. ‐$
4031 Saundersville Access 8 Ea. ‐$
4032 Shutes Branch Day Use Area 20 Ea. ‐$
4033 Stark Knob Access 8 Ea. ‐$
4034 Station Camp Creek Access 15 Ea. ‐$
4035 Walton Ferry Day Use Area 8 Ea. ‐$
Item # Title/Description (Max) Unit Price Total
4036 Comfort Stations 1,650 EA ‐$
4037 Showerhouses 750 EA ‐$
4038 Portable Toilets/Handicap Accessible Portable Toilets 1,500 EA ‐$
4039 Picnic Shelters 4,000 EA ‐$
4040 Picnic Sites 36,000 EA ‐$
4041 Campsites 25,000 EA ‐$
4042 Litter 5,000 EA ‐$
4043 Trash Receptacles 37,000 EA ‐$
4044 Dumpsters 600 EA ‐$
4045 Sanitary Dump Stations 200 EA ‐$
4046 Tailwater Fishing Platform 250 EA ‐$
SECTION C‐3 ‐ Subtotal ‐$
Section C‐4: Janitorial Services Quantity Unit
Item # Title/Description (Max) Unit Price Total
4047 RMO's Office/Visitors Center 12 MO ‐$
4048 Operations Area 12 MO ‐$
4049 ESS and Communications Building 12 MO ‐$
4050 OHL Lock Office, Control Stands and Ops Mgr Office 12 MO ‐$
Item # Title/Description (Max) Unit Price Total
NOTE: Item #'s 0051 ‐ 0079: Bid should be based on Service Wage Rates
4051 Emergency Work Surcharge 20 HR ‐$
4052 Carpenter 240 HR ‐$
4053 General Maintenance Worker Concrete/Masonry 100 HR ‐$
4054 Electrician 150 HR ‐$
4055 Equipment Operator/Truck Driver 20 HR ‐$
4056 Laborer 1,000 HR ‐$
4057 Painter 100 HR ‐$
4058 Plumber 40 HR ‐$
4059 Backhoe/Loader (Case 580 or Equiv.) 60 HR ‐$
4060 Boom Lift (40' min working height) 40 HR ‐$
4061 Brush Chipper (12‐inch intake) 40 HR ‐$
4062 Chainsaw 150 HR ‐$
4063 Generator, Portable (3000 watt) 20 HR ‐$
4064 Log splitter (portable, gas operated) 20 HR ‐$
4065 Pressure Washer (portable, gas, 2.000 psi) 40 HR ‐$
4066 Pump, Trash (Gas 300 GPM) 20 HR ‐$
4067 Saw, Concrete/Pavement 12" 20 HR ‐$
4068 Skidsteer, Loader (Bobcat 700‐800 series) 120 HR ‐$
4069 Angle Broom attachment 20 HR ‐$
4070 Pavement Breaker attachment 20 HR ‐$
4071 Auger attachment 20 HR ‐$
4072 Stump Cutter 20 HR ‐$
4073 Tractor (Ford 3600 or Eq.) 100 HR ‐$
4074 Trencher (Ditchwitch 3700 or Eq.) 40 HR ‐$
4075 Trencher w/Rock saw attachment 20 HR ‐$
4076 Truck 3/4 Ton Pickup 50 HR ‐$
4077 Truck, Dump (14 ton load capacity) 100 HR ‐$
4078 Truck, Stake Bed (10 ton load capacity) 20 HR ‐$
4079 Welder, portable, 200 amp 20 HR ‐$ included in the hourly price of the tractor.
+ Rotary Mower, Heavy Duty 5 ft. Minimum
+ Fertilizer/Seed Spreader
+ Power Broom Min. 6'
NOTE: Item #'s 0080 ‐ 0108: Bid should be based on Davis Bacon Wage Act wage rates
4080 Carpenter 240 HR ‐$
4081 Concrete Finisher 100 HR ‐$
4082 Electrician 100 HR ‐$
4083 Heavy Equipment Operator/Truck Driver 20 HR ‐$
4084 Mason (Rock, Brick, Block) 100 HR ‐$
4085 Laborer 1,000 HR ‐$
4086 Painter 100 HR ‐$
4087 Plumber 40 HR ‐$
4088 Air Compressor (20 cfm w/rock drill) 20 HR ‐$
4089 Chainsaw 40 HR ‐$
4090 Compactor , vibratory plate 40 HR ‐$
4091 Drum Roller, Vibratory (6‐8 ton per. wt.) 20 HR ‐$
4092 Generator, Portable (3000 watt) 20 HR ‐$
4093 Saw, Concrete/Pavement 12" 20 HR ‐$
4094 Track Loader (Komatsu D57S) 20 HR ‐$
4095 Trackhoe (equiv. Case CX 50B, 41hp) 24" bucket 20 HR ‐$
4096 Trackhoe (equiv. Case CX 160B, 120hp) 1/2 yd bucket 20 HR ‐$
4097 Backhoe/Loader (Case 580 or Equiv.) 120 HR ‐$
4098 Skidsteer, Loader (Bobcat 700‐800 series) 120 HR ‐$
4099 Auger attachment 20 HR ‐$
4100 Pavement Breaker attachment 20 HR ‐$
4101 Bulldozer (Caterpillar D‐3 or Eq) 40 HR ‐$
4102 Tractor (Ford 3600 or Eq.) 40 HR ‐$
4103 Trencher (Ditchwitch 3700 or Eq.) 40 HR ‐$
4104 Trencher w/Rock saw attachment 20 HR ‐$
4105 Truck 3/4 Ton Pickup 20 HR ‐$
4106 Truck, Dump (14 ton load capacity) 200 HR ‐$
4107 Truck, Stake Bed (10 ton load capacity) 20 HR ‐$
4108 Welder, portable, 200 amp 20 HR ‐$
Item # Title/Description (Max) Unit Price Total
4109 Seeding 10 AC. ‐$
4110 Overseeding 75 AC. ‐$
4111 Fertilizing 75 AC. ‐$
4112 Herbiciding 80,000 SY. ‐$
SECTION C‐6 ‐ Subtotal ‐$
Section C‐7: Marking and Painting Boundary Lines Quantity Unit
Item # Title/Description (Max) Unit Price Total
4113 Mark and Paint Boundary Lines 75 MI. ‐$
SECTION C‐7 ‐ Subtotal ‐$
Section C‐8: Beach and Playground Maintenance and Beach Water Testing Quantity Unit
Item # Title/Description (Max) Unit Price Total
4114 Routine Beach Maintenance 100 EA ‐$
4115 Routine Playground Maintenance 300 EA ‐$
4116 Beach Water Testing 50 EA ‐$
Item # Title/Description (Max) Unit Price Total
4117 Pavement Sealing 30,000 SY ‐$
4118 Restriping / Layout and Striping 4,000 LF ‐$
SECTION C‐9 ‐ Subtotal ‐$
Section C‐10: Portable Toilets and Sewage Systems Quantity Unit
Item # Title/Description (Max) Unit Price Total
4119 Holding Tanks or Pump Stations 100 EA ‐$
4120 Portable Toilets 350 EA ‐$
4121 Portable Toilets ‐ Handicap Accessible 425 EA ‐$
4122 Wastewater Treatment Plant LB 12 EA ‐$
SECTION C‐10 ‐ Subtotal ‐$
Quantity Unit
Item # Title/Description (Max) Unit Price Total
4123 Payment and Performance Bonds ‐$
SECTION C‐14 ‐ Subtotal ‐$
Totals
Base Year ‐$
Option Year 1 ‐$
Option Year 2 ‐$
Option Year 3 ‐$
Option Year 4 ‐$
Old Hickory Lake ‐ Operation and Maintenance Services
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT
DESCRIPTION/SPECIFICATIONS
SECTION C-1
General
C-1.1 PROJECT INFORMATION. The Nashville District U.S. Army Corps of Engineers (USACE) anticipates a requirement for a firm fixed-price requirements contract with a base and four (4) option years for operation and maintenance services at Old Hickory Lake.
Old Hickory Lake is located on the Cumberland River approximately 25 miles upstream from Nashville, Tennessee. The areas of work are located in Sumner, Wilson, Trousdale, and Davidson counties of Tennessee.
Principal cities in the areas are Hendersonville, Gallatin, Mt. Juliet, Old Hickory, Hermitage and Hartsville Tennessee. Old Hickory Lock and Dam is located on mile 216.2, and the Visitor’s Center, Resource Manager’s Office, Shop Office and Operations Area, and Contract Administrator’s Office are located in close proximity to Old Hickory Dam in Hendersonville, Tennessee.
C-1.2 SCOPE OF WORK. The Contractor shall furnish all necessary management, supervision, inspection, personnel, materials, supplies, parts, tools, tool related hardware, equipment, transportation, vehicles, and fuel except as otherwise provided herein, required to perform mowing, cleaning, janitorial, and other maintenance and operations services at the Old Hickory Lake project recreation areas, as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Attachments, Exhibits, Tables, etc., contained herein or incorporated by reference. Incorporation by reference shall include any and all mandatory provisions required by the Federal Acquisition Regulation (FAR) whether it is referenced or not referenced, current at time of award.
Estimated quantities and/or the work to be performed is described herein and listed on separate sheets as Exhibits.
These quantities are approximate and are provided as information only to assist in the preparation of proposals.
They are not guaranteed and the actual quantities may be less than shown. Variation in these estimated quantities shall not be justification for modification of the contract or request for additional payment. The services required in this contract are in addition to the routine operation and maintenance performed by Government personnel, however, the Government reserves the right to perform any or all of the services described herein with its own personnel or volunteers. Increase or decreased visitation shall not justify a price increase. The Contractor’s work and responsibility shall include, but shall not be limited to, all planning, programming, administration and management necessary to assure that all services are conducted in accordance with the contract and all applicable laws, regulations, codes, or directives. The Contractor shall ensure that all work meets or exceeds critical reliability rates or tolerances specified or included in referenced documents. The Contractor shall perform all related contractor administrative services necessary to perform the work such as supply, procurement, quality control, work scheduling, contractor financial control, and maintenance of accurate and complete records and files as well as timely submission of required files and reports to the Government.
It is emphasized that the work described in this contract is a critical part of the Corps mission. The work described will be performed in a public recreation area. The Corps is committed to "Customer Care" and providing quality professional service.
Minor repair, renovation, lake fluctuations, or lack of funds may cause reduced frequency services ordered or the temporary or permanent closing of some portions or all of some public use areas. Visitation may increase or decrease; such events will not be a basis for a claim under this contract. The Contractor’s work schedule shall be sufficiently flexible to meet these changing needs.
C-1.3 TASK ORDERS. All work under this contract will be ordered by issuance of individual Task Orders (DD Form 1155, see Exhibit E). No work shall be performed under this contract before an individual Task Order has been issued by the Ordering Officer (OO). Only the OO, by issuance of a modification, may make any change to a Task Order. The Task Order will list those items from the bid schedule that are to be performed or used to perform the work.
C-1.4. NEGOTIATION. Task Orders that are to be performed on an hourly basis (e.g., using items from C-5 of the bid schedule) will be agreed upon by negotiation between the Contractor and the Contracting Officer’s Representative (COR). This process is outlined in Section C-5 of this document.
C-1.5 WORKING HOURS.
a. Normal Working Hours. Normal working hours and days, except as otherwise specified herein or approved in advance by the Contracting Officer’s Representative (COR), shall be Monday through Friday, 7 am to 5 pm and for recreational area requirements shall include Saturday through Sunday between 7am to 5pm, or as specified on the Task Order. Work that interferes with other ongoing functions at the project shall be scheduled around normal working hours, as specified by the Contracting Officer Representative (COR). Refer to individual sections of this specification for specific schedules of work.
b. Holiday Work. The ten Federal holidays observed are:
New Year's Day (January 1st) Martin Luther King Day (3rd Monday in January) President's Day (3rd Monday in February) Memorial Day (Last Monday in May) Independence Day (July 4th) Labor Day (1st Monday in September) Columbus Day (2nd Monday in October) Veterans Day (November 11th) Thanksgiving Day (4th Thursday in November) Christmas Day (December 25th)
When one of the above holidays falls on Sunday, the following Monday will be observed as a legal holiday. When a legal holiday falls on Saturday, the proceeding Friday is observed as a holiday. Work shall be scheduled around the above listed Federal holidays except as specified herein or as approved by the COR.
Routine services shall be performed on some holidays (Memorial Day, Independence Day, Labor Day, and Columbus Day) as scheduled in the specifications or as approved by the COR. Refer to the individual sections of this contract for specific Section of work.
c. Inclement Weather Work. The Contractor shall maintain the schedule of services regardless of inclement weather. Exceptions may be approved by the COR when severe conditions make it impractical or dangerous to perform the work. The COR will notify the Contractor, by modification to the Task Order, of any change that extends the performance period due to inclement weather.
d. Emergency and/or After Hours Work. Work may be required on holiday periods during heavy visitation, emergencies, or for other reasons as determined by the COR. Additional personnel may be required to handle the additional work load during holiday periods because of heavy visitation. The COR will notify the Contractor of actual work requirements. Emergency Repair work ordered under Section C-5 may be required 24 hours per day and/or seven days per week.
C-1.6 CONTRACTOR SUBMITTALS. Unless otherwise specified, the Contractor shall submit the following information to the COR prior to the pre-work conference for this contract:
a. Quality Control Plan. This plan must be approved by the COR prior to start of work and becomes a part of the awarded contract.
b. Contractor Quality Control Inspector. List of Quality Control Inspectors.
c. Contractor Representatives. List of names of Contractor Representatives.
d. Accident Prevention Plan (APP). A suggested outline for the Contractor’s Accident Prevention Plan is in Exhibit D. See Section C-1.9 for APP requirements.
e. Emergency Contacts. A prioritized list, including phone numbers, of those persons (normally Contractor Representatives) to call in case of emergencies.
f. Operators. A list of names of qualified equipment/vehicle operators, including experience, training and qualification to operate specific equipment.
g. Certificate of Insurance – See Section H
h. Performance Bond (where applicable) – See Section H
i. Security Requirements – Section H
C-1.7 PERMITS AND LICENSES. The Contractor shall, at his own expense, obtain any licenses, permits, or certifications required to perform all aspects, requirements, and work under this contract. The Contractor shall comply with all current Federal, State, and local laws and regulations and shall comply with any subsequent changes. The government shall pay for utility permit cost and fees charged by the utility company.
C-1.8 IDENTIFICATION OF CONTRACT EMPLOYEES AND VEHICLES. The Contractor shall furnish his employees (including the Contract Representative - Superintendent), other than office and clerical personnel, standardized uniforms (shirt-pants) with a company patch or embroidered identification on the breast pocket or on the sleeve at the top of the arm, within 30 days after notice of award of the contract. Any employee hired 30 calendar days after award of the Contract shall be in the required uniform within 14 calendar days of the date of hire. Contractor uniforms shall not resemble U.S. Army Corps of Engineers uniforms. Contractor employees and subcontractors shall wear these uniforms at all times they are performing work under this contract. Exceptions may be granted by the COR for short term workers, or during disasters, emergencies, wildfire suppression, or special circumstances specified by the COR. Stained or faded uniforms shall not be worn.
All vehicles used by the Contractor and major subcontractors to perform work under this contract shall be identified with the company name prominently displayed (minimum two inch letters) on the outside of both front doors of each vehicle in a professional manner to provide an attractive and readily visible means of identification. Logos shall not be used in lieu of the above described vehicle identification.
The Contractor may require his employees to report in their own vehicles to the project, but these personal vehicles must be parked at a site designated by the COR.
The contractor shall provide a list of employees, their address, telephone contact information, and nationality of all Employees who may perform work under this contract. The contractor shall notify the COR of any personnel changes and provide an updated list within two workdays.
C-1.9 SAFETY AND SECURITY REQUIREMENTS.
a. General. If the Contractor fails or refuses to promptly comply with safety and security requirements as specified herein, the COR or any other project employee may stop all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such work stoppage shall be made subject to any claims for extension of time or for excess costs or damages sustained by the Contractor.
Also, the Contractor will not be paid for work not performed as a result of the stop order.
The Contractor shall comply with the Occupational Safety and Health Act (OSHA), the Corps of Engineers Manual, EM 385-1-1 (http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1- 1_2008Sep_Consolidated_2011Aug.pdf.), and as otherwise stated herein. Special attention shall be given to the requirements for safety meetings. The Contractor shall inform the COR a minimum of 7 days prior to a Contractor monthly safety meeting, to permit a Government representative to attend.
b. Accident Prevention Plan (APP). The Contractor shall prepare an Accident Prevention Plan to assure that requirements of the safety program are provided as specified. This plan must be accepted by the Contracting Officer prior to commencement of any work. One copy of the Accident Prevention Plan shall be provided to the Contracting Officer and the COR one week prior to the pre-work conference. The Accident Prevention Plan must be in the outline and form prescribed in Appendix A of EM 385-1-1.
c. Activity Hazard Analysis.
1) The Contractor shall use Activity Hazard Analyses (AHA’s) as one of many tools to insure safe performance of work. It is the Contractor’s responsibility to prepare the AHA. An approved AHA must be prepared by the Contractor for each Task Order issued by the Government. Sample AHA’s may be available at the project office for review and use by the Contractor to assist in the development of site specific Activity Hazard Analyses prior to the Contractor performing the job. The Contractor is encouraged to revise or add to these sample AHA’s as necessary to address changing conditions. Prior to performing jobs with inherent hazards, the Contractor shall review, at a “Tool Box” safety meeting, the approved AHA’s with those employees who shall perform that work each time the work is ordered. The Government may request advanced notification of the time and date of the above AHA Tool Box safety meeting for Contractor employees so that the Government may attend such reviews.
2) The Government will require the Contractor to prepare an AHA for any jobs for which an adequate
AHA does not already exist. A copy of this AHA shall be submitted to the COR and must be accepted before the Contractor starts the job. This copy of the AHA will become the property of the Government. Guidance is included in Exhibit D, which shall be used by the Contractor as a guide for the preparation of required AHA's.
3) A copy of an approved AHA is required for each Task Order issued by the Government. A copy of the approved AHA’s shall be available at all times to workers at each associated job site and a copy shall be provided to the Government.
d. Public Safety. The Contractor shall ensure that reasonable precautions are taken to protect the public at all times where work is being performed. The Contractor shall immediately report to the COR any potential hazards found by his employees on the project. The Accident Prevention Plan shall include procedures to be taken to provide for public safety.