W912P5-16-B-0001_TSpecs.pdf

PDF 2 MB Posted

Attached to
Paving for the Nashville Area
Solicitation number
W912P5-16-B-0001
Issued by

About this file

Technical Specifications

View the file

Other files

File Type Posted
Bid_Opening_Sign-In_Sheet.pdf PDF
Bid_Abstract.pdf PDF
W912P5-16-B-0001-0001.pdf PDF
W912P5-16-B-0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. W912P5-16-B-0001

US Army Corps Of Engineers Nashville District

REQUIREMENTS CONTRACT

PAVING AND MISCELLANEOUS

ROAD IMPROVEMENTS

Various Recreation Areas in the Nashville Area of Operations to include Old Hickory Lake, Cheatham Lake and J. Percy Priest Reservoir Various Counties, Tennessee

Technical Specifications

July 2016

THIS PAGE INTENTIONALLY LEFT BLANK

FOR DUPLEX PRINTING

Paving and Miscellaneous Various Recreation Areas in the Nashville Area Road Improvements - W912P5-16-B-0001 Various Counties, Tennessee

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 GENERAL REQUIREMENTS

01 22 00 PRICE AND PAYMENT PROCEDURES

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 50 PROJECT SITE SECURITY AND AT/OPSEC PROCEDURES

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 01 QUALITY CONTROL

01 45 02 QUALITY CONTROL SYSTEM (QCS)

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 78 00 CLOSEOUT SUBMITTALS

01 95 00 FORMS AND ATTACHMENTS

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 12 00 PAVING AND MISCELLANEOUS ROAD IMPROVEMENTS - TENNESSEE

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 00 00

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 SCOPE

1.2 SITE LOCATIONS AND DESCRIPTION

1.3 REFERENCES

1.4 STANDARD SPECIFICATIONS

1.4.1 Tennessee Standard Specifications(TDOT Std Specs)

1.4.2 Non-Applicable Provisions of the Standard Specifications

1.5 CONTRACTOR'S USE OF PREMISES

1.5.1 Limits of Use

1.5.2 Site Operation

1.5.3 Materials and Equipment

1.5.4 Loads on Structures

1.6 SITE INVESTIGATION

1.6.1 Underground Utilities

1.7 OWNER OCCUPANCY

1.7.1 Owner Occupancy

1.7.2 Contractor's Operation

1.8 PARTIAL OWNER OCCUPANCY

1.8.1 Partial Occupancy

1.8.2 Government Access

1.8.3 Restoration and Repair

1.9 ACCIDENT PREVENTION

1.10 SUBMITTALS

1.11 PARTNERING

1.12 COORDINATION CONFERENCES

1.13 EVALUATION OF CONTRACTOR PERFORMANCE

1.14 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS

CONTRACTS

1.15 WARRANTY

1.16 MEASUREMENT AND PAYMENT

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section Table of Contents --

SECTION 01 00 00 Page 1

SECTION 01 00 00

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 SCOPE

The Contractor shall furnish all necessary technical expertise; planning;

management; supervision; inspection; personnel; parts; tools; fuel;

equipment; vehicles and transportation; materials and supplies; except as otherwise provided for herein, required to perform the work as requested by each task order. The Contractor shall be required to commence work within ten (10) days of issuance of a task order, unless otherwise described in the task order, and provide the required work within the performance period specified in the task order. The Contractor shall be prepared to receive and execute concurrent task orders at different locations within the boundaries of the contract as specified below. All work shall be completed as specified, detailed and/or in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, contained herein or incorporated by reference. Incorporation by reference shall include any and all mandatory provisions required by the Federal Acquisition Regulation (FAR) whether it is referenced or not referenced, current at time of award.

The work covered by this contract consists of furnishing all equipment, labor, and materials required to pave, seal, resurface, and/or reshape and compact existing roads and parking areas, pavement striping, and installation of curbs and guardrail at various Nashville Area (NAS/A) locations to include Corps of Engineers facilities adjacent to Old Hickory Lake, Cheatham Lake, and J. Percy Priest Reservoir.

1.2 SITE LOCATIONS AND DESCRIPTION

The Contractor is required to perform work at numerous US Government Nashville Area (NAS/A) locations to include Resource Management Recreation Areas adjacent to Old Hickory Lake, Cheatham Lake, and J. Percy Priest Reservoir. These areas are located in various counties in Middle Tennessee.

1.3 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

TENNESSEE DEPARTMENT OF TRANSPORTATION (TDOT)

TDOT Std Specs (2015) Standard Specifications for Road and Bridge Construction, including subsequent Supplementals to date

1.4 STANDARD SPECIFICATIONS

All materials, equipment and workmanship shall be in accordance with the applicable portions of TDOT Std Specs, except as otherwise specified.

SECTION 01 00 00 Page 2

1.4.1 Tennessee Standard Specifications(TDOT Std Specs)

The words listed below are to be substituted in TDOT Std Specs by the words indicated:

Bureau to Government State to Government Department to Corps of Engineers Commissioner to Contracting Officer Engineer to Contracting Officer

1.4.2 Non-Applicable Provisions of the Standard Specifications

Measurement and payment provisions contained in the Standard Specifications (TDOT Std Specs) shall be considered non-applicable to this contract with the exception of specific references to specific provisions. Likewise, no contract administration provisions contained in the Standard Specifications apply to this contract. In general, only the technical provisions associated with a Standard Specification reference will apply. The contract clauses, contract administration provisions, and measurement and payment provisions contained in these specifications and contract documents shall govern over any such provisions in the Standard Specifications.

1.5 CONTRACTOR'S USE OF PREMISES

1.5.1 Limits of Use

Contractor shall limit his use of the premises for Work and for storage to allow for:

1. Work by other Contractors.

2. Government occupancy.

1.5.2 Site Operation

Confine operations at site to areas permitted by law ordinances, permits and Contract Documents.

1.5.3 Materials and Equipment

Do not unreasonably encumber site with materials or equipment.

1.5.4 Loads on Structures

Do not load structures with weight that will endanger structures.

1.6 SITE INVESTIGATION

The Contractor acknowledges that he has satisfied himself as to the nature and location of the Work, the general and local conditions, particularly those bearing upon transportation, disposal, handling and storage of materials, availability of labor, water, electric power, roads and uncertainties of weather, ground water table or similar physical conditions at the site, the conformation and condition of the ground, the character, quality and quantity of surface and subsurface materials to be encountered, the character of equipment and facilities needed prior to and during the prosecution of the Work and all other matters which can in any way affect the Work or the cost thereof under this Contract. Any failure by the

SECTION 01 00 00 Page 3

Contractor to acquaint himself with all the available information concerning these conditions will not relieve him from responsibility for estimating properly the difficulty or cost of successfully performing the Work.

1.6.1 Underground Utilities

There may be underground utilities crossing the jobsite and located within the limits of work. The Contractor shall coordinate all excavation with the Contracting Officer, and tailor his schedule and excavation methods to minimize the chance of damage and service interruptions to the affected utilities.

1.7 OWNER OCCUPANCY

1.7.1 Owner Occupancy

The Government will occupy the premises during the entire period of construction to conduct normal operation of recreation areas. Cooperate with Government in all construction operations to minimize conflict, and to facilitate usage of recreation areas.

1.7.2 Contractor's Operation

Contractor shall at all times conduct his operations as to insure the least inconvenience and the greatest amount of safety and security for the recreation areas.

1.8 PARTIAL OWNER OCCUPANCY

1.8.1 Partial Occupancy

The Government reserves the right of partial occupancy or use of facilities, services, and utilities, prior to Substantial Completion, without implying completion or acceptance of any part of the Project.

1.8.2 Government Access

The Contractor shall provide access to the site for Government personnel plus minimize impact on the operation of the existing recreation areas.

1.8.3 Restoration and Repair

Necessary restoration and repair of damage resulting from partial occupancy or use shall not be at the expense of the Contractor.

1.9 ACCIDENT PREVENTION

Accident prevention requirements for this project are stated in Section

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS.

1.10 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES

SECTION 01 00 00 Page 4

SD-01 Preconstruction Submittals

Project Schedule, G The Contractor shall provide a project schedule for each task order in accordance with Contract Clause 52.236-15 SCHEDULES FOR

CONSTRUCTION CONTRACTS.

Verified/Eligible Employee Candidates Investigation Package Foreign Nationals Submittal requirements for project site security are detailed in the Nashville District Public Website as described in paragraph

PROJECT SITE SECURITY REQUIREMENTS.

1.11 PARTNERING

In order to most effectively accomplish this contract, the Government urges the contractor to join the Government in establishing a cohesive and professional project management team. Through this "partnering" relationship both entities would strive to draw on the strengths of each organization for the ultimate goal of assuring that the project’s intended results are achieved, within budget and on schedule. This endeavor seeks an environment that nurtures team building, cooperation and trust between the Government and the Contractor. The partnering relationship would be bilateral in make-up, and participation will be totally voluntary.

The first step in initiating the concept would be a joint project management team "partnering" conference attended by multiple officers from each organization representing management and the key jobsite staff of each entity. The initial conference would be held within the first thirty (30) days following contract award. The Resident Engineer would chair the conference, establish its agenda and distribute minutes of the meeting. A professional facilitator acceptable to both parties would lead the participants of the session,through the steps of team building and the formation of a problem solving mechanism within the group. The conference duration would be no more than one day. Location of the conference would be offsite within a 60 mile radius of the jobsite at a facility which offers conference rooms and food service. All costs in connection with rented facilities and the facilitator would be shared equally by the Government and the Contractor. Each organization would pay other costs of its respective employees attending the conference.

Additional partnering sessions would be held no less than biannually.

Implementation of the partnering concept and philosophy would be an on-going process.

1.12 COORDINATION CONFERENCES

Routine coordination conferences will be scheduled by the Contracting Officer throughout the life of this contract. Coordination conferences will be held to discuss contract administration, Contractor quality control, phasing, scheduling, and other aspects relating to this construction. The Corps of Engineers and the Contractor will be represented at each of these meetings. Similar information concerning replacement personnel shall be forwarded to the Contracting Officer, should any replacement be required at any time during the life of this contract. Coordination conferences will be scheduled to occur when notified by the Contracting Officer.

SECTION 01 00 00 Page 5

1.13 EVALUATION OF CONTRACTOR PERFORMANCE

The Contractor's performance will be evaluated in accordance with FAR Part

42.15 in the areas of quality, schedule, cost control, management, utilization of small businesses, and regulatory compliance at minimum. The evaluation will include a written narrative and rating of either exceptional, very good, satisfactory, marginal, or unsatisfactory for each. The format for the evaluation is attached at the end of Section

01 95 00 FORMS AND ATTACHMENTS.

The Contractor's review of the evaluation shall be completed electronically at the CPARS website, http://www.cpars.gov. This website also includes guidance and the user's manual.

Upon contract award, the Contractor shall provide the Contracting Officer with the name and e-mail address of the Contractor's Representative to be registered into the system. Following initial completion by the Government, the Contractor will have sixty (60) calendar days to review, comment, and return the evaluation.

1.14 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS

222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

Federal Veteran employment information at:

http://www.fedshirevets.gov/index.aspx

Department of Labor Veterans Employment Assistance:

http://www.dol.gov/vets/

Department of Veterans Affairs-VOW to Hire Heroes Act:

http://benefits.va.gov/vow/

Army Wounded Warrior Program:

http://wtc.army.mil/modules/employers/index.html

U.S. Chamber of Commerce Foundation-Hiring Our Heroes http://www.hiringourheroes.org/

Guide to Hiring Veterans - Reference Material:

http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_-_ guide_to_hiring_veterans_0.pdf

1.15 WARRANTY

Pursuant to the requirements of Contract Clause 52.246-21 WARRANTY OF CONSTRUCTION, the Contractor shall provide the Governement a one year warranty from the date of final acceptance by the Contracting Officer's Representative (COR), and comply with the requirements of Section 01 78 00

CLOSEOUT SUBMITTALS.

SECTION 01 00 00 Page 6

The warranty shall cover defective materials, design and workmanship. In instances where the material or equipment manufacturer's advertised minimum warranty is in excess of one year, it shall remain in force for its full period. Upon receipt of notice from the Contracting Officer of failure of any of the material or equipment during the warranty period, the Contractor shall promptly furnish and install new replacement parts at no additional cost to the Government.

1.16 MEASUREMENT AND PAYMENT

No separate payment will be made for the work covered under this section.

The costs thereof shall be included in the item to which the work most closely pertains

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section --

SECTION 01 00 00 Page 7

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 SUBMITTALS

1.2 GENERAL INFORMATION

1.2.1 Mineral Aggregate Base and Shoulders

1.2.1.1 Payment

1.2.1.2 Measurement

1.2.1.3 Unit of Measure

1.2.2 Bituminous Material for Tack Coat

1.2.2.1 Payment

1.2.2.2 Measurement

1.2.2.3 Unit of Measure

1.2.3 Bituminous Material for Prime Coat

1.2.3.1 Payment

1.2.3.2 Measurement

1.2.3.3 Unit of Measure

1.2.4 Mineral Aggregate for Asphaltic Concrete Surface

1.2.4.1 Payment

1.2.4.2 Measurement

1.2.4.3 Unit of Measure

1.2.5 Asphaltic Cement for Asphaltic Concrete Surface

1.2.5.1 Payment

1.2.5.2 Measurement

1.2.5.3 Unit of Measure

1.2.6 Reshaping and Compaction

1.2.6.1 Payment

1.2.6.2 Measurement

1.2.6.3 Unit of Measure

1.2.7 Pot Hole Filling

1.2.7.1 Payment

1.2.7.2 Measurement

1.2.7.3 Unit of Measure

1.2.8 Deep Patch Repair

1.2.8.1 Payment

1.2.8.2 Measurement

1.2.8.3 Unit of Measure

1.2.9 Pavement Sealing

1.2.9.1 Payment

1.2.9.2 Measurement

1.2.9.3 Unit of Measure

1.2.10 Pavement Striping (with Layout)

1.2.10.1 Payment

1.2.10.2 Measurement

1.2.10.3 Unit of Measure

1.2.11 Pavement Re-Striping

1.2.11.1 Payment

SECTION 01 22 00 Page 1

1.2.11.2 Measurement

1.2.11.3 Unit of Measure

1.2.12 Painting Handicap Parking Symbols

1.2.12.1 Payment

1.2.12.2 Measurement

1.2.12.3 Unit of Measure

1.2.13 Painting Directional Arrows

1.2.13.1 Payment

1.2.13.2 Measurement

1.2.13.3 Unit of Measure

1.2.14 Concrete Curbing - Triangular

1.2.14.1 Payment

1.2.14.2 Measurement

1.2.14.3 Unit of Measure

1.2.15 Concrete Curbing - Rectangular

1.2.15.1 Payment

1.2.15.2 Measurement

1.2.15.3 Unit of Measure

1.2.16 Guardrail

1.2.16.1 Payment

1.2.16.2 Measurement

1.2.16.3 Unit of Measure

PART 2 PRODUCTS

PART 3 EXECUTION

SECTION 01 22 00 Page 2

SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with MATOC Section

01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Certificates Weight Bills

1.2 GENERAL INFORMATION

Payment items for the work required under this contract are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular payment item, shall be included in the listed item most closely associated with the work involved. Payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, equipment, tools, supplies, and incidentals necessary to complete the work, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided. Certified weight bills and/or delivery tickets will be accepted for all materials on which payment is based on weight.

1.2.1 Mineral Aggregate Base and Shoulders

1.2.1.1 Payment

Payment for mineral aggregate for base and shoulders will be made at the contract unit price per ton (TON) for "Mineral Aggregate, Type A Base, Grading D".

1.2.1.2 Measurement

Measurement will be made by the short ton (2,000 pounds) of acceptably placed mineral aggregate base and shoulders, as described in Section

32 12 00 PAVING AND MISCELLANEOUS ROAD IMPROVEMENTS - TENNESSEE.

1.2.1.3 Unit of Measure

Unit of measure: Short ton (TON).

1.2.2 Bituminous Material for Tack Coat

1.2.2.1 Payment

Payment for tack coat will be made at the contract unit price per gallon

SECTION 01 22 00 Page 3

(GAL) for "Bituminous Material for Tack Coat".

1.2.2.2 Measurement

Measurement will be made by the gallon (GAL) of tack coat acceptably placed, as described in Section 32 12 00 PAVING AND MISCELLANEOUS ROAD

IMPROVEMENTS - TENNESSEE.

1.2.2.3 Unit of Measure

Unit of measure: Gallon (GAL).

1.2.3 Bituminous Material for Prime Coat

1.2.3.1 Payment

Payment for prime coat will be made at the contract unit price per gallon (GAL) for "Bituminous Material for Prime Coat".

1.2.3.2 Measurement

Measurement will be made by the gallon (GAL) of prime coat acceptably placed, as described in Section 32 12 00 PAVING AND MISCELLANEOUS ROAD

IMPROVEMENTS - TENNESSEE.

1.2.3.3 Unit of Measure

Unit of measure: Gallon (GAL).

1.2.4 Mineral Aggregate for Asphaltic Concrete Surface

1.2.4.1 Payment

Payment for mineral aggregate for asphaltic concrete surfaces will be made at the contract unit price per ton (TON) for "Mineral Aggregate for Asphaltic Concrete Surfaces (ACS) Grading E".

1.2.4.2 Measurement

Measurement will be made by the short ton (2,000 pounds) of acceptably placed mineral aggregate in asphaltic concrete surface, as described in Section 32 12 00 PAVING AND MISCELLANEOUS ROAD IMPROVEMENTS - TENNESSEE.

1.2.4.3 Unit of Measure

Unit of measure: Short ton (TON).

1.2.5 Asphaltic Cement for Asphaltic Concrete Surface

1.2.5.1 Payment

Payment for asphaltic cement for Asphaltic Concrete Surface will be made at the contract unit price per ton (TON) for "Asphaltic Cement for Asphaltic Concrete Surfaces Grading E".

1.2.5.2 Measurement

Measurement will be made by the short ton (2,000 pounds) of acceptably placed asphaltic cement in asphaltic concrete surfaces, as described in

SECTION 01 22 00 Page 4

Section 32 12 00 PAVING AND MISCELLANEOUS ROAD IMPROVEMENTS - TENNESSEE.

1.2.5.3 Unit of Measure

Unit of measure: Short ton (TON).

1.2.6 Reshaping and Compaction

1.2.6.1 Payment

Payment for reshaping and compaction of existing roads and parking areas will be made at the contract unit price per square yard (SY) for "Reshaping and Compaction".

1.2.6.2 Measurement

Measurement will be made by the square yard (SY) of acceptably reshaped and compacted existing roads and parking areas, as described in Section 32 12 00

PAVING AND MISCELLANEOUS ROAD IMPROVEMENTS - TENNESSEE.

1.2.6.3 Unit of Measure

Unit of measure: Square yard (SY).

1.2.7 Pot Hole Filling

1.2.7.1 Payment

Payment for pot hole filling will be made at the contract unit price per short ton (2,000 pounds) for "Pot Hole Filling".

1.2.7.2 Measurement

Measurement will be made by the short ton (2,000 pounds) of material used to acceptably fill pot holes, as described in Section 32 12 00 PAVING AND

MISCELLANEOUS ROAD IMPROVEMENTS - TENNESSEE.

1.2.7.3 Unit of Measure

Unit of measure: Short ton (TON).

1.2.8 Deep Patch Repair

1.2.8.1 Payment

Payment for deep patch repairs of existing roads and parking areas will be made at the contract unit price per square yard (SY) for "Deep Patch Repair". Payment will be inclusive of all work involving saw cutting of existing pavement, excavation, compaction of subbase and disposal of all materials. All backfill materials such as mineral aggregates, prime coats, tack coats, and asphaltic base and surface materials, shall also be inclusive and paid for in the costs for "Deep Patch Repair".

1.2.8.2 Measurement

Measurement will be made by the square yard (SY) of acceptably performed deep patch repairs, as described in Section 32 12 00 PAVING AND

MISCELLANEOUS ROAD IMPROVEMENTS - TENNESSEE.

SECTION 01 22 00 Page 5

1.2.8.3 Unit of Measure

Unit of measure: Square yard (SY).

1.2.9 Pavement Sealing

1.2.9.1 Payment

Payment for pavement sealing will be made at the contract unit price per square yard (SY) for "Pavement Sealing". Payment will include all costs related to the work necessary to seal the pavement as required.

1.2.9.2 Measurement

Measurement will be made by the square yard (SY) of acceptably sealed pavement, as described in Section 32 12 00 PAVING AND MISCELLANEOUS ROAD

IMPROVEMENTS - TENNESSEE.

1.2.9.3 Unit of Measure

Unit of measure: Square yard (SY).

1.2.10 Pavement Striping (with Layout)

1.2.10.1 Payment

Payment for pavement striping will be made at the contract unit price per linear foot (LF) for "Pavement Striping (with Layout)".

1.2.10.2 Measurement

Measurement will be made by the linear foot (LF) of acceptably placed pavement striping (with layout), as described in Section 32 12 00 PAVING

AND MISCELLANEOUS ROAD IMPROVEMENTS - TENNESSEE.

1.2.10.3 Unit of Measure

Unit of measure: Linear foot (LF).

1.2.11 Pavement Re-Striping

1.2.11.1 Payment

Payment for pavement re-striping will be made at the contract unit price per linear foot (LF) for "Pavement Re-Striping". Payment will include all costs related to the work necessary to re-stripe the pavement as required.

1.2.11.2 Measurement

Measurement will be made by the linear foot (LF) of acceptably re-striped pavement, as described in Section 32 12 00 PAVING AND MISCELLANEOUS ROAD

IMPROVEMENTS - TENNESSEE.

1.2.11.3 Unit of Measure

Unit of measure: Linear foot (LF).

SECTION 01 22 00 Page 6

1.2.12 Painting Handicap Parking Symbols

1.2.12.1 Payment

Payment for painting handicap symbols will be made at the contract unit price per each (EA) for "Painting Handicap Parking Symbols". Payment will include all costs related to the work necessary to paint the handicap symbols as required.

1.2.12.2 Measurement

Measurement will be per each (EA) acceptably painted handicap parking symbol, as described in Section 32 12 00 PAVING AND MISCELLANEOUS ROAD

IMPROVEMENTS - TENNESSEE.

1.2.12.3 Unit of Measure

Unit of measure: Each (EA).

1.2.13 Painting Directional Arrows

1.2.13.1 Payment

Payment for painting directional arrows will be made at the contract unit price per each (EA) for "Painting Directional Arrows". Payment will include all costs related to the work necessary to paint the directional arrows as required.

1.2.13.2 Measurement

Measurement will be per each (EA) acceptably painted directional arrows, as described in Section 32 12 00 PAVING AND MISCELLANEOUS ROAD IMPROVEMENTS -

TENNESSEE.

1.2.13.3 Unit of Measure

Unit of measure: Each (EA).

1.2.14 Concrete Curbing - Triangular

1.2.14.1 Payment

Payment for installing triangular concrete curbing will be made at the contract unit price per linear foot (LF) for "Concrete Curbing - Triangular". Payment will include all costs related to the work necessary to install triangular concrete curbing as required, including costs related to: excavation, formwork, concrete, expansion joints, and backfill (topsoil, compaction, seeding and mulching.)

1.2.14.2 Measurement

Measurement will be made by the linear foot (LF) of acceptably installed triangular concrete curbing, as described in Section 32 12 00 PAVING AND

MISCELLANEOUS ROAD IMPROVEMENTS - TENNESSEE.

1.2.14.3 Unit of Measure

Unit of measure: Linear foot (LF).

SECTION 01 22 00 Page 7

1.2.15 Concrete Curbing - Rectangular

1.2.15.1 Payment

Payment for installing rectangular concrete curbing will be made at the contract unit price per linear foot (LF) for "Concrete Curbing - Rectangular". Payment will include all costs related to the work necessary to install rectangular concrete curbing as required, including costs related to: excavation, formwork, concrete, expansion joints, and backfill (topsoil, compaction, seeding and mulching.)

1.2.15.2 Measurement

Measurement will be made by the linear foot (LF) of acceptably installed rectangular concrete curbing, as described in Section 32 12 00 PAVING AND

MISCELLANEOUS ROAD IMPROVEMENTS - TENNESSEE.

1.2.15.3 Unit of Measure

Unit of measure: Linear foot (LF).

1.2.16 Guardrail

1.2.16.1 Payment

Payment for installing guardrail will be made at the contract unit price per linear foot (LF) for "Guardrail". Payment will include all costs related to the work necessary to install guardrail as required.

1.2.16.2 Measurement

Measurement will be made by the linear foot (LF) of acceptably installed guardrail, as described in Section 32 12 00 PAVING AND MISCELLANEOUS ROAD

IMPROVEMENTS - TENNESSEE.

1.2.16.3 Unit of Measure

Unit of measure: Linear foot (LF).

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 22 00 Page 8

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 DEFINITIONS

1.1.1 Submittal Descriptions (SD)

1.1.2 Approving Authority

1.1.3 Work

1.2 SUBMITTALS

1.3 SUBMITTAL CLASSIFICATION

1.3.1 Government Approved

1.3.2 Information Only

1.4 PREPARATION

1.4.1 Transmittal Form

1.4.2 Electronic File Format

1.5 INFORMATION ONLY SUBMITTALS

1.6 SUBMITTAL PROCEDURES

1.6.1 Shop Drawings

1.6.1.1 General

1.6.1.2 Submission

1.6.1.3 Approval

1.6.1.4 Information Only Submittals

1.6.1.5 Samples

1.6.2 Certificates of Compliance

1.7 VARIATIONS / SUBSTITUTION REQUESTS

1.7.1 Considering Variations

1.7.2 Proposing Variations

1.7.3 Warranting That Variations Are Compatible

1.7.4 Environmental Assessment of Variations

1.7.5 Review Schedule Is Modified

1.8 SUBMITTAL REGISTER

1.8.1 Use of Submittal Register

1.8.2 Contractor Use of Submittal Register

1.8.3 Approving Authority Use of Submittal Register

1.8.4 Contractor Action Code and Action Code

1.8.5 Copies Delivered to the Government

1.9 SCHEDULING

1.10 GOVERNMENT APPROVING AUTHORITY

1.11 DISAPPROVED SUBMITTALS

1.12 APPROVED SUBMITTALS

1.13 APPROVED SAMPLES

1.14 WITHHOLDING OF PAYMENT

1.15 STAMPS

PART 2 PRODUCTS

PART 3 EXECUTION

SECTION 01 33 00 Page 1

SECTION 01 33 00 Page 2

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.

Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.

Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.

Contractor's Quality Control (CQC) System Manager to check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as:

Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.

Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Picked up and disposed of in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations samples remaining upon completion of the work.

1.1 DEFINITIONS

1.1.1 Submittal Descriptions (SD)

Submittals requirements are specified in the technical sections.

Submittals are identified by Submittal Description (SD) numbers and titles as follows:

SD-01 Preconstruction Submittals

Submittals which are required prior to the start of construction activities or the next major phase of the construction on a multi-phase contract. Schedules or tabular list of data or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work, submitted prior to contract construction or next major phase of construction.

Certificates of insurance Surety bonds List of proposed subcontractors List of proposed products Construction Progress Schedule Submittal register Schedule of prices

SECTION 01 33 00 Page 3

Health and safety plan Work plan Quality control(QC) plan Environmental protection plan

SD-03 Product Data

Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.

SD-05 Design Data

Design calculations, mix designs, analyses or other data pertaining to a part of work.

SD-06 Test Reports

Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)

Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.

Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.

SD-07 Certificates

Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.

Document required of Contractor, or of a manufacturer, supplier, installer or subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.

1.1.2 Approving Authority

Office or designated person authorized to approve submittal.

1.1.3 Work

As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.

SECTION 01 33 00 Page 4

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with this section.

SD-01 Preconstruction Submittals

Submittal Register; G

1.3 SUBMITTAL CLASSIFICATION

Submittals are classified as follows:

1.3.1 Government Approved

Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer.

Within the terms of the Contract Clause entitled "Specifications and Drawings for Construction," they are considered to be "shop drawings."

1.3.2 Information Only

Submittals not requiring Government approval will be for information only.

They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.

1.4 PREPARATION

1.4.1 Transmittal Form

Use the attached sample transmittal form (ENG Form 4025) for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms are included in the QCS software that the Contractor is required to use for this contract. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.

1.4.2 Electronic File Format

Provide submittals other than material samples in both hard copy (paper) and electronic formats. The electronic submittal file must be compiled as a single, complete document, to include the Transmittal Form described in paragraph 1.5.1 Transmittal Form. The electronic submittal file must be named specifically according to its contents (e.g. 01 45 01-1.2_Quality Control Plan.pdf).

Electronic files must be of sufficient quality that all information is legible. Electronic format shall be in Adobe.PDF format, unless otherwise specified or directed by the Contracting Officer's Representative (COR).

Whenever possible, PDF files shall be generated from original documents so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR) routines are required. Files exceeding 30 pages shall be indexed and

SECTION 01 33 00 Page 5 bookmarked to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature.

Email electronic submittal documents fewer than 10MB to an email address as directed by the COR. Electronic documents over 10MB shall be provided on a CD/DVD, or through an electronic file sharing system such as the AMRDEC SAFE Web Application located at the following website:

https://safe.amrdec.army.mil/safe/

Provide hard copies of submittals as specified in this or other specification sections.

1.5 INFORMATION ONLY SUBMITTALS

Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals.

The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work;

and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.

1.6 SUBMITTAL PROCEDURES

Submittals shall be made as follows:

1.6.1 Shop Drawings

1.6.1.1 General

Definitions of "Shop Drawings," and general requirements for submission and approval, are covered in Contract Clause entitled "Specifications and Drawings for Construction". The following are supplemental requirements for submission, approval, and use.

1.6.1.2 Submission

The Contractor shall submit to the Contracting Officer two (2) paper copies and an electronic copy of all shop drawings. The drawings shall be submitted using transmittal forms (ENG Form 4025) sample attached. These drawings shall be complete and detailed. The Contractor shall certify by signature on the ENG Form 4025 that he has reviewed the shop drawings in detail and that they are correct and in strict conformance with the contract drawings and specifications except as may be otherwise explicitly stated. All proposed deviations or departures from the contract documents shall be noted on the transmittal ENG Form 4025 and the reasons for the deviations set forth in writing and such deviation annotated on the shop drawing. Each transmitted drawing or item shall be identified as having been reviewed and certified by being so stamped, signed and dated by the Contractor.

SECTION 01 33 00 Page 6

1.6.1.3 Approval

Submittals requiring Contracting Officer approval action are so designated in the contract documents and if approved, each copy of the drawings will be identified as having received such approval by being so stamped and dated. The Contractor shall make any corrections required by the Contracting Officer. If the Contractor considers any correction indicated on the drawings to constitute a change to the contract drawings or specifications, notice as required by under Contract Clause entitled CHANGES shall be given to the Contracting Officer. The approval of the drawings by the Contracting Officer shall not be construed as a complete check, but will indicate only that the general method of construction and detailing is satisfactory.

1.6.1.4 Information Only Submittals

All other submittals are considered to be for information only and shall be subject to review action by the Contracting Officer. Any such, for information only submittals found to contain errors or omissions shall be resubmitted as one requiring "approval" action. No adjustment for time or money will be allowed for corrections required as a result of noncompliance with plans and specifications. One (1) paper copy and an eletronic copy of information only submittals shall be submitted for review.

1.6.1.5 Samples

All samples of materials submitted as required by these specifications shall be properly identified and labeled for ready identification.

1.6.2 Certificates of Compliance

Any Certificates required for demonstrating proof of compliance of materials with specification requirements shall be executed in two (2) copies. Each certificate shall be signed by an official authorized to certify in behalf of the manufacturing company and shall contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the tests to which the report applies.

Certification shall not be construed as relieving the Contractor from furnishing satisfactory material, if after tests are performed on selected samples, the material is found not to meet the specific requirements.

1.7 VARIATIONS / SUBSTITUTION REQUESTS

Variations from contract requirements require Government approval pursuant to contract Clause FAR 52.236-21 and will be considered where advantageous to Government.

1.7.1 Considering Variations

Discussion with Contracting Officer prior to submission, will help ensure functional and quality requirements are met and minimize rejections and re-submittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value Engineering Change Proposal

(VECP).

Specifically point out variations from contract requirements in transmittal

SECTION 01 33 00 Page 7 letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.

1.7.2 Proposing Variations

When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation.

Check the column "variation" of ENG Form 4025 for submittals which include proposed deviations requested by the Contractor. Set forth in writing the reason for any deviations and annotate such deviations on the submittal.

The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.

1.7.3 Warranting That Variations Are Compatible

When delivering a variation for approval, Contractor warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.

1.7.4 Environmental Assessment of Variations

Any variations requested by the Contractor, which may have an environmental impact, shall meet the requirements of Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS. The Contracting Officer reserves the right to disapprove alternate methods, even if they are more cost effective, if the Contracting Officer determines that the proposed alternate method will have an adverse environmental impact.

1.7.5 Review Schedule Is Modified

In addition to the normal submittal review period of 30 calendar days, a period of 10 working days will be allowed for consideration by the Government of submittals with variations. Variations that may have an environmental impact, may require an extended review, processing, and approval time.

1.8 SUBMITTAL REGISTER

Prepare and maintain submittal register, as the work progresses. Do not change data which is output in columns (c), (d), (e), and (f) as delivered by Government; retain data which is output in columns (a), (g), (h), and

(i) as approved. A submittal register showing items of equipment and materials for which submittals are required by the specifications is provided as an attachment. This list may not be all inclusive and additional submittals may be required. Maintain a submittal register for the project in accordance with Section 01 45 02 QUALITY CONTROL SYSTEM (QCS). The Government will provide the initial submittal register in electronic format with the following fields completed, to the extent that will be required by the Government during subsequent usage.

Column (c): Lists specification section in which submittal is required.

SECTION 01 33 00 Page 8

Column (d): Lists each submittal description (SD No. and type, e.g. SD-02 Shop Drawings) required in each specification section.

Column (e): Lists one principal paragraph in specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting project requirements.

Thereafter, the Contractor is to track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.

1.8.1 Use of Submittal Register

Submit submittal register. Submit with QC plan and project schedule.

Verify that all submittals required for project are listed and add missing submittals. Coordinate and complete the following fields on the register submitted with the QC plan and the project schedule:

Column (a) Activity Number: Activity number from the project schedule.

Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.

Column (h) Contractor Approval Date: Date Contractor needs approval of submittal.

Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.

1.8.2 Contractor Use of Submittal Register

Update the following fields in the Government-furnished submittal register program or equivalent fields in program utilized by Contractor with each submittal throughout contract.

Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.

Column (j) Action Code (k): Date of action used to record Contractor's review when forwarding submittals to QC.

Column (l) List date of submittal transmission.

Column (q) List date approval received.

1.8.3 Approving Authority Use of Submittal Register

Update the following fields in the Government-furnished submittal register program or equivalent fields in program utilized by Contractor.

Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.

Column (l) List date of submittal receipt.

Column (m) through (p)List Date related to review actions.

SECTION 01 33 00 Page 9

Column (q) List date returned to Contractor.

1.8.4 Contractor Action Code and Action Code

Entries for columns (j) and (o), are to be used are as follows (others may be prescribed by Transmittal Form):

A -- Approved as submitted. E --Disapproved (See attached).

B -- Approved, except as noted. F --Receipt acknowledged.

C -- Approved, except as noted, resubmission required.

X --Receipt acknowledged, does not comply with contract requirements.

D -- Will be returned by separate correspondence.

G --Other

R --Acceptable for release for construction.

1.8.5 Copies Delivered to the Government

Deliver one copy of submittal register updated by Contractor to Government with each invoice request.

1.9 SCHEDULING

Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals.

a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of requirements.

b. Submittals called for by the contract documents will be listed on the register. If a submittal is called for but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation.

Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the contract documents but which have been omitted from the register or marked "N/A".

c. Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.

d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."

e. Except as specified otherwise, allow review period, beginning with receipt by approving authority, that includes at least 30 working days for submittals for Contracting Officer approval. Period of review for submittals with Contracting Officer approval begins

SECTION 01 33 00 Page 10 when Government receives submittal from QC organization.

f. Period of review for each resubmittal is the same as for initial submittal.

1.10 GOVERNMENT APPROVING AUTHORITY

When approving authority is Contracting Officer, the Government will:

a. Note date on which submittal was received.

b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.

c. Identify returned submittals with one of the actions defined in paragraph entitled "Review Notations" and with markings appropriate for action indicated.

Upon completion of review of submittals requiring Government approval, stamp and date approved submittals. Four (4) copies of the approved submittal will be retained by the Contracting Officer and one (1) copies of the submittal will be returned to the Contractor. If the Government performs a conformance review of other Designer of Record approved submittals, the submittals will be so identified and returned, as described above.

1.11 DISAPPROVED SUBMITTALS

Contractor shall make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the clause entitled, "Changes" is to be given to the Contracting Officer. Contractor is responsible for the dimensions and design of connection details and construction of work.

Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.

If changes are necessary to submittals, the Contractor shall make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.

1.12 APPROVED SUBMITTALS

The Contracting Officer's approval or acceptance of submittals is not be construed as a complete check, and indicates only that the general method of construction, materials, detailing and other…