About this file

Amendment 3. Q A

View the file

Other files

File Type Posted
Amendment 0004.pdf PDF
amendment 0001.pdf PDF
W912P509B0020TSpecs.pdf PDF
solicitation.pdf PDF
W912P509B0020Plans.pdf PDF
W912P509B0020BidSchedule.xls XLS spreadsheet
W912P509B0020TSpecs.pdf PDF
W912P509B0020BidSchedule.xls XLS spreadsheet
W912P509B0020Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W38XDD91918389

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of the Amendment is to post questions and answ ers to the solicitaion. The questions and answ er period is offically closed.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Sep-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P5-09-B-0020

X 9B. DATED (SEE ITEM 11)

25-Aug-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Sep-2009

CODE

USAED NASHVILLE - W912P5

CONTRACTING DIVISION

801 BROADWAY RM A604

NASHVILLE TN 37203-1070

W912P5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P5-09-B-0020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

NO OTHER QUESTIONS WILL BE ACCEPTED AFTER POSTING OF THIS AMENDMENT.

Chickamauga Lock, Muscle Shoals Site Visit 3 Sep 09 - Q&As Ref: Solicitation # W912P5-09-B-0020 Chickamauga Prefabricated Bridges

Q1. Is there flexibility on the 6-month delivery date for the maintenance bridges?

A1. Funding for this fabrication is dependent on American Reinvestment and Recovery Act funding and is intended for early execution. We do not plan to extend the 6-month schedule for completion.

Q2. Can bridge components be assembled and stored at other sites?

A2. Bridges components should be shipped to the Muscle Shoals storage site and assembled for inventory by the government and release of the fabricator.

Questions submitted by email after the Muscle Shoals site visit.

Q3. Note 3 on Sheet 68W506-1 indicates that the bridges are to be designed for HS-20-44 loading or the loads generated by a Grove RT760 crane, whichever is greater. Is the Grove crane to be driving across the bridge only or is it expected to operate upon the bridge. For either condition, we need the loads generated by this crane.

A3. The Grove crane will not be operated upon the bridge. Axle loads can be obtained for the crane on the website: www.manitowoccranes.com

Q4. Are there any drawings of the existing bridges and supporting abutments that can be used for development of the design of the new bridges?

A4. No.

Q5. Is there a maximum outside width for the structure?

A5. No.

Q6. On Sheet 68W506-2, Note 3 discusses using removable shim plates in order to maintain alignment with the Hazmat Platform. Is it anticipated that there will be vertical movement from either the bridge or the Hazmat Platform? How much adjustment in ¼" increments should be provided?

A6. The contractor shall provide for up to 2-inches of vertical adjustment.

Q7. Is there a maximum height above deck on the truss top chord for the 110 foot long bridge?

A7. No.

Q8. What value for concrete compressive strength is to be used for bearing design at the abutments (designed by others)?

W912P5-09-B-0020

A8. Contractor should use 3000 psi concrete strength for design.

Q9. LBYD is assuming that we will not be needed for any site visits. Is this assumption correct?

A9. A site visit is not required. A site visit will be accommodated if requested by contractor.

Q10. Are any utilities, piping, etc. to be supported from the bridges?

A10. No.

Q11. We are beginning our look at the bridge and want to verify a direction concerning the members.

The top chord will be a wide flange with its web oriented horizontally. The member would be rolled on a radius about its weak axis.

The bottom chord will be a 24" deep maximum section with its web oriented vertically. he top of the bottom chord will be at top of deck.

A11. The proposed design presented above sounds reasonable. Please note that the lowest elevation of the bottom of the bridge can be no lower than El. 691.0.

Q12. We are assuming that a pre-fabricated guardrail will be attached to the face of the web members. Please verify this is correct.

A12. The type of guardrail is at the discretion of the contractor, subject to approval of the contracting officer.

(End of Summary of Changes)