About this file

SPECS

View the file

Other files

File Type Posted
Amendment 0003.pdf PDF
W912P509B0019TSpecsAmendPgs.pdf PDF
Amend2.pdf PDF
SiteVisit.pdf PDF
Amendment 0001.pdf PDF
W912P509B0019BidSchedule.xls XLS spreadsheet
solicitation.pdf PDF
W912P509B0019Plans3.pdf PDF
W912P509B0019Plans1.pdf PDF
W912P509B0019Plans2.pdf PDF
W912P509B0019TSpecs.pdf PDF
W912P509B0019BidSchedule.xls XLS spreadsheet
W912P509B0019Plans3.pdf PDF
W912P509B0019Plans2.pdf PDF
W912P509B0019Plans1.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. W912P5-09-B-0019

US Army Corps Of Engineers ® Nashville District

FABRICATION OF MITER GATES,

CULVERT VALVES, AND CULVERT

BULKHEADS

Chickamauga Lock Replacement Tennessee River Hamilton County, Tennessee

Technical Specifications

Nashville, Tennessee

July 2009

Fabrication of Miter Gates, Culvert Valves Chickamauga Lock Replacement and Culvert Bulkheads Hamilton County, Tennessee

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 GENERAL REQUIREMENTS

01 00 50 FORMS AND ATTACHMENTS

01 22 00 MEASUREMENT AND PAYMENT

01 32 17 NETWORK ANALYSIS SCHEDULES (NAS)

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 01 USACE QUALITY CONTROL

01 45 02 USACE QUALITY CONTROL SYSTEM (QCS)

01 57 20 ENVIRONMENTAL PROTECTION

01 78 02 AS-BUILT DRAWINGS

DIVISION 05 - METALS

05 50 14 STRUCTURAL METAL FABRICATIONS

05 50 15 CIVIL WORKS FABRICATIONS

05 59 13 FABRICATION OF HYDRAULIC STEEL STRUCTURES

DIVISION 09 - FINISHES

09 97 02 PAINTING: HYDRAULIC STRUCTURES

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 20 15 CULVERT BULKHEADS

35 20 16.33 MITER GATES

35 20 17 CULVERT VALVES

35 20 28 MITER GATE ANCHORAGE LOAD MEASUREMENT INSTRUMENTATION

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 00 00

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 SCOPE

1.2 REFERENCES

1.3 SUBMITTALS

1.4 INSPECTIONS AND ACCEPTANCE OF WORK

1.4.1 General

1.4.2 Access to Work

1.5 FABRICATION SHOP STORAGE

1.6 STORAGE YARD

1.6.1 Site Access to Storage Yard

1.6.1.1 Marine Access

1.6.1.2 Land Access

1.6.2 Site Preparation

1.6.3 Storage Requirements

1.7 DELIVERY OF FABRICATIONS

1.8 ACCIDENT PREVENTION

PART 2 PRODUCTS

2.1 FENCE AND GATE MATERIALS

2.1.1 Fence Fabric

2.1.2 Gates

2.1.3 Posts

2.1.4 Braces and Rails

2.1.5 Tension Wire

2.1.6 Concrete

2.1.7 Padlocks

2.2 STONE BASE

PART 3 EXECUTION (Not Used)

-- End of Section Table of Contents --

SECTION 01 00 00 Page 1

SECTION 01 00 00

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 SCOPE

This section of the Specifications provides general information and requirements. The work covered by these Specifications consists of furnishing all equipment, labor, and materials required for the fabrication and delivery of miter gates, culvert valves, and culvert bulkheads as shown on the drawings and as described herein.

1.2 REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.

ALABAMA DEPARTMENT OF TRANSPORTATION (ALDOT)

ALDOT Std Specs (2008) Standard Specifications For Highway Construction, including subsequent Supplementals to date

ASTM INTERNATIONAL (ASTM)

ASTM A 392 (2007) Standard Specification for Zinc-Coated Steel Chain-Link Fence Fabric

ASTM A 824 (2001; R 2007) Standard Specification for Metallic-Coated Steel Marcelled Tension Wire for Use With Chain Link Fence

ASTM C 94/C 94M (2009) Standard Specification for Ready-Mixed Concrete

ASTM F 1083 (2008) Standard Specification for Pipe, Steel, Hot-Dipped Zinc Coated (Galvanized) Welded, for Fence Structures

ASTM F 1184 (2005) Industrial and Commercial Horizontal Slide Gates

ASTM F 883 (2004) Padlocks

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SECTION 01 00 00 Page 2

SD-01 Preconstruction Submittals

Fabrication Shop Storage Plan; G RE

A plan describing in detail the proposed layout of mill steel and fabricated items at the Contractor's plant, for which partial payments are requested, shall be submitted for approval. The plan shall be submitted within 15 calendar days after Notice to Proceed.

Site Preparation Work Plan; G RE

A plan describing in detail the proposed work during site preparation activities at the storage yard shall be submitted for approval. The plan shall be submitted at least 60 calendar days prior to the proposed start of site preparation work. No site preparation work shall be started prior to approval of the work plan.

Storage Yard Plan; G RE

A plan describing in detail the proposed layout of delivered fabricated items at the storage yard shall be submitted for approval. The plan shall be submitted at least 60 calendar days prior to the proposed delivery of any item.

Delivery Work Plan; G RE

A plan describing in detail the proposed delivery methods of the fabrications shall be submitted for approval. The plan shall be submitted at least 60 calendar days prior to the proposed delivery of any item.

1.4 INSPECTIONS AND ACCEPTANCE OF WORK

1.4.1 General

Not withstanding other provisions of this contract, all materials and work to be performed under this contract shall be inspected and accepted by the Contracting Officer or his authorized representative(s). The Contracting Officer or his authorized representative shall be the individual(s) solely authorized to reject materials, disapprove or approve any work in progress, or order or direct any revision or change to the plans and specifications as presently shown and stated.

1.4.2 Access to Work

The Contractor shall provide safe access to the fabrication facility and any other areas where work on this contract is performed to permit inspection by the Government.

1.5 FABRICATION SHOP STORAGE

Mill steel, fabricated items, and appurtenances shall be stored in a manner to prevent permanent deflection, distortion, or other damage. Rubber seals shall be stored in as cool a place as practicable, preferably at 70 degrees F or less; and in no case shall the rubber be stored in the open or exposed to the direct rays of the sun. Other storage requirements are stated in Sections 35 20 15 CULVERT BULKHEADS, 35 20 16.33 MITER GATES, 35 20 17

SECTION 01 00 00 Page 3

CULVERT VALVES, and 35 20 28 MITER GATE ANCHORAGE LOAD MEASUREMENT

INSTRUMENTATION.

The Contractor is required to submit a fabrication shop storage plan for approval by the Contracting Officer. The plan shall include a layout of the proposed locations of all items stored at the fabrication shop, for which partial payments are requested.

1.6 STORAGE YARD

The storage site is located at the TVA Muscle Shoals Reservation in Alabama. Site operations at this storage yard will impact or be impacted by other organizations. The Contractor is responsible for coordinating with others in scheduling activities in order to minimize or eliminate conflicts. The point of contact for TVA is Wesley Jaynes Phone:

256-386-3752. Photographs of the storage yard are provided at the back of Section 01 00 50 FORMS AND ATTACHMENTS.

1.6.1 Site Access to Storage Yard

The Contractor is advised that access restrictions will apply to both land and water based activities in the storage yard area. These restrictions are defined in the following paragraphs.

1.6.1.1 Marine Access

This site is accessible by water upstream of Wilson Dam, as shown in the contract drawings. The use or construction of other marine access locations near the storage yard area require the necessary environmental clearances and must be approved by TVA and the Contracting Officer. It is likely that permission to use an alternate marine access location will depend, at least partially, on an environmental assessment as described in Section 01 57 20 ENVIRONMENTAL PROTECTION of these Specifications.

1.6.1.2 Land Access

Land access to the TVA storage yard is accessible off Highway 133 as shown on the contract drawings. Use of any TVA lands outside the designated area requires approval from the Contracting Officer and TVA. In addition, the Contractor shall adhere to all load restrictions and speed limits on public roads when hauling material to the storage yard.

1.6.2 Site Preparation

The Contractor is required to complete preparation of the storage yard, as specified herein and as shown in the Contract Drawings, within 6 months after Notice to Proceed.

The site is generally flat and has crushed stone over much of the 1.6 acres area. There are approximately 800 linear feet of fence to be removed and approximately 1,100 linear feet of fence to be constructed. The new fence will be a 7-ft height chain-linked fence and will follow the general alignment of the existing fence, however some sections are not currently fenced. Two 30 ft roller gates (each with two 15 ft sections) shall be constructed at the locations recommended by the Contractor. A padlock shall be provided for each gate. The site shall be graded for uniformity and a stone base (6 inch thick minimum) shall be spread and compacted over the entire area. An existing drainage ditch shall be graded as necessary to maintain adequate drainage and keep water from standing. The compacted

SECTION 01 00 00 Page 4 stone base shall be adequate to transport and store steel components weighing as much as 75 tons.

Demolish and dispose of existing concrete/stone ramps (approximately 40 ft.

x 50 ft.) in approved landfill. Demolish and dispose of approximately 7 concrete foundation pads (1 @ 12 ft. x 12 ft. and 6 @ 4 ft. x 18 ft.).

Dispose of 6 steel stop logs, steel rack and any other miscellaneous material to clear the site.

The Contractor is required to submit a site preparation work plan for approval by the Contracting Officer.

1.6.3 Storage Requirements

Miter gates, culvert valves, culvert valve bulkheads and bridges will be stored outdoors at the site. Fabricated components will be constructed, painted and stored on lagging which will support them in a safe and transportable manner for up to 5 years. A corridor from gate to gate shall be left open such that components and appurtenances may be stored for easy removal. It is likely that steel embedments and gate sections will be removed first, but all components should be accessible without the need to rearrange them. Adequate turning radius and distance should be preserved to access the components fabricated under this contract in addition to two fixed span bridges constructed under a separate contract. The bridges will be approximately 15 ft. x 113 ft. and 16 ft. x 30 ft and will likely be delivered before the miter gates, culvert valves and culvert bulkheads.

The rubber seals shall be stored indoors at the nearby Corps of Engineers' Tennessee River Operations Center. It shall be stored on lagging to support the seals and avoid deformation for up to 5 years. The Point of Contact for access and storage of the seals is Gerald Choat Phone: 615-847-5535.

The Contractor is required to submit a storage yard plan for approval by the Contracting Officer. The plan shall include a layout that shows the proposed locations of all items to be delivered to the storage yard, including the two steel bridges that are being fabricated under a separate contract.

1.7 DELIVERY OF FABRICATIONS

The contractor is required to submit a delivery work plan for approval by the Contracting Officer. The plan shall describe in detail the proposed methods of delivery of the fabricated items. The plan shall address equipment, machinery and site limitations identified in the specifications and discussed at a pre-delivery meeting between the Contractor and the Contracting Officer. The plan shall be submitted at least 60 calendar days prior to proposed delivery of any item. The plan shall include, but not be limited to the following:

a. Type and size of barge(s) to be used for delivery.

b. Propelling unit to be used for delivery.

c. Location and description of intermediate assembly or handling areas (if any) between the fabrication location and the delivery location.

d. Cranes and other lifting and positioning equipment to be used.

SECTION 01 00 00 Page 5

e. Packaging of components.

f. Blocking.

g. Pre-assembly after delivery.

1.8 ACCIDENT PREVENTION

Accident prevention requirements that are applicable to this project during site operations are stated in Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS. Site operations include TVA storage yard preparation, delivery and unloading to the TVA storage yard and any required pre-assembly at the delivery location.

PART 2 PRODUCTS

2.1 FENCE AND GATE MATERIALS

2.1.1 Fence Fabric

Fence fabric for the 7-foot-high fence shall conform to ASTM A 392, Class 1, zinc-coated steel wire with minimum coating weight of 1.2 ounces of zinc per square foot of coated surface. Fabric shall be fabricated of 9 gauge wire woven in 2 inch mesh. Fabric shall be twisted and barbed on the top selvage and knuckled on the bottom selvage.

2.1.2 Gates

ASTM F 1184. Gate shall be the Type II, Class 1. Gate frames shall conform to strength and coating requirements of ASTM F 1083 for Group IA, steel pipe, with external coating Type A, nominal pipe size (NPS) 1-1/2.

Gate fabric shall be as specified for chain link fabric. Gate leaves shall have either intermediate members and diagonal truss rods or shall have tubular members as necessary to provide rigid construction, free from sag or twist. Gate fabric shall be attached to the gate frame by method standard with the manufacturer except that welding will not be permitted.

Latches, hinges, stops, keepers, rollers, and other hardware items shall be furnished as required for the operation of the gate. Latches shall be arranged for padlocking so that the padlock will be accessible from both sides of the gate. Stops shall be provided for holding the gates in the open position.

2.1.3 Posts

ASTM F 1083, zinc-coated. Group IA, with external coating Type A steel pipe. Line posts and terminal (corner, gate, and pull) posts selected shall be of the same designation throughout the fence. Gate post shall be for the gate type specified subject to the limitation specified in

ASTM F 1184.

2.1.4 Braces and Rails

ASTM F 1083, zinc-coated, Group IA, steel pipe, size NPS 1-1/4.

2.1.5 Tension Wire

Tension wire shall be Type I or Type II, Class 2 coating, in accordance with ASTM A 824.

SECTION 01 00 00 Page 6

2.1.6 Concrete

ASTM C 94/C 94M, using 3/4 inch maximum size aggregate, and having minimum compressive strength of 3000 psi at 28 days. Grout shall consist of one part portland cement to three parts clean, well-graded sand and the minimum amount of water to produce a workable mix.

2.1.7 Padlocks

Padlocks shall conform to ASTM F 883, Type, Size 1-3/4 inch.

2.2 STONE BASE

Stone base shall be Dense Graded Aggregate (DGA) conforming to the general requirements of ALDOT Std Specs Section 801 COARSE AGGREGATE.

PART 3 EXECUTION (Not Used)

-- End of Section --

SECTION 01 00 00 Page 7

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 00 50

FORMS AND ATTACHMENTS

PART 1 GENERAL

1.1 STORAGE YARD PHOTOGRAPHS

1.2 ENG FORM 4025 TRANSMITTAL FORM

1.3 SUBMITTAL REGISTER

1.4 LRNP 385-1-2 CONTRACTOR GUIDELINES

1.5 CONTRACTOR QUALITY CONTROL REPORT FORM

1.6 DEFICIENCY LIST FORM

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

SECTION 01 00 50 Page 1

SECTION 01 00 50

FORMS AND ATTACHMENTS

PART 1 GENERAL

Listed below, and attached at the end of this section, are forms and attachments referred to in other parts of the set of technical specifications.

1.1 STORAGE YARD PHOTOGRAPHS

See Section 01 00 00 GENERAL REQUIREMENTS.

1.2 ENG FORM 4025 TRANSMITTAL FORM

See Section 01 33 00 SUBMITTAL PROCEDURES.

1.3 SUBMITTAL REGISTER

See Section 01 33 00 SUBMITTAL PROCEDURES.

1.4 LRNP 385-1-2 CONTRACTOR GUIDELINES

See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS.

1.5 CONTRACTOR QUALITY CONTROL REPORT FORM

See Section 01 45 01 USACE QUALITY CONTROL.

1.6 DEFICIENCY LIST FORM

See Section 01 45 01 USACE QUALITY CONTROL.

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

SECTION 01 00 50 Page 2 h3ecxjg3 Text Box

1. ACCESS ROAD TO THE HARBOR

2. SLAB TO BE REMOVED

3. STEEL STOPLOGS TO BE REMOVED

4. RAMP TO BE REMOVED

5. DRAINAGE DITCH AND EXISTING FENCE

6. VIEW ALONG TRANSMISSION LINE

7. VIEW FROM THE ROAD INTO THE SITE

F H

UW

LI

WK

D W

WK

H D E R Y H V X E P

LW

WH

G

LW

H P V K D Y H E H H Q

UH

Y

LH

Z H G

LQ

G H

WD

LO

D Q G D

UH

F R

UU

H F W D Q G

LQ

V

WU

LF

W F R Q

IR

UP

D Q F H Z

LW

K

WK

H

F R Q

WU

D F W G

UD

Z

LQ

J V D Q G V S H F

LI

LF

D

WL

R Q V H F H S W D V R

WK

H U Z

LV

H

V

WD

WH

G

,6 ,6

,7

,6 ,6 ,7

,7

,2 R Y H U R Q O\

R Q H V H F

WL

R Q Z

LW

K

H D F K

WU

D Q V P

LW

WD

O�

,7 ,2

LV

W E ,W H P

R

,7 ,1 ,3

�5 H D G

LQ

V

WU

X F

WL

R Q V R Q

WK

H

UH

Y H

UV

H V

LG

H S

UL

R U

WR

LQ

LW

LD

WL

Q J

WK

LV

IR

UP

,2 ,1 ,7

�7 K

LV

V H F

WL

R Q Z

LO

O E H

LQ

LW

LD

WH

G E

WK

H F R Q

WU

D F

WR

U�

,7

,7 ,1 ,7

,2 ,2

,7

D

,3 ,2 ,7 ,7

�7 S H V L] H P R G H O Q X P E H U� H

WF

E

,1

�6 H H

LQ

V

WU

X F

WL

R Q Q R

F

G

H

,1

I�

J

,2

�6 H H

LQ

V

WU

X F

WL

R Q

R

K

L�

�5

�3

UR

S R Q H Q W�

,7 ,2 ,6

,6

,7 ,6

,2

,1 ,2

H F

WL

R Q Z

LO

O E H

LQ

LW

LD

WH

G E

WK

H R Q

WU

D F

WR

U

LQ

WK

H

UH

T X

LU

H G Q X P E H U R I F R S

LH

V

D F K

WU

D Q V P

LW

WD

O V K D

OO

E H Q X P E H

UH

G F R Q V H F X

WL

Y H O\

LQ

WK

H V S D F H S

UR

Y

LG

H G

IR

U

UD

Q V P

LW

WD

O R K

LV

Q X P E H U�

LQ

D G G

LW

LR

Q

WR

WK

H F R Q

WU

D F W Q X P E H U� Z

LO

O

IR

UP

D V H

UL

D O

Q X P E H U

IR

U

LG

H Q

WL

I\

LQ

J H D F K V X E P

LW

WD

O�

R U Q H Z

V X E P

LW

WD

OV

R U

UH

V X E P

LW

WD

OV

P D

UN

WK

H D S S

UR

S

UL

D

WH

E R R Q

UH

V X E P

LW

WD

OV

LQ

V H

UW

WU

D Q V P

LW

WD

O Q X P E H U R I

OD

V W V X E P

LV

V

LR

Q D V

Z H

OO

D V

WK

H Q H Z

V X E P

LW

WD

O Q X P E H U�

K H ,W H P

R Z

LO

O E H

WK

H V D P H ,W H P

R D V

LQ

G

LF

D

WH

G R Q

�5

IR

U H D F K H Q

WU

R Q

WK

LV

IR

UP

X E P

LW

WD

OV

UH

T X

LU

LQ

J H S H G

LW

LR

X V K D Q G

OL

Q J Z

LO

O E H V X E P

LW

WH

G R Q D V H S D

UD

WH

IR

UP

H S D

UD

WH

WU

D Q V P

LW

WD

O

IR

UP

Z

LO

O E H X V H G

IR

U V X E P

LW

WD

OV

X Q G H U V H S D

UD

WH

V H F

WL

R Q V R I

WK

H V S H F

LI

LF

D

WL

R Q V

F K H F N V K D

OO

E H S

OD

F H G

LQ

WK

H D

UL

D

WL

R Q F R

OX

P Q Z K H Q D V X E P

LW

WD

O

LV

Q R W

LQ

D F F R

UG

D Q F H Z

LW

K

WK

H S

OD

Q V D Q G V S H F

LI

LF

D

WL

R Q V D

OV

R D Z

UL

WW

H Q V

WD

WH

P H Q W

WR

WK

D W H

II

H F W

V K D

OO

E H

LQ

F

OX

G H G

LQ

WK

H V S D F H S

UR

Y

LG

H G

IR

U H P D

UN

V

R

UP

LV

V H

OI

�W

UD

Q V P

LW

WD

O�

OH

WW

H U R I

WU

D Q V P

LW

WD

O

LV

Q R W

UH

T X

LU

H G

K H Q D V D P S

OH

R I P D

WH

UL

D O R U D Q X

ID

F

WX

UH

U

V H

UW

LI

LF

D

WH

R I R P S

OL

D Q F H

LV

WU

D Q V P

LW

WH

G

LQ

G

LF

D

WH

D P S

OH

R U H

UW

LI

LF

D

WH

LQ

F R

OX

P Q F H F

WL

R Q

�6

UP

R

US

V R I Q J

LQ

H H

UV

D S S

UR

Y

LQ

J D X

WK

R

UL

W\

Z

LO

O D V V

LJ

Q D F

WL

R Q F R G H V D V

LQ

G

LF

D

WH

G E H

OR

Z

LQ

V S D F H S

UR

Y

LG

H G

LQ

H F

WL

R Q F R

OX

P Q L

WR

H D F K

LW

H P

V X E P

LW

WH

G ,Q

D G G

LW

LR

Q

WK

H Z

LO

O H Q V X

UH

H Q F

OR

V X

UH

V D

UH

LQ

G

LF

D

WH

G D Q G D

WW

D F K H G

WR

WK

H

IR

UP

S

UL

R U

WR

UH

WX

UQ

WR

WK

H F R Q

WU

D F

WR

U�

K H R Q

WU

D F

WR

U Z

LO

O D V V

LJ

Q D F

WL

R Q F R G H V D V

LQ

G

LF

D

WH

G E H

OR

Z

LQ

H F

WL

R Q F R

OX

P Q J

WR

H D F K

LW

H P

V X E P

LW

WH

G

,1 ,2 ,9 ,7 ,7

S S

UR

Y H G D V V X E P

LW

WH

G

S S

UR

Y H G H F H S W D V Q R

WH

G R Q G

UD

Z

LQ

J V

S S

UR

Y H G H F H S W D V Q R

WH

G R Q G

UD

Z

LQ

J V

H

IH

U

WR

D

WW

D F K H G V K H H W

UH

V X E P

LV

V

LR

Q

UH

T X

LU

H G

LO

O E H

UH

WX

UQ

H G E V H S D

UD

WH

F R

UU

H V S R Q G H Q F H

S S

UR

Y D O R I

LW

H P V G R H V Q R W

UH

OL

H Y H

WK

H F R Q

WU

D F

WR

U

IU

R P

F R P S O\

LQ

J Z

LW

K D

OO

WK

H

UH

T X

LU

H P H Q

WV

R I

WK

H F R Q

WU

D F W S

OD

Q V D Q G V S H F

LI

LF

D

WL

R Q V

�5 H Y H

UV

H R I R

UP

�5

LV

D S S

UR

Y H G �6 H H D

WW

D F K H G

H F H

LS

W D F N Q R Z

OH

G J H G

H F H

LS

W D F N Q R Z

OH

G J H G G R H V Q R W F R P S O\

D V Q R

WH

G Z

LW

K F R Q

WU

D F W

UH

T X

LU

H P H Q

WV

WK

H U �6

S H F

LI

S U

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

C hi ck L oc k

G at es a nd V al ve s

S D

-0

P re co ns tru ct io n

S ub m itt al s

1.

G R

E Fa br ic at io n S ho p

S to ra ge

P la n 1.

6.

G R

E S ite P re pa ra tio n W or k

P la n 1.

6.

G R

E S to ra ge Y ar d

P la n 1.

G

R E

D el iv er y W or k

P la n

S

D -0

P re co ns tru ct io n S ub m itt al s 1.

G

Q ua lif ic at io ns 1.

7.

2.

G

S ta nd ar d A ct iv ity

ID

D ic tio na ry 1.

8.

G C on st ru ct io n

N et w or k A na ly si s

S ch ed ul e 1.

8.

G B as el in e

N et w or k A na ly si s

S ch ed ul e S

D -0

C er tif ic at es 1.

8.

G M on th ly N et w or k

A na ly si s U pd at es S

D -1

C lo se ou t S ub m itt al s 1.

8.

G A s- B ui lt

S ch ed ul e

S

D -0

P re co ns tru ct io n S ub m itt al s 1.

G

S ub m itt al re gi st er

S

D -0

P re co ns tru ct io n S ub m itt al s 1.

G

A cc id en t P re ve nt io n

P la n (A

P P

1.

G

A ct iv ity

H az ar d

A na ly si s (A

H A

3.

3.

G C ra ne

C rit ic al

L ift

P la n 3.

3.

G C ra ne

C er tif ic at e of C om pl ia nc e 1.

6.

1.

G

S ite

S af et y an d

H ea lth O ffi ce r (S

S H

O

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

C hi ck L oc k

G at es a nd V al ve s

1.

6.

1.

C ra ne O pe ra to rs

S D

-0

Te st

R ep or ts

1.

R ep or ts

1.

.1 A cc id en t R ep or ts 1.

.3

R eg ul at or y

C ita tio ns a nd

V io la tio ns 1.

.4

C ra ne R ep or ts

S

D -0

P re co ns tru ct io n S ub m itt al s 3.

G

Q ua lit y

C on tro l P la n

3.

4.

G

C on tra ct or Q ua lit y C on tro l S ys te m M an ag er Q ua lif ic at io ns

3.

4.

C on st ru ct io n

Q ua lit y

M an ag em en t F or C on tra ct or s

S

D -0

P re co ns tru ct io n S ub m itt al s 1.

G

E nv iro nm en ta l P ro te ct io n

P la n

S

D -1

C lo se ou t S ub m itt al s 1.

3.

A s-

B ui lt D ra w in gs

S D

-0

S ho p D ra w in gs

1.

3.

G

D et ai l D ra w in gs

S D

-0

P ro du ct

D at a 2.

2.

2.

G

W el di ng o f S tru ct ur al

S te el 2.

3.

G S tru ct ur al

S te el W el di ng R ep ai rs 2.

1.

M at er ia ls O rd er s 2.

1.

M at er ia ls L is t

2.

1.

S hi pp in g

B ill

S D

-0

Te st

R ep or ts

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

C hi ck L oc k

G at es a nd V al ve s

2.

Te st s, In sp ec tio ns

, a nd

V er ifi ca tio ns

S D

-0

C er tif ic at es

1.

3.

Q ua lif ic at io n of W el de rs a nd W el di ng O pe ra to rs

2.

2.

2.

G A pp lic at io n Q ua lif ic at io n fo r S te el

S tu ds

S

D -0

S ho p

D ra w in gs 2.

G

M is ce lla ne ou s M et al s

S ta nd ar d M et al

A rti cl es

2.

G S ho p

Fa br ic at ed M et al

It em s S

D -0

P ro du ct D at a

2.

G M is ce lla ne ou s

M et al s

S ta nd ar d

M et al A rti cl es 2.

G

S ho p Fa br ic at ed

M et al It em s

S D

-0

S am pl es

2.

G M is ce lla ne ou s

M et al s

S ta nd ar d

M et al A rti cl es 2.

G

S ho p Fa br ic at ed

M et al It em s

S D

-0

Te st

R ep or ts

2.

G M is ce lla ne ou s

M et al s

S ta nd ar d

M et al A rti cl es 2.

G

S ho p Fa br ic at ed

M et al It em s

S D

-0

P re co ns tru ct io n

S ub m itt al s

1.

2.

G

D O

W el di ng

P ro ce du re S pe ci fic at io ns

(W P

S

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

C hi ck L oc k

G at es a nd V al ve s

1.

2.

G

D O

Fr ac tu re

C on tro l P la n

(F C

P

1.

2.

G

D O

W el d Tr ac ki ng L og T em pl at e

S D

-0

S ho p D ra w in gs

1.

4.

G

D O

S ho p D ra w in gs

2.

1.

G

D O

A ss em bl y 2.

2.

G D

O W el di ng R ep ai rs

N on

-F ra ct ur e C rit ic al M em be rs 2.

2.

G D

O W el di ng R ep ai rs

Fr ac tu re

C rit ic al

M em be rs

G D

O D el iv er y/

S hi pp in g P la n

G D

O Fi el d

S pl ic in g of th e

Fu rn is he d S eg m en t

S D

-0

P ro du ct

D at a 2.

1.

M at er ia ls D is po si tio n R ec or d S

D -0

Te st R ep or ts 2.

G

D O

C er tif ie d Te st R ep or ts 1.

2.

G D

O W el d

Tr ac ki ng

L og

1.

W itn es s

P oi nt s

S D

-0

C er tif ic at es

1.

G D

O W or k

P la n 1.

4.

G D

O Q ua lif ic at io n of W el de rs a nd W el di ng O pe ra to rs

1.

4.

G

D O

In sp ec to r Q ua lif ic at io ns 1.

4.

G D

O Q ua lif ic at io n of S tru ct ur al

S te el Fa br ic at or

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

C hi ck L oc k

G at es a nd V al ve s

S D

-0

M an uf ac tu re r’s F ie ld

R ep or ts

G D

O C on tro l D im en si on s

S D

-0

P ro du ct

D at a 1.

4.

G S af et y an d H ea lth

P ro vi si on s

G R es pi ra to rs G

C er tif ie d La bo ra to ry

1.

4.

G

M ed ic al

S ta tu s

1.

2.

G

V is ib le

E m is si on s

M on ito rin g 1.

2.

7.

G

P M

-1

M on ito rin g S

D -0

S am pl es 2.

G

S pe ci al

P ai nt F or m ul as

2.

G P ai nt

F or m ul at io ns 2.

3.

G S ol ve nt a nd T hi nn er s

S D

-0

Te st

R ep or ts

1.

2.

7.

G P

M -1

M on ito rin g

G C er tif ie d

La bo ra to ry 3.

G

In sp ec tio n S

D -0

C er tif ic at es 1.

G

Q ua lif ic at io ns 1.

4.

G Q ua lif ie d

P ai nt in g C on tra ct or

1.

4.

G

C oa tin g

Th ic kn es s G ag e

Q ua lif ic at io n

S

D -0

P re co ns tru ct io n S ub m itt al s M at er ia ls

M at er ia ls D is po si tio n

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

C hi ck L oc k

G at es a nd V al ve s

S D

-0

S ho p D ra w in gs

G S ho p

D ra w in gs G

Fa br ic at io n

D ra w in gs S ho p

A ss em bl y D ra w in gs

D el iv er y D ra w in gs

Fi el d In st al la tio n D ra w in gs

S D

-0

P ro du ct

D at a Li st o f M et al M at er ia ls

S D

-0

S am pl es

G S ta nd ar d an d

S ho p Fa br ic at ed

Ite m s S

D -0

Te st R ep or ts M at er ia ls

T es t R ep or ts

.3

S D

-0

S ho p D ra w in gs

1.

3.

G

D et ai l D ra w in gs

2.

3.

G

D et ai l D ra w in gs

G D ia go na ls

P re st re ss in g G

G ud ge on

E m be dd ed A nc ho ra ge

G Li fti ng o f t he F ur ni sh ed

S eg m en ts G

Fi el d S pl ic in g of th e Fu rn is he d

S eg m en ts S

D -0

P ro du ct D at a

2.

M at er ia ls D ia go na ls

P re st re ss in g G ud ge on E m be dd ed

A nc ho ra ge 2.

3.

W el di ng

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

C hi ck L oc k

G at es a nd V al ve s

.3

S D

-0

S am pl es

2.

G M at er ia ls

S D

-0

Te st

R ep or ts

2.

Te st s, In sp ec tio ns

, a nd

V er ifi ca tio ns

S D

-0

P re co ns tru ct io n

S ub m itt al s

2.

M at er ia ls 2.

3.

G E

C W el di ng G

E C

S to ra ge

F ac ili tie s G

E C

E re ct in g E ng in ee r Q ua lif ic at io ns

S D

-0

S ho p D ra w in gs

G S ho p

D ra w in gs G

E C

Fa br ic at io n an d

E re ct io n G

E C

S ho p A ss em bl y

D ra w in gs G

E C

D el iv er y D ra w in gs

G E

C Fi el d

In st al la tio n

D ra w in gs S

D -0

P ro du ct D at a

2.

G E

C M an uf ac tu re d

U ni ts S

D -0

S am pl es 2.

G

E C

M at er ia ls S

D -0

Te st R ep or ts 2.

Te st s, In sp ec tio ns , a nd V er ifi ca tio ns S

D -1

C lo se ou t S ub m itt al s M at er ia ls

D is po si tio n

M ea su re m en ts a nd O bs er va tio ns

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

C hi ck L oc k

G at es a nd V al ve s

S D

-0

P re co ns tru ct io n

S ub m itt al s

G D es ig n C al cu la tio ns S

D -0

S ho p

D ra w in gs G

Fa br ic at io n an d

In st al la tio n

D ra w in gs S

D -0

P ro du ct D at a

3.

E qu ip m en t

1.

G In st al la tio n P la n

S D

-0

Te st

R ep or ts

2.

1.

S tru ct ur al

S te el S

D -1

O pe ra tio n an d

M ai nt en an ce

D at a 2.

2.

Lo ad

P in s C on ne ct or

C ab le s

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

LRNP 385-1-2

March 2009

Nashville District

Contractor Guidelines For:

1. The Preparation of the Accident Prevention Plan (APP)

2. The Preparation of the Activity Hazard Analysis (AHA)

APPENDIX A

HELPFUL HINTS FOR THE PREPARATION OF THE

CONTRACTOR’S

ACCIDENT PREVENTION PLAN (APP)

1. The following are minimum considerations for developing the Contractor’s Accident Prevention Plan. These helpful hints raise a number of basic questions that need to be answered for the Contractor’s accident prevention plan to be an effective management tool for use by on-site supervision. This plan shall be specific for this job.

a. Time Of Submittal. The accident prevention plan and the activity hazard analysis for the first phases of the job shall be acceptable prior to start of work. The plan and analysis shall be submitted for review within ten (10) calendar days after notice of award so that discussion can take place at the pre-construction conference. Job hazard analysis for later phases of work shall be acceptable prior to the start of that phase. It is recommended that the activity hazard analysis for the next phase of work be submitted twenty days before scheduled phase start in order to give ample time for review. The accident prevention plan shall contain a list of the phases to complete the works. Each phase shall have an anticipated start date. On short jobs one submittal covering the total job will be sufficient.

b. Responsible Individual(s). Who will be responsible for enforcing the accident prevention program and what are the basic duties? How will this person be held accountable? Include a statement that there will be compliance with pertinent provisions of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1.

c. Subcontractor Supervision. What procedures will be followed to assure that Subcontractor activities are fully integrated into the project accident prevention plan and activity hazards analysis?

d. Indoctrination of New Employees before Start of Work. Every employee is required to receive an initial safety briefing prior to starting work. The accident prevention plan shall establish the procedure for ensuring the following items are covered:

(1) General safety policy and pertinent provisions of EM-385-1-1.

(2) Requirements for employee and project safety.

(3) Employee’s responsibilities for property and safety of others.

(4) Employee’s responsibilities for reporting all accidents.

(5) Medical facilities and required treatment.

(6) Procedures for reporting or correcting unsafe conditions or practices.

LRN 385-1-2

(7) Safe clearance procedures.

(8) Fire fighting and other emergency procedures.

(9) Activity hazard analysis.

(10) Personal protective equipment.

e. On-the Job Safety Meetings.

(1) When and where will monthly safety meetings for all supervisors be held? Who will conduct the meetings and what will be covered?

(2) How will the weekly “tool box” meetings be conducted?

f. Accident Reporting. The contract requires prompt reporting of injuries, fire, and property damage. Initial reports must be made immediately to the on-site Government representative and written reports shall be submitted within one to four working days. How does the accident prevention plan reflect responsibilities assigned for immediate oral reporting, accident investigation, determining proper corrective action, and preparation of reports?

g. Sanitary Facilities. What toilet facilities will be provided considering the number and distribution of employees? What other considerations are planned for drinking water and washing facilities?

h. First Aid and Medical. Describe first aid facilities and qualifications of attendant. List telephone numbers of physician, ambulance, and hospital.

i. Housekeeping. How will access ways to work areas be maintained during work hours? What procedures will be followed to assure daily cleanup?

j. Fire Protection. Considering the availability of existing fire protection, what general types and size of extinguishers and fire barrels will be required to protect buildings, shops, and storage areas as well as to deal with special hazards such as welding and flammable liquids? Name the local professional fire fighters. List their telephone number.

k. Machinery and Mechanized Equipment. How will inspection of cranes, trucks, and other mechanical equipment be accomplished? Frequency, by whom, what type of records will be kept?

2. Posters, contests, safety awards help develop positive attitudes toward safety rules. What methods, if any, will be used on this project? Most accidents are preventable by well thought out and executed accident prevention plans.

APPENDIX B

GUIDELINES FOR THE PREPARATION OF

ACTIVITY HAZARDS ANALYSIS (AHA)

1. Activity Hazards Analysis Development. Before starting any major phase of work an activity hazards analysis shall be developed and reviewed with the Government representative. This analysis will evaluate anticipated hazards and outline the proposed methods and techniques which will be utilized to accomplish the work in a safe manner.

2. Phases of Work. Listed are examples of major phases of work, but this list is not all inclusive. Phases of work shall be tailored to the specific characteristics of the contract.

Clearing and Grubbing Earthwork Trench Excavation Blasting Concrete Placement Steel Erection Masonry Electrical Work, Exterior Mechanical Work Carpentry

3. Sample Activity Hazards Analysis. The enclosed sample shows a possible format for a phase accident prevention plan that might be submitted on a representative project. This sample incorporates a phase of work, the safety hazards that may be encountered, and precautionary actions that will be taken to overcome these hazards.

Each safety hazard identified in the third vertical column must be accompanied by the appropriate paragraph reference number from EM 385-1-1. If none exists in EM 385-1- 1, so state in the third vertical column of the Activity Hazard Analysis.

4. Indoctrination. Employees performing the work must be made aware of the activity hazard analysis. For this reason, an important part of any phase plan is the indoctrination of all employees who will be performing the work.

A

M P

LE

A C

TI

VI

TY

H

A

ZA

R D

A N

A

LY

SI

S

C on tra ct

N o.

P ro je ct

Fa ci lit y

W

2P 5-

-C

-0

In st al l W at er a nd

S ew er L in es

B lu e H er on

R ec re at io na l A re a

D at e Lo ca tio n E st im at ed

S ta rt D at e

O ct ob er

B ig S ou th

F or k

J an ua ry

Ite m

P ha se o f W or k S af et y H az ar d

P re ca ut io na ry

A ct io ns to b e ta ke n

Tr en ch

E xc av at io n

H itt in g

E xi st in g U til iti es 1.

F in d an d m ar k ex is tin g ut ili tie s be fo re e xc av at in g.

(p ar . 2

5.

A

.1 0)

2.

U se c ar e w hi le e xc av at in g.

3.

S ho re e xi st in g ut ili tie s cr os si ng tr en ch

4.

I ns tru ct o pe ra to r.

5.

W at ch fo r o ve rh ea d el ec tri ca l l in es

C av e- In s 1.

S lo pe s id es

, d ep en di ng o n de pt h an d so il ty pe

(p ar s.

5.

B .0

3, 5.

C

.0 an d

.D

.0 5)

2.

S ho rin g w he n ne ce ss ar y.

3.

L ay b ac k m at er ia l a t l ea st ft . f ro m e dg e de pe nd in g on d ep th s oi l t yp e.

4.

H av e ac ce ss la dd er o r s te ps in o th er th an s ha llo w tr en ch es

5.

B ac kf ill a s so on a s po ss ib le

6.

I ns tru ct w or km en a s to c av e-in s ha za rd s an d pr ec au tio ns

H ea d in ju rie s fro m fa lli ng ro ck s or c lo ds 1.

W ea r h ar dh at s.

(p ar . 2

5.

A

.0 7)

2.

S ca le p ot en tia l f ue ls fr om s id es

B ac ki ng o ve r w or km en

1.

B ac k-up a la rm s on e qu ip m en t.

(p ar

.B .0 an d

.A .0

9) 2.

H av e he lp er to g ui de o pe ra to r w hi le b ac ki ng

3.

I ns tru ct w or km en n ot to s ta nd o r w al k be hi nd e qu ip m en t.

P ed es tri an A cc id en ts

1.

R op e of f o r f en ce tr en ch

(p ar s.

5.

B .0 an d

.B .0

2.

M ar k cl ea rly

3.

B ac kf ill a s so on a s po ss ib le

B ac k In ju rie s 1.

I ns tru ct w or km en h ow to li ft m at er ia ls

(p ar . 1

4.

A

.0 1)

2.

I ns tru ct w or km en to g et h el p an d/ or to u se li fti ng e qu ip m en t.

Fa lli ng 1.

M ai nt ai n em pl oy ee a le rtn es s in a nd a ro un d tre nc he s.

pa rs

. 2 5.

B .0 an d

.B .0

CONTRACTOR’S QUALITY CONTROL REPORT (QCR)

(ER 1180-1-6)

DATE: REPORT NO.

CONTRACT NUMBER AND NAME OF CONTRACTOR: DESCRIPTION AND LOCATION OF THE WORK:

WEATHER CLASSIFICATION: CLASSIFICATION:

CLASS A No interruptions of any kind from weather conditions occurring on this or previous shifts. CLASS _______________ CLASS B Weather occurred during this shift that caused a complete stoppage of all work. TEMPERATURE:

CLASS C Weather occurred during this shift that caused a partial stoppage of work.

CLASS D Weather overhead excellent or suitable during shift. Work completelly stopped MAX _____ MIN _____ due to previous adverse weather. PRECIPITATION:

CLASS E Weather overhead excellent or suitable during shift but work partially stopped due to previous adverse weather.

OTHER Explain. INCHES _______________

CONTRACTOR/SUBCONTRACTORS AND AREA OF RESPONSIBILITY FOR WORK PERFORMED TODAY:

(Attach listof items of equipment either idle or working as appropriate.)

a. ____________________________________________________________________________________________

b. ____________________________________________________________________________________________

c. ____________________________________________________________________________________________

d. ____________________________________________________________________________________________

e. ____________________________________________________________________________________________

f. ____________________________________________________________________________________________

g. ____________________________________________________________________________________________

1. WORK PERFORMED TODAY:(Indicate location and description of work performed. Refer to work performed by prime and/or subcontractors by letter in Table above.)

2. TYPE AND RESULTS OF INSPECTION:(Indicate wether: P-Preparatory, I-Initial, or F-Follow-up and include satisfactory work completed or deficiencies with action to be taken.)

3. TESTS REQUIRED BY PLANS AND/OR SPECIFICATIONS PERFORMED AND RESULTS OF TESTS:

4. VERBAL INSTRUCTIONS RECEIVED:(List any instruction given by the Government personnel on construction deficiencies, retesting required, etc., with action to be taken.)

5. REMARKS: Cover any conflicts in plans, specifications or instructions: acceptability of incoming materials;

offsite surveillance activities; progress of work, delays, causes and extent thereof; days of no work with reasons for same.)

6. SAFETY: Include any infractions of approved safety plan, safety manual or instruction from Government personnel.

Specify corrective action taken.)

SAFETY INSPECTOR

7. CONTRACTOR’S CERTIFICATION: I certify that the above report is complete and correct and that all material and equipment used, work performed and tests conducted during this reporting period were in strict compliance with the contract plans and specifications except as noted above.

CONTRACTOR QUALITY CONTROL SYSTEM MANAGER

D E

F

IC

IE

N

C Y

L

IS

T

C O

N T

R A

C T

N O

P

R O

JE

C

T

D E

F

IC

IE

N

C Y

C O

R R

E C

T

IO

N

D E

F

IC

N

O

D E

S C

R

IP

T

IO

N D

A T

E O

B S

E R

V E

D

C Q

C R

E P

O R

T N

O

D A

T E

C O

R R

E C

T E

D

C Q

C R

E P

O R

T N

O

C O

M M

E N

T

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 LUMP SUM PAYMENT ITEMS

1.1.1 Mobilization and Preparatory work.

1.1.2 Miter Gate and Related Appurtenances

1.1.3 Culvert Valves and Related Appurtenances

1.1.4 Culvert Bulkheads and Related Appurtenances

1.1.5 Painting

1.1.6 Supply Delivery to Storage Yard

1.1.7 DGA Stone at TVA Storage Area

1.1.8 Performance and Payment Bond

1.2 FABRICATED ITEMS PAYMENT SCHEDULE

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

SECTION 01 22 00 Page 1

SECTION 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 LUMP SUM PAYMENT ITEMS

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE and described in the paragraphs below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.1.1 Mobilization and Preparatory work.

Payment for mobilization and preparatory work will be made at the contract lump sum price for "Mobilization and Preparatory Work" in accordance with Contract Clause 252.236-7003, PAYMENT FOR MOBILIZATION AND PREPARATORY WORK. This item will consider all costs associated with TVA storage yard site preparation, except for the stone base, as specified in Section 01 00 00 GENERAL REQUIREMENTS, and includes full compensation for furnishing all materials, equipment, and labor required to prepare the storage yard for long term storage of all fabrications and related appurtenances.

1.1.2 Miter Gate and Related Appurtenances

Payment will be made for costs associated with fabricating miter gates and appurtenant Items, which includes full compensation for the materials fabrication and testing of miter gates and appurtenant items including gate leaves, diagonals, strut connections, miter guides, miter latches, recess latch strikes, quoin and miter contact blocks, gudgeon top anchorages, wall quoins, sill assemblies, recess latches, bumpers, fenders, and all other items necessary for complete installation. Payment for this work, as shown on the contract drawings and specified in Section 35 20 16.33 MITER GATES, will be made at the contract lump sum price for "Miter Gates and Related Appurtenances."

1.1.3 Culvert Valves and Related Appurtenances

Payment for all costs in connection with fabricating the culvert valves and related appurtenances will be made at the contract lump sum price for "Culvert Valves and Related Appurtenances." This price will include consideration for all materials, equipment, and labor; including the trunnion girder assemblies and all other related appurtenances; as shown on the contract drawings and specified in Section 35 20 17 CULVERT VALVES.

SECTION 01 22 00 Page 2

1.1.4 Culvert Bulkheads and Related Appurtenances

Payment for all costs in connection with fabricating the culvert bulkheads and related appurtenances will be made at the contract lump sum price for "Culvert Bulkheads and Related Appurtenances." This price will include consideration for all materials, equipment, and labor; including the air seals and all other related appurtenances; as shown on the contract drawings and specified in Section 35 20 15 CULVERT BULKHEADS.

1.1.5 Painting

Payment for all required painting will be made at the contract lump sum price for "Painting of Miter Gates, Culvert Valves, Bulkheads and Related Appurtenances", which includes full compensation for furnishing all materials, equipment, and labor required to paint the hydraulic structures as specified in Section 09 97 02 PAINTING: HYDRAULIC STRUCTURES.

1.1.6 Supply Delivery to Storage Yard

Payment will be made for costs associated with delivery to storage yard at the contract lump sum price for "Supply Delivery to Storage Yard", which includes full compensation for furnishing all materials, equipment, and labor required to deliver the miter gates, culvert valves, culvert bulkheads, and all related appurtenances to the storage yard; and for providing any required pre-assembly; as specified in Section 01 00 00

GENERAL REQUIREMENTS.

1.1.7 DGA Stone at TVA Storage Area

Payment will be made for costs associated with placement of DGA stone at the storage yard at the contract unit price per ton for "DGA Stone at TVA Storage Area". This price includes full compensation for furnishing all materials, equipment, and labor required to satisfactorily place DGA stone at the TVA storage yard, as specified in Section 01 00 00 GENERAL

REQUIREMENTS.

1.1.8 Performance and Payment Bond

Premiums for performance and payment bonds for shall be included in the contract lump sum price for "Reimbursement of Actual Performance and Payment Bonds." Payment made under this provision shall not exceed the actual amount paid for premiums for performance and payment bonds, which payment shall take into consideration any discounts or rebates to the Contractor from the Surety.

1.2 FABRICATED ITEMS PAYMENT SCHEDULE

Mill steel and fabricated items stored at the Contractor's shop (i.e. Miter Gates, Culvert Valves, and Culvert Bulkheads) will considered for payment as provided in Contract Clauses 52.232-1 PAYMENTS and 52.232.16 PROGRESS PAYMENTS, and as follows:

a. All payments would follow inspection and approval by RE office and invoice.

b. The Contractor shall present paid or receipted invoices or invoices with cancelled checks showing title to the items of the Prime Contractor.

SECTION 01 22 00 Page 3

c. Payment for mill steel delivery (requires positive inventory i.e.

barcode to track materials)

d. The Contractor shall establish a storage system at his shop that segregates, labels, and protects all items for which payment is made under this contract.

e. Partial payment of Miter Gates may be considered upon completion of each section (lower – 10 sections, upper 4 sections.)

f. Partial payment for the crossing bridge on the upper gates may be considered upon completion of the bridge.

g. Partial payment of Culvert Valves (4) may be considered upon completion of fabrication of each valve.

h. Partial payment for Culvert Valve Bulkheads (4) may be considered upon completion of fabrication of each bulkhead.

i. Partial payment for painting may be considered upon completion of painting of each item described above.

j. Partial payment for delivery may be considered after satisfactory delivery, storage, and any necessary pre-assembly at the site at Muscle Shoals or Chickamauga Lock.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

SECTION 01 22 00 Page 4

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 32 17

NETWORK ANALYSIS SCHEDULES (NAS)

PART 1 GENERAL

1.1 DESCRIPTION

1.2 REFERENCES

1.3 SUBMITTALS

1.4 SCHEDULE ACCEPTANCE

1.4.1 Schedule Acceptance Prior to Start of Work

1.4.2 Acceptance

1.5 SOFTWARE

1.6 QUALIFICATIONS

1.7 NETWORK SYSTEM FORMAT

1.7.1 Diagrams

1.7.2 Schedule Activity Properties and Level of Detail

1.7.2.1 Activity Categories

1.7.2.2 Project Milestones

1.7.2.3 Activity Identification (ID) and Description

1.7.2.4 Activity Code Dictionary and Values

1.7.2.5 Cost and Resource Loading

1.7.2.6 Anticipated Weather Delays

1.7.2.7 Schedule Software Settings and Restrictions

1.7.3 Required Tabular Reports

1.8 SUBMISSION AND ACCEPTANCE

1.8.1 Preliminary Meeting

1.8.2 Construction Network Analysis Schedule

1.8.3 Review and Evaluation

1.8.4 Baseline Network Analysis Schedule

1.8.5 Monthly Network Analysis Updates

1.8.6 Summary Network

1.8.7 As-Built Schedule

1.9 CONTRACT MODIFICATION

1.9.1 Time Impact Analysis:

1.9.2 No Reservation-Of-Rights

1.10 CHANGES TO THE NETWORK ANALYSIS SCHEDULE

1.11 FLOAT

1.11.1 Definitions of Float

1.11.2 Ownership of Float

1.11.3 Negative Float

1.12 THREE-WEEK LOOK AHEAD SCHEDULE

1.13 WEEKLY COORDINATION MEETING

1.14 CORRESPONDENCE AND TEST REPORTS

1.15 PAYMENT

PART 2 PRODUCTS

PART 3 EXECUTION

SECTION 01 32 17 Page 1

SECTION 01 32 17 Page 2

SECTION 01 32 17

NETWORK ANALYSIS SCHEDULES (NAS)

PART 1 GENERAL

1.1 DESCRIPTION

The network analysis system shall consist of the network analysis schedule (diagram) and associated reports. The scheduling of all procurement and construction shall be the responsibility of the Contractor. Construction increments will be interrelated on a single schedule that represents the entire project duration from Contract Award to the Contract Completion Date.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .