Amend2.pdf
PDF 39 KB Posted
- Solicitation number
- W912P5-09-B-0019
About this file
Amendment 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0003.pdf | ||
| W912P509B0019TSpecsAmendPgs.pdf | ||
| SiteVisit.pdf | ||
| Amendment 0001.pdf | ||
| W912P509B0019BidSchedule.xls | XLS spreadsheet | |
| solicitation.pdf | ||
| W912P509B0019Plans3.pdf | ||
| W912P509B0019Plans1.pdf | ||
| W912P509B0019Plans2.pdf | ||
| W912P509B0019TSpecs.pdf | ||
| W912P509B0019BidSchedule.xls | XLS spreadsheet | |
| W912P509B0019Plans3.pdf | ||
| W912P509B0019Plans2.pdf | ||
| W912P509B0019Plans1.pdf | ||
| W912P509B0019TSpecs.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W38XDD91837776
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of the modification is to add changes in addition to amendment 0001. See Schedule for changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Sep-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P5-09-B-0019
X 9B. DATED (SEE ITEM 11)
25-Aug-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Sep-2009
CODE
USAED NASHVILLE - W912P5
CONTRACTING DIVISION
801 BROADWAY RM A604
NASHVILLE TN 37203-1070
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P5-09-B-0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
List of Changes
The following is a listing of changes under this amendment:
1. Attachment 1-Technical Changes Listing. (file to be added to the FBO web site under this solicitation number)
2. Attachment 2-Administrative Contract Changes.
3. Attachment 3- Question and Answers to Site Visit and Questions submitted on line.
ATTACHEMENT 1
TECHNICAL CHANGES DESCRIPTION
Fabrication of Miter Gates, Culvert Valves, and Culvert Bulkheads
Chickamauga Lock Replacement
I. CHANGES TO SPECIFICATIONS
A. Section 01 00 00 GENERAL REQUIREMENTS
1. Remove Section 01 00 00 in its entirety (pages 1 thru 7), and replace with revised Section 01
00 00 (pages 1 thru 7).
B. Section 09 97 02 PAINTING: HYDRAULIC STRUCTURES
1. Remove Section 09 97 02 in its entirety (pages 1 thru 26), and replace with revised Section
09 97 02 (pages 1 thru 25).
C. Section 35 20 16.33 MITER GATES
1. Remove Section 35 20 16.33 pages 9 and 10, and replace with revised Section 35 20 16.33 pages 9 and 10.
--- END OF TECHNICAL CHANGES ---
The above changes will be posted to the FBO web site as a separate PDF file titled Specchanges.gates
ATTACHEMENT 2
CONTRACT CHANGES ADMINISTRATIVE
1. The following have been added by Full Text:
52.211-11 Liquidated Damages--Supplies, Services, or
Research and Development
SEP 2000
52.211-11 LIQUIDATED DAMAGES--SUPPLIES, SERVICES, OR RESEARCH AND
DEVELOPMENT (SEP 2000)
(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages of $ 6,680.00 per calendar day of delay. The completion time is critical to other planned work.
(b) If the Government terminates this contract in whole or in part under the Default--Fixed-Price Supply and Service clause, the Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies or services. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor as defined in the Default--Fixed-Price Supply and Service clause in this contract.
(End of clause)
2. The Sign In page for the site visit will be added to FBO web site as a separate file to this solicitation.
3. The Period of Performance for the Miter Gates, Colvert Valves, and Culvert Bulkheads has changed to read “ The Period of Performance for the gates, valves and bulkheads will be 21 months with imbedded metals provided within 18 months”
4. The question and answer period ends on 12 September 2009 at 7:00 A. M. CST.
5. A payment scheduled is listed in the Specifications; however, a payment schedule may be negotiated after award that is better suited to this procurement by mutual agreement of both parties.
ATTACHEMENT 3
QUESTIONS AND ANSWERS
Chickamauga Lock, Muscle Shoals Site Visit 3 Sep 09 - Q&As Ref: Solicitation # W912P5-09-B-0019 Chickamauga Miter Gates, Culvert Valves, and Culvert Bulkheads.
Q1. What is the number of sections required for fabrication of the miter gates?
A1. There are 5 sections for each lower gate leaf and 2 sections for each upper gate leaf.
Ref: Sec 1.22.00
Q2 Due to the schedule we are interested in the amount of time involved in shop drawing review and inspection visits to the shop?
A2. The government has 30 days for shop drawing review as noted in the specifications, but not every submittal will take that long. We can often return drawings within 15 days if issues do not require coordination with the designer.
Q3. Is it a requirement to hire an independent testing contractor?
A3. The testing firm that you select must have the certifications noted in the specifications. If you have in-house expertise and it is separate from your production staff, you may submit your QA/QC plan to the Resident Engineer (RE) for approval.
Ref: 05.59.13
Q4. Is there flexibility on the 18-month delivery date for gates, valves and bulkheads?
A4. The contract period will be extended to 21 months to allow adequate time for fabrication and delivery of all components.
Q5. Will there be partial payments for work during fabrication?
A5. Yes, see question 23 below.
Q6. Are fracture critical members identified in the drawings?
A6. Yes and all tension members must be tested. If you have concern about testing for specific welds, you should submit a request for information (RFI).
Q7. The trunion beam on the culvert valves has limited space for fabrication, are you sure this can be constructed?
A7. Yes, these drawings are modified from another project where these valves have been constructed.
Q8. Are last 2 coats of paint for culvert valves applied in the field?
A8. No. All coats of paint for the valves will be applied at the fabrication site.
Ref: Sec 3.3
Q9. Where will gate seals be stored?
A9. The gate seals will be stored at the COE Tennessee River Operation Center, 704 S. Wilson Dam Road, Florence, AL
Q10. Where can I get a list of local contractors who could develop the site?
A10. Contact the Associated General Contractors office at 919 Mitchell Blvd. #A, Florence, AL 35630-6146, (256) 767-7216
Q11. What clearances are required for contractors/subcontractors to work at Muscle Shoals site?
A11. The required background checks for employees are noted in the specifications. The required information is to be submitted to the Resident Engineer prior to approval.
Subcontractors who are visiting the site for 1-2 days may be escorted by an approved employee.
Q12. Storage site: Will stop logs on site be removed?
Q12. Disposal of the stop logs and miscellaneous metal is the responsibility of the contractor.
Q13. Storage site: Can the concrete pads used to support a previous tank be removed and leveled?
A13. Assume the pads will be removed and the site can be graded level. TVA will confirm.
Q14. Storage site: Do we know what is involved in removal of the abandoned ramps?
A14. The ramps appear to have steel beams on each side and a concrete pad on top.
A15. Storage site: Is the fabricator responsible for unloading shipments from barges and transporting them several hundred feet to the storage yard.
A15. Yes. The fabricator is responsible of all fabrication, site preparation and delivery of the gate, valve and bulkhead components per the specifications.
Questions submitted by email after the Muscle Shoals site visit.
Ref: Solicitation # W912P5-09-B-0019 Chickamauga Miter Gates, Culvert Valves, and Culvert Bulkheads.
Q16. Please clarify the Miter Gate casting material for the pintle, pintle socket, and pintle base.
Spec section 55015 paragraph 2.10.4 & 5 calls for steel castings to be ASTM A148 Grade 115- 95 and the stainless steel casting to be ASTM A743 Grade CF 10SMnN. Spec section
352016.33 paragraph 2.3.7.4 calls for the pintle socket to be ASTM A743. Drawing 64W440 calls for the pintle socket to be ASTM A148 Grade 150-135, the pintle is called out as ASTM A743 Grade CF 10SMnN and the pintle base is ASTM B148 Grade 150-135. Drawing 64W441 calls for the pintle base to be ASTM A148 Grade 90-60. Drawing 64W442 calls for the pintle socket to be ASTM A27 Grade 70-36. Refer to specification section 55014 paragraph 2.3.6 regarding inspection of castings. Please clarify what these materials are and what testing is required on each casting.
A16. The materials required are as follows:
Pintle socket: ASTM A 148 Grade 115-95 [REF: 64W440, and 64W442, Note 1] (callout is ASTM A 148 Grade 115-95, which is correct) Pintle: ASTM A 743. Grade CF 10SMnN [REF: 64W440].
Pintle base: ASTM A148, Grade 90-60 [REF: 64W441] Testing is prescribed by the ASTM specifications.
Contractor shall propose a non-destructive test to show the soundness of the casting meeting the requirements of ASTM 148 S1 or S2.
Q17. Please clarify the bushing and thrust washer material for the tainter valve. The ASTM B22 and B148 designations are given, but what are the respective copper alloy UNS numbers?
A17. ASTM B148, UNS No. C954 and ASTM B22, UNS No. C913.
Q18. The drawings and specifications reference diagonal prestressing and gudgeon embedded anchorage prestressing. Since this contract calls for the upper and lower miter gate to be fabricated and stored in sections, we do not feel this would apply. Please verify that this is not in this contract.
A18. USACE concurs that pre-stressing of the diagonals and embedded anchorage is not required as part of this contract.
Q19. May the fourteen miter gate sub assembly sections be stored on site with the skin plate up?
A19. Yes.
Q20. The upper & lower gate wall quoin contact blocks are called out as 17-4PH Condition H1025. The upper gate quoin contact blocks are called out as Nitronic 60 and the upper gate miter contact blocks are called out as 17-4PH Condition H1025. The lower gate quoin and miter contact blocks are called out as Nitronic 60. The specification section 55015 calls the contact blocks to be stainless steel 17-4PH. Please verify the stainless material on all the contact blocks.
A20. The intent of this is that rubbing surfaces shall be stainless, with one of the surfaces Nitronic to prevent galling. Nitronic is more expensive and more difficult to machine; therefore 17-4PH is used for the mating piece.
Thus, the wall side contact block, which requires more machining, is 17-4PH [ REF: drawing 64W431] and the mating quoin block is Nitronic, UNS S21800 [REF: drawing 64W447] At the miter side, one piece is Nitronic, one piece 17-4. [REF: drawing 64W447 Mk 64W446/1
– the table has 17-4, the column “Opposite Gate Material” has Nitronic.]
Q21. Comparing the upper and lower gate miter and quoin parts lists, the material is in contrast to one another. Especially the base plates, side plates, and brace plates. Please verify.
A21. The embedded quoin parts lists are comparable for drawings 64W416 and 64W431. The wall side contact block is 17-4PH; similarly, drawings 64W447 and 64W450 show a quoin block that is Nitronic. At the miter side, there is a contact block that has Nitronic one side, 17-4PH other side. For further explanation, refer to Answer 20.
Q22. Spec section 55913 paragraph 2.1.6 (a) is in regards to thermal stress relief. It is vague on what parts are to be stress relieved. Please provide list as to what you want stress relieved. It also appears that according to spec section 352016.33 paragraph 2.3.3 that you want the entire gate vibratory stress relieved. Please verify that the 14 miter gate sections need this process done.
A22. The following shall be stress relieved:
a. Thick plates at the end from H to J and A to B should be stress relieved.
b. The miter gate sections (fabricated under this contract).
Stress relief of welding stresses is included in the AWS code.
Thermal stress relief is not always possible because of the size of the part or the location.
Therefore vibratory stress relief is allowed, recommended when thermal stress relief is not possible.
Stress relief for the entire gate is not in this contract.
Q23. The payment schedule in spec section 12200 implies that the contractors cost of the material will be paid for only. The pay schedule implies that payment will only be made for each miter gate section once completely fabricated. The same is implied on the other fabricated components. Are we to assume that no monthly progress billings will be allowed until these milestones are achieved? Will progress billings be allowed for material procured and work completed, but not necessarily shipped? Is it your intent to withhold retainage? Please verify these payment terms.
A23. Payments will be paid for materials as specified based on invoices, as they are delivered to the fabricator's yard and inventoried. Monthly progress payments will also be made based on the estimated percent complete as determined by the Contracting Officer's Representative. Each section of the gates will be considered "complete" when it has been completely fabricated, tested and accepted. A pay request, with appropriate documentation should be submitted monthly for all stored materials and progress payments. Retainage is not withheld unless there are schedule, quality or contract compliance problems.
Q24. Can the bid date be extended due to the size of this contract, the pending answers to the above questions, and the probability of more questions?
A24. The contract period will be extended to 21 months to allow adequate time for fabrication and delivery of all components.
Q25. The “General Scope of Work” states that fabrication, painting, delivery of components, as well as, preparation of the storage site, is the responsibility of the contractor. Is the contractor responsible for furnishing equipment and labor to off-load the barges, transport the fabricated material from the dock area and unload the steel at the storage site?
A25. Yes. The contractor is responsible for offloading of either trucks or barges as well as transport within the storage facility.
Q26. The current paint system specified for the Chickamauga steel supply is currently the 5-EZ paint system. While the 5-EZ system is efficient in corrosion protection, it has a very high Volatile Organic Compound (VOC) content. The system risks the safety of those who apply it and has negative environmental impacts. In some areas, the VOC content of this system are not legal for the application specified. Would the USACE consider an equal or better system in terms of corrosion protection with a lower VOC content?
A26. The paint system specified in the bid documents shall be used with no variation. This system was recommended by both USACE and TVA paint experts and has been used regularly throughout the Corps.
Q27. Are there specific fencing plans for the storage area?
A27. Site plans submitted by the fabricator to the Resident Engineer for approval shall include specific plans for fencing.
(End of Summary of Changes)