About this file
This is a Technical Specifications (RTA) document for the Culvert Valve Maintenance Platform Fabrication project at Barkley Lock in Grand Rivers, Kentucky, solicited by the US Army Corps of Engineers Nashville District. The project involves fabricating and delivering four maintenance access platform sets for culvert valves, with a base platform and three optional platforms, to comply with current USACE and OSHA safety standards.
The technical specifications detail specific requirements for fabricating new railings, grating, ladders, and structural steel components. Key modifications include replacing existing rung ladders with fixed ladders, adding new railings to meet height requirements, installing removable railings around hydraulic shafts, extending lower platform landings, and replacing select grating pieces. The platforms will be fabricated with galvanized steel components, and the work includes shop drawings, quality control, and delivery to the Barkley Lock location at 758 Barkley Lock Road in Grand Rivers, Kentucky. Delivery is restricted to Monday through Thursday between 6:00 am and 4:00 pm, excluding federal holidays.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912P5-25-Q-A048_TPlans_RTA_4SEP2025.pdf | ||
| Solicitation - W912P525QA048.pdf | ||
| SOW Barkley Valve Maintenance Platform Fabrication_15 July.pdf | ||
| W912P5-25-Q-A048_Bid Schedule_RTA.pdf | ||
| 2025.06.09 BLCVMP 100% USACE Submittal DWG Set.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. W912P5-25-Q-A048
US Army Corps Of Engineers Nashville District
Culvert Valve Maintenance Platform Fabrication
Barkley Lock Cumberland River Livingston County, Kentucky
Technical Specifications - Ready to Advertise (RTA)
September 2025
THIS PAGE INTENTIONALLY LEFT BLANK
FOR DUPLEX PRINTING
Culvert Valve Maintenance Platform Fabrication Barkley Lock W912P5-25-R-BLVM RTA Grand Rivers, KY
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 00 00 GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 20 00 PRICE AND PAYMENT PROCEDURES
01 33 00 SUBMITTAL PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 78 00 CLOSEOUT SUBMITTALS
DI VI SI ON 05 - METALS
05 05 20 POST-INSTALLED CONCRETE ANCHORS
05 12 00 STRUCTURAL STEEL
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DI VI SI ON 09 - FI NI SHES
09 90 00 PAINTS AND COATINGS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS Page 2
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 00 00
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 GENERAL
1.2 COORDINATION CONFERENCES
1.3 REFERENCES
1.4 DESCRIPTION
1.5 INSPECTIONS AND ACCEPTANCE
1.6 SHIPPING / DELIVERY
1.6.1 Federal Holidays
1.7 SAFETY REQUIREMENTS
1.8 MEASUREMENT AND PAYMENT
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 00 00 Page 1
SECTION 01 00 00 Page 2
SECTION 01 00 00
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 GENERAL
This section of the Specifications provides general information and requirements. The work consists of furnishing all equipment, labor, materials, and transportation required for the fabrication and delivery of maintenance platforms as described in the specifications and contract drawings.
1.2 COORDINATION CONFERENCES
Routine coordination conferences will be scheduled by the Contracting Officer throughout the life of this project. Coordination conferences will be held to discuss contract administration, Contractor quality control, phasing, scheduling, and other aspects relating to this construction. The Corps of Engineers and the Contractor will be represented at each of these meetings. Coordination conferences will be scheduled to occur when notified by the Contracting Officer.
1.3 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2024) Safety -- Safety and Occupational Health (SOH) Requirements
1.4 DESCRIPTION
Barkley Lock is a high lift navigation lock on the Cumberland River at mile 30.6 in Grand Rivers, Kentucky.
1.5 INSPECTIONS AND ACCEPTANCE
Not withstanding other provisions of this contract, all materials required under this contract will be inspected and accepted by the Contracting Officer or the authorized representative(s). The Contracting Officer and the authorized representative are the individual(s) solely authorized to reject or approve materials, and order or direct any revision or change to the plans and specifications as presently shown and stated.
1.6 SHIPPING / DELIVERY
Delivery will only be accepted Monday through Thursday between the hours of 6:00 am to 4:00 pm and will not occur on a Federal Holiday. At least two weeks prior to delivery, coordination will be made by the Contractor
SECTION 01 00 00 Page 3 to the Government concerning shipment details. Delivery will be made to the following address:
US Army Corps of Engineers Barkley Lock 758 Barkley Lock Road Grand Rivers, KY 42045
1.6.1 Federal Holidays
Refer to OPM Website for Federal holidays listed by calendar year:
https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays .
1.7 SAFETY REQUIREMENTS
The Contractor must comply with all applicable provisions of EM 385-1-1 Safety and Health Requirements Manual.
1.8 MEASUREMENT AND PAYMENT
No separate payment will be made for the work covered under this section.
The costs thereof shall be included in the item to which the work pertains. Payment for the work required under this contract will made as listed in the bidding schedule and as described in Section 01 20 00 PRICE
AND PAYMENT PROCEDURES.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
-- End of Section --
SECTION 01 00 00 Page 4
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUBMITTALS
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.3 EXISTING WORK
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 11 00 Page 1
SECTION 01 11 00 Page 2
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
Plans and Specifications for new superstructures have been developed. The work includes fabricating and delivering railings, grating, ladders, and structural steel and incidental related work for four (4) culvert valve maintenance access pits at Barkley Lock to comply with current USACE and OSHA safety standards. Demolition of existing items and installation of new items will be performed by GOV.
This Scope is described as a Base of one platform, with three Options of one platform each. Any options exercised after initial award will be provided a written notice of intent to exercise within 90 calendar days of base Contract Award.
Railings along the upper platforms and the interior opening on the lower platforms do not meet height requirements. New railings will be fabricated and attached to the current platforms using a mix of new and existing pipe sleeves. The upper platform will also add new removable railings around the hydraulic shaft to eliminate fall hazards.
The existing rung ladders do not meet the minimum tread width requirements and will be replaced by a fixed rung ladder. The existing rung ladders between the upper and lower platforms will be removed and coated to prevent corrosion. New fixed ladders will be installed to replace the rung ladders. The rung ladders below the lower platform will not be replaced.
The landing on the lower platform at the bottom of the ladders will be increased to remove the opening in the corner of the maintenance pit near each ladder. This will include installing new structural structural supports and extending the grating to cover the opening. Select grating pieces will also be replaced in kind and anchored to existing structural members.
1.3 EXISTING WORK
Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
Repair or replace portions of existing work which have been altered during
SECTION 01 11 00 Page 3 construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
SECTION 01 11 00 Page 4
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT
1.2 UNIT PRICE PAYMENT ITEMS
1.2.1 Platform - Upper Platform
1.2.1.1 Payment
1.2.1.2 Measurement
1.2.1.3 Unit of Measure
1.2.2 Platform - Lower Platform
1.2.2.1 Payment
1.2.2.2 Measurement
1.2.2.3 Unit of Measure
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 20 00 Page 1
SECTION 01 20 00 Page 2
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT
1.2 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this Contract on which the Contract unit price payments will be made are listed in the SCHEDULE and described below. The unit price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
1.2.1 Platform - Upper Platform
1.2.1.1 Payment
Payment will be made for the costs associated with fabrication, transporting, and delivering a complete upper platform section as described in contract drawings and specifcations. Price for Platform - Upper Platform includes, but not limited to, all components to secure platform, railings, protective coating, safety gates, and other requirements listed in specifications that are applicable for the upper platform. Payment also includes the delivery of shop drawings, CAD files, and assembly instructions as detailed in specifications.
1.2.1.2 Measurement
Measurement for payment will be a complete Upper Platform section.
1.2.1.3 Unit of Measure
Unit of measure: Each (EA)
1.2.2 Platform - Lower Platform
1.2.2.1 Payment
Payment will be made for the costs associated with fabrication, transporting, and delivering a complete lower platform section as described in contract drawings and specifcations. Price for Platform - Lower Platform includes, but not limited to, all components to secure platform, railings, protective coating, safety gates, and other requirements listed in specifications that are applicable for the lower platform. The price also includes all costs associated with the fabrication and delivery of metal ladder as detailed in contract drawings and in Section 05 51 33 METAL LADDERS. Payment also includes the delivery of shop drawings, CAD files, and assembly instructions as detailed in specifications.
SECTION 01 20 00 Page 3
1.2.2.2 Measurement
Measurement for payment will be a complete Lower Platform section.
1.2.2.3 Unit of Measure
Unit of measure: Each (EA)
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
SECTION 01 20 00 Page 4
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUMMARY
1.1.1 Submittal Information
1.1.2 Project Type
1.1.3 Submission of Submittals
1.2 DEFINITIONS
1.2.1 Submittal Descriptions (SD)
1.2.2 Approving Authority
1.2.3 Work
1.3 SUBMITTALS
1.4 SUBMITTAL CLASSIFICATION
1.4.1 Government Approved (G)
1.4.2 For Information Only
1.5 PREPARATION
1.5.1 Transmittal Form
1.5.2 Submittal Format
1.5.2.1 Format of SD-01 Preconstruction Submittals
1.5.2.2 Format for SD-02 Shop Drawings
1.5.2.2.1 Drawing Identification
1.5.2.3 Format of SD-03 Product Data
1.5.2.3.1 Product Information
1.5.2.3.2 Standards
1.5.2.3.3 Data Submission
1.5.2.4 Format of SD-07 Certificates
1.5.2.5 Format of SD-08 Manufacturer's Instructions
1.5.2.5.1 Standards
1.5.2.6 Format of SD-10 Operation and Maintenance Data (O&M)
1.5.3 Source Drawings for Shop Drawings
1.5.3.1 Source Drawings
1.5.3.2 Terms and Conditions
1.6 QUANTITY OF SUBMITTALS
1.6.1 Number of SD-01 Preconstruction Submittal Copies
1.7 INFORMATION ONLY SUBMITTALS
1.8 PROJECT SUBMITTAL REGISTER
1.8.1 Submittal Management
1.8.2 Preconstruction Use of Submittal Register
1.8.3 Contractor Use of Submittal Register
1.8.4 Approving Authority Use of Submittal Register
1.8.5 Action Codes
1.8.5.1 Contractor Action Codes
1.8.6 Delivery of Copies
1.9 SCHEDULING
1.10 GOVERNMENT APPROVING AUTHORITY
1.10.1 Review Notations
1.11 DISAPPROVED SUBMITTALS
SECTION 01 33 00 Page 1
1.12 APPROVED SUBMITTALS
PART 2 PRODUCTS
PART 3 EXECUTION
ATTACHMENTS:
ENG Form 4025-R
Attachment A - Submittal Register
SECTION 01 33 00 Page 2
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUMMARY
1.1.1 Submittal Information
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.
1.1.2 Project Type
The Contractor's Quality Control (CQC) System Manager are to check and approve all items before submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as:
Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.
1.1.3 Submission of Submittals
Schedule and provide submittals requiring Government approval before acquiring the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Safety Data Sheets (SDS) and in compliance with existing laws and regulations.
1.2 DEFINITIONS
1.2.1 Submittal Descriptions (SD)
Submittal requirements are specified in the technical sections. Examples and descriptions of submittals identified by the Submittal Description (SD) numbers and titles follow:
SD-01 Preconstruction Submittals
Submittals that are required prior to or at the start of fabrication (work) or the next major phase of the fabrication on a multiphase contract.
Government approved Division 01 preconstruction submittals that are required prior to or commencing with the start of work must be submitted within 30 calendar days of contract award unless specified elsewhere in
SECTION 01 33 00 Page 3 the specifications. Contractor approved Division 01 submittals that are required prior to or commencing with the start of work must be submitted within 45 calendar days of contract award unless specified elsewhere in the specifications.
Preconstruction Submittals include schedules and a tabular list of locations, features, and other pertinent information regarding products, materials, equipment, or components to be used in the work.
Certificates Of Insurance
Surety Bonds
List Of Proposed Subcontractors
List Of Proposed Products
Baseline Network Analysis Schedule (NAS)
Submittal Register
Schedule Of Prices Or Earned Value Report
Accident Prevention Plan
Work Plan
Quality Control (QC) plan
Environmental Protection Plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have
SECTION 01 33 00 Page 4 been within three years of date of contract award for the project.
Report that includes findings of a test required to be performed on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report that includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports
Daily logs and checklists
Final acceptance test and operational test procedure
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods, or personnel qualifications.
Confined space entry permits
Text of posted operating instructions
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and Safety Data Sheets(SDS)concerning impedances, hazards and safety precautions.
SD-10 Operation and Maintenance Data
Data provided by the manufacturer, or the system provider, including manufacturer's help and product line documentation, necessary to maintain and install equipment, for operating and maintenance use by facility personnel.
Data required by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
Data incorporated in an operations and maintenance manual or control system.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Submittals required for Guiding Principle Validation (GPV) or Third
SECTION 01 33 00 Page 5
Party Certification (TPC).
Special requirements necessary to properly close out a supply contract. For example, Record Drawings.
1.2.2 Approving Authority
Office or designated person authorized to approve the submittal.
1.2.3 Work
As used in this section, off-site fabrication required by contract documents, including labor necessary to produce submittals, fabrication, materials, products, equipment, and systems incorporated or to be incorporated in such fabrication. In exception, excludes work to produce SD-01 submittals.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Submittal Register; G
1.4 SUBMITTAL CLASSIFICATION
1.4.1 Government Approved (G)
Government approval is required for extensions of design, critical materials, variations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Government.
1.4.2 For Information Only
Submittals not requiring Government approval will be for information only. Within the terms of the Contract Clause SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, they are not considered to be "shop drawings."
1.5 PREPARATION
1.5.1 Transmittal Form
Use the ENG Form 4025-R transmittal form for submitting both Government-approved and information-only submittals. Submit in accordance with the instructions on the reverse side of the form. These forms or similar forms will be furnished to the Fabricator. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.
SECTION 01 33 00 Page 6
1.5.2 Submittal Format
1.5.2.1 Format of SD-01 Preconstruction Submittals
When the submittal includes a document that is to be used in the project, or is to become part of the project record, other than as a submittal, do not apply the Contractor's approval stamp to the document itself, but to a separate sheet accompanying the document.
Provide data in the unit of measure used in the contract documents.
1.5.2.2 Format for SD-02 Shop Drawings
Provide shop drawings not less than 8 1/2 by 11 inches nor more than 30 by 42 inches, except for full-size patterns or templates. Prepare drawings to accurate size, with scale indicated, unless another form is required.
Ensure drawings are suitable for reproduction and of a quality to produce clear, distinct lines and letters, with dark lines on a white background.
a. Include the nameplate data, size, and capacity on drawings. Also include applicable federal, military, industry, and technical society publication references.
b. Dimension drawings, except diagrams and schematic drawings. Prepare drawings demonstrating interface with other trades to scale. Use the same unit of measure for shop drawings as indicated on the contract drawings. Identify materials and products for work shown.
Submit an electronic copy of drawings in PDF format and native electronic format.
1.5.2.2.1 Drawing Identification
Include on each drawing the drawing title, number, date, and revision numbers and dates, in addition to information required in paragraph
IDENTIFYING SUBMITTALS.
Number drawings in a logical sequence. Each drawing is to bear the number of the submittal in a uniform location next to the title block. Place the Government contract number in the margin, immediately below the title block, for each drawing.
Reserve a blank space on the right-hand side of each sheet for the Government disposition stamp.
1.5.2.3 Format of SD-03 Product Data
Present product data submittals for each section. Include a table of contents, listing the page and catalog item numbers for product data.
Indicate, by prominent notation, each product that is being submitted;
indicate the specification section number and paragraph number to which it pertains.
1.5.2.3.1 Product Information
Supplement product data with material prepared for the project to satisfy the submittal requirements where product data does not exist. Identify this material as developed specifically for the project, with information
SECTION 01 33 00 Page 7 and format as required for submission of SD-07 Certificates.
Provide product data in units used in the Contract documents. Where product data are included in preprinted catalogs with another unit, submit the dimensions in contract document units, on a separate sheet.
1.5.2.3.2 Standards
Where equipment or materials are specified to conform to industry or technical-society reference standards of such organizations as the American National Standards Institute (ANSI), ASTM International (ASTM), National Electrical Manufacturer's Association (NEMA), Underwriters Laboratories (UL), or Association of Edison Illuminating Companies (AEIC), submit proof of such compliance. The label or listing by the specified organization will be acceptable evidence of compliance. In lieu of the label or listing, submit a certificate from an independent testing organization, competent to perform testing, and approved by the Contracting Officer. State on the certificate that the item has been tested in accordance with the specified organization's test methods and that the item complies with the specified organization's reference standard.
1.5.2.3.3 Data Submission
Collect required data submittals for each specific material, product, unit of work, or system into a single submittal that is marked for choices, options, and portions applicable to the submittal. Mark each copy of the product data identically. Partial submittals will not be accepted for expedition of the fabrication effort.
Submit the manufacturer's instructions before installation.
1.5.2.4 Format of SD-07 Certificates
Provide design data and certificates on 8 1/2 by 11 inch paper.
1.5.2.5 Format of SD-08 Manufacturer's Instructions
Present manufacturer's instructions submittals for each section. Include the manufacturer's name, trade name, place of manufacture, and catalog model or number on product data. Also include applicable federal, military, industry, and technical-society publication references. If supplemental information is needed to clarify the manufacturer's data, submit it as specified for SD-07 Certificates.
Submit the manufacturer's instructions before installation.
1.5.2.5.1 Standards
Where equipment or materials are specified to conform to industry or technical-society reference standards of such organizations as the American National Standards Institute (ANSI), ASTM International (ASTM), National Electrical Manufacturer's Association (NEMA), Underwriters Laboratories (UL), or Association of Edison Illuminating Companies (AEIC), submit proof of such compliance. The label or listing by the specified organization will be acceptable evidence of compliance. In lieu of the label or listing, submit a certificate from an independent testing organization, competent to perform testing, and approved by the Contracting Officer. State on the certificate that the item has been
SECTION 01 33 00 Page 8 tested in accordance with the specified organization's test methods and that the item complies with the specified organization's reference standard.
1.5.2.6 Format of SD-10 Operation and Maintenance Data (O&M)
Comply with the requirements for O&M Data format.
1.5.3 Source Drawings for Shop Drawings
1.5.3.1 Source Drawings
The entire set of source drawing files (DWG) will not be provided to the Contractor. Request the specific Drawing Number for the preparation of shop drawings. Only those drawings requested to prepare shop drawings will be provided. These drawings are provided only after award.
1.5.3.2 Terms and Conditions
Data contained on these electronic files must not be used for any purpose other than as a convenience in the preparation of fabrication data for the referenced project. Any other use or reuse is at the sole risk of the Contractor and without liability or legal exposure to the Government. The Contractor must make no claim, and waives to the fullest extent permitted by law any claim or cause of action of any nature against the Government, its agents, or its subconsultants that may arise out of or in connection with the use of these electronic files. The Contractor must, to the fullest extent permitted by law, indemnify and hold the Government harmless against all damages, liabilities, or costs, including reasonable attorney's fees and defense costs, arising out of or resulting from the use of these electronic files.
These electronic source drawing files are not fabrication documents.
Differences may exist between the source drawing files and the corresponding fabrication documents. The Government makes no representation regarding the accuracy or completeness of the electronic source drawing files, nor does it make representation to the compatibility of these files with the Contractor hardware or software. The Contractor is responsible for determining if any conflict exists. In the event that a conflict arises between the signed and sealed fabrication documents prepared by the Government and the furnished source drawing files, the signed and sealed fabrication documents govern. Use of these source drawing files does not relieve the Contractor of the duty to fully comply with the contract documents, including and without limitation the need to check, confirm and coordinate the work of all contractors for the project. If the Contractor uses, duplicates or modifies these electronic source drawing files for use in producing fabrication data related to this contract, remove all previous indication of ownership (seals, logos, signatures, initials and dates).
1.6 QUANTITY OF SUBMITTALS
1.6.1 Number of SD-01 Preconstruction Submittal Copies
Unless otherwise specified, submit one set of administrative submittals.
1.7 INFORMATION ONLY SUBMITTALS
Submittals without a "G" designation must be certified by the QC manager
SECTION 01 33 00 Page 9 and submitted to the Contracting Officer for information-only. Provide information-only submittals to the Contracting Officer a minimum of 14 calendar days prior to the Preparatory Meeting for the associated Definable Feature of Work (DFOW). Approval of the Contracting Officer is not required on information only submittals. The Contracting Officer will mark "receipt acknowledged" on submittals for information and will return only the transmittal cover sheet to the Contractor. Normally, submittals for information only will not be returned. However, the Government reserves the right to return unsatisfactory submittals and require the Contractor to resubmit any item found not to comply with the contract.
This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
1.8 PROJECT SUBMITTAL REGISTER
A sample Project Submittal Register showing items of equipment and materials for when submittals are required by the specifications is provided as "Attachment A - Submittal Register."
1.8.1 Submittal Management
Prepare and maintain a submittal register, as the work progresses. Do not change data that is output in columns (c), (d), (e), and (f) as delivered by Government; retain data that is output in columns (a), (g), (h), and
(i) as approved. As an attachment, provide a submittal register showing items of equipment and materials for which submittals are required by the specifications. This list may not be all-inclusive and additional submittals may be required.
Column (c): Lists specification section in which submittal is required.
Column (d): Lists each submittal description (SD Number. and type, e.g., SD-02 Shop Drawings) required in each specification section.
Column (e): Lists one principal paragraph in each specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting the project requirements.
Thereafter, the Contractor is to track all submittals by maintaining a complete list, including completion of all data columns and all dates on which submittals are received by and returned by the Government.
1.8.2 Preconstruction Use of Submittal Register
Submit the submittal register. Include the QC plan and the project schedule. Verify that all submittals required for the project are listed and add missing submittals. Coordinate and complete the following fields on the register submitted with the QC plan and the project schedule:
SECTION 01 33 00 Page 10
Column (a) Activity Number: Activity number from the project schedule.
Column (g) Contractor Submit Date: Scheduled date for the approving authority to receive submittals.
Column (h) Contractor Approval Date: Date that Contractor needs approval of submittal.
Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.
1.8.3 Contractor Use of Submittal Register
Update the following fields with each submittal throughout the contract.
Column (b) Transmittal Number: List of consecutive, Contractor-assigned numbers.
Column (j) Action Code (k): Date of action used to record Contractor's review when forwarding submittals to QC.
Column (l) Date submittal transmitted.
Column (q) Date approval was received.
1.8.4 Approving Authority Use of Submittal Register
Update the following fields:
Column (b) Transmittal Number: List of consecutive, Contractor-assigned numbers.
Column (l) Date submittal was received.
Column (m) through (p) Dates of review actions.
Column (q) Date of return to Contractor.
SECTION 01 33 00 Page 11
1.8.5 Action Codes
1.8.5.1 Contractor Action Codes
DESIGN BID BUILD SUBMITTALS
Submittal Classifications shown in UFGS Sections
Submittal Classification
Corresponding SpecsIntact
Submittal Register Code which is populated in the SI Submittal Register.
Software Limitations:
(The software shows one character delineation in the SpecsIntact Submittal Register)
RMS – The following Submittal
Classifications are populated in RMS when the SpecsIntact
Submittal Data File is pulled into
RMS)
G Submittal requires Government Approval
G GA
BLANK Submittal is For Information Only
(FIO)
BLANK FIO
S Submittal is for documentation of Sustainable requirements
S S/FIO
1.8.6 Delivery of Copies
Submit an updated electronic copy of the submittal register to the Contracting Officer with each invoice request. Provide an updated Submittal Register monthly regardless of whether an invoice is submitted.
1.9 SCHEDULING
Schedule and submit concurrently product data and shop drawings covering component items forming a system or items that are interrelated. Submit pertinent certifications at the same time. No delay damages or time extensions will be allowed for time lost in late submittals.
a. Coordinate scheduling, sequencing, preparing, and processing of submittals with performance of work so that work will not be delayed by submittal processing. The Contractor is responsible for additional time required for Government reviews resulting from required resubmittals. The review period for each resubmittal is the same as for the initial submittal.
b. Submittals required by the contract documents are listed on the submittal register. If a submittal is listed in the submittal register but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not
SECTION 01 33 00 Page 12 relieve the Contractor of supplying submittals required by the contract documents but that have been omitted from the register or marked "N/A."
c. Resubmit the submittal register and annotate it monthly with actual submission and approval dates. When all items on the register have been fully approved, no further resubmittal is required.
Contracting Officer review will be completed within 14 days after the date of submission.
1.10 GOVERNMENT APPROVING AUTHORITY
When the approving authority is the Contracting Officer, the Government will:
a. Note the date on which the submittal was received.
b. Review submittals for approval within the scheduling period specified and only for conformance with project design concepts and compliance with contract documents.
c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with comments and markings appropriate for the action indicated.
1.10.1 Review Notations
Submittals will be returned to the Contractor with the following notations:
a. Submittals marked "approved" or "accepted" authorize proceeding with the work covered.
b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize proceeding with the work covered provided that the Contractor takes no exception to the corrections.
c. Submittals marked "not approved," "disapproved," or "revise and resubmit" indicate incomplete submittal or noncompliance with the contract requirements or design concept. Resubmit with appropriate changes. Do not proceed with work for this item until the resubmittal is approved.
d. Submittals marked "not reviewed" indicate that the submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
e. Submittals marked "receipt acknowledged" indicate that submittals have been received by the Government. This applies only to "information-only submittals" as previously defined.
1.11 DISAPPROVED SUBMITTALS
Make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications, give
SECTION 01 33 00 Page 13 notice to the Contracting Officer as required under the FAR clause titled CHANGES. The Contractor is responsible for the dimensions and design of connection details and the fabrication of work. Failure to point out variations may cause the Government to require rejection and removal of such work at the Contractor's expense.
If changes are necessary to submittals, make such revisions and resubmit in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.12 APPROVED SUBMITTALS
The Contracting Officer's approval of submittals is not to be construed as a complete check, and indicates only that
Approval or acceptance by the Government for a submittal does not relieve the Contractor of the responsibility for meeting the contract requirements or for any error that may exist, because under the Quality Control (QC) requirements of this contract, the Contractor is responsible for ensuring information contained with in each submittal accurately conforms with the requirements of the contract documents.
After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 33 00 Page 14
F H
UW
LI
WK
D W
WK
H D E R Y H V X E P
LW
WH
G
LW
H P V K D Y H E H H Q
UH
Y
LH
Z H G
LQ
G H
WD
LO
D Q G D
UH
F R
UU
H F W D Q G
LQ
V
WU
LF
W F R Q
IR
UP
D Q F H Z
LW
K
WK
H
F R Q
WU
D F W G
UD
Z
LQ
J V D Q G V S H F
LI
LF
D
WL
R Q V H F H S W D V R
WK
H U Z
LV
H
V
WD
WH
G
,6 ,6
,7
,6 ,6 ,7
,7
,2 R Y H U R Q O\
R Q H V H F
WL
R Q Z
LW
K
H D F K
WU
D Q V P
LW
WD
O�
,7 ,2
LV
W E ,W H P
R
,7 ,1 ,3
�5 H D G
LQ
V
WU
X F
WL
R Q V R Q
WK
H
UH
Y H
UV
H V
LG
H S
UL
R U
WR
LQ
LW
LD
WL
Q J
WK
LV
IR
UP
,2 ,1 ,7
�7 K
LV
V H F
WL
R Q Z
LO
O E H
LQ
LW
LD
WH
G E
WK
H F R Q
WU
D F
WR
U�
,7
,7 ,1 ,7
,2 ,2
,7
D
,3 ,2 ,7 ,7
�7 S H V L] H P R G H O Q X P E H U� H
WF
E
,1
�6 H H
LQ
V
WU
X F
WL
R Q Q R
F
G
H
,1
I�
J
,2
�6 H H
LQ
V
WU
X F
WL
R Q
R
K
L�
�5
�3
UR
S R Q H Q W�
,7 ,2 ,6
,6
,7 ,6
,2
,1 ,2
H F
WL
R Q Z
LO
O E H
LQ
LW
LD
WH
G E
WK
H R Q
WU
D F
WR
U
LQ
WK
H
UH
T X
LU
H G Q X P E H U R I F R S
LH
V
D F K
WU
D Q V P
LW
WD
O V K D
OO
E H Q X P E H
UH
G F R Q V H F X
WL
Y H O\
LQ
WK
H V S D F H S
UR
Y
LG
H G
IR
U
UD
Q V P
LW
WD
O R K
LV
Q X P E H U�
LQ
D G G
LW
LR
Q
WR
WK
H F R Q
WU
D F W Q X P E H U� Z
LO
O
IR
UP
D V H
UL
D O
Q X P E H U
IR
U
LG
H Q
WL
I\
LQ
J H D F K V X E P
LW
WD
O�
R U Q H Z
V X E P
LW
WD
OV
R U
UH
V X E P
LW
WD
OV
P D
UN
WK
H D S S
UR
S
UL
D
WH
E R R Q
UH
V X E P
LW
WD
OV
LQ
V H
UW
WU
D Q V P
LW
WD
O Q X P E H U R I
OD
V W V X E P
LV
V
LR
Q D V
Z H
OO
D V
WK
H Q H Z
V X E P
LW
WD
O Q X P E H U�
K H ,W H P
R Z
LO
O E H
WK
H V D P H ,W H P
R D V
LQ
G
LF
D
WH
G R Q
�5
IR
U H D F K H Q
WU
R Q
WK
LV
IR
UP
X E P
LW
WD
OV
UH
T X
LU
LQ
J H S H G
LW
LR
X V K D Q G
OL
Q J Z
LO
O E H V X E P
LW
WH
G R Q D V H S D
UD
WH
IR
UP
H S D
UD
WH
WU
D Q V P
LW
WD
O
IR
UP
Z
LO
O E H X V H G
IR
U V X E P
LW
WD
OV
X Q G H U V H S D
UD
WH
V H F
WL
R Q V R I
WK
H V S H F
LI
LF
D
WL
R Q V
F K H F N V K D
OO
E H S
OD
F H G
LQ
WK
H D
UL
D
WL
R Q F R
OX
P Q Z K H Q D V X E P
LW
WD
O
LV
Q R W
LQ
D F F R
UG
D Q F H Z
LW
K
WK
H S
OD
Q V D Q G V S H F
LI
LF
D
WL
R Q V D
OV
R D Z
UL
WW
H Q V
WD
WH
P H Q W
WR
WK
D W H
II
H F W
V K D
OO
E H
LQ
F
OX
G H G
LQ
WK
H V S D F H S
UR
Y
LG
H G
IR
U H P D
UN
V
R
UP
LV
V H
OI
�W
UD
Q V P
LW
WD
O�
OH
WW
H U R I
WU
D Q V P
LW
WD
O
LV
Q R W
UH
T X
LU
H G
K H Q D V D P S
OH
R I P D
WH
UL
D O R U D Q X
ID
F
WX
UH
U
V H
UW
LI
LF
D
WH
R I R P S
OL
D Q F H
LV
WU
D Q V P
LW
WH
G
LQ
G
LF
D
WH
D P S
OH
R U H
UW
LI
LF
D
WH
LQ
F R
OX
P Q F H F
WL
R Q
�6
UP
R
US
V R I Q J
LQ
H H
UV
D S S
UR
Y
LQ
J D X
WK
R
UL
W\
Z
LO
O D V V
LJ
Q D F
WL
R Q F R G H V D V
LQ
G
LF
D
WH
G E H
OR
Z
LQ
V S D F H S
UR
Y
LG
H G
LQ
H F
WL
R Q F R
OX
P Q L
WR
H D F K
LW
H P
V X E P
LW
WH
G ,Q
D G G
LW
LR
Q
WK
H Z
LO
O H Q V X
UH
H Q F
OR
V X
UH
V D
UH
LQ
G
LF
D
WH
G D Q G D
WW
D F K H G
WR
WK
H
IR
UP
S
UL
R U
WR
UH
WX
UQ
WR
WK
H F R Q
WU
D F
WR
U�
K H R Q
WU
D F
WR
U Z
LO
O D V V
LJ
Q D F
WL
R Q F R G H V D V
LQ
G
LF
D
WH
G E H
OR
Z
LQ
H F
WL
R Q F R
OX
P Q J
WR
H D F K
LW
H P
V X E P
LW
WH
G
,1 ,2 ,9 ,7 ,7
S S
UR
Y H G D V V X E P
LW
WH
G
S S
UR
Y H G H F H S W D V Q R
WH
G R Q G
UD
Z
LQ
J V
S S
UR
Y H G H F H S W D V Q R
WH
G R Q G
UD
Z
LQ
J V
H
IH
U
WR
D
WW
D F K H G V K H H W
UH
V X E P
LV
V
LR
Q
UH
T X
LU
H G
LO
O E H
UH
WX
UQ
H G E V H S D
UD
WH
F R
UU
H V S R Q G H Q F H
S S
UR
Y D O R I
LW
H P V G R H V Q R W
UH
OL
H Y H
WK
H F R Q
WU
D F
WR
U
IU
R P
F R P S O\
LQ
J Z
LW
K D
OO
WK
H
UH
T X
LU
H P H Q
WV
R I
WK
H F R Q
WU
D F W S
OD
Q V D Q G V S H F
LI
LF
D
WL
R Q V
�5 H Y H
UV
H R I R
UP
�5
LV
D S S
UR
Y H G �6 H H D
WW
D F K H G
H F H
LS
W D F N Q R Z
OH
G J H G
H F H
LS
W D F N Q R Z
OH
G J H G G R H V Q R W F R P S O\
D V Q R
WH
G Z
LW
K F R Q
WU
D F W
UH
T X
LU
H P H Q
WV
WK
H U �6
S H F
LI
S U
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N I
S O
B S
O L
E T
E P
A G
E
O F
P
A G
E S
W
P
-2
-Q -A
B a rk le y V a lv e M a in te n a n c e
P la tf o rm U p d a te s
S D
-0
P re c o n s tr u c ti o n S u b m it ta ls
.8
G S u b m it ta l R e g is te r
S D
-1
C lo s e o u t S u b m it ta ls
.1
G F in a l A p p ro v e d S h o p D ra w in g s
S D
-0
P re c o n s tr u c ti o n S u b m it ta ls
.5
.1 .1
G In s ta lle r
Q u a lif ic a ti o n s
.2
G D e te c ti o n P la n
S D
-0
P ro d u c t
D a ta
.1
.1 .3
G A d h e s iv e A n c h o r
S y s te m i n
C o n c re te
.1
.2 G
N o n -S h ri n k
N o n -M e ta lli c G ro u t
S D
-0
C e rt if ic a te s
.1
.1 .1
G P o s t-
In s ta lle d
A n c h o r
C e rt if ic a ti o n
S D
-0
M a n u fa c tu re r’ s I n s tr u c ti o n s
.1
.1 .2
G M a n u fa c tu re r' s P ri n te d
In s ta lla ti o n I n s tr u c ti o n s
.1
.2 G
N o n -S h ri n k
N o n -M e ta lli c G ro u t
.5
M a n u fa c tu re r' s S a fe ty D a ta
S h e e ts
S D
-0
P re c o n s tr u c ti o n S u b m it ta ls
.4
.1 .1
G E re c ti o n a n d
E re c ti o n B ra c in g
D ra w in g s
S D
-0
S h o p
D ra w in g s
.4
.2 G
F a b ri c a ti o n D ra w in g s
S D
-0
P ro d u c t
D a ta
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
L E
A N
D L
O C
A T
IO
N
C O
N T
R A
C T
O R
C O
N T
R A
C T
O R
S
C H
E D
U L
E D
A T
E S
C O
N T
R A
C T
O R
A C
T
IO
N A
P P
R O
V
IN
G A
U T
H O
R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
(r
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N I
S O
B S
O L
E T
E P
A G
E
O F
P
A G
E S
W
P
-2
-Q -A
B a rk le y V a lv e M a in te n a n c e
P la tf o rm U p d a te s
.4
.1 W e ld in g
E le c tr o d e s a n d
R o d s
.4
.2 N o n
-S h ri n k G ro u t
S D
-0
T e s t
R e p o rt s
.3
G B o lt s
N u ts a n d W a s h e rs
.7
.1 .2
G W e ld
I n s p e c ti o n R e p o rt s
.7
.2 .1
G D ir e c t
T e n s io n I n d ic a to r
W a s h e r
In s p e c ti o n R e p o rt s
.7
.3 G
E m b ri tt le m e n t T e s t
R e p o rt s
S D
-0
C e rt if ic a te s
.2
G S te e l
.3
G B o lt s
N u ts a n d W a s h e rs
.5
G G a lv a n iz in g
.3
G A
IS
C
S tr u c tu ra l S te e l F a b ri c a to r
Q u a lit y C e rt if ic a ti o n
.4
.3 .1
G W e ld in g
P ro c e d u re s a n d
Q u a lif ic a ti o n s
.4
.1 G
W e ld in g E le c tr o d e s a n d
R o d s
.7
.1 .1
G C e rt if ie d W e ld in g
I n s p e c to r
.7
.1 .2
G N
D T
T e c h n ic ia n
.4
G W e ld in g
P ro c e d u re S p e c if ic a ti o n s
(W P
S
S D
-0
S h o p
D ra w in g s
.4
G S te e l S e lf -C lo s in g S a fe ty G a te s
.9
G S te e l S e lf -C lo s in g S a fe ty G a te s
S D
-0
P ro d u c t
D a ta
.4
S te e l S e lf -C lo s in g S a fe ty G a te s
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
L E
A N
D L
O C
A T
IO
N
C O
N T
R A
C T
O R
C O
N T
R A
C T
O R
S
C H
E D
U L
E D
A T
E S
C O
N T
R A
C T
O R
A C
T
IO
N A
P P
R O
V
IN
G A
U T
H O
R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N I
S O
B S
O L
E T
E P
A G
E
O F
P
A G
E S
W
P
-2
-Q -A
B a rk le y V a lv e M a in te n a n c e
P la tf o rm U p d a te s
.9
S te e l S e lf -C lo s in g S a fe ty G a te s
.3
G F lo o r G ra ti n g s
S D
-0
C e rt if ic a te s
.1
G C e rt if ie d M ill
S D
-0
S h o p
D ra w in g s
.3
G L a d d e rs
S D
-0
P ro d u c t
D a ta
.3
G L a d d e rs
S D
-0
C e rt if ic a te s
.3
F a b ri c a to r
C e rt if ic a ti o n f o r
L a d d e r
A s s e m b ly
S D
-0
S h o p
D ra w in g s
.2
.1 G
F a b ri c a ti o n D ra w in g s
.5
.1 G
F a b ri c a ti o n D ra w in g s
.2
G Ir o n a n d S te e l H a rd w a re
.2
G S te e l S h a p e s
P la te s
B a rs a n d
S tr ip s
S D
-0
P ro d u c t
D a ta
.1
.2 G
P ro te c ti v e
C o a ti n g
.2
.2 G
S te e l R a ili n g s a n d
H a n d ra ils
.2
.1 G
A n c h o ra g e a n d F a s te n in g
S y s te m s
S D
-0
T e s t
R e p o rt s
.4
.1 G
W e ld in g I n s p e c ti o n s
.3
G M ill T e s t
R e p o rt s
S D
-0
C e rt if ic a te s
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
L E
A N
D L
O C
A T
IO
N
C O
N T
R A
C T
O R
C O
N T
R A
C T
O R
S
C H
E D
U L
E D
A T
E S
C O
N T
R A
C T
O R
A C
T
IO
N A
P P
R O
V
IN
G A
U T
H O
R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T
A L
F O
R M
,J a n
P
R E
V
IO
U S
E D
IT
IO
N I
S O
B S
O L
E T
E P
A G
E
O F
P
A G
E S
W
P
-2
-Q -A
B a rk le y V a lv e M a in te n a n c e
P la tf o rm U p d a te s
.4
.2 G
W e ld e r Q u a lif ic a ti o n
S D
-0
M a n u fa c tu re r’ s I n s tr u c ti o n s
.2
G In s ta lla ti o n I n s tr u c ti o n s
S D
-0
P ro d u c t
D a ta
.1
G C o a ti n g
.1
P ro d u c t
D a ta S h e e ts
.2
G P a in t
S D
-0
M a n u fa c tu re r’ s I n s tr u c ti o n s
.2
.1 A p p lic a ti o n I n s tr u c ti o n s
.1
M ix in g
.7
.1 M a n u fa c tu re r' s S a fe ty D a ta
S h e e ts
S D
-1
O p e ra ti o n a n d
M a in te n a n c e
D a ta
.1
G C o a ti n g s
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
L E
A N
D L
O C
A T
IO
N
C O
N T
R A
C T
O R
C O
N T
R A
C T
O R
S
C H
E D
U L
E D
A T
E S
C O
N T
R A
C T
O R
A C
T
IO
N A
P P
R O
V
IN
G A
U T
H O
R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
PART 1 GENERAL
1.1 REFERENCES
1.2 ORDERING INFORMATION
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 42 00 Page 1
SECTION 01 42 00 Page 2
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
PART 1 GENERAL
1.1 REFERENCES
Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization (e.g., ASTM B564 Standard Specification for Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.
1.2 ORDERING INFORMATION
The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided.
AMERICAN CONCRETE INSTITUTE (ACI)
38800 Country Club Drive Farmington Hills, MI 48331-3439 Ph: 248-848-3800 Fax: 248-848-3701 Internet: https://www.concrete.org/
AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)
3640 Park 42 Drive Cincinnati, OH 45241 Ph: 513-742-2020 Fax: 513-742-3355 Email: customerservice@acgih.org Internet: https://www.acgih.org/
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
130 East Randolph, Suite 2000 Chicago, IL 60601 Ph: 312-670-2400 Fax: 312-670-5403 Steel Solutions Center: 866-275-2472 E-mail: solutions@aisc.org Internet: https://www.aisc.org/
AMERICAN LADDER INSTITUTE (ALI)
1300 Summer Avenue Clevelan, OH 44115 Ph: 216-241-7333 Fax: 216-241-0105 E-mail: info@americanladderinstitute.org Internet: https://www.americanladderinstitute.org
SECTION 01 42 00 Page 3
AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)
1201 Dublin Road Suite G04
Columbus, OH 43215-1045 Ph: 800-222-2768 or 614-274-6003
E-mail: customersupport@asnt.org Internet: https://www.asnt.org/
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
1801 Alexander Bell Drive Reston, VA 20191 Ph: 800-548-2723; 703-295-6300 Email: customercare@asce.org Internet: https://www.asce.org/
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
Two Park Avenue New York, NY 10016-5990 Ph: 800-843-2763 Fax: 973-882-1717 E-mail: customercare@asme.org Internet: https://www.asme.org/
AMERICAN WELDING SOCIETY (AWS)
8669 NW 36 Street, #130 Miami, FL 33166-6672 Ph: 800-443-9353 Email: customercare@aws.org Internet: https://www.aws.org/
ASTM INTERNATIONAL (ASTM)
100 Barr Harbor Drive, P.O. Box C700 West Conshohocken, PA 19428-2959 Ph: 610-832-9500 Fax: 610-832-9555 E-mail: service@astm.org Internet: https://www.astm.org/
CENTERS FOR DISEASE CONTROL AND PREVENTION (CDC)
1600 Clifton Road Atlanta, GA 30329-4027 Ph: 800-232-4636
TTY: 888-232-6348
Internet: https://www.cdc.gov
INTERNATIONAL CODE COUNCIL (ICC)
200 Massachusetts Ave, NW Suite 250 Washington, DC 20001 Ph: 800-786-4452 or 888-422-7233 Fax: 202-783-2348 E-mail: order@iccsafe.org Internet: https://www.iccsafe.org/
MASTER PAINTERS INSTITUTE (MPI)
2800 Ingleton Avenue Burnaby, BC CANADA V5C 6G7 Ph: 1-888-674-8937
SECTION 01 42 00 Page 4
Fax: 1-888-211-8708 E-mail: info@paintinfo.com or techservices@mpi.net Internet: http://www.mpi.net/
NATIONAL ASSOCIATION…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .