2025.06.09 BLCVMP 100% USACE Submittal DWG Set.pdf

PDF 4 MB Posted

Attached to
BARKLEY VALVE MAINTENANCE PLATFORM FABRICATION
Solicitation number
W912P525QA048
Issued by

About this file

These engineering design drawings detail the existing conditions and proposed modifications for an access gallery platform, focusing on structural details for upper and lower platforms, railings, gratings, and support systems. The technical drawings, marked as 100% design, include multiple detailed sections showing elevation views, platform plans, and specific constructional details such as ladder rung details, removable guardrail specifications, toe plate installations, and steel grating attachment methods. The drawings utilize standard architectural notation with detailed callouts for materials like galvanized steel, specific platform elevations, and structural reinforcement strategies, and are prepared by Jacobs Bergman with a Q9 design designation.

The technical drawings comprehensively illustrate platform structural elements including multiple platform levels (shown at elevations like EL. 375.04 and EL. 365.04), intricate steel framing, grating support systems, safety gate details, and removable guardrail specifications. Key technical components include precise measurements for steel members, platform support structures, ladder and access systems, and various connection and reinforcement details. The drawings provide engineering-grade documentation with structural abbreviations, general sheet notes, and detailed views of critical junction points and structural interfaces, suggesting a comprehensive renovation or construction project for a complex multi-level access infrastructure.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .