This is an Amendment of Solicitation/Modification of Contract (SF 30) extending the response due date for solicitation W912P426QA009 from May 20, 2026 to May 26, 2026, issued by the U.S. Army Corps of Engineers, Buffalo District on May 14, 2026. The solicitation relates to FY26 electrical updates at Mount Morris Dam in Mount Morris, New York. The amendment incorporates revisions into an updated Statement of Work (SOW) and addresses comments submitted in ProjNet. Two contract clauses have been modified: FAR 52.244-6 (Subcontracts for Commercial Products and Commercial Services) with an effective date of April 2026, and a new clause FAR 52.222-90 (Addressing DEI Discrimination by Federal Contractors) has been added with an effective date of April 2026, both under Deviation 2026-O0038.

The underlying solicitation involves six bid items for electrical infrastructure work at Mount Morris Dam: (1) Mobilization/Demobilization, (2) Replacement of 15 electrical panels and 14 junction boxes, (3) Replacement of electrical conductors, (4) Installation of a new grounding system, with optional items (5) connecting the grounding system in the operating gallery and (6) replacing conductors from panel 59 to panel 73. All work must be completed within 180 calendar days of Notice to Proceed, with substantial electrical work completed within 120 days. All materials including fasteners and hardware must be 316 stainless steel. The contract requires comprehensive quality control, safety compliance per EM 385-1-1, pre-construction submittals including technical drawings and safety plans, and detailed testing and inspection documentation. Payment will be on a lump-sum basis with partial payments discussed at a pre-construction meeting.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Solicitation/Contract Form Continuation

The following changes have been made:

INFORMATION FROM TO

Response Due Date

20 May 2026 26 May 2026

Contract Clauses

Additional Information/Notes

The following clauses were added:

FAR Clauses Incorporated by Reference Number Title Effective Date Alternate/

Deviation Variation Effective Date

52.222-90 Addressing DEI Discrimination by Federal Contractors. (Deviation 2026-O0038)

Apr 2026

Addendum to Contract Clauses

Additional Information/Notes

The following clauses were modified:

52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026- O0038) Apr 2026 Date Changed From: Feb 2026 To: Apr 2026

W912P426QA0090001

Bid Schedule Mount Morris Dam, Mount Morris, New York

FY26 Electrical Updates

Item No. Description Bid Quantity Bid Unit Unit Price ($) Price ($)

1 (Base) Mobilization/Demobilization 1 JA

2 (Base) Replacement of Electrical Enclosures 1 JA

3 (Base) Replacement of Electrical Conductors 1 JA

4 (Base) Installation of New Grounding System 1 JA

5 (Option) Connect Grounding System in Operating Gallery 1 JA

6 (Option) Replace Conductors from panel 59 to Gate 3 panel 73 1 JA

TOTAL BASE BID AMOUNT (Item(s) 1 - 4): ________________

TOTAL OPTIONAL BID AMOUNT (Item(s) 5 – 6): ________________

TOTAL BID AMOUNT (Item(s) 1 – 8): ________________

U.S. Army Corps of Engineers® Buffalo District

Scope of Work Mount Morris Dam, Mount Morris, NY

FY26 Mount Morris Dam Electrical Updates

Customer:

Manager, Mount Morris Dam

Prepared By:

Eli Rafidi, NY/PA O&M U.S. Army Corps of Engineers Buffalo District 478 Main Street Buffalo, NY 14202

1 Point of Contact 2 Pre-Bid Site Visit 3 Project/Contractual References 4 General Description of Work

4.1 Base Bid Item(s)

4.1.1 Base Bid Item 1 – Mobilization/Demobilization

4.1.2 Base Bid Item 2 – Replacement of Electrical Enclosures

4.1.3 Base Bid Item 3 – Replacement of Electrical Conductors

4.1.4 Base Bid Item 4 – Installation of New Grounding System

4.2 Optional Bid Items

4.2.1 Optional Bid Item 5 – Connect Grounding System in operating gallery

4.2.2 Optional Bid Item 6 – Replace conductors from panel 59 to Gate 3 panel 73

5 Project Information

5.1 Basis for Award

5.1.1 Award Period for Options

5.1.2 Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts

5.2 Period of Performance

5.2.1 Pre-Construction Submittals

5.2.2 Project Timeline

5.3 Pre-Construction Meeting

5.4 Work Schedule

5.5 Material/Equipment Information

5.6 Dimension/Quantity Verification

5.7 Material Storage

5.8 Site Cleanup

6 Quality Assurance (QA)

6.1 Overview

6.1.1 Government Project Manager (PM)

6.1.2 Government Quality Assurance (QA)

6.1.3 Government Inspections

6.1.4 Product Data Sheets

6.1.5 Submission of Contract Documents

6.2 Contractor Quality Control (CQC)

6.2.1 Quality Control Program (QCP)

7 Communication 8 Repair/Restoration of Government Property 9 Work Stoppage, Contract Cancellation Actions 10 Material Change Orders 11 Liquidated Damages

11.1 Pre-Final/Final Inspection

12 Completion 13 Payment 14 Warranty

14.1 Warranty Period

14.2 Repairs

15 Safety 16 Security

16.1 Access and General Protection/Security Policy and Procedures

16.1.1 Candidate Pre-Screening

16.1.2 Background Investigation

16.1.3 Suspicious Activity Reporting Training

16.1.4 Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch or See Something, Say Something)

16.2 Start of Work

16.3 Arrival/Departure

16.4 Video/Camera Equipment

17 Submittals

17.1 Bid Submittals

17.2 Pre-Construction Submittals

17.3 Project Completion Submittals

Attachment #1 – Directions to Mount Morris Dam Attachment #2 – Section 01 35 26 Governmental Safety Requirements Attachment #3 – Section 01 45 00 Quality Control Specification Attachment #4 – Section 01 45 00.15 10 Resident Management Contractor Mode (RMS CM) Attachment #5 – Contractor Quality Control Plan Checklist Attachment #6 – Submission of Contract Documents Attachment #7 – Mount Morris Dam Site Map Attachment #8 – Overall Locations Attachment #9 – Example Photos of Panels and Junction Boxes Attachment #10 – Ground rods and Wire run Attachment #11 – Ground Bus Bar Level 6 Attachment #12 – Approximate location of ground rods Attachment #13 – ARC Flash Data Collection sheet Attachment #14 – Mount Morris Dam Full One-Line Drawings

1 Point of Contact

For scheduling project site visits and/or questions regarding this Scope of Work:

U.S. Army Corps of Engineers, Buffalo District Attn: Jeff Ernest, Contracting Officer 478 Main Street Buffalo, New York 14202

Phone: 716-879-4126 Facsimile: 716-879-4353

2 Pre-Bid Site Visit There will be one (1) scheduled pre-bid site visit for prospective bidders. The date and time of the visit will be posted on SAM.GOV. The location of the visit will be the William B. Hoyt II Visitor Center, 6103 Visitor Center Road, Mount Morris, New York 14510. Prospective bidders are urged to attend to gain information that will be necessary in the preparation of bid submittals. Due to maintenance, operation and security requirements, unscheduled visits may not be honored. Following the visit to the project site, a question-and-answer session will be held. During this session, prospective bidders are asked to direct all questions concerning the project to the Buffalo District Contracting Office

(DCO).

3 Project/Contractual References

• 81-1983-IEEE Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a

Ground System

• EM 385-1-1, March 2024, U.S. Army Safety and Health Requirements Manual

• IEEE C2, National Electrical Safety Code (2023)

• IEEE 1584, Guide for Performing Arc-Flash Hazard Calculation (2018)

• National Electrical Manufacturer’s Association (NEMA)

• NEMA KS-1

• National Fire Protection Association (NFPA)

• NFPA 70 (2026) National Electrical Code (NEC)

• NFPA 70E (2024)

• NFPA 70B (2023)

• Shop Drawings/As-Built Drawings/Etc.

• UL 467 Grounding and Bonding Equipment

• UL 98

4 General Description of Work

The contractor must perform the following work under this contract:

Mount Morris Dam (MMD) has outdated electrical panels and junction enclosures that require replacement. This project includes the replacement of power conductors and the installation of additional grounding circuits. Currently the Dam has several segments of conductors that have reached the end of their service life. These conductors must be replaced. Also, equipment ground has not been established at all panels.

1. Provide all submittals listed in section 17 through the Resident Management System (RMS) submittal process subject to government approval.

2. All distances are estimated and must be field verified by the contractor.

3. The contractor must provide all cabling, conduit, and materials needed for installation of all new equipment.

4. Label all conductors, boxes, breakers, and newly installed equipment to appropriate code and industry standards.

5. All hardware including fasteners, anchors, conduit clips and any other hardware required as part of this contract to be installed in this project must be made of 316 stainless steel.

6. All branch circuit cabling at each panel is to be reconnected.

7. The use of the word “provide” in this document must be understood to be inclusive of “install/oversee” for the work following its use. (Typical for all situations.)

8. All local and industry safety and operational standards must be adhered to while working. Follow all manufacturers recommendations for installation of equipment. All work must be accomplished while meeting the Safety requirements in Attachment #2 – Section 01 35 26 Governmental Safety Requirements and the EM 385-1-1.

4.1 Base Bid Item(s)

4.1.1 Base Bid Item 1 – Mobilization/Demobilization

1. Include all costs to mobilize all personnel, equipment, supplies, tools, testing equipment, etc. to the worksite and demobilize upon completion of all awarded base and optional items. Mobilization and demobilization include any costs associated with proper handling, storage, and disposal of waste such as demolished/removed parts unless separately itemized. Mobilization payment will be 60% of the CLIN and demobilization will be the remaining 40%. All electrical work must be performed and checked by a licensed electrician in accordance with the current National Electrical Code and any applicable local standards and requirements.

2. All waste generated from the replacement any equipment is the property of contractor to properly dispose of off-site according to local, state, and federal regulations.

3. Provide complete one line and as built drawings of all work completed under this contract in DWG format and in PDF format. This is a submittal item under section 17.

4. Perform megger testing, ground testing, phase rotation, and arc flash analysis testing in accordance with NETA and IEEE standards. Megger testing is to be completed during the installation of all new cables. Identify cables and perform megger testing in accordance with industry standards. A report must be provided for all the following tests: megger, ground, phase rotation, and arc flash analysis *No ARC flash analysis is to be performed as part of this project only ARC flash data collection as part of attachment #14. Provide pdf copies of test reports one for each type of testing listed above that includes all relevant test information for each conductor tested in accordance with industry standards.

5. Complete ARC Flash data collection attachment #14.

4.1.2 Base Bid Item 2 – Replacement of Electrical Enclosures

1. Currently the MMD Building 306 (the dam) has electrical enclosures that show signs of significant corrosion and have outlived their service life. Additionally, many of the enclosures are not adequate for their current use and do not meet current code requirements. They include unsecured components and/or do not have proper buses. Example pictures of existing enclosures can be seen in Attachment # 9 – Example Photos of Panels and Junction Boxes, and locations of these enclosures are found in Attachment #8 – Overall Locations.

2. Replace 15 panels and 14 junction boxes as listed in the table 1 below:

Table 1 – Panel/Junction box Schedule

Panel # Junction box # Level Gate 20A SP 15A SP 30A 3 Phase Breaker

39 N/A 3 N/A 2 3 41 40 *3N N/A 5 1 1

42 *3N N/A 44 43 *3N N/A 5 1 1 46 46A *6N N/A 6 1 1

47 NEW 2 N/A 3 1

59 59 1 N/A 6 1 64 63 1 1 5 1 1 69 69 1 2 3 1 73 72 1 3 4 1 1 77 76 1 4 3 1 1 81 80 1 5 5 1 1 85 84 1 6 3 1 89 88 1 7 4 1 1 93 92 1 8 3 1 97 96 1 9 5 1 1

*Level 3N = level 3 North side accessible by walking across dam.

*Level 6N = level 6 North side limited to stair access only.

3. Install new 3 phase receptacles type NEMA 18-30R within a maximum of 2 feet of new panels.

4. Install new 20-amp duplex GFCI receptacles within 2 feet of all newly installed panels.

5. Insall new 20-amp duplex receptacles within 2 feet of all newly installed panels.

a. Both receptacles listed above (items 4&5) must be in separate enclosures and powered from separate circuits.

b. All receptacles are to be installed in NEMA 4x enclosure with in-use covers.

6. Provide and install new 20-amp 120-volt duplex outlet with in-use cover plates 30 feet beyond panel 44 on the far north side of level 3. Provide and install new 1-inch PVC conduit for this 30-foot extension and connect to panel 44.

7. Panel 59 and 69 junction boxes are not labeled but must be replaced as part of this SOW.

8. Install a new junction box within 5 feet of panel 47.

9. Provide and install new panels that meet or exceed the specifications listed below in Table 2:

Table 2 Panel type 1 specifications:

120/208 3 phase 12 circuits NEMA 4X rated Isolated Grounding bar Isolated Neutral bar 22kaic minimum 100A Main breaker

10. Current existing panels are approximately 10 inch x 5 inch x 3.5 inch (sizes may vary by location). Above each panel are junction boxes approximately 8 inch x 4 inch x 3 inch (sizes may vary by location). All newly installed enclosures must be NEMA type 4X stainless steel 316 enclosures with continuous hinge clamp style latch doors and need to be sized properly to accommodate existing electrical components and meet current

NFPA 70 (NEC).

a. Field-verify all enclosures and junction boxes for current size and replacement size and location.

Conduit may be reused with the appropriate fittings per manufacture recommendations.

b. Any conduit to be replaced must be RMC threaded PVC Schedule 40 not RMC threaded, sized per NFPA 70 and be no smaller than 1 inch in diameter.

c. Seal all conduit to prevent condensation and seal the ends of the conduit with a non-hardening, pliable putty like duct seal to block the flow of air inside of enclosures and conduit.

d. Internal electrical equipment such as circuit breakers must also be replaced with new circuit breakers as the panels are replaced.

e. All panels must be composed of new components, nothing previously used. All new circuit breakers installed must be the same size and same quantity as breakers removed.

f. All new circuit breakers and panels installed must be of the same manufacturer. Label each branch circuit and all panels with the same panel numbers identified in table 3.

g. Panels must have a one-way breather drain at the lowest point.

11. All panels including but not limited to panels 59, 64, 69, 73, 77, 81, 85, 89, 93, and 97 must be relocated to ensure proper working clearance in accordance with NFPA 70 in every gate bay in the operating gallery.

a. These panels should be shifted approximately 3-4 feet to the left of their current locations. All panels in gate bays must be installed vertically. All panels installed as part of this bid item must allow for proper working clearance per NFPA 70 (2026).

b. Submit shop drawing of panels for government approval of locations.

12. Prior to the installation of any new panels or junction boxes, mounting locations must be approved (in writing) by a Government representative. Submit locations for official approval before any installation work begins.

13. De-energization of circuits in Panels 59, 64, 69, 73, 77, 81, 85, 89, 93, and 97 are associated with the operation of hydraulic lift gates and data acquisition sensors. De-energization of these circuits must be coordinated with MMD manager at least 48 hours in advance. These systems must be restored within 24 hours unless otherwise coordinated. If emergency gate operations are needed, the Contractor must re-energize these systems within 12-hours of notification.

14. The panels on level 1 in each of the 9 gate bays (Panels 59-97) must be installed within 8-10 inches of the back right hand corner, see Attachment #9 – Example Photos of Panels and Junction Boxes, and meet any minimum working clearance requirements per of NFPA 70 (2026). All panels must be installed in accordance with NFPA 70 (2026).

15. All work must be accomplished using proper Lock Out/Tag Out of energized power sources in direct coordination with MMD Manager or a Government representative. Give three (3) business days’ notice before for any Lock Out/Tag Out work begins. Contractor must provide copy of their hazardous energy control program for review as a submittal.

4.1.3 Base Bid Item 3 – Replacement of Electrical Conductors

1. Remove existing conductors and the pull new conductors through existing conduit. Conductor locations and lengths are based on one-line drawings.

Table 3 - Power Conductors with Equipment Grounding Conductor

Cable/Conductor number

Power Conductors (4) Size/Material/Insulation

Equipment Ground (1) Size/Material/Insulation

Distance Approximate (feet)

CBL-0015 4 - 3/0 AWG Copper

XHHW-2

1 - 4 AWG Copper

XHHW-2

CBL-0027

*see note 1(1a-1c)

4 - 3/0 AWG Copper

XHHW-2

1 - 4 AWG Copper

XHHW-2

CBL-0028

*see note 1(1a-1c)

4 - 3/0 AWG Copper

XHHW-2

1 - 4 AWG Copper

XHHW-2

CBL-0030 4 - 1/0 AWG Copper

XHHW-2

1 - 4 AWG Copper

XHHW-2

CBL-0047 4 - 2 AWG Copper

XHHW-2

1 - 8 AWG Copper

XHHW-2

CBL-0048 4 - 2 AWG Copper

1 - 8 AWG Copper

CBL-0049 4 - 2 AWG Copper

1 - 8 AWG Copper

XHHW-2

CBL-0050 4 - 2 AWG Copper

XHHW-2

1 - 8 AWG Copper

XHHW-2

CBL-0051 4 - 2 AWG Copper

XHHW-2

1 - 8 AWG Copper

XHHW-2

CBL-0052 4 - 2 AWG Copper

XHHW-2

1 - 8 AWG Copper

XHHW-2

CBL-0053 4 - 2 AWG Copper

XHHW-2

1 - 8 AWG Copper

XHHW-2

CBL-0054 4 - 2 AWG Copper

XHHW-2

1 - 8 AWG Copper

XHHW-2

CBL-0055 4 - 2 AWG Copper

XHHW-2

1 - 8 AWG Copper

XHHW-2

CBL-0056 4 - 2 AWG Copper

XHHW-2

1 - 8 AWG Copper

XHHW-2

CBL-0057 4 - 2 AWG Copper

XHHW-2

1 - 8 AWG Copper

XHHW-2

CBL-0058 4 - 2 AWG Copper

XHHW-2

1 - 8 AWG Copper

XHHW-2

*Notes:

2. Cable/Conductor-0027 and Cable/Conductor-0028 must be one continuous length with no splices.

3. Cable/Conductor-0027, runs from Junction box 40 to junction box 42 on level 3 north.

4. Cable/Conductor-0028, runs from junction box 42 to junction box 43 on level 3.

5. Remove junction box 42. After Cable/Conductor 27 and Cable/Conductor 28 are replaced this junction box will not be needed.

6. Replace PVC conduit from Junction box 40 to Junction box 42 with 2.5” stainless-steel PVC schedule 40 threaded RMC and match existing galvanized RMC conduit size. Total distance is approximately 40 feet.

7. Cable/Conductor-0015, runs from circuit breaker 18 in Level 6 distribution panel to Junction box 40 on level 3.

8. Cable/Conductors 0047 - 0058, 4-#2 AWG Copper XHHW-2 with #8 AWG Copper XHHW-2 insulated ground conductor from Gate #3 panel 73 to Gate #9 panel 97.

9. Pull new grounding conductors through existing conduit from level 6 to level 1(Operating Gallery). The grounding conductor specifications are: #8 AWG XHHW-2 labeled per NFPA 70. Grounding conductors need to be ran to both Hydraulic Power Units (HPU) enclosures, sump pump enclosure and every electrical panel replaced as part of this contract on level 1 (10 panels total excluding HPU and Sump Pump enclosures).

Table 4 - Equipment Grounding Conductors – Level 6 to Operating Gallery (Level 1) number

Equipment Ground (1) Size/Material/Insulation

Distance Approximate (feet)

CBL-0035 1 - 8 AWG Copper

XHHW-2

CBL-0031

1 - 8 AWG Copper

CBL-0032

1 - 8 AWG Copper

CBL-0030 1 - 8 AWG Copper

XHHW-2

CBL-0036 1 - 8 AWG Copper

XHHW-2

CBL-0037 1 - 8 AWG Copper

CBL-0014 1 - 8 AWG Copper

CBL-0041 1 - 8 AWG Copper

10. All equipment grounding conductors must be reconnected if disconnected. Contractor must provide all conduit, cabling, and materials needed for installation of all new equipment and panels.

11. Provide color coding of ungrounded conductors in different voltage systems as follows:

a. 208/120 volt, three-phase

i. Phase A – black

ii. Phase B – red

iii. Phase C – blue

12. Ground and Neutral Conductors. Provide color coding of ground and neutral conductors as follows:

a. Grounding conductors: Green.

b. Neutral conductors: White.

13. All work must be accomplished using proper Lock Out/Tag Out of energized power sources in direct coordination with MMD Manager or Government representative. Give three (3) business days’ notice before for any Lock Out/Tag Out work begins.

4.1.4 Base Bid Item 4 – Installation of New Grounding System

Install a grounding system of approximately 375 feet of ground conductor from the existing ground busbar on level 6 of the Dam, Building 306 (see Attachment #11 – Ground Bus Bar Level 6), down through the elevator shaft and out the South training wall access door on level 2 then to the 2 ground rods to be installed into the side of the gorge wall just above the training wall. See Attachment #10 – Ground rods and Wire run for approximate locations.

Approximate location of ground rods can be seen in Attachment #12 – Approximate location of ground rods. Any work in the elevator shaft must be coordinated with the elevator service company. Any additional cost this may incur will be the responsibility of the contractor.

1. Two ground rods and ground access wells must be installed to the following specifications:

a. Before installation of the new ground rods and conductor, the contractor must perform testing to determine adequate locations of new ground rods in accordance with IEEE 81 standards and NFPA 70 standards. The ground resistance values must be recorded and included in a submittal. The grounding system resistance to ground must not exceed five ohms (Ω). Provide documented findings to the Government as a submittal.

b. Copper-clad steel conforming to UL 467. Ground rods must be 0.75 inches (19 mm) in diameter and 12 feet (3650 mm) in length. Ground rods must be clean, smooth and have a cone-shaped point. Ground rods must be die-stamped near the top with the name or trademark of the manufacturer and the length of the rod.

c. These ground rods must be installed a minimum of 6 feet apart.

d. Install both ground rods into the side of the gorge walls approximately 40-60 inches high from the base of the training wall. Location must be approved by a government representative in writing before installation.

e. Install ground access wells at the two locations to be identified and approved by a Government representative. Drive the ground rods 11.5 feet into the earth at the bottom of the pit such that 6 inches are exposed inside the ground well for the ground conductor connections and inspection. The rods must be centrally positioned inside the well.

f. Ground rods must be orientated vertically except if prohibited by earthen obstructions, in which case they must not exceed 45 degrees from the vertical. position Install the ground rods using appropriate ground rod drivers without breaking or deforming the rods.

g. Install ground rods in 6 inch wide ground access wells made of High-Density Polyethylene (HDPE) or schedule 80 PVC with a cap made for the purpose of inspecting ground rods.

i. This well should have adequate drainage to prevent water from infiltrating.

h. Ground access wells will be flush with stone.

2. The ground conductor/wire must be #2 AWG stranded copper wire and must be connected to the ground rods by exothermic weld.

a. Exothermic welding must be done by qualified personnel with the appropriate Personal Protective

Equipment (PPE) in accordance with OSHA standards and requirements. Installation must be done in accordance with the NEC standards and manufacturer’s instructions.

3. Run the ground conductor from the ground rods to building 306, level 6, and connect to the existing ground bus bar. The conductor inside the elevator shaft must be installed in a minimum of 1 inch stainless threaded RMC secured with all stainless mounting hardware the full length of the conduit run. Route conductor in schedule 80 pvc conduit sized per NFPA 70 for the total length of outdoor run to the door on level two all other areas inside the dam the ground conductor is to be ran, open air installation is sufficient.

4. Install the ground conductor in one continuous, straight length without splices or joints. When necessary, bends at locations including but not limited to the corner of the walls, and top and bottom of the elevator shaft must be made in such a way to avoid damage to the conductor.

5. Secure the conductor wire against the wall using proper size EPDM cushion clamps or equivalent with stainless steel fasteners. The conductor must be secured in accordance with NEC specifications.

6. Route the ground conductor through the wall next to training wall door and then route the copper wire down and below the platform and along the second lift joint from the ground into the location of the ground rods.

This ground conductor should be installed in the Monolith joints during vertical transitions and lift joints during horizontal transitions. See Attachment #10 – Ground rods and Wire run.

7. Ground conductor must be routed inside concrete lift joint cavity in the wall to reduce shearing of conductor by falling rock and/or ice.

8. Clean the entire surface of ground busbar and drill the holes into the ground busbar prior to making connections to the bare copper wire. The bare copper wire and ground busbar connections must be made by using tin-plated copper or copper-alloy bolts and nuts.

9. Apply corrosion inhibitor to all contact surfaces when making ground bonding connections. Use corrosion inhibitor appropriate for protecting a connection between the metals used. Submit a corrosion inhibitor compound as a proposal which can be accepted or denied.

10. After installation of the new ground rods and conductor, the contractor must test the new ground network according to IEEE 81 standards. The ground resistance values must be recorded and included in a submittal.

The grounding system resistance to ground must not exceed five ohms (Ω). Provide documented finding to the Government as a submittal.

Submit pre-construction submittals to the Government for approval prior to ordering any materials and equipment.

4.2 Optional Bid Items

4.2.1 Optional Bid Item 5 – Connect Grounding System in operating gallery

Connect all electrical panels on level 1 to newly installed ground system described in Bid Item 4.1.4. The connection to this ground system should be done exothermically, as described in section 4.1.4. The distance of this ground run is approximately 230 feet.

1. Ground wire must be #2 AWG XHHW-2 and must be connected to the newly installed ground system exothermically, as described in section 4.1.4.

2. Connect the level 1 ground wire to the newly installed ground conductor in the newly installed junction box above panel 59. This connection can be made where the conductor enters the dam from the training wall.

3. This bid item also requires running new grounding conductors from panel 59 and connecting them to both the

HPU cabinets and the sump pump cabinet. HPU cabinets and the sump pump cabinet are located within 20 feet of panel 59.

a. Ground wire must be #2 AWG XHHW-2

4.2.2 Optional Bid Item 6 – Replace conductors from panel 59 to Gate 3 panel 73

Remove existing conductors and replace with new conductors through existing conduit. Conductor run locations and lengths are based on one-line drawings, seen in Attachment #14 – Full One-line diagrams of entire Dam, and reported in the table below. The contractor must field verify actual lengths of each run before replacement.

Table 5 - Power Conductors number

Power Conductors (4) Size/Material/Insulation

Equipment Ground (1) Size/Material/Insulation

Distance Approximate (feet)

CBL-0042 4 - 2 AWG Copper

XHHW-2

1 - 8 AWG Copper

XHHW-2

CBL-0043 4 - 2 AWG Copper

XHHW-2

1 - 8 AWG Copper

CBL-0044 4 - 2 AWG Copper

1 - 8 AWG Copper

XHHW-2

CBL-0045 4 - 2 AWG Copper

XHHW-2

1 - 8 AWG Copper

XHHW-2

CBL-0046 4 - 2 AWG Copper

XHHW-2

1 - 8 AWG Copper

1. Cable/Conductor 0042-0046, 4-#2 AWG Copper XHHW-2 with #8 AWG Copper XHHW-2 insulated ground conductor from Operating Gallery panel 59 to Gate #3 panel 73.

5 Project Information

5.1 Basis for Award

The Government must award the contract to the offeror who provides the best value trade-off.

5.1.1 Award Period for Options

The Government reserves the right to award any and/or all optional bid items within sixty (60) calendar days following the initial award.

5.1.2 Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

- U.S. Department of Labor Veterans’ Employment and Training Service (VETS):

https://www.dol.gov/vets/

- Federal Veteran Employment Information:

https://www.fedshirevets.gov/

- Veterans Opportunity to Work (VOW) Program:

https://www.benefits.va.gov/vow/

- U.S. Army Warrior Transition Command Employment Index:

https://wct.army.mil/modules/employers/index.html

- Hiring Our Heroes:

https://www.uschamberfoundation.org/hiring-our-heroes https://www.dol.gov/vets/ https://www.fedshirevets.gov/ https://www.benefits.va.gov/vow/ https://wct.army.mil/modules/employers/index.html https://www.uschamberfoundation.org/hiring-our-heroes

5.2 Period of Performance

The project completion date is set at 180 calendar days following the Notice to Proceed (NTP) for the awarded contract.

5.2.1 Pre-Construction Submittals

All pre-construction submittals, as stated in Section 17.2 of this SOW, must be provided to the Government within twenty-one (21) calendar days following the NTP of the contract. The contractor must allow up to twenty-one (21) calendar days from time of receipt for Government review of submittals. Work may not begin until Government approval of all submittals required in Section 17.2 of this Scope of Work. Submittals must include ENG FORM 4025.

5.2.2 Project Timeline

As part of the pre-construction submittals, the contractor must supply a timeline or schedule for accomplishing the work showing the following minimum milestones and completion dates: submittal completion date, start date, mobilization completion date, electrical enclosures replacement completion date, electrical conductors replacement completion date, new grounding system installation completion date, operating galley ground system installation completion date (if applicable), panel conductor replacement completion date (if applicable), grouting gallery rehabilitation completion date (if applicable), and 100% completion date.

1. Pre-construction submittals – complete within 21 calendar days after NTP

2. All substantial electrical installation work – complete within 120 calendar days after NTP

3. All testing and project work – complete within 180 calendar days after NTP

5.3 Pre-Construction Meeting

Following the award of the contract and review and acceptance of the contractor’s pre-construction submittals, the prime contractor must attend a mandatory pre-work conference. The meeting must be scheduled by the Government, and conducted on-site, at the Mount Morris Dam, at a time and date to be announced following the award of the contract.

5.4 Work Schedule

All scheduled work is to be performed Monday through Friday between the hours of 0730-1630, excluding Federal holidays. If the Contractor desires to work beyond the previously stated hours and days, written permission to do so must be obtained from the Government. Schedule changes must be requested at minimum 24 hours in advance, unless there is an emergency.

Holidays for federal employees: (No work to be performed on observed holidays listed)

• New Years Day (January 1st)

• Martin Luther King Jr. Day (Third Monday in January)

• George Washington’s Birthday (Third Monday in February)

• Memorial Day (Last Monday in May)

• Juneteenth National Independence Day (June 19th)

• Independence Day (July 4th)

• Labor Day (First Monday in September)

• Columbus Day (Second Monday in October)

• Veterans Day (November 11th)

• Thanksgiving (Fourth Thursday in November)

• Christmas Day (December 25th)

When one of the above designated holidays falls on a Sunday, the following Monday is observed as a legal holiday.

When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday. The last two weeks of the calendar year must not be considered when scheduling review or meeting times.

5.5 Material/Equipment Information

Contractor must provide all labor, tools, ladders, scaffolding, equipment, supplies, and materials needed to complete the work described herein, unless otherwise noted herein that any of these items will be provided by the Government.

5.6 Dimension/Quantity Verification

Contractor must independently measure and verify all dimensions and quantities given herein prior to ordering materials and supplies for the project. This information must be provided to the Government COR as part of the pre-work submittals.

5.7 Material Storage

If temporary storage of equipment is requested, the contractor must make a written request to the Government’s QA person and receive written approval from the Government. If material is found to be hazardous, flammable, combustible, etc., the contractor will be required to provide the appropriate hazardous material storage locker. Storage locations will be discussed at the pre-bid site visit and during the pre-con meeting. See Section 17 of this SOW for further information.

5.8 Site Cleanup

All excess, waste, and removed material related to this project must become the Contractor’s property and must be promptly removed from the site and disposed of or reused/recycled in accordance with applicable local, state, and Federal regulations. Documentation describing disposal of material must be furnished to the Government as part of the project closeout files. The Contractor must not dispose of any project generated waste in Government receptacles or on Government grounds.

6 Quality Assurance (QA)

6.1 Overview

6.1.1 Government Project Manager (PM)

The Government has appointed a Contracting Officer’s Representative (COR) for this project. The COR must ensure all questions of a technical nature concerning the contractual work are answered.

6.1.2 Government Quality Assurance (QA)

The Government will appoint a Quality Assurance (QA) person to ensure the Contractors QC is verifying all work is performed in accordance with the contract documents. The QA person for this contract will be identified after the contract is awarded. The QA person serves as the liaison between the contractor, PM, and the DCO. The QA person does not have the authority to modify contractual agreements.

6.1.3 Government Inspections

Contractor must allow inspection by the Government PM, QA person, DCO personnel, and District Safety and Health personnel, at any time during the life cycle of the project. The contractor must provide safe access for Government personnel visiting the project.

6.1.4 Product Data Sheets

The Contractor must provide to the Government product data sheets from the manufacturer for all materials used on this job, as part of the pre-construction submittals. All materials must be delivered to the project site in new condition, in their original containers and wrapping material, with labels clearly showing all product information.

6.1.5 Submission of Contract Documents

Refer to Attachment #6 - Submission of Contract Documents for requirements on submitting documents to the Government.

6.2 Contractor Quality Control (CQC)

Contractor Quality Control (CQC) is the means by which the contractor ensures that the removal, to include that of subcontractors and suppliers, complies with the requirements of this contract.

6.2.1 Quality Control Program (QCP)

Contractor must refer to Attachment #3 – Section 01 45 00 Quality Control Specifications of this Scope of Work, and Attachment #4 – Section 10 45 00.15 10 Resident Management System Contractor Mode (RMS CM). Include the checklist found in Attachment #5 - Contractor Quality Control Plan Checklist when submitting the QCP.

7 Communication

During the execution of the contract, the PM must receive daily status reports from the contractor on issues such as milestones met and/or missed, and issues standing in the way of project completion. The DCO must be the communication hub for the Government QA Person, PM, and the contractor regarding clarification of contractual issues. By adhering to the established lines of communication, it will reduce or avoid generation of duplicate requests for information, which may inadvertently result in the Government or the contractor to the acceptance of contractual changes without official approval by the DCO.

8 Repair/Restoration of Government Property Contractor, at no expense to the Government, is required to protect all Government facilities, grounds, equipment, sidewalks, and pavement during construction. All Government structures, grounds, and equipment disturbed by contractor during the performance of work must be returned to a pre-work condition prior to request of final payment.

Damages to Government property that were caused by contractor and/or sub-contractor will be repaired at no expense to the Government by the prime contractor.

9 Work Stoppage, Contract Cancellation Actions The Mount Morris Dam Manager, PM, or Government QA person may issue temporary “Stop Work” notification if they find activities or job site conditions are in violation of Federal, Department of Defense, State or local health, safety and/or environmental standards, laws and regulations. The District Safety Officer (DSO), the DCO, and the PM must be contacted immediately after a Stop Work notification order is issued or rescinded. Violation of health, safety or environmental regulations committed by the contractor must not be grounds for compensation by the Government to the contractor. Refer to contractual documents provided by the District Contracting Office regarding additional work stoppage and/or contract cancellation actions.

10 Material Change Orders Once equipment and materials are approved and accepted by the Government, the Contractor must not substitute equipment or materials without providing a detailed explanation for the substitution. Changes in materials will require full justification and approval from the District Contracting Officer (DCO) / Administrative Contracting Officer (ACO).

Modifications to contractual documents must be reviewed by the Government and the COR. Requests for modifications must be in writing explaining the reasons for the modification, detailed description of the modification and what the benefits are, and an estimated cost broken down by materials, labor and equipment for prime and subcontractor work.

11 Liquidated Damages Liquidated damages of $1,125 per work day will be assessed if the work is not completed within the time period described in Section 5.2 of this Scope of Work. Liquidated damages must be assessed beginning the day following the end of the initial period.

11.1 Pre-Final/Final Inspection

Upon completion of the work, the Government will perform a pre-final inspection to verify that the project is complete. A Government pre-final punch list may be developed as a result of this inspection. If contractual requirements are not met, this list must be provided to the COR, who will bring them to the attention of the Contractor. The Contractor’s QC supervisor must ensure that all items on this list have been corrected in a timely manner before notifying the Government, so that a final inspection with the Government and Contractor can be scheduled. The Contractor’s QC supervisor, Government COR, PM, DCO representative, and QAR must be in attendance at the final acceptance inspection.

12 Completion The contract will not be deemed fulfilled until all submittals, products, services, equipment, material, installation, construction work, and final inspection is provided by the contractor under the terms of the contractual documents and found satisfactory to the DCO.

13 Payment The project will be paid for on a lump sum basis, the price for which includes all labor, materials, equipment, mobilization/demobilization, disposal, and other costs required to complete the work. Partial payment(s) may be made;

this will be discussed at the pre-construction meeting.

14 Warranty

14.1 Warranty Period

Contractor must, at a minimum, warranty all workmanship against deficiencies for a period of one (1) year from the date of acceptance of the work. The contractor must also provide the manufacturer’s warranty new equipment and/or materials produced by said manufacturer. Manufacturer’s warranty must be minimum five (5) years. The period of warranty must commence at time of Government's acceptance of the work. If within the warranty period the installed equipment/materials experiences failures, breakdowns, excessive wear, or become unreliable, the costs to repair or replace installed equipment and materials must be borne by the prime Contractor. The warranty must bear the name of the Buffalo District, U.S. Army Corps of Engineers as the recipient of the warranty and display the period of coverage. All warranties must be submitted prior to request of final payment on this contract.

14.2 Repairs

When repairs are required because of factory issues or defective workmanship during the warranty period, Contractor must make such repairs within 72 hours of notification. When repairs are not performed within the specified time, emergency repairs performed by others will not void the warranty and Contractor must reimburse the Government for the cost of said repairs. Contractor must not bill the Government for costs of repair work and delay of payment due to repair work. Contractor must resolve defective workmanship and/or problems with materials used and services provided.

15 Safety

Refer to Attachment #2 – Section 01 35 26 Governmental Safety Requirements for Government safety requirements.

16 Security

16.1 Access and General Protection/Security Policy and Procedures

The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract.

The Contractor is responsible for compliance with these security requirements. Questions regarding security matters must be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)).

Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel must complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor must provide written documentation (e.g., email or memorandum) to the Government representative. The documentation must include the names of contract personnel trained and which training they completed; the Contractor must maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations.

Additionally, all contract personnel must comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The

Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor must ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

16.1.1 Candidate Pre-Screening

Contractors must comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates must be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

16.1.2 Background Investigation

For all prime and subcontractor employees working at Mount Morris Dam, the following Personally Identifiable Information (PII) must be provided for the US Army Corps of Engineers to perform a limited background check:

Complete name, social security number, driver’s license number, date of birth, place of birth, and current address of residence. This information is mandatory before any workers will be allowed to enter the facility. The contractor must allow up to twenty-one (21) calendar days from time of receipt for Government completion of background checks. Work may not begin until Government clearance of employees is given to the prime contractor.

16.1.3 Suspicious Activity Reporting Training

For all prime and subcontractor employees working at Mount Morris Dam, the following Personally Identifiable Information (PII) must be provided for the US Army Corps of Engineers to perform a limited background check:

Complete name, social security number, driver’s license number, date of birth, place of birth, and current address of residence. This information is mandatory before any workers will be allowed to enter the facility. The contractor must allow up to twenty-one calendar days from time of receipt for Government completion of background checks.

Work may not begin until Government clearance of employees is given to the prime contractor.

16.1.4 Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch or See Something, Say

Something) All contract personnel must receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

16.2 Start of Work

Contractor must notify the PM of their planned arrival at the project to start work at least seven (7) calendar days in advance. Contractor must submit a weekly work schedule thereafter by no later than the Friday before the coming work week.

16.3 Arrival/Departure

Contractor is required to notify the Government QA person Park Manager of their arrival to and departure from the project site. A similar notification is required if there must be any deviation or cancellation of a scheduled workday during the life of the project.

16.4 Video/Camera Equipment

Contractor must not transport or use video or camera equipment while working at Mount Morris Dam unless permission to do so is requested through the Park Manager and approval is granted by the Buffalo District Security Officer.

17 Submittals

17.1…